HomeMy WebLinkAboutCouncil Resolution 1382Resolution No. 1
A RESOLUTION ADOPTING THE CENTRAL POINT STORMWATER MASTER PLAN
FINAL REPORT PUBLISHED ON SEPTEMBER 10, 2013
RECITALS:
A. Central Point is currently one of the fastest growing cities in Southern Oregon. As projected
growth continues to fill in the Urban Growth Boundary and the City plans for future expansion
into the urban reserve areas to the north and west, stormwater master planning is needed to
anticipate infrastructure needs in a manner that provides the expected levels of service and
maintains the community compliance with state and federal regulatory requirements.
B. The City entered into a contract with Brown & Caldwell on September 14, 2012 to develop a
multi -objective stormwater master plan that includes a 20 -year planning horizon for capital
improvements that address stormwater system capacity limitations, as well as stormwater
quantity and quality control.
C. The Stormwater Master Plan Final Report identifies 21 flood control Capital Improvement
Projects (CIPS) and 9 water quality CIPS that reduce localized flooding for current and future
development conditions, exceeds stormwater quality requirements currently established
through the National Pollution Discharge Elimination System Phase II program and advances the
Total Maximum Daily Load (TMDL) objectives to reduce temperature and bacteria loading in
Bear Creek tributaries.
The City of Central Point resolves:
Section 1. The Central Point Stormwater Master Plan Final Report, prepared by Brown & Caldwell and
published on September 10, 2013 is hereby adopted.
Passed by the Council and signed by me in authentication of its passage thi� day of October,
2013.
Mayor Hank Williams
ATTE
City Recorder