Loading...
HomeMy WebLinkAboutCouncil Resolution 561RESOLUTION NO. 561 A RESOLUTION GRANTING PRELIMINARY PLAT APPROVAL FOR STONECREEK SUBDIVISION NO. 4, PHASE II WHEREAS, Gary Whittle, hereinafter referred to as Subdivider, has submitted a preliminary plat for Stonecreek Subdivision No. 4, Phase Ii, a subdivision located west of Hog Creek and north of Beall Lane, within the City, more particularly described in the Jackson County Tax Assessor's records as 37 2W lODA TL100 and TL200, and WHEREAS, the Planning Commission of the City on the 7th day of August 1990, reviewed said application and by Planning Commission Resolution No. 203 recommended approval of said preliminary plat, subject to the conditions set forth in the staff report, which conditions are attached hereto, marked Exhibit A, and which are by this reference incorporated into the within resolution, and WHEREAS, the City Council of the City of Central Point held a public hearing upon said application for approval of preliminary plat on August 16, 1990, pursuant to Central Point Municipal Code Section 1.24.020D, and having at said public hearing received. and reviewed the City staff report, the Planning Commission report and resolution, and public hearing evidence, and being fully advised, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CENTRAL POINT', OREGON, AS FOLLOWS: Section 1. Based upon. the staff report, Planning Commission report and resolution, and evidence relating to said application, the City Council hereby finds that said application meets the requirements for preliminary plat application, that said preliminary plat as proposed is in compliance with the City's Comprehensive Plan and Zoning Code, and if the conditions set forth hereinafter are met, said application meets the City's requirements for subdivision layout, park dedication, street standards, water system systems, sanitary sewer standards and storm drainage standards. Section 2. The City Council hereby grants approval to the preliminary plat submitted by Subdivider for Stonecreek Subdivision No. 4, Phase II, subject to the conditions set forth in Exhibit A, attached hereto. Section 3. The Mayor is hereby authorized and directed to execute all documents on behalf of the City in connection with the within preliminary plat approval. RESOLUTION NO. 561 - 1 (STONECR2.RES - 080790) Section 4. This action of the Council shall be noted on two copies of the preliminary plat, including reference to the conditions set forth in Exhibit A, with one copy to be returned to Subdivider and one copy to be retained in the City planning files with a memorandum setting forth the action of the Council, as required by Central Point Municipal Code Section 16.24.080. Passed by the Council and its passage this ~ day of ATTEST: /~ ~~i/1i// ,/ rr~ 1 City Repr, entative me in authentication of 1990. APPROVED by me this a~ RESOLUTION NO. Sbl _ 2 (STONECR2.RES - 080790) EXHIBIT Page Six - Staff Report Stonecreek 4, Phase II - August 2, 1990 CONDITIONS STONECREEK #4, PHASE II 1. Place "North" arrow on preliminary plat. 2. Provide topographic information on Preliminary Plat so drainage areas can be defined. 3. Locate existing seasonal runoff streams on the preliminary plat. 4. The Master Plan for Stonecreek No. 4 identifies Glenn. Way as being adequately served by a 50 R.O:W. and a 36' curb to curb street section. 5. A Storm Drainage Master Plan for this area shall be developed as a part of the construction. documents to assure all seasonal drainage has been provided for. 6. Storm Drainage calculations shall be provided by the engineer with final construction drawings adhering to existing Master Plans, 7. Access driveways for corner lots 15 and 16 shall be located the furthest point away from the intersection on the new cul-de-sac. 8. Ths cul-de-sac must be renamed. Amy Street already exists in Central. Point, 9. Street name signs including posts, labor and equipment for installation of street signs shall be paid for by the developer of this subdivision. and the installation shall be completed by the City. 10. A traffic control signing plan shall be included as a part of the final construction plans, and will be installed by the City and all costs associated with traffic control sign installation shall be paid for by the Developer. ~ 11. A soils engineer must evaluate the strength of the soil (R-value) to determine the street section design. The City's engineer shall be used, and the developer shall pay for the costs of these services. A design life for Glenn Way shall be a minimum 20 year life, given a daily traffic volume not to exceed 3500 vehicle trips .per day and 2% truck traffic shall be used. Page Seven - Staff Report Stonecreek 4, Phase II - August 2, 1990 12. A street lighting plan shall be included in the construction documents according to the requirements of the Public Works Director. All intersections shall be illuminated. Developer to install all pads and conduits for street lights as a part of the construction of the subdivision. The developer shall also pay for street lights and for the installation of all street lights in this subdivision. 13. Ladder rungs shall be installed in each sanitary sewer manhole of a depth greater than 3.0' to the flow line of the manhole. Developer shall use ladder rungs approved by the Central Point Public Works Department. 14. There is a small seasonal stream which flows through this property.. Developer shall construct a storm drainage system which collects the flow from this stream and carries the flow through this subdivision in such a manner as to not cause flooding of any lot. 15. Developer shall install or cause to be installed, conduits for utilities at intersections, or locations determined by utility companies. Developer shall also provide conduit crossings for utility companies who will not install their services until after the subdivision is constructed. The developer shall. be responsible for all costs. associated with the installation of these conduit crossings. 16. The water system shall. be designed to provide a minimum flow at each fire hydrant in the subdivision of 1000 gpm. 17. All construction for utilities, streets and other structures discussed herein within rights of ways owned or to be owned by the City of Central Point, shall be done so according to all rules,. regulations, ordinances, resolutions, and other applicable requirements of the Gity of Central Point for construction of this subdivision. 18. The preliminary plat review for the preliminary plat submitted herein by Gary Whittle was done in accordance with the rules, regulations and ordinances in effect as of the date of this review. Any modifications by the developer which would allow this subdivision not to meet standards set forth in the Central Point Municipal Code or would require staff to complete a new preliminary plat review shall require a new submittal of preliminary plat for City approval. 19. The developer or developer's engineer shall submit two (2) sets of construction plans, and specifications, and any other appurtenant information required by the Public Works Director in order to review for compliance with Public Works Standards for Central Point. [aOKE~:rtSNT''PROCESSING `CC CITY OF CENTRAL PC BACKGROUND INFORMATION AGREEMENT TITLE: ~p ~ ,r~ , _~~ua__ e _ . ~ _ i INITIATOR: C':~r~~% AGREEMENT :PURPOSE CONTRACT PARTIESc CONTRACT TERM- WHO PREPARED :THE ; AGREEMENT AMOUNT• HAS ATTORNEY Al IS FUNDING: BUD( WERE BIDS LET? ARE ALL EXFiIBIR HAS :THE OTHER F HAS BOND OR OTH HAS INSURANCE B HAVE' LEGAL 'DESC AND CHECKED HAS COUNCIL`AUT ~fij=,, 'OTHER 'COMMENTS: %~~-. :REQUIRED APPROVALS' Public Works DeF Finance Dept. Fire )Dept. Police Dept. Planning Dept. : City Administrat ACTION RECORD CITY COUNCIL ACT. MAYOR EXECUTION DISTRIBUTIONi^ sf a ~„T.^f 2ECORD Yes N/A