HomeMy WebLinkAboutCouncil Resolution 582RESOLUTION NO. 582
A RESOLUTION GRANTING TENTATIVE PLAN APPROVAL FOR
PHASE I OF JACKSON CREEK ESTATES UNIT NO, 3 SUBDIVISION
WHEREAS, Tom Malot, hereinafter referred to as Subdivider, has
submitted a tentative plan for Phase I of Jackson Creek Estates
Unit No. 3, a subdivision located in the southwest quadrant of the
City at the southeasterly extension of Vincent Avenue, more
particularly described in the Jackson County Tax Assessor's records
as 37 2W 10 TL 3100, and
WHEREAS, the Planning Commission of the City on May 7, 1991
reviewed said application and by Planning Commission Resolution
No, 221 recommended approval of said tentative plan, subject to
the conditions: set forth in the staff report, which conditions are
attached hereto, marked Exhibit A, and which are by this reference
incorporated into the within resolution, and
WHEREAS, the City Council of the City of Central Point held
a public hearing upon said application for approval of the
tentative plan on May 16, 1991, pursuant to Central Point Municipal
Code Section 1.24.020D, and having at said public hearing received
and reviewed the City staff report, the Planning Cormnission report
and resolution, and public hearing evidence., and being fully
advised, now, therefore
RESOLUTION NO. 582
(JACKSCR.REV/050991) 1
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CENTRAL
POINT, OREGON, AS FOLLOWS:
Section 1. Based upon. the staff report, Planning Commission
report and resolution, and evidence relating to said application
the City Council hereby finds that said application meets the
requirements for tentative plan applications., that said plan as
proposed is in compliance with the City's Comprehensive Plan and
Zoning Code, and if the conditions set forth hereinafter are. met,
said application meets the City's requirements for subdivision
layout, park dedication, street standards, water system standards,
sanitary sewer standards and storm drainage standards..
Section 2. The City Council hereby grants approval to the
tentative plan submitted by applicant Tom Malot for Phase I of
Jackson Creek Estates Unit No. 3, subject to the conditions set
forth in Exhibit A, attached hereto.
Section 3. This action of the Council shall be noted on two
copies of the tentative plan, including reference to the conditions
set forth in Exhibit A, with one copy to be returned to Subdivider
and one copy to be retained in the City planning files with a
memorandum setting forth the action of the Council, as required by
Central Point Municipal Cade Section 16.10.080.
Passed by the Council an
its passage this. ~ ~ 'day of
d signed by me in authentication of
1Y U _' 1991.
a*'
ayor
ATTEST:
City Repr~_ en~ ive
APPROVED by me this ~~"'day of
1991.
/~~ (!~
M or
RESOLUTION NO. 582
(JACKSCR.REV/050991) 2
EY.HiBIT
C®Ir~®OTO®U~S
~~co~~®~ ~l~~~us ~~~~T~~ ~~o~ ~®. ~, ~~~~~ o
1. Provide the easement information for the Storm Drainage System between Lot
80 and 81. Also show the Sanitary Sewer Easement required to service this
Development.
2. The Developer shall provide information from the Division of State Lands that
this Development does not impact designated Wetlands within the proposed
Development.
3. Place a note on the Tentative Plat, that street grade shall not exceed 6% nor
be less than .5%. Radius of curves on residential streets shall exceed 100 ft.
4. Lot 86 and 87 need. a minimum of 60' street frontage. Only cul-de-sacs can
have street frontage less than 60'.
5. All roof drains, area drains, and crawl spaces shall have positive drainage away
from the structure, and shall be connected to a curb drain or an approved storm
sewer. Provide topographical information to determine that all lots will drain and
all. streets will drain.
6. Provide a Plan Profile on the Construction Drawings that gives proper cover and
fall for all sanitary sewer services.
7. Street name signs including posts, labor and equipment for installation of street
signs shall be paid for by the Developer of this Subdivision, and the installation
shall be completed by the City.
8, A Traffic Control Signing Plan shall be included as part of the final construction.
plans,. and will be installed by the City and all costs associated with traffic
control sign. installation shall be paid for by the Developer.
9. A soils engineer must evaluate the strength. of the soil (R-value) to determine
the street section design. The City's Engineer shall be used, and the developer
shall pay for the costs of these services. A design life for Vincent Street in the
subdivision with a minimum 20 year Life, given a daily traffic volume not to
exceed 1000 vehicle trips per day and 2% truck traffic shall be used. All other
streets shall be designed fora 20 year life, a daily traffic volume of 1000
vehicle trips per day and 2% truck traffic.
Jackson Creek 3, Phase I -Conditions
April 30, 1991 -Page Two
10. A Street Lighting Plan shall be included in the construction documents
according. to the requirements of PP&L. All intersections shall be illuminated.
Street lights shall be located no greater than every 200 feet. Developer is to
install ali pads and conduits for street lights as a part of the construction of this
subdivision. The Developer shall also pay for street lights and for the
installation of all street lights in this subdivision.
11. The Developer shall construct a valve at the end of the street in this phase for
the future connection of the next phase of this development.
12. Ladder rungs shall be installed in each sanitary sewer manhole of a depth
greater than 3.0 feet to the flow line of the manhole. Developer shall use
ladder rungs approved by the Central Point Public Works Department.
13. There is a small seasonal stream which flows through this property at its
northern property line. Developer shall construct a storm drainage system
which collects the flow from. this subdivision and carries it through this
subdivision in such a manner as to not cause flooding of any lot in the drainage
area of this seasonal stream.
14. According to the Master Plan for Jackson Creek Estates, a 15" storm pipe
would cross between Lot 80 and 81. The storm sewer will cross lots 80 and
81 and discharge directly to Griffin Creek.
15. Catchbasins must be located no greater than 350 feet for any section of curb
and gutter.
16. Developer shall design the storm drainage system to provide for discharge of
properties in future phases or within the drainage service area of this
subdivision's storm drainage system. The developer shall follow the Storm
Drainage Plan done as a part of the Stonecreek Subdivision No. I, Master Plan,
a copy of which may be obtained at the Public Works Department in Central
Point City Hall.
17. As originally approved in Jackson Creek Estates Unit #1, the Developer shall
provide park land in lieu of paying $200.00 per lot development fee for property
located along Griffin. Creek as a part of the Park Master Plan. This property is
to be dedicated as the requirements set forth in Title 16.20.. Total park land
to be transferred to the City free and clear of taxes and/or liens is 4.67 acres.
Jackson Creek 3, Phase I -Conditions
April. 30, 1991 -Page Three
18. The Developer shall install or cause to be installed conduits for utilities at
intersections or locations determined by utility companies who wilt not install
their services until after the subdivision. is constructed. The Developer shall be
responsible for all costs associated: with the installation of these conduit
crossing.
19. All construction for utilities, streets and other structures discussed herein in
rights of way owned or to be owned by the City of Central Point, shall be done
according to all rules, regulations, ordinances, resolutions, and other applicable
requirements of the City of Central Point for construction of this Subdivision.
20. The Final Plat for this Subdivision shal- not be approved by the City Council
until all. conditions as herein stipulated and as approved for this Subdivision
have been met, unless adequate provisions have been made according to
C.P.M.C. 16.28.070 and 16.28..080.
21. The review for this Tentative Plat submitted herein by Tom Malot Construction
was done in accordance with the rules, regulations, and ordinances in effect as
of the date of this review. Any modifications by the Developer which require
further conditions to meet standards set forth in the City of Central Point
Municipal Code or would intensify the use of the property beyond the standards
set forth herein, shall require resubmittal of the Tentative Plat to the Planning
Commission.
22. The Developer must remove the 1 ft. reserve strip from Unit No. 2 on Vincent
Avenue.
23. A 25` clear vision area at all intersections shall. be noted on the Tentative Plat
and provided as a part of the Subdivision Construction Plans.
24. Driveway accesses at street intersections shall be placed at the furthest point
on the lot away from the intersections.
25. No construction will begin on this project until such time as plans and
specifications have been reviewed and approved, and a Public Works Permit is
issued.
cc: 02-014
PW 90015