Loading...
HomeMy WebLinkAboutCouncil Resolution 589RESOLUTION NO. 589 A RESOLUTION ESTABLISHING A PARK SYSTEM DEVELOPMENT CHARGE, INCLUDING IMPROVEMENT FEE AND METHODOLOGY THEREFOR WHEREAS, Oregon Revised Statutes Chapter 223 and Central Point Municipal Code Chapter 11.12 authorize collection of system development charges for parks. and recreation, and the City has heretofore retained McDonald Environmental Planning (MEP) to study the Central Point park system and make recommendations regarding a park system development charge; and WHEREAS, MEP has issued. its Park Facilities System Development Charge Report dated June 20, 1991, analyzing the City's park system and recommending certain capital improvements and the imposition of a certain park system development charge; and fdHEREAS, the City Council has reviewed said MEP report and determined! that new development within the City will benefit from such capital impfovements and should pay a proportionate share of the cost thereof, as determined by the methodology incorporated herein; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. IMPROVEMENT PLAN. The City Council hereby adopts, as its park improvement plan required by ORS 223.309, the improvement plan contained in the MEP Park Facilities System Development Charge Report dated June 20, 1991. Said report defines the cost of projected capital improvements needed to increase the capacity of the park system to which the improvement fee is related, and lists capital improvements that may be funded with improvement fee revenue and the estimated cost and timing thereof. The capital improvements that may be funded with the improvement fee revenues collected: hereunder shall include the following: A. Land acquisition; B. Site preparation; C. Construction of active and passive park and recreation improvements contained in the MEP improvement plan; D. All appurtenant facilities and equipment, including but not limited to, tables, landscaping, swings and benches; E. Contingency construction costs; F. Engineering, planning consultant and administrative costs for park capital improvements, appurtenant facilities and. equipment; G. Interest charges, administrative costs and construction inspection costs related to such capital improvements; and H. Planning consultant costs for developing future park SDC plans. 1 - RESOLUTION N0. 589 (062491) The improvement plan adopted herein may be modified from time to time by resolution of the Council, following an analysis, receipt of recommendations for modifications, and presentation to the Council. Section 2. IMPROVEMENT FEE. Effective July 1, 1991, an improvement fee for any development subject to Chapter 11.12 of the Central Point Municipal Code shall 6e required in the amount of $515 per dwelling unit for a single family, two family, multiple family, mobile home, manufactured home or trailer home, as provided in Central Point Municipal Code Chapter 11.12. In the case of mobile home par{<s or trailer parks, the improvement fee shall apply to each improved mobile home or trailer site. Section 3. METHODOLOGY. The methodology for the park systems development charge is set forth in the MEP report, and such methodology is hereby adopted.. The methodology is to examine the present and future population of the City of Central Point, the benefits of the present and future park facilities to present and future residents, and then to divide the total future costs of necessary facilities by the expected future population, to arrive at a park SDC on a per single-family residential unit basis. Section 4. COLLECTION OF CHARGE, Effective July 1, 1991, the park systems development charge is payable to the City of Central Point upon application. for a building permit, a site permit for mobile or manufactured homes, or a development permit for trailer site. developments. The City Building Official' or the Public works Director, in case of trailer site permits, shall collect such charges pursuant to Chapter 11.12 of the Central Point Municipal Code and shall not issue the applicable permit until such charge has been paid in full, or arrangements have been made for payment pursuant to CPMC 11.12.09D. Passed by the Council and signed by me in authentication of its passage th i s ~3~`'day of 199/1 . /~ ~ ~:~, n ~~1~~-vi~~z9-Ch.~J C9~C8C ~ CpIINCIL PRESIDENT ATTEST: OC/ry ~/_ o~ } //L ~,P 1 City Rep entative Approved by me this a~~'day of ~-~/ 1991. Q97Ei1~}970{~~d{@fX f COUNCIL PRESIDENT 2 - RESOLUTION NO. 589 (062491) EXHIBIT "A" PARK FACILITIES SYSTEM DEVELOPMENT CHARGE REPORT I. IIVI'RODUCTIOIV The City of Central Point adopted a Land Dedication Ordinance through Ordinance 723 in 1963. As a part of this Ordinance, a fee in lieu of dedication was established so that if the City of Central Point could not utilize property, they could collect funds. The funds were to be expended for the purpose of acquiring and developing new or existing park sites or recreational facilities within the City of Central Point Urban Growth Boundary. By adoption of ORS 223.297 through 223.314, the State of Oregon established procedures for the collection and use of Systems Development Charge (SDGI revenues. Among other things, these provisions require adoption of an fmprovement Plan which includes a list of capital improvements to be funded with the SDC revenues, together with the estimated cost. and timing of each project. Also required is the adoption by ordinance or resolution of methodology which considers the cost of the projected capital improvements needed to increase the capacity of the systems to which the fee is related. This Report will provide the project list and the methodology for establishing a Park SDC in the City of Central Point. Summarizing the results of the calculation of the Parks SDC on a per residential unit basis, this Report determined the total cost of land and facilities necessary to accommodate future growth (based upon a 2.4% per year population growth) to be S1,023,300. That sum was divided by the total number of additional households served, which is 1,683, arriving at a Parks SDC of S550 per unit. This level of SDC charge and the development funded therewith is projected. to continue the existing community standard of parks into the next twenty years. Cost of park improvements are projected to increase at approximately 5% per year, therefore the Park Reimbursement Fee will be recalculated each year. Recalculation of the Park Reimbursement Fee will include the increase in cost of improvements and the amount of improvements which have been completed. 11. INVENTORY OF EXISTING FACILITIES Recreational opportunities in the Central Point community occur at both passive and' active facilities. This study shall take both types of recreation into consideration and make comparisons to the standards established by the National Recreation and Park Association. 1 A. PASSIVE RECREATION: The passive recreational opportunities occur predominantly at the Bear Creek Greenway (42.3 acres) managed by Jackson County Parks, and is currently in the development phase of different segments. This open space is comprised of a trail system with both walking/jogging pathways and horse riding trails. It is planned to have one access point located near the Central Point community and planned for development in the near future. The recreational opportunities offered here include walking, jogging, horseback riding, and nature interpretation. Also, the existing parks in the City of Central Point offer passive recreation opportunities including picnics and. walking. B. ACTIVE RECREATION: The active recreation. facilities in the Central Point Park System occur at the three (3) developed parks, and a City Patk adjacent to a school. Other facilities are planned to be located at two 12- undeveloped properties. Although the existing parks provide basic recreation opportunities, the City Council is currently planning to continue to develop existing and future parks at the same level as past park development to meet future demands. Table 1 identifies both the passive and active recreational acreage in the Central Point Park System. This system is comprised of the developed City property, Bear Creek Greenway, 5.5 acres of undeveloped park, and properties adjacent to Richardson School. TABLE 1 RECREATION OPEN SPACE EXISTING OPfN SPACE: Central Park 1.8& Acres Van Horn Park 2..00 Acres Liberty Park .50 Acres Griffin Creek -Undeveloped 5.53 Acres Bear Creek Greenway 42.30 Acres School District #6 -Developed' - Undeveloped TOTAL ACREAGE 3.62 Acres 5.00 Acres 60.81 2 C. PARK AND RECREATION FACILITY REPLACEMENT VALUE The Central Point Park system was evaluated to inventory the existing community facilities. These activities and their land area requirements have been summarized in the Recreation Facilities Replacement Value Table (Table 2~. TABLE 2 RECREATION FACILITY REPLACEMENT VALUE Activity/Facility Existing Facility Replacement Value Softball 2 S 110,250 Baseball Field 2 110,250 Multi-Purpose Court 1 16,500 Tennis Court 2 88,000 Basketball Court 1 16,500 Restroom Facilities 1 60,600 Picnic Shelters 1 25,400 Playground Areas 2 37,500 Bear Creek Greenway 42.3 840,000 Undeveloped Acreage 5.5 110,000 Developed Acreage 7.98 159.000 TOTAL 51, 574,000 Table 2 indicates the total replacement value of the existing park system is 51,574,000. This existing park system benefits a population that is estimated to be 7735 on July 1, 1991. Therefore, the per capita. value of park facilities is 5203.00. 3 TABLE 3 RECREATION. FACILITY STANDARDS Activity/Facility NRPA Std. City Std_ Existing Facility Space for Activity Softball Field 1/5,000 1/3,750 2 1.5-2 Acres Baseball Field 1 /5,000 1 /3,750 2 3-3.5 Acres Multi-Purpose Court 1 /1.0,000 1 /3,750 2 .25 Acre Tennis Court 1/2,000 1/3,750 2 7,200 s.f. Basketball Court 1 /5,000 1 /3,750 1 5 to 8,000 s.f. Restroom Facilities 1 .25 Acre Picnic Shelters 1 .25 Acre Play Ground Areas 2 .25 Acre Table 3 also indicates the actual area. required. for each activity and enables calculation of acreage minimums for meeting these average demands. Some activities identified here can not be accommodated on the existing park sites. Softball and baseball fields. require substantial areas and therefore, to meet this future demand, the City will have to acquire additional. land located within the community to serve the growing neighborhoods. 4 In Table 4, the following specific park lands have been identified for development of these activities and facilities. The improvements listed below include the amenities necessary to provide a functional facility such as, but not exclusively, to power, lighting, parking, site furnishings, landscaping and irrigation. TABLE 4 RECREATION NEEDS Development Timing/Acreage Activity 1995 2000 2005 2011 Acres 1 Softball Field 0 0 ' SE Park 0 2 1 Baseball Field 0 0 SE Park 0 3.5 1 Multi-Purpose Court 0 Griffin 0 0 .25 2 Tennis Courts 0 Griffin SE Park 0 .50 1 Basketball Court 0 SE Park 0 .25 3 Restroom Facilities 0 Griffin SE Park SE Park .75 4 Picnic Shelters Van Horn Griffin SE Park SE Park 1.0 3 Play Ground Areas 0 Griffin SE Park SE Park .75 The acreage needed without parking and general open space for transition between activities totals approximately 9.0 acres. When adding the connecting spaces, minimum size of lots available, and the parking needed to provide the ball fields and. park development, the total area would add up to 19.5 acres. IV. II~iPROVEn/IENT PLANS Those facilities identified in Table 4 as being needed in the years 1995 through 2011 have been proposed for the park properties. In the case of Griffin Creek Park, it is likely that the demand for this facility will correspond to the development of the residential neighborhood surrounding the park property and the proposed improvements for Griffin Creek Park, serve to provide the City standard. The following listing of proposed improvements is comprised of items which serve to meet the City recreation standards as the population grows. The park improvements for each park are itemized below with their location, estimated timing, and. representative cost. 5 TABLE 5 FACILITY IMPROVEMENTS PARK ITEM COST TOTAL Van Horn S 34,500 Picnic Shelter 5 34,500 Griffin Creek S 238,600 IViulti-Purpose Area S 18,000 Play Equipment S 37,500 Restroom/Storage S 60,600 Picnic Shelter S 34,500 Tennis Court S 88,000 SE Park S 360,200 Picnic Shelter (2) 5 69,000 Restroom/Storage (2) S 116,000 Playground Area (2) 5 40,000 Softbaii Field S 50,000 Baseball. Field S 50,000 Basketball Court S 18,000 COST OF IMPROVEMENTS S 633,300 i nese ngures mcwoe Design piannmg ana tacnrcy costs. V. ACQUISITION OF PARK LANDS To meet the community recreation and park standard in the year 2005, Central Point will need to acquire additional land and develop facilities by 2011. Central Point needs to acquire approximately 19.5 acres to meet the standard that community leaders have established. (See Table 1 -Recreation Facilities. Open Space Needed). These acquisitions shall require substantial capital expenditures by the City. In fact, based on the average cost of undeveloped land of 520,000 per acre in 1993, a 5390,000 dollar investment into property would need to be made. The park lands under consideration here are located adjacent to Griffin Creek. (5.53 acresl, in the Southeast quadrant of the City on Tax Lot 3300, 3301, and 3404, T37S, R2W, Section 11, and Tax Lot 3404 T37S R2W Section 12C, (4.5 acres) see the vicinity map for the park locations and in the northeast quadrant of the City adjacent to Griffin Creek and I-5 and Highway 99. 6 Therefore, when combining the acquisition costs identified with the proposed development costs of the park land, the City of Central Point is looking at a minimum development cost of 51,023,300 to bring Griffin Creek Park and the Southeast Park into recreational use. TABLE 6 TOTAL COST FOR PARK & RECREATION SYSTEM DEVELOPMEfVT Definition Cost of Items Expansion of Existing Park Facilities S 34,500 Acquisition of Park Properties (19.5 Acres) S 390,000 Development of New Acquisitions S 598.800 TOTAL COST FOR RECREATION 51,023,300 VI. METHODOLOGY A. Explanation of Population Statistics and Projected Population. On Page 4 of this Report, Item III-A, 1, 2, 3, discussed future projections. In order to establish a future growth statistic, a 2.4% growth rate was used as a conservative Tong-term prediction. However, programs such as this are reviewed every year. B. Benefits to Existing Population. On Page 3 of this Report, it was determined that the replacement value for existing land and park facilities development is 51,579,000. The improvements benefit a population of 7735 for a cost per person of approximately 5203. C. Benefits to Future Population. The proposed new facilities acquisition and development defined above, will serve a total population of 12,430 and will cost 51,023,300, benefitting an additional City population of 5041 people. D. SDC Calculation -Total Cost divided by Future Population Benefit. The total cost of S 1,023,300, divided by number of benefitted persons, 5041, equals 5203 per person. The City has an average of 2.71 persons per residential unit, so that the Parks Systems Development Charge is 5203 multiplied by 2.71 or 5550.00 per dwelling unit. 7 RESOLUTION NO. 589 A RESOLUTION ESTABLISHING A PARK SYSTEM DEVELOPMENT CHARGE, INCLUDING IMPROVEMENT FEE AND METHODOLOGY THEREFOR WHEREAS, Oregon Revised Statutes Chapter 223 and Central Point Municipal Code Chapter 11.12 authorize collection of system development charges for parks and recreation,. and the City has heretofore retained McDonald Environmental Planning (MEP) to study the Central Point park system and make recommendations regarding a park system development charge; and WHEREAS, MEP has issued its Park Facilities System Development Charge Report dated June 20, 1991, analyzing the City's park system and recommending certain capital improvements and the imposition of a certain. park system development charge; and WHEREAS, the City Council has reviewed said MEP report and determined that new development within the City will benefit from such capital improvements and should pay a proportionate share of the cost thereof, as determined by the methodology incorporated herein; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. IMPROVEMENT PLAN. The City Council hereby adopts, as (((( ~ its park improvement plan required by ORS 223.309 ,. the improvement l__,,~ plan contained in the MEP Park Facilities System Development Charge Report dated June 20, 1991. Said. report defines the cost of projected: capital improvements needed to increase the capacity of the park system to which the improvement fee is related., and lists capital improvements that may be funded with improvement fee revenue and the estimated cost and timing thereof. The capital improvements that may be funded with the improvement fee revenues collected hereunder shall include the following: A. Land acquisition; B. Site preparation; C. Construction of active and passive park and recreation improvements contained in the MEP improvement plan; D. All appurtenant facilities and equipment, including but not limited to, tables, landscaping, swings and benches; E. Contingency construction costs; F. Engineering, planning consultant and administrative costs for park capital improvements, appurtenant facilities and equipment; G. Interest charges, administrative costs and construction. inspection costs related to such capital improvements; and H. Planning consultant costs for developing future park SDC plans. 1 - RESOLUTION N0. 589 (062491) The improvement plan adopted herein may be modified from time to time by resolution of the Council, following an analysis, receipt of ~. recommendations for modifications, and presentation to the Council. ,erection 2. IMPROVEMENT FEE. Effective July 1, 1991, an improvement fee for any development subject to Chapter 11.12 of the Central Point Municipal Code shall be required in the amount of $515 per dwelling unit for a single family, two family, multiple family, mobile home, manufactured home or trailer home, as provided in Central Point Municipal Code Chapter 11.12. In the case of mobile home parks or tra filer parks, the improvement fee shall apply to each improved mobile home or trailer site. Section 3. METHODOLOGY. The meth d 1 ~~ Q~- the park systems development charge is set forth in the t, and such methodology is hereby adopted. The methodology is to examine the present and future population of the City of Central Point, the benefits of the present and future park facilities to present and future residents, and then to divide the total future costs of necessary facilities by the expected. future population, to arrive at a park SDC on a per single-family residential unit basis. Section 4. COLLECTION OF CHARGE. Effective July 1, 1991, the park systems development charge is payable to the City of Central Point upon application for a building permit, a site permit for mobile or manufactured homes, or a development permit for trailer site developments. The City Building Official or the Public Works ~• Director, in case of trailer site permits, shall collect such charges ~,~~ pursuant to Chapter 11.12 of the Central Point Municipal Code and shall not issue the applicable permit until such charge has been paid in full, or arrangements have been made for payment pursuant to CPMC 1.1.12.090. Passed by th~Council and~A 51gf10Ci by me in authentication of its City Rep entative Approved by me this a~_~"day of 1991 . COUNCIL PRESIDENT passage this ~5 day of 199/-1._ Q,, • COIINCZL PRESIDENT ATTEST: 2 - RESOLUTION N0. 589 (062491 )