HomeMy WebLinkAboutPlanning Commission Packet - June 18, 1996
~~ i~/'
` 'CITX OF.CENTRAL POINT
~ ~7
/ PLANNING COMIVIISSION AGENDA
""~~'~',. June 18, 1996 -'7:00 ~.w".
Next Planning Commission Resolution No. 353
L MEETING CALLED TO ORDER
II. ROLL CALL
Cktuck lailand ~ Angela Curtis, Jan Dunlap, Candy k~sh, Bob Gilkey, 'Karolyne:Johnson;
;and Valerie Rapp "
III. ":CORRESPONDENCE
,.r,
IV. MINC7TES
`"i - z A. Review and approval of Jun~.4, 1996' Planuang Commission Minutes
' "V. `PUBLIC"APPEARANCES ,
VL `.:BUSINESS
3 _ 1 s A. Public Bearing - Review and recoinn}eq~latio~hregarding Tentative Plan
Application for Snowy Mounty'i'iew Subdivision (372W10 TL 8400) (Appl;cants:'
bean & Meridee Faucher)
19 -' 39 B. Public Hearing -Review and recommendation regarding Tentative Plan
Application on Green Park Subdivision, Phase 5 (372W12C TL 3460) (Applicant,
Pac'I7rend Tnc.)
VB. MISCELLANEOUS
~`" VIII. ADJOURNMENT
Y~
J
CITY OF CENTRAL POINT
PLANNING COMMISSION
MINUTES
JUNE 4, 1996
THE MEETING WAS CALLED TO ORDER AT 7:00 P.M.
I1. ROLL CALL -Those present were: Chuck Piland, Jan Dunlap, Angela Curtis,
Candy Fish, Bob Gilkey
III. CORRESPONDENCE
There was no correspondence
IV. MINUTES
Commissioner Fish moved to approve the May 7, 1996 Planning Commission
Minutes as written. Commissioner Dunlap seconded the motion. ROLL CALL
,, VOTE: Dunlap, yes; Curtis, abstain, Fish, yes; Gilkey, abstain.
V. PUBLIC APPEARANCES
There were no public appearances.
VI. BUSINESS
A. Review and determination regarding Comprehensive Plan/Zone Text
Amendment to g_roperty on North 10th Street, commonly known as Gloria
Dei Lutheran Church (Aonlicant• Gloria Dei Lutheran by Agent Alex
Forrester & Associates)
B. Review and de termin atio n r~. gardi ng_Site Plan Aonlication to fro e~rty on
North 10th Str eet c omm only kno wn as Gloria Dei Lutheran Church
(Aonlic ant• Glo ria De i Lut hera n by Agent Alex Forrester & Associates)
Chairman Piland opened the Public Hearing on both Items A and B.
Jim Bennett, Planning Director, read into the record a letter from the Agent for
the applicant, Alex Forrester and Associates, requesting that both applications
be withdrawn. The Planning Department recommended that the Planning
Commission grant the applicant's request to withdraw the proposed
comprehensive plan amendment, zoning map amendment, and site plan
applications.
Jim stated that the Applicant will resubmit the project as a Planned Unit
Development that will not require a comprehensive plan and zone map
amendment.
„ CITY OF CENTRAL POINT
PLANNING COMMISSION MINUTES
June 4, 1996
Commissioner Fish made a motion to accept the withdrawal of the application for
a Comprehensive Plan/Zone Text Amendment to property on North 10th Street,
commonly known as Gloria Dei Lutheran Church (Applicant: Gloria Dei Lutheran
by Agent Alex Forrester & Associates) and the Site Plan Application to property
on North 10th Street, commonly known as Gloria Dei Lutheran Church
(Applicant: Gloria Dei Lutheran by Agent Alex Forrester & Associates).
Commissioner Dunlap seconded the motion. ROLL CALL VOTE: Dunlap, yes;
Curtis, yes; Fish, yes; Gilkey, yes.
C. RPSOlution No 352 A Resolution of Intent to Amend Zone for oroperty located at
372W3B Tax Lots 1501 1502 and 1504-N from Residential Two Family IR-21
and Ingle Family Residential (R-1-8) to Thoroughfare Commercial (C-51 Zone.
Jim Bennett reviewed the proposed Resolution. He stated that all the property
owners have been contacted and they support the zone change. Staff
recommends that the Planning Commission adopt Resolution 352.
Commissioner Fish made a motion to adopt Resolution 352 to amend the Zone
for property located at 372W36 Tax Lots 1501, 1502, and 1504-N from
- Residential Two Family (R-2) and Single Family Residential (R-1-8) to
Thoroughfare Commercial (C-51 Zone. The motion was seconded by
Commissioner Gilkey. ROLL CALL VOTE: Dunlap, yes; Curtis, yes; Fish, yes;
Gilkey, yes. Resolution was approved.
VII. MISCELLANEOUS
Jim Bennett informed the Planning Commission of projects currently in the
Planning Department that would be on future agendas.
Jim Bennett told the Commission that Paul Worth, as requested by the
Commission, had inspected the sidewalk on Mingus Creek at The Meadows.
Since it is on private property the City can discuss a possible guardrail with the
management of The Meadows. Commissioner Dunlap asked about the portion of
sidewalk on Freeman Road which crosses the creek and is City property. Jim
stated that a request for a guardrail on this section of Freeman would have to be
brought before the City Council.
VIII. ADJOURNMENT
Commissioner Fish made a motion to adjourn. Commissioner Gilkey seconded
the motion. All said "aye" and the meeting adjourned at 7:25 p.m.
2
PLANNING DEPARTMENT STAFF REPORT
HEARING
DATE: June 18 , 1996
TO: Central Point Planning Commission
FROM: James H. Bennett, AICI~
Planning Director
SUBJECT: Tentative Plan for Snowy Mountain View Subdivision
Summat
The applicant, Redha Corporation, is proposing a tentative plan for the Snowy Mountain
View Subdivision consisting of thirty duplex lots. The site is zoned R-3, Residential Multiple-
Family and is located between Columbine Way and Hopkins Road, west of the Countryside
Village Subdivision, Phase I.
A thori
CPMC 1.24.020 invests the Planning Commission with the authority to hold a public hearing
and render a decision on any application for a subdivision tentative plan. Notice of the public
hearing was effected in accordance with CPMC 1.24.060.
Discussion
The Planning, Public Safety and Public Works Departments have reviewed the tentative plan
for the Snowy Mountain View Subdivision and have concluded that it is in compliance with
all city requirements if all conditions of approval are met. The recommended conditions of
approval included in the Public Works Staff Report dated June 7, 1996 and Public Safety
Staff Report dated June 12, 1996 are incorporated herein by reference.
Exhi i
A. Tentative Plan -Snowy Mountain View Subdivision
B. Notice of Public Hearing
C. Public Works Staff Report -June 7, 1996
D. Public Safety Staff Report -June 12, 1996
3
~~r~,$zr ~
0
O ~
(mil] i a
~t
a w
ccC
•\ V ~
j F
~.
0
tl I
I a r a
;I I i
l' . I o
8 I ~ S a 'P i
0
;
" a
`, ~!
_ _
_ _
_
_
_ I I
_
_
p
u
~
r""- ~.
~
COLUMB INE_ u,.u
off., •u_.. r..•. u
._ =
. ,
WAY
•IF _ _ _
wa
5
' .. t ~
\~ ~. _..~ ~.M it .. ~.. ~ ._ o
~W t
b
l~
l
I' ^
_
z
a 8
1=
~I w
l I ~
° ~.~
,.a.,,. ,.,. I ~ ~ ~ I I i ~I faPR 171996'
Ix I I ,,., -
I ,...N. ~I
I
clrv ~F. cer;rr,;~~_ rouvT
'
. ,.. ,,
,..,., I I I I I _ I, II _ T i Aq F .~.3S~,o ° s../_-L~______
= ~ I ' ^ ^ l a
a I® I I ,$,.
. ~f,. I e~
~
I ~kt e'a`t
I 1 to mr. . u..w . . at
_
,..,.„. .,, ., a . ~I
I _
~ ' II E~
I _ ~ to I
;
f s
I '; :; ~;~;
k~ ~ ,,
,
I ~ ~
= I ~ ~ z
~ ~ I
. ,
a
Z
~ ^: I=
= I
I
i
,.I,..».. ,., ..
I
ig
I I
..a.`,. ,Po.
,•
d
is
' I I
1 I
I
Nara,'. ,w.w
I
I I
IY I
.
--~-~
__________ NOPI(INS__
~' ~a~ ~
~
I
~ - -
N.,~ ~
.,.,,.,
,N N I
II
~ ~ I
l p I~
~ $ ^ -
,
`
^I ~ I
=~~ I~~
N.,, «.n II I I
l ...... ....... Nasvr¢ uf.~e ..... II
I
........I
a „a I
.
I =
~e
I
^~ i
L ,.,.,,
-- _ .
---
i
. J
_ ,o
..,,.I,.
Na,.,,.. ,,..a _ .
_ _
___.._ _ ._ . _.. _ .._ . R~::=
~, _.., ROAO ~
6
_ _______ _ ___ ____
~
qr__
,
G zty o, f ~ G'e~2~~d~ 1'ozn~ EXHIBIT -!'L-^
.~x.~vnv~.~Er.~.~Tn~.~rr
NOTICE OF PUBLIC HEARING
Date of Notice: June 3, 1996
Hearing Date: Tuesday, June 18, 1996
Time: 7:00 p.m.(Approximate)
Place: Central Point City Council Chamber
155 South Second Street
Central Point, Oregon
NATURE OF HEARINGS
names Benue
Planning Direct
Sandy Lomm~
Admiztistrati~
Planning Secreta~
Beginning at the above place and time, the Central Point Planning Commission will conduct a
public hearing to review a Tentative Plan Application for a land partition located in the
Residential Multiple Family Zone (R-3) on property north of Hopkins Road, east of Primrose
Drive, and south of Columbine Way. The site is located on Tax Lot 1700 of Jackson County
Tax Assessor Map Page 37 2W 11A. The agent of record is L. J. Friar & Associates, P.C..
CRITERIA FOR DECISION
The requirements for approval of tentative plans are set forth in Chapter 16 of the Central Point
Municipal Code, relating to tentative plans, land partitions, street, water system, storm drainage
and sanitary sewer and CPMC Chapter 17 relating to lot dimensions. The Tentative Plan is also
reviewed for compliance with the City's Public Works Standards.
PUBLIC COMMENTS
Any person interested in commenting on the above-mentioned land use decision may
submit written comments up until the close of the hearing scheduled for Tuesday,
June 18, 1996.
2. Written comments may be sent in advance of the hearing to Central Point City Hall, 155
South Second Street, Central Point, Oregon 97502.
Issues which may provide the basis for an appeal on the matters shall be raised prior to
the expiration of the comment period noted above. Any testimony and written comments
about the decisions described above will need to be related to the proposal and should be
stated clearly to the Planning Commission.
ndStreet • Central Point, OR 97502 • (541) 664-3321 • Fax (541) 664-6384
4. Copies of all evidence relied upon by the applicant are available for public review at City
Hall, 155 South Second Street, Central Point, Oregon. Copies of the same are available
at 15 cents per page.
5. For additional information, the public may contact the Planning Department at
(541) 664-3324 (extension 231).
SUMMARY OF PROCEDURE
At the public hearing, the Planning Commission will review the application, and technical staff
reports, hear testimony from the applicant, proponents, and opponents and hear arguments on the
application. Any testimony or written comments must be related to the criteria set forth above.
At the conclusion of the review hearing, the Planning Commission may approve or deny the
Tentative Plan for the proposed land partition. City regulations provide that the Central Point
City Council be informed about all Planning Commission decisions. The Council may, on its
own motion, no later than the regularly scheduled Council meeting following the decision date,
call for a review of the Planning Commission decision. Any party aggrieved by the action of the
Planning Commission may request a review of such action by the City Council by filing a
written appeal to the city no more than seven days after the date the city mails the notice of the
decision.
N
NOPHTENT/ADMIN
6
/ ~
, PUBL/C WORKS DEPARTMENT E~j$~
' TENTAT/VE PLAN REV/EW
~~Q~ r~ ~~~~~~
Date: June 7, 1996
Project: Snowy Mountain View Subdivision
PW 96017
Zone: R - 3
# of Lots: 30
No. of
Structures 30
Applicant: Redha Corporation
339 West Valley View Road
Ashland, OR 97520
(541) 488-3925
Agent: L. J. Friar & Associates, P.C.
304 So. Holly Street
Medford, OR 97501
(541) 772-2782
Type of Land
Use Action: Subdivision - T37S R2W, Will. Mer. Section 11A, TL 1700
Name of
Development Snowy Mountain View Subdivision
Applicable
Codes: Central Point Municipal Code (CPMC) 8.24, 8.28, 10.04, 10.16, 12.04,
12.08, 12.12, 12.20, 13.04, 13.20, 14, 15.12, 15.40, 16, 17.20, 17.64
Prepared
By: Paul W. Worth -Public Works Technician
Snowy Mountain View Subdivision - PW 96017
June 7, 1996 -Page Two
I. TENTATIVE PLAN REQUIREMENTS (16.10, 16.24)
rue noo,..i„rb.., Srarns• Conditions/Comments/Info Needed
16.10.010 Filing Fee MS
16.10.020 Scale MS
16.10.030 General Conditions
a. Name of Subdivision MS
b. Date North Arrow Scale MS
c. Legal location of
subdivision MS
d. Names/Address of
Owner/Surveyor MS
16.10.040 Existing Conditions
a. Location of street
widths & easements, etc. TPR/DMS/FP Locate end Labol all easements on Final Pla[
b. Topographic Info TPR/DMS/FP Show Contour lines
c. Benchmark established TPR/DMS/FP Show Benchmark
d. Location and direction of all
water courses N/A
e. Natural features rock
outcroppings, marshes, N/A
wooded areas
f. Existing uses of the land MS
g. Location of all existing
streets and utilities DM Show all existing utilities
h. Zoning on and adjacent to
tract is compatible MS
16.10.050 Proposed Plan
a. Street Location, and the lanes,
grades, radius of curves,
relationship to other existing DMS,CPP Show street grades for individual
or proposed streets, and other streets
utilities.
b. Easements-Widths/Purpose FP, CPP Show all easements on final plat and
c. Lot Dimension MS construction drawings
d. Other Uses NIA
e. Lot square footage MS
*ST ATUS LEGEND:
MS - MEETS STANDARD
- DMS - DOES NOT MEET $TANDARD
NA - NoT ARPUCnRLE
BPP - BUILDING PLAN PROCESS
CPP - CONSTRUCTION PLAN PROCESS
TPR - TENTATIVE PLAN REVISION
FP - FINAL PLAT
IN - INFORMATION NEEDED
V
Snowy Mountain View Subdivision - PW 96017
` June 7, 1996 -Page Three
Tentative Plan Requirements (16.10, 16.24 -Continued)
~,-:.~_ n .......:...:.... C~nrucK Cnnriitinne/(:~mments\tnfn Neadrd
16.10.060 Partial Development MS
Is other property adjacent to this
property being considered in the
design) This property can be
owned by the subdivider.
16.10.070 Explanatory Information
a. Vicinity maps to explain
relationship to existing
streets, can require correction
to existing streets. MS
b. Proposed Deed restrictions CPP/MS At the time of Final Plat
c. Center Lane profile of streets
to show grade 1100" beyond
street) CPP
d. Approximate location and
proposed size of utilities. MS,CPP
16.24.010 Block length MS
Width MS
Shape MS
Not greater than 1200' MS
16.24.020 Block size MS
16.24.030 Blocks Easements
a. Utilities MS,FP
b. Water Courses N/A
c. Pedestrian Ways N/A
16.24.040 Lots Shapes and Sizes MS
16.24.050 Lots-Size & Determination MS
Lot length greater than
2.5 times width prohibited
16.24.060 Through Lots N/A
16.24.070 Lot Sidelines MS
16.24.080 Large Lot Subdivision N/A
STATUS LEGEND:
MS - MEETS STANDARD
DMS - DOES NOT MEET STANDARD
NA - NOT APPLICABLE
BPP - BUILDING PLAN PROCESS
CPP - CONSTRUCTION PLAN PROCESS
TPR - TENTATIVE PLAN REVISION
FP - FINAL PLAT
IN - INFORMATION NEEDED Q
Snowy Mountain View Subdivision - PW 96017
' June 7, 1996 -Page Four
II. STREET IMPROVEMENTS:
Includes: Street sub-grade, street base, street paving, street lighting, traffic control/delineating improvements,
curbs/gutters, safety improvements, ingress/egress improvement, off-street parking, delivery truck
access, traffic requirements, sidewalk, and bikeways.
A. Existing Conditions
1. Street Name -Hopkins Road - CSM
Descriation
-Right of Way
-Street Width
-Moving Lanes
-Parking Lanes
-Traffic Volume
-Sidewalks
-Curb & Gutter
-Street Lights
-Bikeways
Existina Conditions
60' Property to Property
36' Curb to Curb
2
2
7 VT/D
yes
yes
yes
yes
Jurisdiction -City of Central Point
Future Reauirements
60-66' Property to Property
40' Curb to Curb
2 moving lanes
2 parking lanes
2500-5000 VT/D
Required
Required
Required
Required
2. Street Name -Columbine Way LS 159 Jurisdiction -Private Ito be dedicated)
(Note: Does not meet standards for street design. See Exhibit A, Condition 2(dl• Also refer to
Planning Commission Resolutions 280, 3/8/95 and 302, 10/4/94)
Descriniion
-Right of Way
-Street Width
-Moving Lanes
-Parking Lanes
-Traffic Volume
-Sidewalks
-Curb & Gutter
-Street Lights
-Bikeways
Existin~onditions
50' Property to Property
36' Curb to Curb
2
2
~ VT/D
yes
yes
yes
yes
Future Reauirements
50' Property to Property
36' Curb to Curb
2 moving lanes
2 parking lanes
2500 VT/D
Required
Required
Required
Part of traveled way
3. Street Name -Village Drive LS 176 Jurisdiction -Private (to be dedicated)
(Note: Does not meet standards for street design. See Exhibit A, Condition 2 (d)
Description
-Right of Way
-Street Width
-Moving Lanes
-Parking Lanes
-Traffic Volume
-Sidewalks
-Curb & Gutter
-Street Lights
-Bikeways
Existina Conditions
50' Property to Property
30' Curb to Curb
2
2
1 VT/D
yes
yes
yes
yes
future Reauirements
50' Property to Property
36' Curb to Curb
2 moving lanes
2 parking lanes
2500 VT/D
Required
Required
Required
Part of traveled way
~~
Snowy Mountain View Subdivision
` June 7, 1996 -Page Five
B. Street Standards
ra„ no~,..l..a,,.,
Srarns'~ Conditions/Comments/Info Needed
16.20.020 Street Generally
a. Location MS
b. Width DMS,CPP See Exhibit A, Conditions 2c, 2d
c. Grade CPP
d. Relationship to existing street CPP
e. Topography as it relates to
drainage CPP Exhibit A, Condition #1
f. Provide for Street Construction CPP Exhibit A, Condition #2 & #3
g. Follows a Master Plan CPP See Info Needed Item #1
h. Traffic Volume CPP Exhibit A, Condition #3
I. Safety Features CPP Exhibit A, Condition #3 and #8
j. Accesses CPP Exhibit A, Condition #2 & #8
Comp Plans. Street R.O.W. & Widths
LS ROW 50' MS
LS Width " 36' CPP
CS ROW 60-66' N/A
CS Width 40' N/A
16.20.030 Street Reserve Strip CPP Exhibit "A" Condition #11
16.20.050 Street Extension CPP Exhibit "A" Condition #11
PWS,VII,G Street Intersection Angles 90° CPP Minimum corner radius - 30 feet at
- right of way lines
16.20.060 Existing Streets additional width DMS,CPP Village Drive, Columbine Way, Exhibit
"A", Conditions 2c, 2d
16.20.070 Half Street/Flag Lot Access NIA
16.20.080 Cul-de-Sac and/or dead-end NIA
streets
a. Shall not serve more than 12
lots
b. Shall not be greater than 400'
c. Turn-around
16.20.090 Street Names MS
15.40 Street Grades and Curves CPP
Public Works -MA SA CS not greater than 6% N/A
Standards -Not greater than 12% on LS CPP
-Cannot be less than 1/2% CPP
Curve Radius
-LS - 100' CPP
-CS - 100' CPP
-SA - 200'
-MS - 300' NIA
Stationing CPP
STATUS LEGEND:
MS-MEETS STANDARD
, DMS -DOES NOT MEET STANDARD
NA -NOT APPLICABLE
BPP- BUILDING PLAN PROCESS
~~ CPP -CONSTRUCTION PLAN PROCESS
TPR -TENTATIVE PLAN REVISION
FP -FINAL PLAT
IN -INFORMATION NEEDED
1
" SNOWY MOUNTAIN VIEW SUBDIVISION - PW 9601 7
JDNE 7, 1996 -PAGE SIX
11. WATER IMPROVEMENTS
Includes: Mainlines, Property Service, Fire Service and Back-flaw Protection.
A. Existing Conditions
1. An existing 8" ductile iron water main lies in Columbine Way.
2. An existing 8" ductile iron water main lies in Village Drive.
3. An existing 12" ductile iron City water main lies in the North Lane of Hopkins Road.
4. An existing 16" MWC Transmission Line lies in the North Lane of Hopkins Road.
5. Existing fire hydrants lie on Columbine, Village Drive and Hopkins Road.
B. Water Standards:
Sr~r„sµ Conditions/Comments/Info Needed
15.40 Water System provided mains CPP Exhibit "A", Condition N4 and General
Public Works
Standards Service Laterals, 1 ea. lot CPP Exhibit "A", Condition 5a
Fire Hydrants not greater than 300'
apart CPP Exhibit "A", Condition 4
Fire Flow 1000 g.p.m. provide
minimum pressure 40 psi CPP Exhibit "A", Condition 4 and General
Conditions
13.20 Backflow Prevention BPP Building Permit Process. Required for
sprinkler systems. Exhibit "A"
Condition 5 (b)
IV. SANITARY SEWER IMPROVEMENTS
Includes: Mainline, Property Service, Regional System Development Charge, Local Systems Development
Charge.
A. Existing Conditions:
1. A 12" sanitary sewer line lies in_Columbine Way and also runs north to "The Meadows".
2. A 42" BCVSA trunk lies in the North lane of Hopkins Road, thence North along the East line
of TL 1700 to the Regional Interceptor.
3. An 8"City Sanitary Sewer lies in the West Lane of Village Drive.
8. Sanitary Sewer Standards:
ceor„s« Conditions/Cnmmonts/Info Needed
nua .,y.,v.. _ ___
15.40 Adequate sizing,Mainline services CPP Exhibit "A", Condition 6a, 6b
Public Works
Standards Regional SDC (fee paid at time
building permit is issued.) BPP See Exhibit "A", General Conditions
Local SDC (fee paid at time
building permit is issued.) BPP See Exhibit "A", General Conditions
"STATUS LEGEND
MS -MEETS STANDARDS BPP -BUILDING PLAN PROCESS CPP- CONSTRUCTION PLAN PROCESS
DMS -DOES NOT MEET STANDARD TPR- TENTATIVE PLAN REVISION IN - INFORMATION NEEDED
" NA -NOT APPLICABLE FP -FINAL PLAT
i :~
. Snowy Mountain View Subdivision PW 96017
' June 7, 1996 -Page Seven
' IV. STORM DRAINAGE IMPROVEMENTS
Includes: Discharge Basin, Wetlands Requirements, pretreatment requirements, mainlines, services, catch
basins, and erosion protection.
A. Existing Conditions:
1. A 24" storm drain is stubbed out to the easterly end of Columbine Way (flows west).
2. An 18"/15" storm drain Ties in Village Drive. (flows North)
Note: Storm Drain catch basins in Village Drive do not meet City standards.
6. Storm Drain Conditions:
cror„~• Conditions/Comments/Info Needed
15.40 Surface Drainage and storm sewer CPP Exhibit "A" Condition 111, 7(b)
Public Works system
Standards
Provide drainage through the
subdivision CPP Exhibit "A", Condition 7 (al (b)
Are there adverse effects placed
on downstream structures) CPP Exhibit "A", Condition 7 (a) (b)
No catchbasin located greater than
350 feet apart for any curb and
gutter section CPP Exhibit "A", Condition 11 7(a) Ib)
Discharge Basin N/A
ORS 196.800 Wetlands Disturbance CPP None shown on Wetlands Inventory
Map
ORS 468.740 Erosion Control Plan CPP Exhibit A, Condition N1
Roof Drainage, Area Drains, Crawl
Spaces
ORS 8.28 Flood Management N/A
" STA TUS LEGEND:
M$ - MEETS STANDARD
DMS - DOES NOT MEET $TANDARD
NA - NOT APPLICABLE
BPP - BUILDING PLAN PROCESS
CPP - CONSTRUCTION PLAN PROCESS
TPR - TENTATIVE PLAN REVISION
FP - FINAL PLAT
IN - INFORMATION NEEDED
13
EXHIBIT "A"
PUBLIC WORKS DEPARTMENT
TENTATIVE PLAN CONDITIONS
SNOWY MOUNTAIN VIEW SUBDIVISION
GENERAL
o ORS Chapter 468.740 requires that all developments which will disturb 5 ACRES OR
MORE of land adjacent to a stream which discharges to surface waters of the State of
Oregon shall as a part of th o~ nstruction permitting process submit an "Erosion
Control Plan."
The "Erosion Control Plan" shall require a PERMIT from DEQ. No construction on any
Tentative Plan storm drainage system can occur until authorization to do so has been
granted by DEQ. Developer shall provide a copy of the DEO permit to the City prior
to beginning construction.
o Developer shall provide and install ladder rungs approved by the Central Point Public
Works Department for each sanitary sewer manhole with a depth greater than 4.0 feet
to the flow line of the manhole.
o Developer's engineer shall design the water system to provide a minimum flow of 1000
g.p.m. at each fire hydrant.
o Developer shall construct all utilities, streets, and other structures discussed herein,
within rights-of-way owned, or to be owned by the City of Central Point, in accordance
with all rules, regulations, ordinances, resolutions and other applicable requirements
of the City of Central Point for the construction of this development.
o This review for the Tentative Plan submitted by the applicant was done so in
accordance with all the rules, regulations and ordinances in effect as of the date of this
review. Any modifications by Developer of this project after City Planning Commission
approval, could require resubmittal of an application, and approval by the City Planning
Commission based on the recommendation of staff responsible for this review.
_o All costs associated with this Development and the conditions placed on this
Development shall be the sole responsibility of the applicant/owner.
o No construction will begin on this project or any building until such time as plans and
specifications have been reviewed and approved by the Public Works Department and
other required divisions of the City and a Construction Permit has been issued for each
portion of the project requiring a permit.
o The Final Plat of this Subdivision shall not be approved by the Planning Commission
until all conditions as herein stipulated and approved for this project have been met by
construction and acceptance thereof or bonding for construction.
o The City shall approve street stationing prior to Developer's engineer designing the
improvements for this Tentative Plan.
1~
EXHIBIT "A"
Public Works Department
Tentative Plan Conditions
SNOWY MOUNTAIN VIEW SUBDIVISION
1. All structures shall have roof drains, area drains, and crawl spaces with positive
drainage away from the structure and drain lines connected to a curb drain, or an
approved storm sewer. The developer shall provide the necessary storm drainage
improvements, lot grading and stabilization materials to assure that all streets, lots, and
properties will drain properly and provide foundation support. The developer shall
submit a grading plan with the construction drawings and perform such grading,
compaction, stabilization and drainage improvements which satisfies the drainage and
stabilization condition leaving only minor grading required for each lot during
construction.
2(a). Construction of this development shall include but not be limited to the street
subgrade, base rock, paving, lighting, traffic control and delineation improvements,
water, sanitary sewer improvements, storm drain, curb and gutter, safety
improvements, ingress and egress improvements, and sidewalks, and utility crossings
including widening of that portion of Hopkins Road adjacent to 737S R2W, 11 A, Tax
Lot 1700. All improvements shall be designed and constructed in accordance with
City of central Point Standards and Specifications for Public Works Construction.
2(b). The developer can secure the above future widening improvements for Hopkins Road
by signing a Deferred Improvement Agreement to construct the above street
improvements. The Planning Department has the option to require this security.
2(c). The City's engineer shall, at the cost of the developer, evaluate the strength of the
native soils and determine the street section design in accordance with the Public
Works Department Design Standards. The engineer shall use the following design
criteria:
Street Name Average Daily Traffic % Trucks
Village Drive 1,500 VT/D 2%
Columbine Drive 2,500 VT/D 5%
Mountain View 1.500 VT/D 2%
2(d) Prior to dedication and acceptance by the City, developer shall design and reconstruct
Columbine Way and Village Drive in accordance with City of Central Point Public Works
Standards and Specifications.
3. The construction drawings for this Tentative Plan shall include a Street Lighting Plan
and a Traffic Control Plan in accordance with the requirements of the City of Central
Point Public Works Department. The construction drawings shall include clear vision
areas designed to meet the City's Public Works Standards. The developer shall pay
for all costs associated with the design and installation of the improvements specified
on these plans.
1~
Snowy Mountain View Subdivision
June 6, 9996
Exhibit `A "- page Two
4. The construction drawings will indicate type, size and location of water service, water
mains and fire hydrants in accordance with the City's Public Works Standards and the
recommendation of the City's Fire Chief. All water systems shall be loop constructed
where feasible.
5(a). Separate water service laterals shall be properly sized and configured for each dwelling
unit. Include easement on Final Plat for any water laterals crossing adjacent
property/padlot parcels.
5(b). Applicant shall install OSHA approved, testable backflow assemblies behind the City
water meter for any system which connects to applicants irrigation system or another
water system which may be a potential cross connection or backflow hazard.
61a). Developer's engineer shall design the sewer system to serve the development of this
tract and all coordinate with the development East of this tract (Crown West
Properties) which these improvements will serve. The sanitary sewer design shall be
approved by DEO prior to approval of construction plans by the Public Works Director.
61b). Separate sanitary sewer serving each parcel shall be connected to the City sanitary
sewers located in Village Drive, Mountain View and Colombine Way. The service
lateral shall be sized in accordance with the Oregon Plumbing Code. In the event
parcels are partitioned for padlots, each dwelling shall be served by a separate sewer.
7(a1. Developer shall construct an adequately sized storm drainage system to provide for
runoff onto the subdivision property and from each lot. As a part of the construction
of the improvements for this Tentative Plan, Developer's engineer shall provide a
complete set of drainage calculations for sizing the storm drainage system for this
development. Developer shall submit this information to the Public Works Department
at the time construction drawings for the subdivision are submitted to the Public Works
Department for permits. The engineer shall use the rainfall/intensity curve obtained
from the Public Works Department for hydrology calculations.
7(b). Developer shall execute a development plan with the Planning Department which
includes a street protection plan and storm drainage/sedimentation protection during
construction and building activities. Developer shall warrantee all improvements for
a period of two years after acceptance.
8. The construction drawings shall include the locations of the driveways for lots 8, 16,
17, 12, 24, 30 confirming with the Public Works Standards. Accesses shall be located
the farthest distance away from intersection. A 55' sight triangle is required at the
intersections of Village Drive and Mountain View Drive with Hopkins Road.
9. The Developer shall provide the City's Public Works Department with an aerial
photograph or topographic map which delineates the boundaries of the project and any
1~
Snowy Mountain View Subdivision
June 6, 9996
Exhibit `.4"- Page Three
wetlands in the immediate vicinity. The developer shall be responsible for all
conditions and comply with all permits required by DEQ or DSL for construction of this
subdivision.
10. The Developer shall coordinate with the 'developer' to the East (Colombine Way) for
the design of the utilities and streets for this subdivision. Included with the
construction drawing will be a separate drawing which details required coordination.
11. Shown on Final Plata (1') one foot access control strip at the East end of Colombine
Way.
12. Prior to acceptance of street improvements including all water, sanitary sewer, storm
drainage and utilities. Developer shall provide "as constructed" drawings on Mylar. "As
constructed" drawings shall include all field revisions including final invert elevations
of sewer and storm systems, street grades and curb elevations.
Additionally, Developer shall provide an AutoCad compatible digitized copy of the "as
constructed" drawings and Final Plat. Digitized copy shall be presented in DWG or DXF
format.
13. Developer shall be required to pay all previous City incurred costs for the Castle Court
Condominium project IPW #92018) in addition to costs incurred for the Snowy
Mountain View Subdivision.
EXHIBIT ~ -
interoffice
M E M O R A N D U M
to: Jim Bennett Planning Director
from: Mark A. Servatius Fire Chief/Building Official "'~
sub)ect: Tentative Plan Snowy Mountain View Subdivision (Redha Corporation, Larry Friar
Agent) (Project no. 96017TP)
date: June 12, 1996
I have reviewed the Tentative Plan, for Snowy Mountain View Subdivision, further described as
follows: AMP 37-2W-I IA, Tax Lot 1700.
The following are my findings:
1. All fire protection requirements; including ,hydrant locations & water supply have not been
satisfied for this development. Developer will supply the Fire Department with plans indicating
fire hydrant spacing not to exceed 300'. Fire Chief will approve final location(s) of all hydrants.
In addition water system will be tested by the developer and approved by the City of Central
Point.
2. Fire Department access is approved as submitted
3. No Building Permits will be issued for this development until all City of Central Point
conditions including installation of Fre hydrants have been met and final plat approval is given.
CONCLUSIONS: The Aforementioned Tentative Plan meets all Fire & Building Department
requirements & is approved pending all conditions outlined herein are complied with.
Approval of submitted Tentative Plan Application(s) is not an approval of omissions or
oversights by this office; or ofnon-compliance with any applicable regulations of this
jurisdiction except as noted.
Reviewed By:
cc: Public Works Department
Public Safety Project File
C:\OFFICE\WI'WQJIWPDOCS\Tf'SNOMIN. WPD
A. Servatius Fire Chief/Building Official
18
PLANNING DEPARTMENT STAFF REPORT
HEARING
DATE: June 18, 1996
TO: Central Point Planning Commission
FROM: James H. Bennett, AIC~
Planning Director
SUBJECT: Tentative Plan for Green Park Village Subdivision, Phase V
Summary
The applicant, Louis F. Mahar, is proposing a tentative plan for Phase V of the Green Park
Village Subdivision consisting of thirty-seven single-family lots. This subdivision was
originally approved by the Planning Commission on June 7, 1994. However, the applicant
failed to get final plat approval within one year of this approval and the tentative plan
subsequently expired. It is being resubmitted at this time with no substantial changes. The
subdivision is generally located west of Interstate 5, north of Green Park Village #1 and east
of Forest Glen #1.
Authority
CPC 1.24.020 invests the Planning Commission with the authority to hold a public hearing
and render a decision on any application for a subdivision tentative plan. Notice of the public
hearing was effected in accordance with CPC 1.24.060.
Discussion
The Planning, Public Safety and Public Works Departments have reviewed the tentative plan
for Phase V of the Green Park Village Subdivision and have concluded that it is in compliance
with all city requirements if all conditions of approval are met. The recommended conditions
of approval included in the Public Works Staff Report dated May 22, 1996 are incorporated
herein by reference.
Exhi i
A. Tentative Plan -Green Park Village Subdivision, Phase V
B. Notice of Public Hearing
C. Public Safety Staff Report -May 20, 1996
D. Public Works Staff Report -May 22, 1996
i9
<O
n
1/go1q/~m~Ir~'
2PU~Y
~~Oq
~:is~
j~~M
O a
J~Sv
I~~Y
FWh
s~T
~ZZ
N~Y
uui`oY
~~ 1
N
~WQ~
nap
=0=~
~3~HIBI'P
4`.&~
~~.
x
s
J
x(!o C o[~~iv
nN~ C. ut.,=~'=
_ W ^~
„LLO `~k
.o=
~`-=-a
a a I~ //
/
/
/
/
/
~ /
/
/
O /
z ,/
~ /'
~ /
Zo /
z ~ a ~ /,
o # € \~ //
~ /
E-I ~ o , /
/ ,~;~
~ '' Z ~! \ / / / / \ \ I'.
a / / \ \ :\
W F~'i .~.I y ~ E ~\~ /// ~1~c //// / \ W\ \ \\
~~~
(z] \ a it /E/!/ 7 \ _7r L° - I v.s ~ sea I. t
(~si~ ao ~~ \\'~~~,,~~ yo~~6~5'\\,.g~y~' 9T,~y~~ & •jzvr,N~- t ,g~~\I
' 'K °~gg dt' ~'%6 /~\'t `~ `~F r i 00:$ a'K fv ~ s .
''w. ^& ~ o% / ~t`~'4@e 4 ~$~. T~ ~$f~J' er g I ~ ~9a ~~ ~ ~~. d
+aJYll- _ ~'
/ ^~ ~ a; ) (Fn...Ta~- _'p~ '~nzo(-_-~ _~zY ~'~-zvm~_ _vom•_ _.n.z
:.?4J~: ,,~W''~~: ti'7: '-~rsr.-ten ~--~-~:~~"'~-.tsF ~- -. ~ It-__-..,~-._-_.
./
.,'~C~ I~k.^v
CA 35e~,d jy319
a~f&a ~PSz~k ~~$ ~ ~ ~cP °°w
^~Rp° 8
rv<§ .oo~av <I•vv " R8y ~gla -«3. n~
c ~_ .u'vv .n'ac .uro. .. ~ 8
Jtp ~~Ri ~PJn ~~ ~EJI~ ~ Iy~d{~~C
ay ~ (APIA 35vHd 'NY@319 15'y~ J '
19 q ~ xi;.
~~
~~ ~~ ~ ~
~~ ~, m
~
Z R ~ §>
l m
~,
u
4
tl tl ` a
~.
fiQ~
W k
E ~
~
<
~ ~
\
o
yq
04
a~
'
~~
s •p
^~.
~~
y
~ H ~
V
~~ N q ~ N C
p~
1 ~ I ~~ 3
., ' _
NE
I ~
Ir` ` __
~7 0
N
$ ~
\
\ f~
\ ~
\
\
\
\ \
l \
a. \
¢_ ~ _y ,
!S~ ~i" \ Y~i U
E9 ~.~Y ~z s
g \~~' \''~^ $
w\ „ gi~4N
~ lla.m'
,; s ^ d5 $ $~~g
~. ~ r g €'~,~ w
~ ~.._~-[E8 ~
'\ii ~ "Eqi~~~
o~ /
~~~~ ~~~~
b~
Sa ~~ - / ~~
~i y vJ ~c:rc~r~c ~ vo.o~
EXHIBIT
PL~INNIlVG DE,I',A.~TN,tENT
NOTICE OF PUBLIC HEARING
Date of Notice: June 3, 1996
Hearing Date: Tuesday, June 18, 1996
Time: 7:00 p.m.(Approximate)
Place: Central Point City Council Chamber
155 South Second Street
Central Point, Oregon
NATURE OF HEARINGS
lames $enzte
Planning Din;ct
Sandy I.omm
Adzninis[zati~
Planning Sceceta
Beginning at the above place and time, the Central Point Planning Commission will conduct a
public hearing to review a Tentative Plan Application for a land partition located in the Single
Family Residential Zone (R-1-6) on property north of Green Park Subdivision, east of Interstate
5, and south of Forest Glen Subdivision. The site is located on Tax Lot 3400 of Jackson County
Tax Assessor Map Page 3'12W 12C. The agent of record Douglas McMahan of Hoffbuhr and
Associates.
,CRITERIA FOR DECISION
The requirements for approval of tentative plans are set forth in Chapter 16 of the Central Point
Municipal Code, relating to tentative plans, land partitions, street, water system, storm drainage
and sanitary sewer and CPMC Chapter 17 relating to lot dimensions. The Tentative Plan is alsc
reviewed for compliance with the City's Public Works Standards.
PUBLIC COMMENTS
1. Any person interested in commenting on the above-mentioned land use decision may
submit written comments up until the close of the hearing scheduled for Tuesday,
June 18, 1996.
2. Written comments may be sent in advance of the hearing to Central Point City Hall, 155
South Second Street, Central Point, Oregon 97502.
,,i NOPIig~~nd Street • Central Point, OR 97502 • (541) G64-3321 • Fax (541) 664-6384
2~
3. Issues which may provide the basis for an appeal on the matters shall be raised prior to
the expiration of the comment period noted above. Any testimony and written comments
about the decisions described above will need to be related to the proposal and should be
stated clearly to the Planning Commission.
4. Copies of all evidence relied upon by the applicant are available for public review at City
Hall, 155 South Second Street, Central Point, Oregon. Copies of the same are available
at IS cents per page.
5. For additional information, the public may contact the Planning Department at
(541) 664-3324 (extension 231).
SUMMARX OF PROCFDIIRE
At the public hearing, the Planning Commission wilt review the application, and technical staff
reports, hear testimony from the applicant, proponents, and opponents and hear arguments on the
application. Any testimony or written comments must be related to the criteria set forth above.
At the conclusion of the review hearing, the Planning Commission may approve or deny the
Tentative Plan for the proposed land partition. City regulations provide that the Central Point
City Council be informed about all Planning Commission decisions. The Council may, on its
own motion, no later than the regularly scheduled Council meeting following the decision date,
call for a review of the Planning Commission decision. Any party aggrieved by the action of the
Planning Commission may request a review of such action by the City Council by filing a
written appeal to the city no more than seven days after the date the city mails the notice of the
decision.
4
N
NOPHTGNT/ADMIN
22
>-~=~
M E M O R A N D U M
to: Jim Bennett Planning Director
from: Mark A. Servatius Fite ChiefBui(ding Official
subject: Tentative Plan Green Park Village Subdivision Unit #5, Louis MahadPactrend, Inc.
applicant)
date: May 20, 1996
I have reviewed the Tentative Plan, for Green Park Village Subdivision Unit #5, further
described as follows: AMP 37-2W-12C, Tax Lot 3460.
The following are my findings:
1. Al( fire protection requirements; including fire department access, hydrant locations & water
supply have been satisfied for this development.
2. No Building Permits will be issued for this development phase until all City of Central Point
conditions have been met and final plat approval is given.
CONCLUSIONS: The Aforementioned Tentative Plan meets all Fire & Building Department
requirements & is approved as submitted.
Approval of submitted Tentative Plan Application(s) is not an approval of omissions or
oversights by this office; or ofnon-compliance with any applicable regulations of this
jurisdiction except as noted.
Reviewed By:
A. Servatius Fire ChiefBuilding Official
c:~orFice~wPwrt~weoocs~catm>xsm>. wao
23
EXHIBIT ~
PUBL/C WORKS DEPARTMENT
TENTAT/VE PLAN REV/EW
~~a~~ G°3Cp0~~
Date: May 22, 1996
Project: Green Park Subdivision Unit 5
PW 95020
Zone: R - 1-6
# of Lots: 37
No. of
Structures 37
Applicant: Louis F. Mahar
1014 orth Riverside Avenue
Medford, OR 97501
Agent: Douglas C. McMahan
Hoffbuhr & Associates, Inc.
1062 East Jackson Street
Medford, OR 97504
(541) 779-4641
Type of Land
Use Action: Subdivision, T37S R2W, Section 12C, Taxlot 3460
Name of
Development Green Park, Unit 5
Applicable
Codes: Central Point Municipal Code (CPMC) 8.24, 8.28, 10.04, 10.16, 12.04,
12.08, 12.12, 12.20, 13.04, 13.20, 14, 15.12, 15.40, 16, 17.20, 17.64
Prepared
By: Paul W. Worth -Public Works Technician
24
1
~; Green Park Subdivision Unit 5
May 22, 1996 -Page Two
I. TENTATIVE PLAN REQUIREMENTS (16.10, 16.24)
Title Desr•.rintinn Statuc+ r:,,.,,ttr~...,<rc,.,.,..,on~an..r.. nh„a..a
16.10.010 Filing Fee MS
16.10.020 Scale MS
16.10.030 General Conditions
a. Name of Subdivision MS
b. Date North Arrow Scale MS
c. Legal location of
subdivision MS
d. Names/Address of
Owner/Surveyor MS
16.10.040 Existing Conditions
a. Location of street
widths & easements, etc. MS
b. Topographic Info MS
c. Benchmark established MS
d. Location and direction of all MS/CPP Show top of bank for both sides of Elk
water courses Creek Channel on construction plans
e. Natural features rock
outcroppings, marshes,
wooded areas MS
f. Existing uses of the land MS
g. Location of all existing
streets and utilities MS/CPP Show all existing utilities
h. Zoning on and adjacent to
tract is compatible MS
16.10.050 Proposed Plan MS, CPP Show street grades for individual
a. Street Location, and the lanes, streets.
grades, radius of curves,
relationship to other existing
or proposed streets, and other
utilities.
b. Easements-Widths/Purpose MS/CPP
c. Lot Dimension
d. Other Uses N/A
e. Lot square footage MS
*ST ATUS LEGEND:
' M$ - MEETS STANDARD
DMS - DOES NOT MEET STANDARD
NA - Nor APPLICABLE
BPP- BUILDING PLAN PROCESS
CPP- CONSTRUCTION PLAN PROCESS
TPR - TENTATIVE PLAN flEVI$ION
FP - FINAL PLAT
IN - INFORMATION NEEDED
25
Green Park Subdivision, Unit 5
" May 22, 1996 -Page Three
Tentative Plan Requirements (16.10, 16.24 -Continued)
TitIR nRSr:I1rIfIRR Sf nfnc• Cnnrl7fln nc /Cnmmn MC\Inin ~Inn.lnd
16.10.060 Partial Development CPP, IN See information needed IN.(2)
Is other property adjacent to this
property being considered in the
designs This property can be
owned by the subdivider.
16.10.070 Explanatory Information MS
a. Vicinity maps to explain
relationship to existing
streets, can require correction
to existing streets.
b. Proposed Deed restrictions CPP/FP At the time of Final Plat
c. Center Lane profile of streets
to show grade (100" beyond
street) CPP
d. Approximate location and
proposed size of utilities. CPP Show location and size of utilities on
construction plan.
16.24.010 Block length MS
Width MS
Shape MS
Not greater than 1200' MS
16.24.020 Block size MS
16.24.030 Blocks Easements FP Show utility easements on Final Plat
a. Utilities
b. Water Courses FP Provide easements for Storm Drainage.
CPP See Exhibit "A" Condition 11. Show on
Final Plat.
c. Pedestrian Ways N/A
16.24.040 Lots Shapes and Sizes MS
16.24.050 Lots-Size & Determination MS
Lot length greater than
2.5 times width prohibited
16.24.060 Through Lots N/A
16.24.070 Lot Sidelines MS
16.24.080 Large Lot Subdivision N/A
STATUS LEGEND•
MS - MEETS STANDARD
DMS - DOES NOT MEET STANDARD
NA - NOT APPLICABLE
BPP - BUILDING PLAN PROCESS
CPP - CONSTRUCTION PLAN PROCESS
TPR - TENTATIVE PLAN REVISION
FP - FINAL PLAT
IN - INFORMATION NEEDED ~~
Y
Green Park Subdivision Unit 5
May 22, 1996 -Page Four
II. STREET IMPROVEMENTS:
Includes: Street sub-grade, street base, street paving, street lighting, traffic control/delineating improvements,
curbs/gutters, safety improvements, ingresslegress improvement, off-street parking, delivery truck
access, traffic requirements, sidewalk, and bikeways.
A. Existing Conditions
1. Street Name - GatePark Drive, LS-157
pescri t
-Right of Way
-Street Width
-Moving Lanes
-Parking Lanes
-Traffic Volume
-Sidewalks
-Curb & Gutter
-Street Lights
-Bikeways
Exisfina Conditions
50' Property to Property
36' Curb to Curb
2
2
7 VT/D
Yes
Yes
Yes
No
Street Name - Glengrove Avenue - LS 143
pescri tR ion
-Right of Way
-Street Width
-Moving Lanes
-Parking Lanes
-Traffic Volume
-Sidewalks
-Curb & Gutter
-Street Lights
-Bikeways
Exisfina Conditions
50' Property to Property
36' Curb to Curb
2
2
1 VT/D
Yes
Yes
Yes
No
B. Street Standards
Title Description
Jurisdiction -City of Central Point
Future Requirements
50' Property to Property
36' Curb to Curb
2 moving lanes
2 parking lanes
1000 - 2000 VT/D
Required
Required
Required
Part of travel lanes
Jurisdiction -City of Central Point
Future Reauirements
50' Property to Property
36' Curb to Curb
2 moving lanes
2 parking lanes
2500 VT/D
Required
Required
Required
Part of travel lanes
Status" Conditions/Comments/Info Needed
16.20.020 Street Generally
a. Location MS
b. Width MS
c. Grade CPP
d. Relationship to existing street CPP
e. Topography as it relates to
drainage CPP Exhibit A, Condition #1
f. Provide for Street Construction CPP Exhibit A, Condition #2 & #3
g. Follows a Master Plan CPP, IN See Info Needed Item #1
h. Traffic Volume CPP Exhibit A, Condition #2
I. Safety Features CPP Exhibit A, Condition #3 & #5
j. Accesses CPP Exhibit A, Condition #8
Comp Plans. Street R.O.W. & Widths
LS ROW *50' MS 50'
LS Width *36' CPP 36' curb to curb
SA ROW *' N!A
SA Width *' N/A
STATUS LEGEND:
MS-MEETS STANDARD
BPP- BVILOING PLAN PROCESS
FP -FINAL PLAT
NA -NOT APPLICABLE CPP -CONSTRUCTION PLAN PROCESS
DMS -DOES NOT MEET STANDARD n R -TENTATIVE PLAN REVISION
IN -INFORMATION NEEDED /Gj
Green Park Subdivision Unit 5
May 22, 1996 -Page Five
~~ Street Standards -Continued.
7irlc na~~.L,rt„~ Sraruc• Conditions/Comments/Info Needed
16.20.030 Street Reserve Strip CPP Exhibit "A" Condition #12
16.20.050 Street Extension CPP Exhibit "A" Condition #12
PWS,VII,G Street Intersection Angles 90~ CPP
16.20.060 Existing Streets additional width N/A
16.20.070 Half Street/Flag Lot Access NlA
16.20.080 Cul-de-Sac and/or dead-end
streets
a. Shall not serve more than 12
lots MS
b. Shall not be greater than 400' MS
c. Turn-around MS
16.20.090 Street Names MS
15.40 Street Grades and Curves
Public Works -MA SA CS not greater than 6% CPP
Standards -Not greater than 12% on LS CPP
-Cannot be less than 1/2% CPP
Curve Radius
-LS - 100' CPP
-CS - 100' N/A
-SA - 200' N/A
-MS - 300' N/A
Stationing CPP
11. WATER IMPROVEMENTS
Includes: Mainlines, Property Service, Fire Service and Back-flow Protection.
A. Existing Conditions
1. An existing 8" ductile iron water main lies in the West lane of Glengrove Avenue (Forest
Glen #5) and is stubbed to South side of Elk Creek.
2. An existing 8" ductile iron water main lies in the East lane of Glengrove Avenue (Green Park
Unit 41
3 An existing 8" ductile iron water main exists in the South lane of Gate Park Drive (Green
Park, Unit 4.
* STATUS LEGEND:
MS - MEETS STANDARD
DMS - DOES NOT MEET STANDARD
NA - NOT APPLICABLE
BPP - BUILDING PLAN PROCESS
CPP - CONSTRUCTION PLAN PROCESS
TPR - TENTATIVE PLAN REVISION
FP - FINAL PLAT
" IN - INFORMATION NEEDED
28
n
Green Park .Subdivision Unit 5
May 22, 1996 -Page Six
B. Water Standards:
Tlln fleecrinfinn
sratus" Conditions/Comments/Info Needed
15.40 Water System provided mains CPP Exhibit "A" Condition #5 and General
Public Works Conditions
Standards Service Laterals, 1 ea. lot CPP
Fire Hydrants not greater than 300'
apart CPP Exhibit "A" Condition #5
Fire Flow 1000 g.p.m. provide
minimum pressure 40 psi CPP Exhibit "A", General Conditions
13.20 Backflow Prevention BPP Building Permit Process. Required for
all sprinkler systems.
IV. SANITARY SEWER IMPROVEMENTS
Includes: Mainline, Property Service, Regional System Development Charge, Local Systems Development
Charge.
A. Existing Conditions:
1. An 8" sanitary sewer line is stubbed out at ends of Glengrove Avenue, STA. 22 + 76
(Forest Glen 5.) and Tax Lot 4000 (Green Park, Unit 4)
B. Sanitary Sewer Standards:
Title Description
Status" Conditions/Comments/Info Needed
15.40 Adequate sizing,Mainline services CPP Exhibit "A", Condition 6
Public Works
Standards Regional Systems Development BPP See Exhibit "A", General Conditions
Charge
Local Systems Development BPP See Exhibit "A", General Conditions
Charge
"STATUS LEGEND
M$ -MEETS STANDARDS
DMS -DOES NOT MEET STANDARD
NA -NOT APPLICABLE
BPP -BUILDING PLAN PROCESS
CPP -CONSTRUCTION PLAN PROCESS
TPR -TENTATIVE PLAN REVISION
FP -FINAL PLAT
IN - INFORMATION NEEDED
29
Green Park Subdivision Unit 5
May 22, 1996 -Page Seven
IV. STORM DRAINAGE IMPROVEMENTS
Includes: Discharge Basin, Wetlands Requirements, pretreatment requirements, mainlines, services, catch
basins, and erosion protection.
A. Existing Conditions:
1. A 15" storm drain exits Glengrove Avenue at Sta. 1 +48 (Green Park, Unit 4) to open ditch
along'Interstate 5.
2. A 12" storm drain ends at catch inlet, Sta. 3+40, Gatepark Drive (Greenpark Unit 4)
3. Elk Creek lies along the West boundary of the subdivision adjacent to Lots 194 through 204.
B. Storm Drain Conditions:
Title Descriotion
Status" Conditions/Comments/Info Needed
15.40 Surface Drainage and storm sewer CPP Exhibit "A" Conditions #1, 7(a), 71b)
Public Works system
Standards
Provide drainage through the
subdivision CPP Exhibit "A", Condition #1
Are there adverse effects placed
on downstream structures) CPP Exhibit "A", Condition #1, 7(a), 7(b)
No catchbasin located greater than
350 feet apart for any curb and
gutter section CPP
Discharge Basin N/A
ORS 196.800 Wetlands Disturbance CPP Elk Creek may be identified as a
Westland site. See Exhibit "A",
Condition #9
ORS 468.740 Erosion Control Plan CPP As required by DEO, Exhibit "A"
Roof Drainage, Area Drains, Crawl 8PP Exhibit "A", Condition #1
Spaces
ORS 8.28 Flood Management CPP Exhibit "A", Condition #4
" STA TUS LEGEND:
M$ - MEETS STANDARD
DM$ - DOES NOT MEET STANDARD
NA - NOT APPLICABLE
BPP - BUILDING PLAN PROCESS
CPP - CONSTRUCTION PLAN PROCESS
TPR - TENTATIVE PLAN REVISION
FP - FINAL PLAT
IN - INFORMATION NEEDED
v O
GREEN PARK, UNIT 5
INFORMATION NEEDED ON THE TENTATIVE PLAN
IN (1) Provide a Master Street Plan and information on how Gate Park Drive will serve
properties or connect to other developments to the West and South of this
development.
IN (2) Provide information regarding development of the non-lotted property lying north
of Lot 193.
31
t, EXHIBIT "A"
PUBLIC WORKS DEPARTMENT
TENTATIVE PLAN CONDITIONS
" GREEN PARK, UNIT 5
GENERAL
o ORS Chapter 468.740 requires that all developments which will disturb 5 ACRES OR
MORE of land adjacent to a stream which discharges to surface waters of the State of
Oregon shall as a Bart of the construction permitting process submit an "Erosion
Control Plan."
The "Erosion Control Plan" shall require a PERMIT from DEQ. No construction activity
on any Tentative Plan can occur until authorization to do so has been granted by DEO.
Developer shall provide a copy of the DEQ permit to the City prior to beginning
construction.
o Developer shall provide and install ladder rungs approved by the Central Point Public
Works Department for each sanitary sewer manhole with a depth greater than 4.0 feet
to the flow line of the manhole.
o Developer's engineer shall design the water system to provide a minimum flow of 1000
g.p.m. at each fire hydrant.
o Developer shall construct all utilities, streets, and other structures discussed herein,
within rights-of-way owned, or to be owned by the City of Central Point, in accordance
with all rules, regulations, ordinances, resolutions and other applicable requirements
of the City of Central Point for the construction of this development.
o This review for the Tentative Plan submitted by the applicant was done so in
accordance with all the rules, regulations and ordinances in effect as of the date of this
review. Any modifications by Developer of this project after City Planning Commission
approval, could require resubmittal of an application, and approval by the City Planning
Commission based on the recommendation of staff responsible for this review.
o All costs associated with this Development and the conditions placed on this
Development shall be the sole responsibility of the applicant/owner.
o No construction will begin on this project or any building until such time as plans and
specifications have been reviewed and approved by the Public Works Department, DEO
and other required divisions of the City and a Construction Permit has been issued for
each portion of the project requiring a permit.
o The Final Plat of this Partition shall not be approved by the Planning Commission until
all conditions as herein stipulated and approved for this project have been met by
construction and acceptance thereof, or bonding for construction.
o The City shall approve street stationing prior to Developer's engineer designing the
"' improvements for this Tentative Plan.
~~
PURL/C WORKS DEPARTMENT
TENTAT/VE PLAN COND/T/ONS
GREEN PARK SUBD/V/S/ON, UN/T 5
1. All structures shall have roof drains, area drains and crawl spaces with positive
drainage away from the structure to drain lines connected to a curb drain, or an
approved storm sewer. The developer shall provide the necessary storm drainage
improvements and stabilization materials lot grading to assure that all streets, lots, and
all properties will drain properly and provide foundation support. The developer shall
submit a grading plan with the construction drawings and perform such grading ,
compaction, material stabilization and drainage improvements which satisfies the
drainage and stabilization condition leaving only minor grading required for each lot
during house construction.
2. The City's engineer shall, at the cost of the developer, evaluate the strength of the
native soils and determine the street section design in accordance with the Public
Works Department Design Standards. The engineer shall use the following design
criteria:
~ Street Name Age Daily Traffic % Trucks
Wedgewood Drive 2,500 VT/D 2%
Paisley Court 1,000 VT/D 2%
Angela Court 1,000 VT/D 2%
Glengrove Avenue 2,500 VT/D 5%
Gatepark Drive 2,500 VT/D 2%
3. The construction drawings for this Tentative Plan shall include a Street Lighting Plan
and a Traffic Control Plan in accordance with the requirements of the City of Central
Point Public Works Department. The construction drawings shall include clear vision
areas designed to meet the City's Public Works Standards. The developer shall pay for
all costs associated with the design and installation of the improvements specified on
these plans.
4. Developer shall jointly, with Crown West Properties (Forest Glen 5), construct a box
culvert across Elk Creek at Glengrove Avenue, sized to carry a 100 year storm as
stipulated in CPMC 8.24. Developer shall indicate the 100 year horizontal flood plain
boundary on construction drawings and on Final Plat. Top of bank shall also be shown
on construction drawings.
5. The construction drawings shall indicate type, size and location of water service,
water mains and fire hydrants in accordance with the City's Public Works Standards
and the recommendation of the City's Fire Chief. All water systems shall be designed
for loop construction where feasible.
6. The developers engineer shall design the sewer system to serve the development of
this tract and all future development west of this tract which these improvements will
serve. The sanitary sewer design shall be approved by DEQ prior to approval of
construction plans by the Public Works Director.
7.(a) The developer shall construct an adequately sized storm drainage system to provide
for runoff onto the subdivision property and from each lot. As a part of the
~.~
Green Park Subdivision, Unit 5
~' May 22, 1996
`'1 Exhibit "A" -Page Two
construction of the improvements for this Tentative Plan, the developer's engineer shall
provide a complete set of drainage calculations for sizing the storm drainage system
for this development. The developer shall submit this information to the Public Works
Department at the time storm drain construction drawings for the subdivision are
submitted to the Public Works Department for construction permits. The engineer shall
use the rainfall/intensity curve obtained from the Public Works Department for
hydrology calculations.
7.(b) Developer shall execute a development plan with the Planning Department which
incudes a street protection plan and storm drainage/sedimentation protection during
construction and building activities. Developer shall warrantee all improvements for
a period of two years after acceptance.
8. The construction drawings shall include the locations of the driveways for lots 178, 180,
185, 186, 189, 194, & 208 conforming with the Public Works Standards. Accesses shall be
located the farthest distance away from intersection.
9. Developer shall provide the City's Public Works Department with an aerial photograph or
' topographic map which delineates the boundaries of the project and any wetlands in the
immediate vicinity. Developer shall be responsible for demonstrating compliance with all
. permits required by DEQ or DSL for construction of this subdivision.
. Developer shall provide the City with copies of permits and conditions required for this
development.
10. The Developer shall coordinate with the developer to the north' (Glengrove Avenue), and
to the developer to the west' (Gatepark Drive) for the design of the utilities and streets for
this subdivision. Included with the construction drawing will be a separate drawing which
details required coordination.
11. Developer shall provide a storm water easement for lots 193 through 204 adjacent to Elk
Creek.
The storm water easement shall be located from the centerline of the channel to a line 15'
beyond the top of bank on each lot.
12. Shown on Final Plata (1') one foot access control strip at the end of Gatepark Drive.
13. Prior to acceptance of street improvements including all water, sanitary sewer, storm
drainage and utilities. Developer shall provide "As Constructed" drawings on Mylar.
"As Constructed" drawings shall include all field revisions including final invert
elevations of sewer and storm systems, street grades and curb elevations.
Additionally, Developer shall provide an AutoCad compatible digitized copy of the "as
~; constructed" drawings and Final Plat. Digitized copy shall be presented in DWG or DXF
format.