.CITY OF CENTRAL POINT
PLANNING COMMISSION AGENDA
May 6, 1997 - 7:00 p.m.
Next Planning Commission Resolution No. 383
L _MEETING CALLED TO ORDER
~'
II. ROLL CALL
Chuck Piland -Angela Curtis, Jan Dunlap, Candy Fish, Bob Gilkey, Karolyne
Johnson, and Valerie Rapp
III. CORRESPONDENCE
IV. MINUTES.. ° ;
A. Review and approval of April 15, 1997 Planning Commission Minutes
V. PUBLIC APPEARANCES
VI. BUSINESS.
Pss . i- z b A. Continued Public"Hearing -Review and decision: regarding a Tentative Plan for
the Beall Estates Subdivision, Phase III, R-2 zoning'district.
(37 2W 12C Tax Lot 3404) (Noel A. Moore.&.Bret A. Moore, applicants)
Pg, z7 B. Continued Public Hearing- Review and decision regarding a Tentative Plan for
the Central Point East Subdivision, R-1-6, R-1-8, R-2 & R-3 zoning districts.
(37 2W;O1C Tax Lots 100. & 200;.37 2W O1B Tax Lots 2500, 2700 & 2900)
(Partners Trust Company, applicant)
VII. MISCELLANEOUS,
VIII. ADJOURNMENT:
~'
CITY OF CENTRAL POINT.
PLANNING COMMISSION MINUTES
April 15, 1997`
I. MEETING WAS CALLED TO ORDER AT 7:00 P.M.
il. ROLL CALL: Chuck Piland, Angela Curtis, Candy Fish, Bob Gilkey,' Karolyne .
Johnson, Valerie Rapp. Absent: Jan Dunlap
III. CORRESPONDENCE
There was no correspondence
IV. MINUTES
A. Commissioner Fish made a motion to approve the Planning,.
Commission Minutes for April 1, 1997, as written. Motion was
seconded. by Commissioner Rapp. -.ROLL CALL: Curtis,: yes; Fish, yes;
Gilkey, yes; Johnson, yes; Rapp, yes.
V. BUSINESS
A. Public He~rina Review and derision regarding a Tentative Plan for
the Beall Estates Subdivision Phase III. R-2 zonjng district 137 2W
Chairman Piland opened the public hearing. There were no conflicts
of interest or ex-parte communications.
Jim Sennett, Planning Director, stated that the applicant requests that
the' pubtlc' hearing be continued to the next Planking- Commission
meeting.
Commissioner Gilkey made a motion to continue the Public Hearing on
the Tentative Plan for the Beall Estates Subdivision, Phase III, to May
6, 1997. Motion was seconded by Commissioner Fish. ROLL CALL:
Curtis, yes; Fish, yes; Gilkey, yes; Johnson, yes; Rapp,: yes. ;
B. PP ~bli~arina R view and recommendation regarding on
~ngQ from R-1-10. Residential Single Family (10.000 s.f.l to R-1-8.
Residential Sipgl . F~ 18 000 s f 1 (37 2lM 10 Tax Lot 59001
(Dallas P~ge• ,a~pli an 1
C.
Page, aR li an 1
Jim Bennett stated that Item B and Item C on the agenda vvilLbe
combined for this meeting.
Commissioner Rapp declared a conflict of interest and withdrew.
Jim Bennett stated that the letters that haye .been received regarding
this development are in the packets.
Ken Gerschler, Planning Technician,, tated that due to an error in the
Notice for Public Hearing, staff is requesting that the Planning
Commission postpone the hearing so that a corrected Notice of Public
Hearing can be mailed.
Dallas Page, 900 Windemar Dr., Ashland; the<applicant, came
forward.
Lee Brennan, Public Works Director, stated that the Public Works
Staff Report would be revised and provided to the commissioners.
Commissioner Gilkey made a motion to postpone the Public Hearing
regarding a Zone Change from R-1-10, Residential Single-Family
(10;000 s.f.)`to R-1'~8; Residential Single Family (8,000 sf:) (3Z 2W
10 Tax lot 5900) (Dallas Page, applicant) ahd the Public Hearing
regarding a Planned Unit Development, Rosewood Estates. ; (37 2W
10 Tax Lot 5900) (Dallas Page, applicant) -to May 20, 1997. Motion
vvas seconded by Commissioher Fish. ROLL'CALL: Curtis, yes; fish,
yes; Gilkey, ye§ Johnson, yes; Rapp, yes:
VII. MISCELLANEOUS
There were no miscellaneous items.
VIII. ADJOURNMENT
Commissioner Johnson made a motion to adjourn. Motion was seconded by
Commissioner Fish. All said "aye" and the meeting adjourned at 7:50 p.m.
r'
nr'errnr1lU DEPARTMENT STAFF REPORT
HEARING
DATE: May 6, 1997
TO: Central Poinf Planning Commission
'`FROM: James H. Bennett, AICP
City Administrator
SUBJECT: Public Hearing -Tentative Plan for Beall Estates, Phase III
37 2W 12C Tax Lot 3404 '
li t/ Noel A. Moore & Bret A. Moore
Owner: 1461 E. McAndrews Rd.
Medford, OR 97504
agent: Herbert A. Farber dba Farber Surveying
120 Mistletoe St.
Medford, OR 97502
Sum
The applicants, Noel A. Moore & Bret A. Moore; are proposing & tentative plan for the
subdivision of 9.90 acres located north of Beall Lane between the Beall Estates, Phase I and
` Green Park Village, Phase V subdivisions; (Exhibit A). The site is designated as R-2,
Residential Two-Family, but will be developed as asingle-family residential subdivision, Beall
Estates Phase IIL The total number of lots proposed for the subdivision is thirty (30). The
average density for the subdivision is 3.03 units/acre, The maximum density permitted in the
R-2 district is 12 units/acre which would allow up to 118 dwelling units on the site.
uthority
CPMC 1.24.020 invests the Planning Commission with the authority to hold a public hearing
and render a decision on any application for a tentative plan for a land partition. Notice of
the public hearing was effected in accordance with CPMC 1.24.060 (Exhibit $).
Applicable Law, _
Central Point Comprehensive Plan -Urbanization Element & Comprehensive Plan Map `
CPMC 16.10A10 et seq. -Tentative Plans
CPMC 17.24.010 et seq. - R-2, Residential Two-Family District
.- .. 1
Discussion
The proposed subdivision is located on 9:90 acres north of Beall Ln. The. applicants are
proposing to construct asingle-family residential subdivision, Beall Estates, Phase III on the
site. It will consist of 30 single-family homes. Access to the subdivision will be from Beall
Ln: and; with development of Green Park Village, Phase V, from the extension of Woodridge
Dr. and Gatepark Dr. Surrounding uses include Beall Estates, Phase I to the. west; Forest
Glen; Phase VIII to the north; Green Park Village, Phase V to the east, and City of Medford
to the south across Beall Ln.
The Planning' Department has reviewed the tentative plan for. compliance with the
Comprehensive Plan and the Zoning Ordinance. No zone changes are proposed as a part of
this development. Accordingly, the subdivision complies with the City Comprehensive Plan
Urbanization Element which identifies this area (Subarea D) for future low- and medium-
density residential development and with the Comprehensive Plan Map and Zoning Map.
Each lot meets the minimum requirements for lots in the R-2 zoning district.
The Parks & Recreation Element of the Comprehensive Plan identifies a neighborhood park
for the southeast quadrant of the city. The subdivision site is one of the last remaining areas
in the southeast available for park development:. The Parks Commission had previously
discussed including a park site in the design of this subdivision with the applicants. ~As a
result of negotiations between the City and the applicants, the tentative plan for Beall Estates,
Phase III, includes atwo-acre neighborhood park site comparable to Van Horn Park.
The applicants will develop the park to City standards and provide a turn key facility for
residents of the area. The City will then purchase the developed park from the applicants.
The City will also work with adjacent property owners to provide access to the new park for
city residents on the other side of Elk Creek.
The Public Works Department has reviewed the tentative plan for compliance with the City's
water, sewer, storm drain and transportation standards. The Public Works staff report is
attached as Exhibit D. Written comments were also received from Fire District #3, Rogue
River Valley Irrigation District and Bear Creek Valley Sanitary Authority which discuss each
agency's requirements for the development of the proposed subdivision (Exhibit E).
i~~of Fact & Conclusion
The project site is located in an R-2, Residential Two-Family.
The project site is consistent with Subarea "D" of the Urbanization Element of
the Comprehensive Plan which calls for low density and medium density residential
development in the area and with the Comprehensive Plan Map which designates the
project site as Medium Density Residential. The project site is located in an R-2,
Residential Two-Family District. This zoning designation is also consistent with the
referenced portions of the Comprehensive Plan.
2
2. The project consists of a tentative plan application for the subdivision of 9:90 acres
for the purpose of deveioping asingle-family residential subdivision, Beall Estates Phase III.
The total number of lots proposed for the subdivision is thirty. The average density for the
subdivision is-3.03 units/acre.
The proposed single-family subdivision meets the density requirements for the
R-2 zone which is a maximum of 12 units/acre. Each lot within the subdivision meets
the minimum lot size and lot frontage requirements for the R 2 zone. The tentative plan
includes all information required by CPMC 16.10.010 et seq.
3. The Planning and Public Works Departments have reviewed the tentative plan for the
proposed subdivision for compliance with municipal rules, regulations and standards.
The project meets all City standards and requirements subject to .the
recommended conditions `of the Planning Department (Exhibit C) .and the Public
WorksDepartmenf(ExhibitD). -
Exhibits
A. " Tentative Plan -Beall Estates Phase III
B. Notice of Public Hearing
C. Planning Department Recommended Conditions
D. Public Works Staff Report & Recommended Conditions
E. Written Comments
3
CYty of Central Point.
' EXHIBIT f~,
Planning!Departmeltt
' .ILN '-M.N..;..~ .
Tentative Nan .•. • • - ••- -•••^•° _ _
IwtuN n aN .«nN«I ra.• q Iwu« u...«+w 1. • : } ~ \
a.nw MN. a wI N ~n~Iwu. M.N..+ av • x
twlr•1 MIN. :r (w.la. rv•Nn
Beall Estates. Phase III •~i~'.
.•NaNrvw•••.111 ~++~~+~,•
tone n-Y6r.: ,~~: ~ • .. ~ 8
'"""' ~ :. PROPOSED PARK
vsv ..::a.::...; ~. .... S
1.96 Acres ~.;
•`N Nw 5 sCY
•1 ~e• S •Nti•Naia •{ • • u wi
:v•:i• w : is o`
.I riwNU •.: Y: ~
t ~ k
M1: p. h ': a
r ~ • INrM 1...•
N/.q •.S• •: nor .j .-~.w .I~.s---~r•r.•Y: YJ
;:^ ~~ 1••• ~ 3
~ M • M la7
~.• r •+, 4 •W• I gilµia wlr Mnaaa~i•A .n.a~7N Ii Ma.ryxM1
W I I "i i :¢A •~ •. ••• ~ •:
• M"Sli.• ~ i NM .w t•M •N N.41• • •
i Af N • • • N.N I l • .• •• •./t•1^
1 NaM i 4t N, .~,;
. _ .I L•unit«N ~=gw.wNn; awlMNUs •:
. I wM Mn,
• INAt ~ wWy Nll +
.1..
.'r.% J a.:4 I ~ Circ boa! r ~ ti
M N
it:e~ wlw 4 ... :I •'• f' 1 G era°N M:tF '
w.« INr • I ~._ ur ~ .:
aeolleaw4• S•usNw Ii~ _ uii•. l~wa : ~ ? «
~fbel A. Haor! ,•1 •.olwi• iS. `w,w,fl„•~
.N '
Byrelt A1~vH~oware <a. awl ~N ... ~ • r
«~..waMN\irl~il .[w 1b~s i.. N ~I ~ ut M; a~.N f1.N• £:r
~. •M • MM.wNn ' ..
w '•
<•wll ~vwNNN~.klo-s+•NCwu1 Ma ~ ~ •~apHNN R=Nw uNN r~r _ ..
~• a N~Na 1•N11N•MMYNt N11MMWlM<MM • l pg
~~ N ~fN~yNnl{{IN,MN [Y •' M.M. • ~ •q.N NlatNl. aly~~g ~Ne
• W WM~~KYYMNM N1W~M~ ~ ~~{~ a r d e ~i^~ • «i ~ jai II M~i•w~~a~1 MN
N~•yNN1tM.~N•11•w NN • a' a MtNt•NIM IMIM
.µr `v IM NI MI a~i+w{MwMMMw NNwI • rY~ •'
~~~~~~+!~11 a _ :t! wMM1
~~•"'lil ~.ll• 1 +: :w: M.: w i" - ~ eauNliV4TOi
'0'G'f't~ia w .~"1~.'~~iiq{~~" }. ~.1 Q11 wto /
~w µ•~•NMIII• atM •M•IN - •ap MIaL MN`_ Nl4 %~
Ji _ •N W I}'
1y IwMI i ~Ir
MYaMwMIM tWI MM <{M N ~ 11lIIfM40L1 •f1a<f
s•wlwl ..hilt«w ~:. _ ael~i liwM w~Na44 •
• 4 •. ~ •11X1 fM.rM' .
• 'R••::w :`rte MTICC tr4itgc w11UK /a011ET[
an 1•u~ .p,l:::i:~ MleaMtlll '~ <. •. <ta qw
~! .elms aww mx eawelM«I. ar4w qw
kql bM ,1 hwW MW a•••`w M
ar' w« uw. ""' ee.mm ev Ir wlnw. <a-
MwNtM~ ROn <y1L. 11WIgNN MY. g1Fq «.IN1l NM•
N•a a14.w Mll laa
µ
wM~~/ NL.
CIKH YIaO MIN • ~ W4a Mf.MI < NM.1M <
4
City of Central Point
PLANNING DEPARTMENT
James Bennett
Planning Director
Ken Gerschler
Planning Technician
NOTICE OP MEETING
Date of Noflceo March 27,1997
Meeting Date: Tuesday, April 15th 1997
Time: 7:00 p.m. (Approximate)
Place: Central Point City Hail ,
155 South Second Street
Central Point, Oregon
NATLIRE OF MEETING
Beginning at the above place and time, the Central Point Planning Commission will review an
application fora 381ot Tentative Subdivision Plat to be named Beali Estates, Phase 3. The parcel is
located in the the Residential Two-Single-Family (R:1-6) and Residential Two-Family (R-2)zones on
Tax Lot 3404 of Jackson County Assessor Map Page 37 2W 12C.
ERIA. FOR DECISIO
The requirements for approval of Terita ive Plats are set forth in Chapter I7 of the Central Point
Municipal Code, relating to General Regulations, Off-street Parking, Site Plan, Landscaping and
Construction Plans. The proposed plan {s also reviewed in accordance to the City's Public Works
Standards.
PUBLIC COMMENTS
L Anyperson interested in commenting on the above-mentioned land use decision may submit
'.written comments up untiLthe date of the meeting schedgled for Tuesday, April 15th, 1997.
2. Written comments maybe sent in advance of the meeting to Central Point City Hall, 155
South Seeond Street, Central Point, OJt 97502:
155 South Second Street • Central Point OR 97502 ~ (541) 664-3321 ~ Fax: (541) 664-6384
5
~~
w
~--,
~~
3. Tssues which may provide the basis for an appeal on the matters shall be raised prior to the
expiration of the comment period noted above. Any testimony and written comments about
:.the decisions described above will need to be related to the proposal and should be stated
clearly do the Planning Commission.
4. Copies of all evidence relied upon by the applicant are available for public review at City
1Tall, 155 South Second Street, Central Point, Oregon. Copies of the same are available at
15 cents per page.
5. For additional information, the public may contact the Planning Department at (541) 664-
3321 (ext. 231)
4UMMARY OR PROCEDURE
At the meeting, Planning Commission will review the applications, technical staff reports, hear
testimony from the applicant, proponents, and opponents and hear arguments on the application.
Any testimony or written comments must be related to the criteria set forth above. At the
conclusion of the review the Planning Commission may approve or deny the Tentative Plan. City
regulations provide that the Central Point City Council be informed about all Planning Commission
decisions.
P
EXI-IIBIT C,
PLANNING DEPARTMENT RECOMMENDED CONDITIONS
1. The applicants shall comply with all requirements of BCVSA, Fire District #3, Jackson
County Roads Department, Rogue River Valley Irrigation District and any other affected
agencies as they pertain to the development of the subdivision. Evidence of such compliance
shall be submitted to the City prior to final plat approval.
2. The applicants shall submit a park developmentplan to the Planning Department indicating
the manner and schedule by which the neighborhood park within the subdivision will be
developed. This shall include any proposed landscaping, irrigation, natural areas, architectural
features and play equipment.
3. The applicants shall submit a copy of the recorded:: covenants, conditions, and restrictions
(CC&Rs) for the subdivision to the Planning Department.
4. The applicants shall comply'with alt requirements of the Division of State Lands for the
project as indicated by its response to the Wetland Land Use Notification Form.
S. The approval !of the tentative plan shall become void one year following the date of~such
' 'approval unless as application £or a final plat has. been submitted to the Plamung Department.
6. The subdivision shall be developed in accordance with the tentative plan as approved by
the Planning Commission. Modifications to the tentative plan shall be subject to further
review and approval by the Planning Commission.
CITY OF CENTRAL POINT.
DEPARTMENT OF PUBL/C WORKS
STAFF REPORT
for
BEALL ESTATES PHASE 3
PW#97015
Date: ,:. :04/30/97
Applicant: Noel Moore and Bret Moore
1461 E. McAndrews Road, Medford, OR 97504
Project: Subdivision
Location: Bealt Lane and Circlewood Drive
Legal: T37S, R2W, Section 12C, Tax lot 3404 ,
'
Zoning: .
R-1-6
Lots: 30
Units: ; ` '30 Residential
Plans: Beali Estates, Phase 3, 04/28/97
Report By: Paul W. Worth, Public Works Technician
Lee Brennan, Public Works Director
Purpose,
Provide information to the Planning Commission and Applicant (hereinafter referred
to as "Developer") regarding Public Works standards and proposed new standards
to be included in the design. Gather information from the Developer/Engineer
regarding proposed development.
Special Requirements
1. In accordance with the Comprehensive Plan, Section VII, Proposed Parks and
Recreation Facilities, a ten (10) acre park is shown for the area which is also
the location of the proposed subdivision. ,The. Developer. has proposed to
develop an approximate two (2) acre park within the proposed development,
and develop a cost sharing or purchase agreement with the City; so that the
City will own and maintain the park after its completion. The park vvill serve
several purposes providing land for wetland mitigation measures for the
development and additional flood storage for Elk Creek during major. storm
events.' The Developer-shall work with. Public,: Works staff in the
development and layout of the park so that the park, wetland, and flood
storage uses of the park will be functional and maintainable. The Developer
shall also make every effort to preserve and potentially enhance the "stand"
Beall Estates Phase Ill
PWD Staff Report on Tentative Plat - ~-
April30, 1997
Page 2
of oak trees located on the northwest portion of the proposed park site.
2. The Developer shall work with the City to obtain an easement through the
existing subdivision to the North of the proposed subdivision to obtain
pedestrian/bicycle access from Forest Glen Drive to the. proposed park
location.
General
1. Developer shall submit to the City's Public Works Department (City's PWD)
for review and approval, plans and specifications for all improvements
proposed for construction or modifications within the City or public rights-of-
ways and easements.
2. Public improvements include, but are not limited to, streets (including
sidewalks, curbs and gutters); storm drainage and sanitary sewer collection
and conveyance systems; water distribution system (up to the service meter
and including fire protection); street' lighting; and traffic control devices,.
street signs and delineation.
3. All construction of public improvements shall conform to the City's Public
Works Standard Specifications and Details (City PWD Standards) and other
special specifications, details, standards, and/or upgrades as may be
approved by the City's Public Works Director.
4. During construction, changes proposed by the peveloper shall be ubmitted
in writing by the Developer's engineerao the City PWD for approval prior to
installation:
5: No constructioh shall commence until the City PWD has reviewed; approved,
and issued a Public Works permit for-the proposed improvements.
4
9
Beall Estates Phase Ill
PWO Staff Report on Tentative Plat
Apfil 30, 9997
Page 3
6. The Developer shall pay for all costs associated with the design and
' installation of the improvements specified on the:approved;plans.
7.' Developer shall provide copies of any permits, variances, approvals, and
cohditions' as may be required_by other agencies, including, but not limited to
Oregon Department of Fish and Wildlife (DFW), Oregon Department of
Environmental Quality (DEQ), Oregon Division of State Lands (DSL1, U.S.
Army Corps of Engineers-IACQE);.affected irrigation districts, and Jackson
County Road and Park Services Department (JC Roads).
8. Prior to approval and acceptance of the project, the Developer's engineer or
surveyor shall provide the Public Works Department. with a digital drawing of
the construction "as-builts" in an. AutoCAD: compatible format. -
As-built drawings are to be provided to the City which provide "red-line"
changes to final approved construction plans which identify the locations and
or elevations (as appropriate) of actual installed items; including„but not
limited to, invert, inlet; and rim>elevations; spot elevations identified on
drawings; road alignment; water lines, valves, and fire hydrants; water and
sewer lateral stationing; modifications to street section; manhole and curb
inlet locations; street light locations; other below grade; utility line locations
and depths; etc. Provide a "red-line" hard copy (on Mylar) of construction
drawings, and an acceptable AutoCAD compatible drawing electronic file to
the City at completion of construction.
9. The Developer's engineer or surveyorahall provide to the Public Works
Department a drawing of the recorded Final Plat-map, reproduced on Mylar
and in an acceptable electronic form in AutoCAD format. The. Final-Plat shall
be tied to a legal Government corner and the State. Plane Coordinate.System.
10. All elevations used oh'the construction .plans, orr temporary benchmarks, and
on the permanent ,benchmark shall be-tied into an established City approved
benchmark and be so noted on the plans. At least one permanent
'Benchmark' shall be provided.for the proposed development, :the location of
vvhich shalF be as jointly determined by he City PWD and the;Developer's
surveyor.
10
(•
Beall Estates Phase 111
PWD Staff Report on TentativePlai
April 30, 1997 -
Page 4
1 1. All fill placed in the development shall be "engineered fill", and compacted to
City standards. All existing concrete, pipe, building materials, structures,
clear and grub materials, and other deleterious materials shall be removed
from'the sife'and either recycled or properly disposed of in accordance with
the requirements of the Oregon Department of, Environmental Quality.
12. Identify easement dedications and widths on the Plot-Plan.
13. Easements for City infrastructure (i.e. sanitary sewer, water, and storm
drain] must be a minimum of 15-feet wide, and should not split lot lines.
Easements fior storm drainage, sanitary sewer, and water lines should be
dedicated to the City and not just a P.U.E: Centerline of buried infrastructure
shall be aligned a minimum of five (5) feet from the edge of the easement.
14. All design, construction plans and specifications, and as-built drawings must
be prepared to acceptable professional: standards.
15. All street and water improvement plans must be approved in :writing, by Fire
District 3 prior fo review by the City's PWD. -
16. If the proposed development places structures within the 100-year
floodzone, how does the placement of these structures modify the
floodzone.'What affect will it have on the floodplain elevation and floodzone
boundary, and what affects-will'the modification: of the floodplain elevation
and floodzone boundary have on the existing facilities and properties
surrounding the proposed development.
17. Prior ~o the City.PWD-fina4 approval.of the construction; plans#or,the
`proposed improvements; the following must be submitted:,,
'^ A copy of written approval from Fire. District 3 of the final street and
"water system improvement plans for the. proposed development.
11
Beall Estates Phase pl
PWD Staff Report on Tentative Plat
April 30, 1997
Page 5
^ The plans relating to the sanitary sewers must be approved. in writing
by BCVSA, and the appropriate signature blocks must be completed
on the plans.
^ Copies of written approvals and/or permits from the various agencies
involved: DSL, DFW, DEQ,: and/or ALOE.
18. Field verify all existing infrastructure elevations and locations (i.e. pipe
inverts, curb `elevations; street elevations, etc.l, to which the proposed
subdivision vVill connect into existing improvements, prioC to final
'construction plan design.
19. The Developer's engineer shall provide suitable engineering certification and
justification (i.e. calculations, analyses, plots, etc.,) that all connections to
existing infrastructure (i.e. street; water, sanitary;sevver, Storm drain,
systems; natural drainage systems; etc.,) will not intgrfere with the effective
level of service or operation of the infrastructure facilities, and that the
existing infrastructure facilities. have. adequate capaci#ies to, accommodate
the'flovvs and/or demands imposed on the existing infrastructure as the result
of-the connection of the proposed developmenf's infrastructure.
20. The accurate locations of the MWC water line and the natural gas main (and
any associated appurtenancesl, and the location of the associated easements
with these facilities,'shal4 be accurately portrayed (both horizontally and
vertically) on the construction plans and final plat.
21. Overhead power lines. Coordinate efforts with Pacific Power and Light to
convert overhead electrical power facilities to underground facilities, prior to
the acceptance by the City PWD of the public improvements associated with
the proposed `developments. Aii agreements and costs associated with the
cdnversioh of the eleotrical power facilities from overhead to underground
facilities; shall lie by' and between Pacific, Power and Light and the Developer.
Z2
Beall Estates Phase 111
PWD Staff Report on Tentative Plat
April 30, 1997
Page 6
Streets/Traffic
Existing Improvements - Beall Lane -Secondary Arterial:, ROW. 60' wide,
pavement 30' wide. Jurisdiction -Jackson
County.
- Woodridge Drive -.ROW 50' wide, street width 36'
- Gatepark Drive -ROW 50' wide, street width 36'
1. Construction drawingsfior this Tentative Plan shall ,include a Street Lighting..
Plan and Traffic Control Plan in accordance with the requirements of the City
PWD. The construction drawings shall include clear vision areas designed to
meet the City's PWD Standards. 25-foot unobstructed sight triangle areas
shall be required at all uncontrolled intersections. 55 feet shall be required at
arterial intersections.
2. The City'PWD shall, at the cost of the Developer, evaluate the strength of
the- native soils and determine the street section designs in accordance with
'the City PWD Standards. The City's engineering staff or selected
`engineering consultant (at Developer's expense, shall. evaluate the strength
of the native soils ahd determine the street section designs in accordance
with the City PWD Standards. Minimum street section shall be as follows:
- 3-inches Class "B" A.C.
4-inches of 1 "-0" crushed rock '.
- 8-inches of 4"-0" crushed rock;(City, of Medford specifications,
woven geotextile fabric. over compacted. subgrade.
Street section (excluding the asphalt concrete portion) shall be extended
underneath the sidewalk portion of the street section to provide structural
support for the sidewalk section.
3. All improvements to Beall Lane -.including, but not, limited to, street section,
curbs, gutters, sidevvalks, and traffic control and delineation, shall be
coordinated and' approved by the JC Roads and the City;PWD. Acceleration
and deceleration lanes meeting JC Roads standards may need to be provided
at the proposed development's intersection of Circlewood Drive with Beall
Lane.
13
Beall Estates Phase 111
PWD Staff Report on Tentative Plat
April 30, 1997
Page 7
4. Stop signs shall be required at the intersections with Beall: Lane.
5. Mihimum'curb to curb width of local. streets is 36 feet. Radius of cul-de-sacs
' and street knuckles shall be a minimum of 45-feet. ,
Storm Drainage, Irrigation Improvements
Existing Improvements - Elk Creek adjacent to the west boundary of the
proposed development..
- A drainage ditch beginning at the outlet of a 48"
culvert under Beall Lane near lot 22, traversing in a
northerly direction across the proposed Gatepark
- Drive to a discharge point in Elk Creek to the north...
of the proposed park location. Stream has wide
splay areas which possibly afford flood storage
- Rogue River Valley-:Irrigation. District indicates that
.2:35 acres of irrigated land are included in the
project area.
1. Developer's engineer shall develop a master plan for the stormdrain
collection, retention, and conveyance system (SD System) which provides
for storm vvater run-off firom-and run-on onto the proposed development
(either surface run-on or culvert or creek/ditch conveyance), any future
development on adjacent properties, conveyed storm drainage, or surface
weterflow (i.e. Elk Creek), and any areas deemed by the City that will need
to connect-into the proposed development's. SD System.
2. Developer's engineer shall determine how,SD ystem will work during 10-
year and •100 year flood events associated with Elk Creek.. What is HGL in
Elk Creek during 10- and 100-year event, and what affect will it have on the
proposed outlets and storm drain system. System must be designed to
'adequately drain 10-year storm without 'surcharging. or must be provided with
adequate storage to prevent surcharging;. and be designed to prevent,
backflow of storm water from Elk-Creek up into SD,system.
14
Beall Estates Phase ll/ -
PWD Staff Report on Tentative Plat
April 30, 1997
Page 8
3. Need plan arid profile drawing of HGL in Elk Creek channel and indication of
floodway and flood-zone boundary during the 100-year flood event. The City
DPW does not have a complete copy of the flood study work performed on
Elk Creek`in this area. Was the flood study done with the inclusion. of the
proposed development? if the proposed development was not included, in
the original study, then a revised study (with the inclusion of the proposed
development and surrounding future developments (if applicable) will need to
be performed.
4. Easements need to be 15-feet 'wide, and need clause in final property deeds
or final CC&Rs to maintain driveable access to manholes for getting
vactor/fetter to manholes. fVeed copy of either document prior to approval of
construction plans
5. During the design of the SD System, the Developer's engineer shall consider
the effect 'of finished lot elevations with regards to the floodway and 100
yearfloodplain for Elk Creek and-the drainage ditch on the east side of the
proposed development. The allowable flow rates into Elk Creek or into the
unnamed' ditch from the proposed development shall not be greater than the
run-off flow'rates experienced from the property in its current status. The
Developer's engineer must provide suitable hydrological calculations and
storm hydrographs to depict the existing condition and the finished condition
of the proposed development. The Developer's engineer and the City PWD
shall agree on the applicable run-off coefficients, curve numbers, retardance
etc'.; used in the Developer engineer's calculations... Provide analysis of the
'drainage ditch along the east side of the develcpment.as well as EIk Creek.
6. ` Plans which propose to include discharge to Elk Creek. or the existing ;
drainage ditch and any construction thereof, shall be in compliance with DSL,
ACOE, ODFW, and DEQ guidelines and requirements. Any modifications to
the drainage ditch and Elk Creek shall be done in accordance with any,
requiremehts and applicable conditions of the DSL, ACOE, and/or DEQ.
7. The discharge point and potential retention of storm water run-off shalt be
coordinated with aspects of the .proposed park-to provide an aesthetically
pleasing, useful, and iow maintenance facility.
15
Y
Beall Estates Phase ll1
PWD Staff Report on Tentative Plat
April 30, 1997
Page 9
8i ` Prior to construction plan approval.of the improvements for this Tentative
Plan, the Developer's engineer shallproyide the City PWD with a complete
set of hydrologic and hydraulic calculations and profile plots for sizing the
SD system. The engineer shall use the rainfall/intensity curve obtained from
the City PWD forhydrologic calculations, and the negotiated run-off
parameters.
9. The SD system shall be designed to carry runoff from a 10 year storm event
if Q< 100cfs. Use runoff for 50 year storm if O> 100 or < 200 cfs. Use
100 storm runoff if O is > 200 cfs.
10. Minimum storm drain diameter shall be,1.5 inches.
11. Materials shall be PVC (ASIM D 3034 with ;gaskets);. HDPE (meeting ODOT
requirements for corrugated polyethylene storm sewer pipe, including a
provision for premium water-tight coupling bands), or approved equal..
Provide concrete encasement where required to prevent pipe deformation in
areas of minimum cover.
12. Construct grated inlets/catch basins in gutter section. Ref. APWA, California
Section, drawing #303-1. If inlets/catch basins are to exceed 4.5 feet in
depth from the lip of the. inlet, then the. inlets and catch basins shall be
desighed to afford suitable "man" entry into the inlets/catch basin for
maintenance/cleaning !purposes.
13. Developer's engineer. shall: provide. hydrology and hydraulic calculations and
flow line plots for private and public storm drains. Plot HGL on profile or
provide a separate profile drawing that indicates the HGL on the profile.
Pipes must maintain. cleaning velocity and have adequate capacities without
surcharging.
14. 'Due to he high IeveF of groundwater. in the area, the Developer may wish to
incorporate the use:of a perforated SD system,,: If so, then the perforated
storm drain system shall be designed to have adequate capacities to:
1.6
Beall Estates Phase Ul
PWD Staff Report on Tentative Plat
Apri130, 1997
Page 10
^ Convey the collected groundwater and storm water with. the minimum.
'cleaning velocities and without surcharging the collection and
'conveyance piping; and
^ Minimize silts, sands, gravels,'-and fines migration from the native soils
into the SD system.
The plotted HGL shall include both the groundwater infiltration, and the
storm water run-off and run-on inflows into the SD system.,,
15. All storm drain easements must be 15-feet wide, and include a clause to
maintain driveable access to manholes for getting a suitable truck mounted
vactor/fetter machine to manholes, clean-outs; or inlets::.
16. ' As illustrated on the tentative' plat, a 30-foot wide storm drainage easement
'shall be located on the northern portion of lots 49, 50,-and 5.1 to afford
access to the Elk Creek channel.
17. Construction of private storm drains is discouraged by the City. However, if
a private storm drain is to be constructed, the following information must be
provided'to the Cityt
- How will the private storm drains be maintained, repaired, etc.
- All`roof and iot drainage must be'drained to the curbline:
- Provide invert elevations and lateral stationing for construction
of private storm drain system.
- Provide plan and profile views and elevations for any private
storms drain systemxhat may be proposed. _
18.' Provide 0.2-foot drop through all manholes and curb inlets.
19. "Roof drains and'uhderdrains shall not be directly connected to public-storm
drain lines, and shall drain to the street at the curbline, whenever possible.
Lots should be raised if necessary. Building #oundation under drains. (and
these type of facilities only) may drain to private storm drain lines that
1~
tl
Beall Estates Phase 111
PWD Staff Report on Tentative Plat
April 30, 1997
Page 77
discharge. onto the streets, or into a storm drain curb inlet or manhole only;
must tie approved 4efore construction by the'City PWD; and musf be
identified: and accurately. portrayed on as-built drawings.
20. Curb.and gutter sections shall not exceed. 350 feet before entering a catch
basin or curb inlet.
21. Developer shall be required,to,coordinate with Rogue. River Valley Irrigation
District to resolve. any irrigation rights or use of water from Elk"Creek.
Sanitary Sewer
Existing: Facilities - 8-inch ACP stubbed to approimate Sta. 1 +Z0 in
Woodridge Dr. (Green Pa~kl•
Other - 8-inch sewer is proposed for installation to the end of
-Gate Park Drive as illustrated in he unapproved
construction plans for the Green Park V subdivision.
1. All sanitary sewer collection and conveyance system (SS System) design,
construction and testing shall conform to the standards and guidelines of the
Oregon DEQ, 1990 APWA Standards, Oregon Chapter, Bear Creek Valley
Sanitary Authority (BCVSA), and the City PWD Standards, where applicable.
2. The Developer's engineer shall provide hydrology and hydraulic calculations`
:and, flow line. plots for existing and proposed sanitary sewers to both BCVSA
and,the, Cjty. Calculations and flow line plots should include allowances for
existing flows and projected future or existing development that will be
connected to the, system. Plot HGL on profile or provide a separatepi•ofile
drawing that indicates the HGL on the profile. All pipes must maintain
cleaning velocity and have adequate capacities without surcharging.
3. The construction plans and the as-built drawings shall identify lateral
stationing for construction of sewer laterals.
is
Beall Estates Phase l1l
PWD Staff RepoK on Tentative Plat
April 30, 1997
Page 12
4. The-City upon. completion of initial construction plan review and preliminary
approval, will forward the plans to BCVSA for completioh of the review
process with DEQ. Upon completion bf the review by DEQ and'BCVSA,
completion of final revisions to the plans by the Developer's engineer, and
following the final approval and signature on the construction plans by
BCVSA, the Public Works Director will approve the plans in firal form.
5. All testing and video inspection of lines and manholes shall be done in
accordance with BCVSA requirements, at Developer's expense. Thee
Developer shall provide bEQ; BCVSA, and the City with-test reports, TV
reports and certification of the sewer system construction prior to final
acceptance.
6.
7.
The SS System shall be designed in accordance' with any master planning
prepared by Bear Creek Valley Sanifary Authority (BCVSA) and/or the City to
provide adequate. capacity for the proposed development area, any future
development on adjacent properties, and any existing sanitary sewer
collection systems thaf may need to cohnect-into the proposed
development's SS System. If a master plan for the proposed development
.area is,unavailable, then a master plan shall be prepared for the proposed
development which acCOmniodates the capacity needs for the proposed
development as well as the' capacity needs for the adjoihing properties, and
any additional flows as determined by BCVSA and the City PWD:
Any. proposals .requesting the City or BCVSA to share in costs for
development of the sanitary sewer collection system to accommodate the
upgrade of lihe sizing to handle the additional capacity requirements for
surrounding development, shall include detailed engineering calculations and
costs analyses. The Developer'will be respohsible to coordinate and develop
any cost sharing agreements with any identified adjacent property "-
owners/developers.
19
Beall Estates Phase ll1
PWD Sfaff Report on Tentative Plaf
April 30, 1997
Page 73
Water System
Existing Improvements - A 12 inch. D.I. line ends approximately. at the
intersection of Hulse Lane (proposed Circlewood
Dr.) with a reduction to a 8 inch D.I. line.
- A 2 inch line ends at the.last service on Circlewood
Drive.
- A 8 inch D.I. line ends at the west end of
Woodridge prive. A 8 inch line is to be installed at
the end of Gatepark,Dr. as-illustrated in the
unapproved construction plans for the Green
Park V subdivision.
- A 36 inch MWC main transmission line traverses
the proposed development along. Elk Creek to lot
55 then south, along the proposed Circlewood Drive
~; ROW to Beall Lane
1. A=water distribution system shall be designed in accordance with the .1979
Water System Master Plan which accommodates the proposed development,
any future development on adjacent property, and any areas deemed by the
City that will need to connect-into the proposed development's water
distribution system.
2. Developer's engiheer shall ascertain the configuration of the existing 12 inch
by 8 inch reduction irr BeaIF Lane: at.Hulse>Lane and provide connection of the
proposed 8 inch line in Circlewood Drive to the existing 12 inch line in Beall
Lane with valuing adequate to isolate the systems.
3. Developer shall provide abandonment of the 2 inch line in Hulse Lane and
'reconnect existing servicerlines (2) to the proposed $ :inch main...
`4. ' •'` Developer's engineer shall design the water system to provide a minimum
flow of 1,000 gpm and conform to Fire District 3 requirements. Maximum
spacing of fire hydrants shall be 300 feet. Construction plans shall be
reviewed by Fire District 3.
~~
Beall Estates Phase 111
PWD Staff Report on Tentative Plat
April 30, 1997
Page 14
5. Specifications for the design and construction of the water system shall be in
accordance with City PWD Standards.
6. Lateral /connection stationing and size shall be provided on construction
plans and as-built drawings.
7. Developer's engineer shall provide a reinforced flow ("looped") water system
with connections at Woodridge'Drive; Gatepark Drive and the existing 12
inch City water line in Beall Lane. '
8. Developer shall comply with Oregon Health Division (OHD) and City
requirements for backflovv prevention: An OHD approved backflow
prevention assembly shall be installed immediately downstream of the water
meter serving eaoh dvvelling'unit.
9. Construction drawings shall include the size, type, and location of all water
mains, hydrants, air valves, service connection, and other appurtenance
details in accordance with City PWD Standards and as`required by the
City'PWD.
10. All connections to the water supply system must comply with OHD
requirements. Water will not be "turned on" by the City until such
requirements have been met to the satisfaction of the City's designated
inspector (currently the Jackson County plumbing inspectorl.
11'. V1/atersystem shall be tested in accordance with City-PWD Standards and.
requirements at Developer's expense and must be approved by the City.
21
Beall Estates Phase 111
PWD Staff Report on Tentative Plat
April 30, 1997
Page 15
Site work, Grading and'Design, and Utility Plans
Existing Improvements - Drainage ditch, Elk Creek
Wetlands - 2 areas classified as,PEMC and PUBHx on the
Wetlands nventory Map-are located in close
proximity to the proposed development.
1. Developer shall provide a. grading/paving plan(s) with the construction
drawing submittal to the City PWD. Plants) shall illustrate the location and
elevations of the base flood event flood zone and floodway of streams in
proximity to the development (if applicable); curb elevations; finish grades;
and building pad and lowest floor elevations.
2. '' All structures shall have roof drains, area drains, and/or cravvl spaces with
positive drainage away from the building: Drain lines shall be connected to
the curb and gutter and discharge from the curb face.
3. Developer shall provide the necessary "rough" lot grading to assure that all
lots will drain properly to the curb and gutter, or to a drainage system that
drains to the curb and gutter.
4." Provide the City with copies of any required permits and approvals lincluding
any mitigating'requirements or cohditions) from DSL, DEQ and ALOE
lincluding any mitigating requirements), for any required wetland or flood
hazard mitigation work to be performed as part of the proposed
development.
5. Grading plans must have original/existing grades and final grades plotted on
the plan. 'Typidally; existing grade contour lines are dashed and screened
back; and final grade contourlihes are overlaid on top of the existing grades
and are in a heavier line vJidth and solid. Contour lines must,be;iabeled with
elevations.
22
Beall Estates Phase 111
PWD Staff Report on Tentative Plat
April 30, 1997
Page 16
6. Need to place street lights on plans, with table indicatingstationing and
offsets.
7. Provide City with a utility plan-approved by each utility company which
reflects all utility crossings, transformer locations, valves, etc.
8. Utility locations must be accurately depicted on the as-built drawings, or as a
separate set of drawings attached to the as-built. drawings: ,
Rights of'Ways/Easements
1. All easements for improvements dedicated to the City shall have a minimum
15 foot width and shall be located (whenever possible) contiguously along
`the exterior boundaries of properties and shall not split lot lines.. Public utility
easements shall have a minimum width of 10 feet.:
2. The City will require a 50 foot ROW width on local streets and 60 foot ROW
on collector streets.
3. Developer shall provide a Statement of Water Rights (on a City approved
forml, for the affected property (Tax lot 3404). For properties determined to
have water rights, the developer will coordinate with the State Watermaster,
the re-allocation ofi any waters attached to lands no onger irrigable as a
result of the proposed development.
4. Developer shall comply with all existing easement owner requirements
regarding any proposed development that may overlap any existing
easement: Any deyelopment proposed which overlaps or alters an existing
easement must be approved by the easement's owner in writing, and a copy
of that written approval must be submitted to the City PWD prior to;
submission of construction plans for City PWD review and approval..
5. All existing easement locations and those proposed for this development
~~
'I
n.
Beall Estates Phase llf
PWD Staff Report on Tentative Plat
April 30, 9997
Page 17
shall be shown on the final plat with reference to the recordation number and
Grantee.
~~}
Steven R. & Debbie M. Childs
484 Beall Lane
Central Point, OR 97502
(541) 6648604
City of Central Point
155 S. 2nd
Central Point, OR 97502
RE: Beall Estates Proposal
To Whom it May Concern;
:~i~
fiPR 1 ~ i9~7'
I have a few concerns regarding the proposed development. Our fast concern involves
environmental issues. The area proposed for development was a dairy farm for many
years and all the barns and outbuildings were on this properly. This allows for the•° '
possibility of contaminadon of soil and ground water from fertilizers, fuels and chemicals
used in a dairy operation. In addition, a number of old barns and buildings have been tom
down recently which suggests a possibility of asbestos contamination.
Have these issues been addressed?
The property is also surrounded on three sides by small creeks which provide a habitat for
wildlife.
How will this be maintained?
There are two tax lots bordering the Beall Estates development fronting on Hulse Lane
(current name on local maps). We want to be assured that access wt71 not be changed by
the proposed streets.
We understand that development is part of the growth of the community, however we want
to be sure existing habitats are protected and the area is emrirotlmentallyssfe for fatni7'tea.
Sin
Steve and Debbie Chdda
25
I M1{ ~j
i ~ `~
~~~~~~~®
CITY OF CENTRAL POINT APR Z B ~99~
PLANNING DEPARTMENT
April 10, 1997
CITY OF GEN'I'RA~ FaOtNT
TIME _~:.~..._..,..
Dear Mr. James Bennett,
SUBJECT:
Subdivision Plat to be named Beall Estates, Phase 3.
I live on Bea11 Lane directly across from the new subdivision and
have since!1984. There are"three concerns I have.
First .the epnstruction dust:
With the previous development d' suffered the` lose of several
established plants including `a Rhododendron that was 8- feet
across.
Seoond Traffic: _
I worry about being hit while waiting to enter my driveway. Now
am L going to have trouble leaving the driveway?
Third noise:
The increased traffic, from the pervious subdivision, has greatly
amplified the noise and partly because the 6 foot wooden fence
across the road has no~sound absorbing qualities. There must be
studies about what could be planted along such fences to delete
noise and be very low maintenance.
Si erely, ~/ .
` , ~/~is2~~~
Virginis.L. Kimball
40.5 Beall Lane
Central Point, Or 97502
772-2534
26
PLELNNING DEPARTMENT STAFF REPORT
DATE: Apri130, 1997
TO: Central Point Planning Conunission
FROM: James H. Bennett, AICP
City Administrator
SUBJECT: Continued Public Hearing -Tentative Plan for Central Point East;
37 2W O1C Tax Lots 100 & 200; 37 2W'O1B Tax Lots'250Q, 2700 & 2900;
Partners Trust Company, applicant.
At the regular meeting of March d8, 1997, the Planning Commission opened the public
hearing and received public testimony regarding the proposed Central Point East Subdivision.
The Planning Commission continued the public hearing to its regular meeting of April 1,
1997, and left the hearing open to receive additional public testimony and to receive
-additional information from the applicant regarding t~-e buffering of residential lots ,adjacent
to the Table Rock Rd. industrial area and the proposal,of a new park site to'serve the area;
among other issues.
The applicant subsequently requested that the public hearing be further continued to the
regular meeting of May 6, 1997, to allow them additional time to prepare a response. Staff
has met with t e applicant recently and expects them to make a complete presentation to the
Planning Comr~'ssion at the meeting. To date, however, no additional application materials
or exhibits have been submitted to the city.
27
CITY OF CENTRAL POINT
DEPARTMENT OF PUBLIC WORKS
STAFF REPORT
for
HOPE CHRISTIAN CHURCH NEW (ADDITIONAL) DAY CARE FACILITY
SITE PLAN
PW#97019
Date:
Applicant:
Project:
Location:
Legal:'
Zoning:
Lots:
Units:
Plans:
Report By
Purpose
May 30, 1997
Hope Christian Church, 325 Oak St., CP, Darold L. Hutsell, Agent
Day Care Facility Expansion
325 Oak Street
T37S, R2W, Section 2CC, Tax Lot 9800
C-2
1
1 New Day Care Facility
1 Page, By GM Building Design
Paul W. Worth, Public Works Technician
Provide information to the Planning Commission and Applicant regarding Public Works
standards and additional standards to be included in the design. Gather information
from the Applicant/Engineer regarding proposed development.
Special Requirements
1. Applicant shall prepare and submit, for City Public Works Department (PWD)
review and approval, a suitable landscape plan for the western and northwestern
portions of the project. The plan shall be prepared and implemented by and at
the expense of the Applicant. At a minimum, the landscape plan shall provide
for a landscape buffer adjacent to the public right-of-way along Third Street.
2. The sidewalk,-gutter, and curb section along Third Street will need to 6e
replaced, and a new driveway apron will need to be installed at the Third Street
entrance to the alley. All broken cracked, or raised (lowered) curb and sidewalk
sections along Oak Street will need to be replaced, as directed by the City PWD.
Need to remove and replace two existing driveway aprons on Oak Street,. in
accordance with City standards. Need to remove and replace corner radius
panels on the northeast corner of Third and Oak Streets, and the northwest
corner of Fourth and Oak Streets, to access ramps which. meet ADA/City
Standards.
3. Coordinate with PP&L to relocate the street light pole (pole no. 64830) to the
Hope Christian Church Day Care Facility Site Plan
PWD Staff Report
Page 2
back of the Third street right-of-way; and to install a proper extension arm/fixture
to move light further out onto Third .Street. Also coordinate with PP&L on the
installation of an appropriate street light on the existing power pole (813962)
near the northwest corner of the subject property.
4. The current proposed location of the new day care facility building apparently
affords the necessary current minimum 15-foot sight triangle City PWD standard
for the connection of the alley to Third Street. However, the City PWD is going
to revise the standard to require a minimum 25-foot sight triangle. We would
therefore request the Applicant to relocate the proposed building 10 feet to the
South, which would afford the more desirable sight triangle. The relocation of
the building also preserves the limited number of parking spaces for the existing
facilities and the new day care facility.
5. Need a site drainage/storm drain plan that corrects and enhances existing site
drainage for the entire tax lot. Sheet flow surface drainage from the property
onto the public right-of-way is generally unacceptable, unless the Applicant
implements City PWD approved improvements to the existing alley surfacing
(and potentially base rock) materials and drainage facilities.
6. In lieu of the requirements for designing and constructing the sidewalk, curb,
and/or gutter improvements on Oak and Third Street, and the drainage and
surfacing improvements on the alley, the Applicant can enter into a City PWD
approved deferred improvement agreement for the future development of these
facilities. However, the Applicant will still be required to replace and reconstruct
the driveway approaches and ADA access ramps at the noted street intersection
radii; as discussed above, as part of the development of this project.
Genera/
1. Applicant shall submit to the City's Public Works Department (City's PWD) for
review and approval, plans and specifications for all improvements proposed for
construction or modifications within the City rights-of-ways and easements.
2. Public improvements, where applicable, include, but are not limited to, streets
(including sidewalks, curbs and gutters); storm drainage and sanitary sewer
collection and conveyance systems; water distribution system (up to the service
meter and including fire protection); street lighting; and traffic control devices,
street signs and delineation.
3. All construction of public improvements within the City shall conform to the
Nope Christian Church Day Care Facility Site Plan
PWD StaJj'Repor!
Page 3
City's Public Works Standard Specifications and Details (City PWD Standards)
and other special specifications, details, standards, and/or upgrades as may be
approved by the City's Public Works Director.
4. During construction, changes proposed by the Applicant shall be submitted in
writing by the Applicant's engineer to the City PWD for approval prior to
installation.
5. No construction shall commence until the City PWD has reviewed and approved
a professionally prepared set of engineered construction plans and specifications
for the public improvements or connection to the public improvements, and the
City PWD has issued a Public Works permit for the proposed improvements.
6. The Applicant shall pay for all costs associated with the design, specification and
installation of the improvements specified on the approved plans.
7. The applicant shall pay all fees and system development charges, as applicable,
prior to obtaining a City building or public works permit.
8. As applicable, the Applicant shall provide copies of any permits, variances,
approvals, and conditions as may be required by other agencies, including, but.
not limited to Oregon Department of Fish and Wildlife (DFWI, Oregon
Department of Environmental Quality (DEO.), Oregon Division of State Lands
(DSL), U.S. Army Corps of Engineers (ACOE), affected irrigation districts, and
Jackson County Road and Park Services Department (JC Roads).
9. Prior to approval and acceptance of the project, the Applicant's engineer or surveyor
shall provide the Public Works Department with "red-line" as-built drawings.
As-built drawings are to be provided to the City which provide "red-line" changes
to final approved construction plans which identify the locations and or
elevations (as appropriate) of actual installed items, including, but not limited to,
invert, inlet, and rim elevations; spot elevations identified on drawings; road
alignment; water lines, valves, and fire hydrants; water and sewer lateral
stationing; modifications to street section; manhole and curb inlet locations;
street light locations; other below grade utility line locations and depths; etc.
Provide a 'red-line' hard copy (on Mylar) of construction drawings.
10. As applicable, the Developer's engineer or surveyor shall provide to the Public
Works Department a drawing of the recorded Final Plat map reproduced on Mylar
and in an acceptable electronic form in AutoCAD format. The Final Plat shall be
tied to a legal Government corner and the State Plane Coordinate System.
Hope Christian Church Day Care Facility Site Plan
PWD Staff Report
Page 4
1 1. All elevations used on the construction plans, on temporary benchmarks, and on
any permanent benchmark shall be tied into an established benchmark
designated and approved by the City's PWD. All elevations used on the
construction plans shall reflect true elevations based on the said City PWD
approved benchmark and vertical datum. An equation station will not be
acceptable. The nearest City PWD approved Benchmark is a brass disk on the
North curb of County Bridge #116 on W. Pine Street: elevation 1274.83.
12. All fill materials placed in the development shall be "engineered fill", placed and
compacted in accordance with City standards. All existing concrete, pipe,
building materials, removed structures, clear and grub materials, and other
deleterious materials shall be removed from the site and either recycled or
properly disposed of in accordance with the requirements of the DEQ.
13. As applicable, identify easement dedications and widths on the Final Plat and
Construction Drawings.
14. Easements for City infrastructure (i.e. sanitary sewer, water, and storm . .
drain) must be a minimum of 1 5-feet wide, and should not split lot lines.
Easements for public storm drainage, sanitary sewer, and water lines should
be dedicated to the City and not just a public utilities easement (PUE).
Centerline of buried infrastructure shall be aligned a minimum of five (5) feet
from the edge of the easement. PUEs must have a minimum 10-foot width.
Easement dedications in final deeds or in CC&Rs need a statement which clearly
states that easements must be maintained for suitable, driveable access, as
determined and approved by the City PWD.
15. All design, construction plans and specifications, and as-built drawings must
be prepared to acceptable professional standards.
16. All street and water improvement plans must be approved in writing by Fire
District 3 prior to review by the City's PWD.
17. All work shall be performed in accordance with the requirements of the City's
Municipal Code; in particular, the recently revised chapter pertaining to Flood
Damage Prevention and Hazard Mitigation (Chapter 8.241.
18. Public street lights and fire hydrants shall not be placed within PUEs.
19. Prior to the City PWD final approval of the construction plans for the proposed
improvements, the following must be submitted:
Hope Christian Church Day Care Facility Site Plan
PWD Staff Report
Page S
• A copy of written approval from Fire District 3 of the water system and fire
equipment access on the improvement plans for the proposed development.
• The plans relating to the sanitary sewers must be approved in writing by
BCVSA, and the appropriate signature blocks must be completed on the
plans.
• As applicable, copies of written approvals and/or permits from the various
agencies involved: DSL, DFW, DEQ, and/or ACOE.
20. Field verify all existing infrastructure elevations and locations (i.e. pipe inverts, curb
elevations, street elevations, etc.), to which the proposed development will connect
into existing improvements, prior to final construction plan design.
21. The Applicant's engineer shall provide suitable engineering certification and
justification (i.e. calculations, analyses, plots, etc.,) that all connections to existing
infrastructure (i.e. street; water, sanitary sewer, storm drain systems; natural
drainage systems; etc.,) will not interfere with the effective level of service or
operation of the infrastructure facilities, and that the existing infrastructure facilities
have adequate capacities to accommodate the flows and/or demands imposed on
the existing infrastructure as the .result of the connection of the proposed
development's infrastructure.
Streets/Traffic
Existing Improvements
- Poor condition of sidewalk, curb, and gutter along Third Street. Fair
condition of sidewalk and curb section (no Gutter section) along Oak.
1. The construction drawings shall include clear vision areas (i.e. sight triangles)
designed to meet the City's PWD requirements.
2. The Applicant's engineer shall evaluate the strength of the native soils and
determine the road and parking section designs to handle the expected loads
(including fire equipment) to be traveled on these private driveways and parking
areas.
Hope Christian Church Day Care Facility Site Plan
PWD Staff Report
Page 6
Storm Drainage
Existing Improvements
- Surface Run-off from Existing Property onto the public rights-of-way.
1. Applicant's engineer shall provide a site drainage plan with the facilities being
designed, at a minimum, to accommodate a 10 year storm event. System must
be designed to adequately drain the 10-year storm event without surcharging or
must be provided with adequate storage to prevent surcharging; and be designed
to not impact existing public storm drainage facilities.
2. The discharge point(s) for the site shall be designed to mitigate erosion, and to
provide an aesthetically pleasing, useful, and low maintenance facility. Any
storm water retention facilities shall be suitably landscaped and designed to
mitigate erosion, and sediment deposition onto the neighboring streets, and to
mitigate the "attractive nuisance" hazards associated with these facilities.
3. Roof drains and underdrains shall not be directly connected to public storm drain
lines, and shall drain to the street at the curbline, whenever possible.. Lots should
be raised if necessary. Building foundation under drains (and these type of
facilities only) may drain to private storm drain lines that discharge onto the
streets, or into a storm drain curb inlet or manhole only; must be approved
before construction by the City PWD; and must be identified and accurately
portrayed on as-built drawings.
Sanitary Sewer
1 All sanitary sewer collection and conveyance system (SS System) design,
construction and testing shall conform to the standards and guidelines of the
Oregon DEO, 1990 APWA Standards, Oregon Chapter, Bear Creek Valley
Sanitary Authority (BCVSA), the City PWD Standards, and Oregon Plumbing
Specialty code, where applicable.
2. Applicant shall make application for any sewer service and construction with
BCVSA. A Public Works Permit will be required to construct sewer within the
public rights-of-way or easements.
3. The construction plans and the as-built drawings shall identify lateral stationing
for construction of sewer laterals.
Hope Christian Church Day Care Facility Site Plan
PWD Staff Report
Page 7
Water System
Existing Improvements
- Tax Lot 9800 is currently served by a 5/8-inch-diameter water meter
facing Oak Street..
1. Applicant shall provide properly sized service lines to the buildings in accordance
with the Oregon. State Plumbing Specialty Code. Applicant shall pay any
associated costs and system development charges required as the result of up-
sizing the meter or additional tap and lateral required to serve the new
development.
2. Provide construction drawings for the location of any fire hydrants required.. If
applicable, steamer ports at hydrants located on the building shall face the
buildings. Fire hydrants shall be protected from vehicle damage and
encroachment.
3. Specifications for the design and construction of the water system shall be in
accordance with City PWD standards and requirements.
4. Lateral/connection stationing and size shall be provided on construction plans and
as-built drawings.
5. Applicant shall comply with Oregon Health Division (OHD) and City requirements
for backflow prevention. An OHD approved backflow prevention assembly shall
be installed immediately downstream of each installed water meter.
6. Construction drawings shall include the size, type, and location of all water
mains, hydrants, air valves, service connection, and other appurtenance details in
accordance with City PWD Standards and as required by the City PWD.
7. All connections to the water supply system must comply with OHD
requirements. Water will not be 'turned on' by the City until such requirements
have been met to the satisfaction of the City's designated inspector (currently
the Jackson County plumbing inspector-.
Site work, Grading and Utility P/ans
M1 ~ f n
Hope Christian Church Day Care Facility Site Plan
PWD Staff Report
Page 8
1. Applicant shall provide agrading/paving plan(s) with the construction drawing
submittal to the City PWD. Plan(s) shall illustrate the location and elevations of
curb elevations; finish grades and contours; and building pad and lowest floor
elevations.
2. All structures shall have roof drains, area drains, and/or crawl spaces with
positive drainage away from the building.
3. Applicant shall provide the necessary 'rough" lot grading to assure that the
property will drain properly.
5. Grading plans must have original/existing grades and final grades plotted on the
plan. Typically, existing grade contour lines are dashed and screened back, and
final grade contour lines are overlaid on top of the existing grades and are in a
heavier line width and solid. Contour lines must be labeled with elevations.
6. Provide for a landscaped buffer along building frontage with Third Street.
7. Provide City with a utility plan approved by each utility company which reflects all
utility crossings, transformer locations, valves, etc.
8. Utility locations must be accurately included on the as-built drawings, or as a
separate set of drawings attached to the as-built drawings.