Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution 751 - Site Plan - Federal Express Ground
PLANNING COMMISSION RESOLUTION NO. ~' ~ ~ RESOLUTION GRANTING APPROVAL OF A SITE PLAN APPLICATION FOR THE CONSTRUCTION OF A 59,135 SQ. FT. PACKAGE DISTRIBUTION AND DELIVERY CENTER FOR FEDEX GROUND Lot 9 Federal Way Business Park 37S 2W 12 B, part of Tax Lot 200 File No. 08183 WHEREAS, the applicant has submitted a Site Plan application fora 59,135 square foot building for a package distribution and delivery center for FedEx Ground, located on Lot 9 of tentatively approved Federal Way Business Park in the City of Central Point, Oregon; and WHEREAS, on August 5, 2008, the City of Central Point Planning Commission conducted a duly-noticed public hearing on the application, at which time it reviewed the City staff report and heard testimony and comments on the application; and WHEREAS, the Planning Commission's consideration of the application is based on the standards and criteria applicable to the M-1 Industrial zoning district Section 17.48, Off-Street Parking and Loading Section 17.64, and Site Plan, Landscaping and Construction Plan Section 17.72 of the Central Point Municipal Code; and WHEREAS, after duly considering the applicant's request, it is the Planning Commission's determination that the application does comply with applicable standards, criteria and subject to compliance with conditions as set forth in the Planning Department Staff Report (Exhibit "A") dated August 5, 2008; NOW, THEREFORE, BE IT RESOLVED, that the City of Central Point Planning Commission, by this Resolution No. ~t 5 f does hereby approve the application based on the findings and conditions of approval as set forth on Exhibit "A", the Planning Department Staff Report dated August 5, 2008, which includes attachments, which is attached hereto by reference and incorporated herein. PASSED by the Planning Commission and signed by me in authentication of its passage this 5th day of August, 2008, Planning Co issio hai Planning Commission Resolution No. ~ ~ 1 {$/~/zaa$~ ATTEST; ~ ~~~ City Representative Approved by me this Sth day of August, 2008. ..~- 4 s Planning Co is 'on C Planning Commission Resolution No. '~ ~ ( {8/5/2008) Planning Department STAFF REPORT STAFF REPORT August 5, 20x8 AGENDA ITEM: FILE NO. 081.83 'tom Humphrey, AiCP, Community Development Director/ Assistant City Administrator Consideration of a Site Plan review for the construction of a 59,135 square foot building for a package distribution and delivery center for FedEx Ground. The project site is located in the M-1 Industrial zoning district, Lot 9 of tentatively approved Federal Way Business Park and identif ed is on the Jackson County Assessor's map as 37S 2W 12 B, part of Tax Lot 200. Applicant: Bob Gude, dba Janes Medford, LLC; Agent: Neathamer Surveying, Inc. STAFF SOURCE: Connie Clune, BACKGROUND: On May 6, 2008, the Planning Commission granted tentative approval for the Airway Business Park Subdivision by Resolution No. 746. The subdivision name has changed to Federal Way Business Park. A final plat for the subdivision has no# yet been filed, and as such, completion of the subdivision is necessary and a condition of any site plan approval. General Project Description: The proposed 59,135 square foot single story building will be a package distribution and delivery center for FedEx Ground. The project site is 8.26 acres known as Lot 9 of Federal Way Business Park. The site design provides the package distribution center, administrative offices, material handing, van loading areas and the required parking areas. Fencing along the perimeter of the site will be eight (8} feet in height providing security for the facility and will be a black vinyl coated chain link design. In addition, the site plan indicates an area for future expansion of the building, truck and auto parking. The project site is large enough to accommodate this building and parking area expansion {see Attachment A, Applicant's sheet C.2). As submitted, the future addition complies with CPMC setback and parking requirements. FedEx Ground distribution and delivery facilities are in operation 24 hours per day, seven (7) days a week, and 365 days per year. Incoming packages are delivered. to the facility via tractor trailers, sorted, distributed and loaded onto FedEx Ground delivery vehicles. The delivery vehicles return with packages picked up during the day. These delivery vehicles are parked inside the facility until the next day's deliveries. Access: The project has direct access from Federal Way that intersects with Hamrick Road. Federal Way is an industrial street within the approved subdivision. A condition of the tentative approval for the Page 1 of 3 subdivision is the improvements to Hamrick Raad and construction of Federal Way. The landowner, Cris Galpin, is working with the City's Public Works Department to design these improvements. As noted in the Public Works staff report, a Traffic Impact Analysis is not required for this project; however, future structural development within the Business Park may #rigger the need for updated data (see Attacchmen# D}. Landscaping The design incorporates low ground cover planting with street trees along Federal Way and in front of the building. Lawn areas will utilize a droughttolerant hydro seeding method similar to that used along freeway interchanges. The irrigation system will be designed to maintain all planting areas. Parking: CPMC Section 17.E4.020 requires two (2) truck loading berths; this project provides two {2) loading bays and seventeen {i7) docking bays. Packages are distributed to each delivery van through the drive-in loading bays, and the docking bays handle incoming packages. Additionally, CPMC 17.64(H)(2) requires two (2} spaces per each three {3) employees ar one (1) space per 1,000 square feet of gross floor area, whichever is greater. The project will have 40 employees {13 spaces) and the gross floox area will require 59 spaces. The project provides G4 auto parking spaces, the appropriate number of dedicated ADA spaces and a designated area for an additiona128 spaces. The project satisfies the off-street parking spaces requirements. FINDINGS: See Attachment "H" ISSUES: Ta date, the final subdivision plat has not been f led. CONDITIONS OF APPROVAL: 1. A final plat for the Federal Way Business Park subdivision shall be approved and f led prior to commencement of construction and issuance of any building permits. 2. An eight (8) foot perimeter fence will require a building permit per CPMC section 17.57.020. 3. Conditions as listed by the City of Central Point Public Works {Attachment D), Jackson County Roads {Attachment E), Building Department (Attachment F),), and Rogue Valley Sewer Services (Attachment G). 4. The applicant shall submit a signage plan prior to sign permit approval. Said plan shall be consistent with the provisions of CPMC Section 15.24 and Section 17.48.080. S. Site Plan Approval shall lapse and became void one {1) year following the date an which it becomes effective unless construction has commenced. ATTACHMENTS/EXHIBITS: Attachment "A"- Site Plan, Sheet C.1 and C.2 Page 2 of 3 Attachment "B"- Building Elevations and Landscape Plan, Sheets C.3, A2.a and L1 Attachment "C"- Applicant's Findings Attachment "D"- Public Works Staff Report Attachment "E"- Jackson County Roads Attachment "F"- Building Department Staff Report Attachment "G"- RVSS Comments Attachment "H"- Findings Attachment "1"- Proposed Resolution ACTION: Consideration of a Site Plan Review for the 59,135 square foot single story building that is a package distribution and delivery center for FedEx Ground. (File No. 8183). RECOMMENDATION: Approval of Resolution No. ,granting Site Plan approval for the 59,135 square foot single story building that is a package distribution and delivery center for FedEx Ground. (File No. 8183). Page 3 of 3 ~, ~. ICI AFT ~M s xor ro ~ VICINITY MAP G/~!-I IDI 1 37 2W 0211 I TAX LOT 2000 L Rr lkroPORATEO I 37 zw rC TAX LOT 800 VSP REDOAWAY ATTACHMENT" A' ~` 371w 728 I TAX LO7 rO0 I A~En>-oRn uc nauR,cx ROAD _ _ _ ~ - - `III I I ~I I ~ I i ~ ~ ~~ ~ I LO7 r ~ }.~ vl I I ` _ _ I LOT r7 I I f I w ~~ I L ~~ ~ I I tar rr I I I J ~I ~ ~ Lar2 ~~ ~~ I! Q'1 ~- II I I I I ~ p~ 37 2W I2B TAX L0T 300 L7.Y 1NCOPORATED • ~ I I ~ Q GOT r3 I ~ r I Lor 3 ~ I I I 0~,~~5 I I r ~ ,~ I 4 I I ~~, ~~ I] "~ ~ ~ ~.`. _ ~• ,r.~,;,;d;ll~ ""I^~ ~ I k f it ~J III I S k a 1~ I LOT a tOT 10 T;'':"r.:-- ~ I I I PRO EC7 LOCATION I I a I _ I I © a•f .1f 1 i ~ LOTS I --------~.. -...~.~- -------_~ r~ ~ ~.,.ii'~i .i:f lV~ ~ r ~~ I ~ I ~ _ ~i;~; ~ I - ---- I 1 '' ~' {j caT s ~;i~::. I II I ~~~ - \ ~ - - - - ;~ ~~~;~ I` ~ LOT r4 I I J~ ~ LOT ] I I I I I PARCEL 7, 1 1 I I /~ W60-ZOOa ~ _ I -. ? i I LTA! lNQ~°ORATEO , 1 3 I l _ ~~ III ~ / .y I ~\ ~~ LO7 9 I ~ ~ 1 \ , ` 1 i +( N/A'N~GANAwCATC.PS WAYW~AY I } / i CRAPHIC~SCALE ~9R~\\ 372w 128 ~,J~ TAX LOTT900 ~ f TI ROWE R1vfi7 u7F, fXS7RlCT liaMLfN PROPERTIES !!, tLC ~ I ,. m yo m w I \\ ~ ] I ImeL-f00A ________________________......-.___.____~ ~ (a•• TI MY Bn, YY1( OA TC 03/09 >wC aL1a$IG+ DALE 8Y G~lygTRUCT O~ a't ~ar. PMN ~~ cC/oB ~arrSFACCSiI a~~P~g~ff CfTYOFCENTRALPOINT ~aKrr~w l ENGI NG e..t a ~6 CONSIIL~T aTti'~5 rAOwr. oaTe.~ :a.cr°s`". p- Ground CENTRAL POINY auw.rervc AOKR• OA ~' 0 r P.o. 9ax 1124 • I~P09- OAE~DN Y9mL yEp; 0,~~_ h'# r.e~ PROJECT LACATiON MAP ~e,a~m ra Isu) ~+o-szee •rax tsery rn-sLSa, fir. ~r ~.~ FRQNT BUELD[NG ELEVATION (WEST VIEVS~ swe i+ia o~ ogre r.succsu `a ~rzorvreurcouvo ~arronr Foy Ground G~~~R.q o~ yam; < ~. ~:' C V ,..2..~`.f-'~r ~ ~~~°° QRE crrr of cewTRA~ Fanrr covraA~ Fowr Ground FRONT BULLOSNG FI NATION A3"fACMME~T.... ~E d~ ~'~ ~ ~E~, ~~~ °~~' ~~~ ;~~ ~~~ ~~~_ ~i ~ Al NORT~T~~N gg~ W YZ N $ ~ pni ~~ # ~ ~ n _f rW ~ `LL ~d ~. ~i i D uaa/x yy*x8r, wm iCB 110. IDm~ MlG O~ua~ t r - SC-9" A2.0 or. o1L A'riACHM~NT " ~ ..~ xOR~x avyC ~+COP rrr, galbra~irh ^v^°~~uOmed+~e •.u ii~einxsoHC ]IbAGAAP85Tk3T ~monvn,nRmwo nasa.xRaw. ~.,.~~..~' ~. rrem.i.. FedEx Distribution Center Central Poias, OR cevncmvs: L1 PRE1JIdDWRY PLPNfING SGHEOULE ' uTxx~aE rq.Rnxxie RPP PP£UMINMYIANW^CAPE NOTES TPLC6 aouxov""' eaE ~ .~,.~.,.,..x.a~a~acw~.xR.~«.~. R.~w. . uwna~~.x,.o~»r..~a~rwowo~ ~r,er~ ..w..~ a..,. x..e.,~...w ~ ~ti =x.x~..»..R...~. ~~ xwx...xx.,._. ~.-. y.mo.m eROaeow+r.~ axpa...xox..aa..a.w eaewa,..w. ~w.ruc na.ax.xw xrwx.w..o.a w,a.,..ew~r,w. .~ .4.~mram.x a.xaxxnx ,.ao.. Asa o~+w,_._r~e x"°--' xa..d.ar..wv. o.a.~•.r..o..e x~x..~...a.ex...ax u...a..~vaw. SIIMC6 Na9~v~~ xYVare Z ~a~jyylw~.~e.ruR ura~x.bMwYiulYxawwnh 6 xo~exp~w'e ~my.e'b WUe1.~.n~. ~9~W . RuaYlubpl9r,q RmC m.y BO.~Mmxri IP4M xC .ianw.wMEnMmw M1a ~i~ n a .wpa~wxw.axa. xwxrr4em ~RCr o-ss Boa. er ~~.esW ~iowia•poom.+am~e.~...•w• wcw+.~.~q.~.~ aw.waw.iwa~ am.a.rcw ~w_aw r.x..a..m..r+awwnw.,.,.an.n....a. ~. marak,.amxwa.wwaMww..e.~ar rs..e.ax.o.9mm~awxxaa.rawow.. ~.~.m.esweaea~Abxp.aoor w.+~+ xm..~~arr.ew.n.ec`+v.~ wwapuwxwp.,ro....x 'r ~ , i Nd A~1"ACHM~HT" C BEFORE THE CITY OF CENTRAL POINT JACKSON COUNTY, OREGON IN THE MATTER OF AN APPLICATION FOR ) SITE PLAN APPROVAL OF THE PROPOSED ) EXHIBIT "A" PACKAGE DISTRIBUTION CENTER LOCATED ) IN THE FEDERAL WAY BUSINESS PARK ) FINDINGS OF FACT SUBDIVISION IN THE CITY OF CENTRAL POINT, ) JACKSON COUNTY, OREGON ) AND CONCLUSIONS OF LAW APPLICANT: Jones Medford, LLC AGENT: Neathamer Surveying, Inc. I. BACKGROUND AND SUMMARY The Applicant is seeking Site Plan Approval fora 59,135 square foot building encompassing a package distribution and delivery center far FedEx Ground within the M-i Industrial zoning district. APre-Application- Conference was held on June 3, 2008 to discuss the proposed site and procedural requirements pursuant to Sections 17.64 and 17.72 of the City of Central Point Land Development Code. Said package distribution center site is located within Lot 9 of the future Federal Way Business Park Subdivision, fronting on Federal Way southwesterly of the intersection of Hamrick Road and Tabie Rock Road (Jackson County Assessor's Map Number 37 2W 12B, Tax Lot 200). The total project site area is 8.26 acres, consisting of: a central employee parking area adjacent to the primary access point; an accessory parking area for trailer, dolly and tractor trailer parking; a paved lot encircling the central structure for internal looped circulation; and the central building housing the distribution center itself. Contained within the package distribution center are administration offices, restrooms, material handling and van loading areas. In addition, there is an area at the northeast corner of the proposed structure indicated for future building expansion. The intent here is to provide the ability to further expand the shipping and processing uses within the facility, if such growth was deemed necessary at a point in the future. This expansion area would contain the equipment needed for shipping and processing uses. As shown on Sheet A2.0 of the structural elevations plans, said expansion area would include 4 additional docking bays along the northerly elevation of the structure. Additional areas for potential future employee and tractor trailer parking are proposed as well. Distribution and delivery facilities for FedEx Ground such as the one proposed are in operation 24 hours per day, 7 days per week, and 365 days per year. Each pick-up and delivery facility primarily sorts and redistributes small packages, housing a professional off ce and management staff, as well as well as a labor workforce. Incoming packages are delivered to the facility via tractor trailers from Hubs and other facilities throughout the FedEx Ground system, and are received through the unload-docking doors sealed to each trailer arriving to the facility. Though the hours of operation are unlimited, these deliveries occur primarily during evening and early morning hours, although deliveries to the facility from smaller tractor trailers can occur during the day. Once received, the packages are sorted, distributed and loaded to Fed>ax Ground delivery vehicles parked inside the facility (this process takes approximately 4 hours). The FedEx Ground delivery drivers arrive in the morning and then the vans exit the facility to deliver packages to customers. FedEx Home delivery vehicles arrive shortly thereafter, the drivers load the packages sorted for them, and then the vans exit the facility. The FedEx Ground delivery vehicles return to the facility in the late afternoon to early evening with packages picked up during the day. FedEx Ground delivery vehicles are parked inside the facility and turned off until they leave again the next day. Any packages picked up during the day are unloaded from the vans and sorted (an additional 4-hour process) to destination trailers waiting at load doors. This process is repeated daily. Jones Medford, I,LC Site Plan Findings r' II. ADDITIONAL EXHIBITS PROVIDED Exhibit B -Related Plans (Site Plan, Structural Elevations, Landscape Plan) Exhibit C -- Aerial Photograph Exhibit D -Assessor's Map of Project Site Exhibit E -Site Plan Review Application Form Exhibit F -Agency Authorization Form Exhibit G -Fire District No. 3 Review Continents III. APPROVAL CRITERIA Pursuant to the June 3, 2408 Pre-Application Conference, the provision of Sections 17.64 and 17.72 of the Central Point Land Development Code apply to the subject property as stated below: I7.72.020 Site plan approval required A. A site plan application conforming to the requirements of Section 17.72.030 shall be made: 1. For all construction requiring issuance of a building permit. E. When the siting of a structure has the potential to interfere with future streets extended from subdivided or partitioned lands, such site plans shall be subject to approval by the planning commission. F. ~ No building permit shall be issued until approval, as provided in this chapter, has been obtained for any building or structure requiring plan approval according to the provisions of this title. .I7.72.040 Standards. In approving, conditionally approving, or denying the plans submitted, the city shall base their decision on the following standards: A. Landscaping and fencing and the construction of walls on the site in such a manner as to cause the same to not substantially interfere with the landscaping scheme of the neighborhood, and in such a manner as to use the same to screen such activities and sights as might be heterogeneous to existing neighborhood uses. The planning commission may require the maintaining of existing trees for screening purposes and for sound and sight insulation from existing neighborhood use; B. Design, number and location of ingress and egress points so as to improve and to avoid interference with the traffic flow on public streets; C. To provide off street parking and loading facilities and pedestrian and vehicle flow facilities in such a manner as is compatible with the use for which the site is proposed to be used and capable of use, and in such a manner as to improve and avoid interference with the traffic flow on public streets; D. Signs and other outdoor advertising structures to ensure that they do not conflict with or deter from traffic control signs or devices and that they are compatible with the design of their buildings ar uses and will not interfere with or detract from the appearance or visibility of nearby signs; E. Accessibility and sufficiency offire fighting facilities to such a standard as to provide for the reasonable safety of life, limb and property, including, but not limited to, suitable gates, access roads and frre lanes so that all buildings on the premises are accessible to fre apparatus. I7.64.020 Off street loading. A. In all districts, except those specifically excepted and noted, for each use for which a building is to be erected or structurally altered to the extent of increasing the floor area to equal the minimum floor area required to provide loading space and which will require the receipt or distribution of materials or merchandise by truck or similar vehicle, there shall be provided off-street loading space on the basis of minimum requirements, as follows: 1, Commercial, industrial, andpublic utility uses which have a gross floor area offive thousand square feet or more shall provide ofj=street truck loading or unleading berths in accordance with the following table: Square Feet ofFtoor.4rea No, afBerthsRequtred 5,000 to 30,000 1 30,001 ro 100,000 2 ]ones Medford, LLC Site Plan Findings i , B. A loading berth shall not be less than ten feet wide, thirty-five feet long and have a height clearance of twelve feet: Where the vehicles generally used for loading and unloading exceed these dimensions, the required length of these berths shall be increased. C. If loading space has been provided in connection with an existing use or is added to an existing use, the loading space shall not be eliminated if elimination would result in less space than is required to adequately meet the needs of the use, 17.64.030 Off-street parking--Required. In all districts, except those specifically excepted and noted, in connection with any use whatsoever, there shall be provided, at the time any building or structure is erected or is enlarged or increased in capacity or the use is changed or increased in intensity, o, f, j`-street parking spaces for automobiles for the enlarged or increased portion in the case of an addition or for the building, structure or use in other cases, in accordance with the requirements herein. 17.64.40 Off-street parking--Number of spaces. The number of off-street parking spaces required far specific land uses shall be as set forth in the following schedule: (ISE STANDARD . Industrial and Mant~acturing 2. Warehousing and other of less than hvo spaces per each three employees on the two largest ar(lacent sh{Jts*, or one space per each one forage facilities. thousand square feet of gross floor area, whichever is greater. (*One space per employoee 'the business has only one sh(ft). 3. Industrial vehicles. One space for each vehicle kept or operated In connection with the use. lV. FINDINGS Criterion 1 A. A site plan application conforming to the requirements of Section 17.72.030 shall be made: 1. For all construction requiring issuance of a building permit. E. When the siting of a structure has the potential to interfere with future streets extended from subdivided or partitioned lands, such site plans shall be subject to approval by the planning commission. F. No building permit shall be issued until approval, as provided in this chapter, has been obtained for any building or structure requiring plan approval according to the provisions of this title. FINDING -The proposed Site Plan Application is consistent with all applicable design standards set forth in Section 17.72.030 for issuance of a building permit. The proposed structure is located centrally within the subject property, takes access from the proposed Federal Way and does not create any potential to interfere with future streets currently proposed at this time. CONChUSION -The Site Plan Application as prepared is consistent with Criterion 1. Criterion 2 In approving, conditionally approving, or denying the plans submitted, the city shall base their decision on the following standards: A. Landscaping and fencing and the construction of walls on the site in such a manner as to cause the same to not substantially interfere with the landscaping scheme of the neighborhood, and in such a manner as to use the same to screen such activities and sights as might be heterogeneous to existing neighborhood uses. The planning commission may require the maintaining of existing trees for screening purposes and for sound and sight insulation from existing neighborhood use; B. Design, number and location of ingress and egress points so as to improve and to avoid interference with the tr~c flow on public streets; C. To provide off-street parking and loading facilities and pedestrian and vehicle,Jlow facilities in such a manner as is compatible with the use for which the site is proposed to be used and capable of use, and in such a manner as to improve and avoid interference with the tr~cfdow on public streets; D. Signs and other outdoor advertising structures to ensure that they do not cor{fl'ict with or deter from traffic control signs or devices and that they are compatible with the design of their buildings or uses and will not interfere with or detract from the appearance or visibility of nearby signs; Jones Medford, LLC Site Plan Findings E. Accessibility and sufficiency off re fghting facilities to such a standard as to provide far the reasonable safety of life, limb and property, including, but not limited to, suitable gates, access roads and fire lanes so that all buildings on the premises are accessible to ire apparatus. FINDINGS -The proposed Landscape Plan reflects the Applicant's efforts to provide an aesthetic value to the currently vacant property. through professional building design and landscaping. As shown on said plan, landscaping design for the developed portion of the subject property contains a variety of low ground-cover plantings, with Marshall Red Ash and Red Oak trees along the property's entire Federal Way frontage for a visual screen affect. Bloodgood Plane trees shall be placed intermittently along the westerly facade of the structure for additional aesthetic value. Areas indicated as `low-maintenance lawn area' are shown along portions of the subject property. These areas indicate sections of the site that are not proposed to be improved at this current time. Said areas will utilize ahydro- seeding method per the same specifications currently employed by ODOT along areas such as landscaped freeway interchanges. This method makes use of a particular seed which is very drought-tolerant and is recommended for areas that receive k0"-18" of annual rainfall, The method has been utilized throughout county and state highway areas of high congestion to minimize maintenance while providing a clean, professional look. Said areas will not receive supplemental irrigation but should be mowed at least twice each year (late spring and fall}. Fencing along the perimeter of the subject property will be 8' tall, consisting of black vinyl-coated chain ]ink design. An aesthetic mix of two-tone monarch brick along the metal-frame structure's fagade, combined with the intermittent trees along the westerly side of the structure, provide a clean view from the access point sufficient for the M-1 zoning designation. Access for the subject property is taken solely from Federal Way, which connects directly to Hamrick Road. As discussed in the Pxe-Application Conference, impact to the existing public street (Hamrick Road) has been addressed previously in the Federal Way Business Park Subdivision, which is approved and currently udder construction. The proposed access point onto Federal Way was deemed adequate with no additional access points required. The proposed structure is located centrally within the subject property, therein providing for an efficient design which lends itself to sufficient supply for parking, loading and looped internal circulation, This configuration suitably provides the necessary balance between vehiclelpedestrian ixaffic flows and parking/loading areas within the M-1 zoning, in a safe and efficient manner. As shown on the structure elevations plans within Exhibit B {Sheets: C,3 & A2.0}, the proposed signage for the site is lirrlited solely to a singular small lit sign located along the westerly elevation of the proposed structure, towards the upper left-hand corner of the side elevation. As indicated in the review comments supplied by Fire District No. 3 and incorporated herewith these findings, the Site Plan has been reviewed and approved with conditions for construction. CONCLUSION -The Site Plan Application overall is consistent with Criterion 2. Criterion 3 A. In all districts, except those specif tally excepted and notes; for each use for which a building is to be erected or structurally altered to the extent of increasing the floor area to equal the minimum floor area required to provide loading space and which will require the receipt or distribution of materials or merchandise by truck or similar vehicle, there shall be provided off=street loading space on the basis of minimum requirements, as follows: 1. Commercial, industrial, and public utility uses which have a gross floor area offve thousand square feet or more shall provide o -street truck loadin or unloadin berths in accordance with the ollowin table: Square Feet of F1oorArea o. of Berths Re ulred 5,000 to 30,000 1 30, 001 to 100, 000 2 B. A loading berth shall not be less than ten feet wide, thirty-five feet long and have a height clearance of twelve feet. Where the vehicles generally used for loading and unloading exceed these dimensions, the required length of these berths shall be increased. Tones Medford, LLC 14 Site Plan Findings FINDING -Currently the structural plans call for two 14'x 16' drive-in loading bays along the southerly side of the structure, as well as seventeen 8'x9' individual docking bays along the northerly side (see Sheet A2.0). Packages are distributed to each delivery van through the drive-in loading bays, and the docking bays handle incoming packages. This number of loading areas adequately handles the needs of the proposed use while more than sufficiently addressing the requirements in Section 17.64.020. CONCLUSION -The proposed parking and loading facilities adequately address those requirements of Section 17.64.020 and are consistent with Criterion 3. Criterion 4 In all districts, except those specifically excepted and noted, in connection with any use whatsoever, there shall be provided, at the time any building or structure is erected or is enlarged or increased in capacity or the use is changed or increased in intensity, off=street parking spaces for automobiles for the enlarged or increased portion in the case of an addition or for the building, structure or use in other cases, in accordance with the requirements herein. The number ofof)=street parktnQ spaces required for specific land uses shall be asset forth in the following schedule: USE STANDARD I. Industrial and anufacturing 2. Warehousing and other of less than two spaces per each three employees on the two largest adjacent sh~s*, or one space storage facilities. er each one thousand square feet ofgross floor area, whichever is greater. (*One space per employee if the business has only one shy}, 3. Industrial vehicles. One space for each vehicle kept or operated in connection with the use. FINDING -There is an anticipated number of 40 employees on staff during the largest shift, and the facility overall contains 59,135 square feet of area. Pursuant to the requirements of Section 17.64.040 listed above, the Applicant finds that the calculation utilizing the grass floor area should be applied, requiring a minimum of 59 standard parking spaces. The 64 standard parking spaces shown on the proposed Site Plan, as well as the 4 additional handicap parking spaces, demonstrate that the parking requirement is more than sufficiently met. This is due in part to the vast experience over time constructing and managing previous facilities identical to the one currently proposed, therein allowing FedEx Ground to calculate the parking requirements necessary far such an event. In addition, it is anticipated that some of the package handlers and office staff may likely elect to utilize mass-transit for their commute(s), therein diminishing the possible number of employees parking on site. CONCLUSION -The Site Plan is consistent with Criterion 4. VI. SUMMARY AND CONCLUSLONS: The Commission concludes that the request complies with Sections 17.64 and 17.72 of the Central Point Land Development Code. Respectfully submitted, NEATIIAMER SURVEYING, INC. By: Co athamer, Project Manager Jones Medford, LLC Site Plan Findings n~~A~+r rn~Cli1~ tt~39 Public Works Department Bob Prerce, Director Matt Samitore, Dev. Services PUBLIC WORKS STAFF REPORT 7/1/2008 AGENDA ITEM: Commercial Building Applicant: FEDEX Ground Zoning: M-l, Light Industrial Traffic: No traffic study is warranted for this development. The updated TSP and corresponding subdivision planned for this growth to include eventual widening of Table Rock Road, widening of Hamrick Road and intersection alignment of Hamrick and Table Rock Road. No additional traff c studies are warranted for this development. Subsequent development within the business park may require additional traffic studies depending on their estimated traffic volume. Existing Infrastructure: All utilities are being constructed as part of the Federal Way Subdivision Conditions of Approval: 1. Street Tree Plan:. Plantings shall comply with Municipal Code Section 12.36. Tree plantings shall have at least a 1 %2" trunk diameter at the time of installation. All street trees shall be irrigated with an automatic underground irrigation system. Maintenance of the landscape row will be the responsibility of the property owners who own the property directly adjacent to the landscape strip. 2. Storm Water Detention: Applicant will submit to the Building and Public Works Department and Rogue Valley Sanitary Sewer their storm water detention plan. Applicant shall conduct a pre and post development run-off plan and detain all water on site that exceeds the difference. 740 Soufh 3"~ Sfreef • Cenfra! Poinf, OR 97502 •541.664.3329 • Fax 549.664.6384 JUI,/14/200$/M4N 09:57 ~IACKSON COUl~lTY GOADS FAX No, 541 774 6265 ATTACHMENT "..,~.~" JACKSON COUNTY Roads July 2, zoos F, O01/001 rtoaa s ramp rnuu. ~r ,~~C ~,~EVQlOp1f7RAI ~I1gLfB@I' Cf10 hntatopa Rand WMte Clly, aR 87505 vnana; (S+y17'i4-a2ao FeR:(&41]i74-8295 onltplwlQ~lsckeonrountv.oro www, f e duo n co cnty. orp l4tt~ntion: Connie Glune City of Centre! Point Planning . ~ 40 South Third Street Central Point, OR 97502 ~ . RE: Development off Hamrick Road - ecounty-maintained road. Planning File; 48183, Dear Connie: Thenk you for the opportunity to comment on this application for the sits plan fora 59,139 square faot building on 1_ot 9 of tentatively approved Federal Way Business Park. Jackson _... _.. ... _ -.-.County..Roads••hee~the•fiollowing•comments:.... .-..__....,.. _....._. _._........ ,. .,_.,,.._. _........... ...._... .. _ ... 1. Utiiity Perrnits are required from Roads for any utility work within the county, read righ#-of way, .,, 2, , ~ „ , If County storm„d1C`dlnage facilities a,re, utilized, the applicant's. registered engineer shall , ,_ provide a hydraulic repork and plan for review and approval by Jackson County }loads. storm drainage runoff` +s limiters to tf~at area currently draining to the County storm drainage system. Upon completion of the pro~eat the developer's ~ngin®®r shall certify that the construction of the drainage system was constructed per the approved plan. A copy of the certification shall be sent to E~uss Logue at Jackson County Roads. 3. If the Traffic Study for the Federal Way Busin®ss P~rl4 Subdivision does not take in to account this facility, g new Traffic Study is s•ecommended. Sincerely, z - ~~ J mes Philp, PE Traffic & Development Engineer I:IEng IneeringlDevelopmenllClrllwSICNTRlP1'108189.wpd City of Central Point, 4re~on___ _ __ 140 S Third Street, Central Paint, Oft 97502 541.664.3321 Fax 541.6l~4.161 I www.ci.central-point.or us G1tYaf CENl'RA~ P4~NT Or~c~nr~ ,` ~~h~T~~HMENT`. " _ _......_....m........._ Building_Depar-timent Todd Meador, Building Official BUILDING DEPARTMENT STAFF REPORT DATE: TO: Planning Department Planning file: 8183 FROM:Building Department SUBJECT: FedEx Name: Address: City: Central Point State: OR Property Description: See Attached PURPOSE: Zip Code: 97502 The staff report is to provide information to the Planning Commission and the Applicant regarding City Building Department requirements and conditions to be included in the design and development of the proposed project. This is not a plan review. This report is preliminary and compiled solely for use by the Central Point Planning Commission. 1 940 S Third Sfreef • Cenfral Poinf, OR 97502.549.664.3329 • Fax 541.664.1691 1. ~ K Building Dept. Staff Report, Page 2 BUILDING DEPARTMENT COMMENTS 1. Applicant, agent and contractors must comply with all current State of Oregon adopted codes, and apply for all permits through the Central Point Building Department. 2. If a private storm drain system is proposed it must be reviewed and a permit issued by the Central Point Plumbing Department. 3. Any private street lighting must be reviewed and permitted by the Central Point Electrical Department. 4. Provide the building department with a Geotechnical report as required by OSSC Appendix J and chapter 18 of the OSSC. A written report ofthe investigation shall include, but need not be limited to, the following information: a. A plot plan showing the location of all test borings and/or excavations. b. Descriptions and classifications of the materials encountered. c. Elevations of the water table, if encountered. d. Recommendations for foundation type and design criteria, including bearing capacity, provisions to mitigate the effects of expansive soils, provisions to mitigate the effects of liquefaction and soil strength, and the effects of adjacent loads. e. When expansive soils are present, special provisions shall be provided in the foundation design and construction to safeguard against damage due to expansiveness. Said design shall be based on geotechnical recommendations. 5. Grading/excavation permits are required in accordance with OSSC Appendix J and chapter 18 and regarding any fill material placed on the site. Fills to be used to support the foundation of any building or structure shall be placed in accordance with accepted engineering practices. . A soil investigation report, and a report of satisfactory placement of fill (including special inspections of placement off 11 and compaction} acceptable to the Building Official, shall be submitted prior to final of the grading/excavation permit. Building permits will not be issued until grading/excavation permit is finaled. Exception: 1. The upper 1.5 foot of fill placed outside of public tights-ol=way. 2. The upper 1.5 foot of fill that does not underlie buildings, structures, or vehicular access ways or parking areas. 2 940 S Third Street • Central Point, OR 97502 •549.664.3329 • Fax 541.664.9691 1. .1 Y, Building Department Staff Report, page 3 6. To move or demolish any existing structures located on the property, call the Building Department for permit requirements. 7. Notify the City Building Department of any existing wells, or septic systems located on the property. 8. Any development {any man-made change) to improved or unimproved real estate located within the flood hazard area of the City of Central Point shall require a Development Permit as set forth in the Central Point Municipal Code 8.24.120. , 9. Dust control, erosion control, and track out elimination procedures must be implemented. 10. Application for building permits will require three sets of complete plans indicating compliance with Oregon Structural Specialty Code {2005). 11. Fire District 3 will determine fire hydrant locations, as well as access to buildings. Any changes proposed shall be submitted in writing by the Applicant, or Applicant's contractor to the Building Department for approval prior to start of work. 12. No encroachment upon adjacent property is allowed. if grade changes at property lines occur, approved retaining walls must be planned and provided. If questions, please call Todd Meador.....664-6325, ext. 228. 140 S Third Sfreet • Central Poinf, OR 97502 •541.664.3321 • Fax 54 9.664.9 67 9 0/02/2008 07:46 543.-6647171 R11S PAGE 01/01 v~-~_tl ~~~~~HMENT. «~,~ ~ sly I~~ July 'i, 2008 ~aGUE VALLE1r SEINER SERVICES I...ocntlan: 13B Went Vilna !food. Ccntrel Point, bR - Mntling 6Addreas: P.O. >'3ox 313p, Contrnl Point, OR 7S02,UOOS Tel. (541) 664-630(1, Pax (541) bG4.7171 www.ItVSS.~aa Connie Clunt^ FAX b6~-638 City of Central Paint Planning Department ~ 55 South Second Street Central Point, Oregon 9750 Re; Site Plan review for FedEx Ground, File ~' 08183 The proposed project will be served i,y a new sewer main constructed 'for the l='ederal Way Qusiness Parlc. Plans for this subdivision have been approved but construction is not complete. The project is within the Phase 2 Stormwater Quality Management Area and must comply with starmwater quality requirements outlined in the RVS Design Manual. Rogue Valley Sewer Services requests that approval of the proposed development be subject to the following conditions:. 1, Applicant must obtain a permit from Roque Valley Sewer Services to connect to the sewer system and pay all related development fees. The permit for the sanitary sewer will not he issued until the new main line construction is complete and accepted as a public facility by RVS. 2. Applicant must submft a site plan to RVS demonstrating compliance with 5tormwater Quality requirements. Feel free to call me if you have any questions regarding this project. Sincerely, /~~ / . Carl Tapp/ert, PE District Engineer K:IDAT1\VUgenci~slCENTT'1i1?T /~NNC+I~ite3'1~nRcview120081Ut~ 1$3 X=ulEx Grnuncl,doc Attachment "H" FINDINGS OF FACT AND CONCLUSIONS OF LAW File No: 08183 INTRODUCTION In the Matter of a Site Plan Review for the construction of a 59,135 square foot building for package distribution and`delivery center for FedEx Ground. The project site is located in the M-1 Industrial zoning district, Lot 9 of tentatively approved Federal Way Business Park and is identified on the Jackson County Assessor's map as 37S 2W 12 B, part of Tax Lot 200. Applicant: Bob Gude, dba Jones Medford, LLC; Agent: Neathamer Surveying, inc. 17.48.020 Permitted uses. The following uses and their accessory uses are permitted in an M-1 distrl`ct, subject to the limitations imposed in Section 17.48.030: A. Warehousing; Finding: The proposed distribution, delivery center and office for FedEx Ground is a permitted use in the M-1 zoning district. Conclusion: The proposal complies. 17.48.030 Standards for permitted uses. All uses within the M-1 district shall be subject to the following conditions and standards: A. All raw materials, finished products, machinery and equipment, with the exception of automobiles and trucks normally used in the business, shall be stored within an entirely enclosed building or sight-obscuring, nonpierced fence not less than six feet in height; B. The facility shall be in compliance with all applicable state and federal environmental, health and safety regulations; C. In any M-1 district directly across a street from any residential (R) district, all outdoor parking, loading or display areas shall be set back at least ten feet from the public right-of--way and this setback area shall be planted with trees appropriate for the neighborhood, ground cover or other landscaping materials that are consistent with the general existing character of the area, or that will establish a landscape theme for other developments to follow. This setback and landscaping requirement shall also apply to M- 1lots fronting on any street designated in the comprehensive plan as a major arterial. Finding: All parcels or packages will be sorted and stored within the building. Finding: The project site is .not locatedwithin a residential district and exceeds the minimum public right-of-way setback. The landscape design provides street trees along Federal Way and planting areas. Page 1 of 6 Conclusion: The proposal complies. 17.48.050 Height regulations. Maximum height of any building or structure in an M 1 district shall be sixty feet. (ord. 14.36 ~2(part), 1981). Finding: The building elevations, {Applicant sheet A2.0} illustrate that the building will not exceed thirty feet in height. Conclusion: The proposal complies. 17.48.070 -Yard requirements. The following measurements indicate minimum yard requirements in an M-1 district: A. Front Yard. The front yard shall be a minimum of twenty feet. (Also, see Section 17.48.030(C)). B. Side Yard. The side yard shall be a minimum of ten feet except when the side lot line is abutting a lot in any residential (R) district and then the side yard shall be a minimum of twenty feet and shall be increased by one-halffoot for each foot by which the building height exceeds twenty feet. C. Rear Yard. The rear yard shall be a minimum of ten feet except when the rear lot line is abutting a lot in any residential (R) district and then the rear yard shall be a minimum of twenty feet and shall be increased by one-half foot for each foot by which the building height exceeds twenty feet. D. Lot Coverage. No requirements. Finding; The proposed project has a front yard setback of 196 feet from Federal Way to the building. Finding: The building is situated in the center of the property, thus the site design can meet all required yard setbacks. The design will provide a minimum side and rear yard setback of 28 feet. Conclusion: The proposal exceeds the required setbacks of the M-1 zoning district. 17.48.080 Signs. Signs within the M-1 district shall be limited to the following: A. 1. Permitted signs shall contain not more than one hundred square feet of surface area on any one side, or 'an aggregate of two hundred square feet of surface on all sides which can be utilized for display purposes; 2. Lighted signs shall be indirectly illuminated and nonflashing; 3. Identification signs shall be permitted within any required setback areas provided it does not extend into or overhang any parking area, sidewalk or other public right-of--way; 4. Signs located within vision clearance areas at intersections of streets shall conform to Section 17.60.110. Page 2 of 6 B. Signs advertising the property 'for rent" or 'far sale"shall not exceed four square feet of area on any one side and one such sign shall be permitted for each street frontage. C. Signs in the M-1 district shall he permitted and designed according to provisions of Chapter 15.24. Finding: The submitted building elevation, sheet C-3, illustrates a wall mounted FedEx logo sign identifying the facility. An illustrated sign design will be required prior to issuance of a sign permit. Conclusion: The sign design can be reviewed during the sign permit process. CPMC 17.72.010 (A) Purpose. The purpose of site plan, landscaping and construction plan approval is to review the site and landscaping plans of the proposed use, structure or building to determine compliance with this title and the building code, and to promote the orderly and harmonious development of the city, the stability of land values and investments, and the general welfare, and to promote aesthetic considerations, and to help prevent impairment or depreciation of land values and development by the erection of structures or additions or alterations thereto without proper attention to site planning, landscaping and the aesthetic acceptability in relation to the development of neighboring properties. CPMC 17.72.020 Site plan approval required: (A) A site plan application conforming to the requirements of Section 17.72.030 shall be made: 1. For all construction requiring issuance of a building permit; or '2. Upon a change of use. Finding: The application and supporting documents provide the information necessary for review of the proposed 59,135 square. foot structure for FedEx Ground. The proposed building will require issuance of a building permit. Conclusion: A Site Plan review for the proposed structure is necessary and the submitted application complies. CPMC 17.72.030 (A) - (E) Infarrraation Required. This section of the code addresses all of the necessary information to make a decision for approval or denial of the site plan application. Finding: The applicant has provided all of the necessary information as outlined in the above referenced code. Conclusion: The proposal complies. CPMC 17.72.030 (F) In the discretion of the city, a traffrc study performed by a licensed professional engineer; Finding: The City of Central Point Public Works found that a Traffic Impact Analysis is not required for this project; however, future structural development Page 3 of b within the Business Park may trigger the need for updated data as evidenced in the Public Works staff report dated July 1, 2008. Conclusion: The proposal complies. CPMC 17.72.040 Standards. 1n approving, conditionally approving, or denying the plans submitted, the city shall base their decision on the following standards: CPMC 17.72.040 (A). Landscaping and fencing and the construction of walls on the site in such a manner as to cause the same to not substantially interfere with the landscaping scheme of the neighborhood, and in such a manner as to use the same to screen such activities and sights as might be heterogeneous to existing neighborhood uses. The Planning Commission may require the maintaining of existing trees far screening purposes and for sound and sight insulation from existing neighborhood use; Finding: The landscape design, (Applicants sheet L-1 }, incorporates low ground cover plantings that flank the facility entrance. Street trees are along Federal Way in conformance with CPMC Section. 12.36. Trees are also located in front of the building. The lawn areas will be planted with adrought-tolerant hydro seeding method similar to that used along freeway interchanges. The irrigation system will be designed to maintain all planting areas. Finding: Fencing along the perimeter of the site will be eight {8} feet in height providing security for the facility and will be a black vinyl coated chain link design. Conclusion: The proposal complies. CPMC 17:72.040 (B) Design, number and location of ingress and egress points so as to improve and to avoid interference with the traffic flow orgy public streets; Finding: The project has direct access from. Federal Way, an industrial street within the approved subdivision, which intersects with Hamrick Road. One ingress/egress along Federal Way is proposed. A condition of the tentative approval for the subdivision lists the improvements to Hamrick Road and construction of Federal Way are required for final plat approval. The landowner, Cris Galpin, is working with the City's Public Works Department to design these improvements. Conclusion: The proposal complies. CPMC 17.72.040 (C) To provide off-street parking and loading facilities and pedestrian and vehicle flow facilities in such a manner as is compatible with the use for which the site is proposed to be used and capable of use, and in such a manner as to improve and avoid interference with the traffic flow on public streets; Finding: CPMC Section 17.(4.020 requires two {2) truck loading berths; this project provides two {2) loading bays and seventeen (17} docking bays. Packages are Page 4 of 6 distributed to each delivery van through the drive-in loading bays, and the docking bays handle incoming packages. Finding: CPMC Section 17.640}(2) for warehousing and distribution requires two {2} spaces per each three {3} employees or one (1}space per 1,000 square feet of gross floor area, whichever is greater. The project will have 40 employees (13 spaces) and the gross floor area will require 59 spaces. The project provides 64 automobile parking spaces, the appropriate number of dedicated ADA spaces, and a designated area for an additional 2S spaces. Conclusion: The proposal complies. CPMC 17.72.040 (D) Signs and other outdoor advertising structures to ensure that they do not conflict with or deter from traffic control signs or devices and that they are compatible with the design of their buildings or uses and will not interfere with or detract from the appearance ar visibility of nearby signs; Finding: As noted previously, the submitted building elevation, sheet C-3, illustrates an identifying FedEx sign attached to the building. A sign design will be required prior to issuance of a sign permit for all signs. Conclusion: The sign design can be reviewed during the sign permit process. CPMC 17.72.040 (E) Accessibility and sufficiency of fire fighting facilities to such a standard as to provide for the reasonable safety of life, limb and property, including, but not limited to, suitable gates, access roads and fire lanes so that all buildings on the premises are accessible to fzre apparatus; Finding: Deputy Fire Marshall Fire Don Hickman, in a June 13, 2008 memo, listed three (3) comments following a review of the project. Mark Kamrath, project designer, is aware of the requirements and agrees to meet each standard. Finding: District No. 3 will review the structural plans and comment during the building permit process. Conclusion: Fire District 3's requirements can be monitored in the building and engineering plan review process prior to issuance of a building permit. CPMC 17.72.040 (F) Compliance with all city ordinances and regulations, including Section 16, 20.080 pertaining to the maximum number of single family dwellings or dwelling units allowable on cul-de-sac streets, and applicable state laws,• Finding: No single-family dwellings are proposed with this application. Conclusion: Not applicable CPMC 17.72.040 (G) Compliance with such architecture and design standards as to provide aesthetic acceptability in relation to the neighborhood and the Central Point Page 5 of 6 area and its environs. The architecture and design proposals may be rejected by the Planning Commission if found to be incompatible with the existing architectural or design characteristics of adjacent properties or uses. In addition, the Planning Commission reserves the right to establish additional height, setback, buffering, or other development requirements that may be necessary to ensure land use compatibility and ensure the health, safety, and privacy of Central Point residents. Finding: The project site is located within an industrial zoned area with structures and uses of similar design and use. Finding: The project is designed to Federal Express specification and is similar to other such distribution facilities. The building is designed to meet the height and setback requirements off' CPMC Section 17.48. Conclusion: The proposal complies. Page 6 of 6 ~,~~~~ H M E NT' ".~" PLANNING COMMISSION RESOLUTION NO. RESOLUTION GRANTING APPROVAL OF A SITE PLAN APPLICATION FOR THE CONSTRUCTION OF A 59,135 SQ. FT. PACKAGE DISTRIBUTION AND DELIVERY CENTER FOR FEDEX GROUND Lot 9 Federal Way Business Park 37S 2W 12 B, part of Tax Lot 200 File No. 081$3 WHEREAS, the applicant has submitted a Site Plan application fora 59,135 square foot building for a package distribution and delivery center for FedEx Ground, located on Lot 9 of tentatively approved Federal Way Business Park in the City of Central Point, Oregon; and WHEREAS, on August 5, 2008, the City of Central Point Planning Commission conducted a duly-noticed public hearing on the application, at which time it reviewed the City staff report and heard testimony and comments on the application; and WHEREAS, the Planning Commission's consideration of the application is based on the standards and criteria applicable to the M-1 Industrial zoning district Section 17.48, Off-Street Parking and Loading Section 17.64, and Site Plan, Landscaping and Construction Plan Section 17,72 of the Central Point Municipal Code; and WHEREAS, after duly considering the applicant's request, it is the Planning Commission's determination that the application does comply with applicable standards, criteria and subject to compliance with conditions as set forth in the Planning Department Staff Report (Exhibit "A") dated August 5, 2008; NOW, THEREFORE, BE IT RESOLVED, that the City of Central Point Planning Commission, by this Resolution No: does hereby approve the application based on the findings and conditions of approval as set forth on Exhibit "A", the Planning Department Staff Report dated August S, 2008, which includes attachments, which is attached hereto by reference and incorporated herein, PASSED by the Planning Commission and signed by me in authentication of its passage this 5th day of August, 2008. Planning Commission Chair Planning Commission Resolution No. (8/5/2008} ATTEST: City Representative Approved by me this 5th day of August, 2x08. Planning Commission Chair Planning Commission Resolution No. {8/5/20Q8}