Loading...
HomeMy WebLinkAboutCouncil Resolution 1410RESOLUTION NO. J J ► n A RESOLUTION AUTHORIZING THE CITY MANAGER TO SIGN THE TWIN CREEKS CROSSING PROJECT LETTER OF UNDERSTANDING Recitals: A. The City of Central Point was awarded a grant in the amount of $2,670,000 for the construction of the Twin Creeks Rail Crossing associated with the 2015-2018 Oregon Surface Transportation Improvement Program (STIP). The grant requires a match of $994,406.55. The City has reached an agreement with Twin Creeks Development, LLC for $500,000.00 for its share of the crossing. Additionally, Twin Creeks Development LLC is obligated to complete an additional $250,000.00 of estimated costs of the project including the irrigation and sewer relocation and construction of the Griffin Creek and Twin Creeks Crossing floodway overflow culverts. B. City has an anticipated maximum contribution of $244,406.55 based upon current project estimates, including the agreed-upon contributions from Twin Creeks Development, LLC. C. The Oregon Department of Transportation requires a project letter of understanding to be signed by the city. The City of Central Point resolves as follows: Section 1. Allows the City Manager or his designee to sign the Project Letter of Understanding for the Twin Creeks Rail Crossing project. Pass d by the Council and signed by me in authentication of its passage this __� ��day ofVA014. 4:'e — Mayor Hank Williams ATT T. ity Recorder John A. Kitihabe., NIA., Govern.. August 8, 2014 Matt Samitore Public Works Director City of Central Point 140 S. Third Street Central Point, OR 97502 Subject: Project Letter of Understanding - 2015-2018 STIP Enhance Project Project Name: TWIN CREEKS RAIL CROSSING (CENTRAL POINT) KN: 18972 Department of Transportation ODOT Region 3 Headquarters 3500 NW Stewart Parkway Roseburg, OR 97470 Phone: (541) 388-6180 We are pleased to announce the above project has been placed on the Oregon Transportation Commission preliminary award list. This list is referred to as the STIP Enhance 100% list and is moving forward in the process. While the project will not be `officially" awarded funding until final approval by the OTC, ODOT has been working with you to finalize the details of your project. Based on the application, the project scoping visits, and the information received from the Pre - Award Letter, our final understanding of the project details are listed below. It is important to note that this letter is not a legal agreement. The intent, of this letter, is to document each parties understanding of the project details and the timeline for moving forward. The details of your project as stated below will be used to prepare the Intergovernmental Agreement (IGA). Final Project Details Project Financials: Enhance STIP Funding Amount: $2,670,000.00 Required Non-federal Minimum Match 10.27%): $305,593.45 Additional Match: $994,406.55 Other Funding: $0.00 Estimated Total Project Cost: $3,970,000.00 *Funding Ratio: MTEP - 67.25% Agency - 32.75% Match Type: Cash Match Provided By: LPA Project Details: STIP Project: Requires - New IGA Project Scope (IGA Exhibit B SOW): Project entails a new at grade rail crossing, traffic signal and roadway construction to connect vehicles, bicycles, pedestrians and bus routes from the Twin Creeks Development area to Highway 99. The project also includes roadway and sidewalk improvements along Hwy 99 including a sidewalk crossiraz of Griffin Creek. Deliver Method: Non -Certified Local Administered "Estimated Obligation Month/Ycar—PE: 1/31/2015 Estimated Obligation Month/Year—ROW: 6/30/2015 Estimated Obligation Month/Year— Construction: 9/30/2016 Dale IGA must be executed by: 12/2/2014 = 60 days prior to Estimated Obligation Month/Year— PE: or I" base, above, or sooner). State Contact Information: - Signature Authority Contact Name: Matt Samitwe Title: Public Works Director Email: Matt.Samitoreacentral ointore on. ov Phone: 541 423-1017 Mailing Address: 140 S. Third Street Ci Central Point State: OR Page 1 Zip: 97502 - LAUPM Contact Name: Kelli Sparkman Email: kelli.s arknrana.odol.state.or.us Phone: 541.774.6383 Mailing Address: 100 Antelope Rd City: White City State: OR Zip Code: 97503-1674 *Funning Ratio is defined as the relationship between STIP Enhance fimds and lotalproject cost and Agency! finnds and the total project cost. **/f Delivoy method is 'Stale Administered -Region Technical Center", PE date is only used to generate 1GA drcft in timely roamer. We are asking that a representative from your Agency sign and return a scanned copy of this letter via Email to Art Anderson, at Arthtir.H.ANDERSON rr odot.state.or.us and CC: the ODOT mailbox at STIP-Enhance a odot.state.ocus. within 30 dµNs ojreceipl. IJ' rve do not hear backfi'orn your Agency within 30 days the fimds will be in jeopardy of redistribution to another recipient. Please don't hesitate to contact me if you have any questions, (541) 774-6353. Regards, Art Anderson Area Manager Please check one of the following: ❑ Upon final approval by the OTC - My agency will accept the STIP Enhance Award for this project and has secured the match for this project. ❑ My agency has decided to decline the STIP Enhance Award Agency Representative & Title b� ,e fiYG.+ i lana,�r OD09'Rcprescntativc— rile Page 2 Date: �f- 6-H Date: