Loading...
HomeMy WebLinkAboutCouncil Resolution 701RESOLUTION N0. 701 RESOLUTION MODIFYING WASTEWATER TREATMENT PLANT REIMBURSEMENT FEE (SYSTEMS DEVELOPMENT CHARGE) Recitals 1. Pursuant to Oregon Revised Statutes Chapter 223, Central Point enacted Ordinance No. 1657, authorizing the City to establish and revise by resolution System Development Charges for various types of capital improvements. 2. By Resolution No. 588, on June 24, 1991, the City established a Wastewater Treatment Plant Reimbursement Fee (System Development Charge), setting forth certain System Development Charges for various sewer system uses within the City. 3. Based on a Final Report by Economic and Engineering Services, Inc., entitled, "System Development Charges for the Medford Regional Water Quality Control Plant, October, 1992", the Council determined that the schedules of System Development Charges set forth in Resolution No. 588 should be updated and revised, and the same were revised in Resolution No. 656 on May 20, 1993. 4. In August, 1993, the Regional Rate Committee further modified the rates as they pertained to the "Type of Building and Sewer Use" listed below under numbers 4, 9 and 12. Those categories did not exist in Resolution No. 588 or 656, and were added to the Central Point SDC by Resolution No. 672 on December 17, 1993. 5. Economic and Engineering Services, Inc. has now drafted an updated "System Development Charges for the Medford Regional Water Quality Control Plant", dated January, 1994. Based on that report, the City Council has determined that the schedules of System Development Charges set forth in Resolution No. 672, dated December 17, 1993, should now be updated and revised as set forth herein. Now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CZTY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. The following schedule of System Development Charges for the Wastewater Treatment Plant Reimbursement Fee is hereby adopted to replace the schedule of these contained in Resolution No. 672: 1 - RESOLUTION NO. 701 (051794) TYPE OF BUILDING SINGLE FAMILY RESIDENCE SYSTEMS DEVELOP- AND SEWER USE EpUIVALENT UNIT MENT CHARGE 1. Single family residence 1.0 $1,208.00 2. Multiple family residential 0.65 per dwelling unit 3. Mobile home space in mobile home park, including temporary connections (common buildings at additional commercial rate and laundry facilities at laundry rate) 0.65 per space 4. Recreational vehicle waste dumping station 0.65 per station 5. Schools 0.03 per student capacity 6. Churches (school uses at additional per student capa- city rate) 7. Hospitals - general 8. Convalescent hospitals (rest homes) 9. Residential care/ boarding facilities 10. Hotels and motels (in addition to charge for restaurant, tavern, laundry and conference facilities under items 9, 11 and 12) 0.64 per 100 seats 1.0 per bed 0.5 per bed 0.25 per room 0.25 per room or motel unit 11. Food preparation and and/or serving areas 0.15 per 100 square feet 2 - RESOLUTION NO. 701 (051794) $785.00 per dwelling unit $785.00 per space $785.00 per station $36.00 per student capacity $773.00 per 100 seats $1,208.00 per bed $6D 4.00 per bed $302.00 per room or $1,208 each, which- ever is greater $302.00 per room or motel unit $181.00 per 100 square feet 12. Vehicle wash: Self-Service 1.17 per bay $1,413.00 per bay Full-Service 15.65 per bay $18,905.00 per bay All Other See Wet Industrial 13. Laundries and laundromats 14. Commercial, office and dry industrial, service station and auto repair shops Bath tub w/or 0.3 per 100 square feet $362.00 per 100 square feet Per each plumbing fixture Charge for to be installed each plumbing fixture to be installed w/out shower 0.13 $157.00 dental unit or cuspidor 0.10 $121.00 Dishwasher 0.1.0 $121.00 Disposal 0.10 $121.00 Drinking fountain 0.05 $ 61.00 Kitchen sink 0.08 $ 97.00 Laundry tray 0.08 $ 97.00 Lavatory 0.05 $ 97.00 Service sink 0.08 $ 97.00 Shower (each head) 0.13 $157.00 Urinal 0.17 $205.00 Urinal trough (for each 2-foot section) 0.17 $205.00 Wash sink (for each. set of faucets) 0.08 $ 97.00 Washing machine 0.07 $ 85.00 Water closet 0.33 $399.00 Floor drain 0.013 $ 16.00 15. Wet industrial To be determined on an individual basis by the Technical Committee 16. Undefined building To be determined on an individual basis or sewer use by the Technical Committee 17. Additional loading Determined on basis of new use for entire or change of use facility less credit for former use. No refunds if new use is less than former use. In case of a remodel in types 4-13 which results in no increase in the units on which the charge for a new building is calculated, the System Development Charge for the. remodel will be calculated on the basis of the fixtures added using the amounts in item 14. 3 - RESOLUTION NO. 701 (051794) When the charges are changed from time to time, the prior schedule of charges shall remain in effect for all buildings for which a completed application for building permit was filed prior to the effective date of the new schedule.. Section 2. The foregoing schedule of charges shall be effective July 1, 1994, except that the prior schedule of charges shall remain in effect for all buildings for which a completed application for building permit was filed prior to July 1, 1994. Passed by the Council and signed by me in authentication of its passage this ~ day of , 1994. ~v~'v~.,~,~Ed Mayo~"Roger Westensee ATTEST: City Repr to ive Approved by me this ~_ day of , 1994. May Roger Westensee 4 - RESOLUTION NO. 701 (051794)