HomeMy WebLinkAboutDCP012612
Meeting time, date, or location may be subject to change. Please contact the City Recorder at
541-423-1026 for additional information.
I. MEETING CALLED TO ORDER – 6:00 p.m.
II. ROLL CALL
III. DISCUSSION ITEMS
A. Planning Commission and Citizens Advisory Committee Recommendations
B. Affected Tax District Communications
C. Proposed Projects (Section 1.6)
D. Misc. Draft Plan Comments
E. Updated Schedule
VI. BUSINESS
A. Approve Resolution forwarding The Downtown & East Pine Street Corridor
Revitalization Plan and Report to the City Council with a recommendation to approve
VII. ADJOURNEMENT
City of Central Point
Development Commission
Meeting
Thursday, January 26, 2012
6:00 P.M.
Central Point
Council Chambers
140 S. 3rd Street
Central Point, Oregon
Members: Hank Williams
Allen Broderick
Bruce Dingler
Carol Fischer
Ellie George
Kelly Geiger
Kay Harrison
Staff Liaison: Chris Clayton
Don Burt
CITY OF CENTRAL POINT
Development Commission Minutes
November 11, 2011
I. REGULAR MEETING CALLED TO ORDER
Chair, Mayor Hank Williams called the meeting to order at 6:00 p.m.
II. ROLL CALL: Chair: Mayor Hank Williams
Commission Members: Allen Broderick, Carol Fischer,
Kelly Geiger, Kay Harrison, and Ellie George were present.
Bruce Dingler was excused.
City Manager Phil Messina; Community Development
Director Tom Humphrey; Assistant City Manager Chris
Clayton; Planning Manager Don Burt; Planning Technician
Connie Clune; and City Recorder Deanna Casey were also
present.
III. APPROVAL OF MINUTES
A. Approval of Development Commission Minutes for August 25, 2011.
Kay Harrison made a motion to approve the minutes as presented. Kelly
Geiger seconded. Roll call: Allen Broderick, yes, Kelly Geiger, yes; Carol Fischer,
yes; Kay Harrison, yes; Hank Williams, yes; and Ellie George, yes. Motion
approved.
IV. DISCUSSION ITEMS
A. Open House
Planning Manager Don Burt explained that this was an Open House. If the
members in the audience have any questions as we proceed with discussion of
the Draft Urban Renewal Plan please feel free to ask them.
He provided a brief explanation of the plan and process. The challenge to Urban
Renewal is to create projects that will expand the tax base, bringing in revenue to
the city through the taxing districts and economic growth. The city is considering
the Urban Renewal District in order facilitate revitalization of the East Pine Street
Corridor area. Over the past six years the assessed value of the city grew at an
annual average of 4.8% while the proposed Urban Renewal District grew at
1.6%.
The mission of the UR District is to eliminate blight and depreciating property
values within the Urban Renewal area; revitalize the area as the city’s traditional
mixed use urban core; and maximize public and private investments.
B. Distribution of Draft Urban Renewal Plan
City of Central Point
Development Commission Minutes
November 2, 2011
Page 2
Mr. Burt provided a copy of the plan and stated that we are about 98% complete.
He provided a brief list of possible UR capital projects which must be defined in
the plan. Projects can be added after the plan is adopted but that money
designated in the Plan would remain constant. He provided a list of the tasks that
are required by state when creating a district.
Task 1: Create an Urban Renewal Agency. The City Council created the
Development Commission on April 14, 2011.
Task 2: Define the Urban Renewal Area. Staff and the Development
Commission have defined 18% of Central Point with 447 acres in the downtown
core area.
Task 3: Present the list of projects and program costs: he presented the costs
for a total of $46,462,230 which includes 6% for administration costs. Projects
will be prioritized in the first year according to what their revenue to the city would
be. The District must be flexible in the list so that projects can be moved up if the
need arises or if specific funding is available.
Task 4: Identify Maximum Indebtedness. The estimated project cost is mentioned
above. That would be our maximum indebtedness. The project costs would be
held to that amount for the term of the district.
Task 5: Determine Financial Feasibility. It must be demonstrated that the Plan
as proposed is financially feasible, which has been demonstrated in the Report
Section of the Plan. Annual Financial Statements will be required by the State
just like the City. The Urban Renewal District will have a budget committee and
budget meetings separate from the City process.
Task 6: Determine Fiscal Impact. This task is in regards to how this program will
impact other taxing districts. All the taxing districts have been contacted and do
not have issue with the proposal. Currently the growth is small within the urban
renewal district. After approving the district the area should see an increase in
growth because of the improvements that will be conducted. The other districts
will see an increase in their revenue after the district ends in 25 years. The
school district amount would be provided by the state. The fire district is the other
large district and they have been involved in the process and are in support of it.
There was discussion regarding the Hamrick Penninger extension. Staff
explained the reasoning and challenges behind the additional connection and the
creek crossing issues connecting the south end of Penninger to Hamrick Road.
C. Meeting Schedule
Mr. Burt explained that the board has directed staff to forward the plan to the
Planning Commission, the Citizens Advisory Committee and an AdHoc
Committee for review and return with recommendations at their next meeting. As
it stands now the schedule is as follows:
City of Central Point
Development Commission Minutes
November 2, 2011
Page 3
January: the Board meets to review the Planning Commission CAC and
AdHoc recommendations.
February: The city Council considers and acts on the Urban Renewal
Plan
May, 2012: The district becomes official.
A few of the Commission members are concerned that they have not clearly
discussed the project list and boundaries and would like to have more discussion
and input into these areas. Mr. Burt explained that anyone is welcome to come to
his office for further discussion on the issues. We do not want to into too much
depth on the project list. The project list should remain general so that project
scope can be fined tuned as the projects come up for completion. The cost
estimate for each project comes from previous studies done by the city. At some
point the City has discussed all of these projects but has not had the funds to do
them. With and Urban Renewal District these projects can finally be completed.
Some of the items on the list may seem like they should be issues paid for by the
developer. However, when faced with the cost of including the improvements into
their project plans it also becomes to costly for a developer to do the traffic
infrastructure. The Urban Renewal District would be able to help with those
issues and help develop problem areas.
VI. ADJOURNMENT
The November 2, 2011 meeting was adjourned at 7:23 p.m.
Dated: _________________________
Chair Mayor Hank Williams
ATTEST:
__________________________
City Recorder
Page 1 of 2
MEMORANDUM
To: Development Commission
From: Don Burt, Planning Manager
Subject: Urban Renewal Meeting, January 26, 2012
Date: January 19, 2012
The following is an overview of the Discussion section of the Agenda. With the exception of item
C the discussion should be very brief. Item C is the primary purpose of the meeting. In the event
that the Commission is comfortable with the project list Business Item A provides for approval of
the Urban Renewal Plan. If the Commission decides to continue discussion on the Plan and
projects; then item IV - A can be continued.
III. DISCUSSION
A. Planning Commission and Citizens Advisory Committee Recommendations. On
December 6, 2011 the Planning Commission reviewed the Urban Renewal Plan dated
November 2, 2011 and by Resolution No. 784 forwarded a favorable recommendation to
the City Council per ORS 457.095. On December 7, 2011 the Citizens Advisory
Committee met to discuss the draft Urban Renewal Plan and forwarded a favorable
recommendation to the City Council.
B. Affected Taxing Districts. All affected taxing districts have been contacted regarding the
draft urban renewal plan. The only written comments received have been from Fire District
No. 3. The Fire District’s comments have been incorporated into the Plan, Sections
1.6.1(C)(5)(c) and 1.6.1(C)(14) as fire safety needs. At the meeting staff will update the
Commission on any other comments that may have been received. February 6th is the
noticed deadline for comments from taxing districts.
C. Proposed Projects. The primary purpose of the January 26th meeting is for the
Commission to finalize discussion of the projects as proposed in Section 1.6.1(C) (page
14). Staff will provide a brief overview of each project, starting with Project No. 1, then
open for Commission discussion/questions, and conclude with a Commission consensus for
that project before moving on to the next project.
D. Misc. Draft Plan Comments. Since release of the November 2, 2011 draft Plan staff has
completed the technical Report section and adjusted for noted reference errors throughout
the draft Plan and re-published as the December 6, 2011 draft Plan. No policy or project
Page 2 of 2
changes have been made since the Planning Commission and the CAC’s review of the
November 2nd draft.
E. Updated Schedule. If the Commission takes final action at the meeting the schedule for
completion of the Urban Renewal Plan would appear as follows:
a. January 26, 2012 – Resolution from Commission to City Council with
recommendation to approve
b. January 30, 2012 – Notice of City Council Public Hearing mailed (20 day
minimum notice).
c. February 23, 2012 – Public Hearing and action by City Council.
d. March 8, 2012 – Second Reading and approval of ordinance by City Council.
e. March 8, 2012 – City Council approves resolution directing the Commission to
record the approved Urban Renewal Plan.
f. March 12, 2012 – Notification in newspaper of adoption of Urban Renewal Plan.
g. April 7, 2012 – Urban Renewal Plan becomes effective (30 days from approval)
h. June 6, 2012 – Appeal Period ends (90 days from adoption).
IV. BUSINESS
A. Final Approval of Urban Renewal Plan. Pending outcome of discussion on item III-C the
Commission can proceed with a final decision on the Plan. If the Commission elects to
continue discussion, then this item should be continued. See attached Staff Report for
details.
Page 1 of 2
STAFF REPORT
January 26, 2012
AGENDA ITEM: File No. 08160(02)
Consideration of Downtown and East Pine Street Corridor Revitalization Plan, an Urban Renewal Plan
for the City of Central Point; Applicant: City of Central Point.
STAFF SOURCE:
Don Burt, Planning Manager
BACKGROUND:
On November 2, 2011 the Central Point Development Commission directed staff to forward to the
Planning Commission the draft Downtown and East Pine Street Corridor Revitalization Plan dated
11/2/11 for review and recommendation by the Planning Commission per ORS 457.085(4) and ORS
457.095. On December 6, 2011 the Planning Commission reviewed the Urban Renewal Plan and by
Resolution No.784 forwarded a favorable recommendation to approve. The Citizens Advisory Committee
reviewed the Urban Renewal Plan on December 7, 2011 and by minute action recommended approval.
In summary the Urban Renewal Plan:
1. Covers an area of 446.30 acres, or approximately 15.5% of the total city area;
2. Includes sixteen (16) projects, with a maximum indebtedness limitation of $46,462,230;
3. Has a duration of 25 year, beginning in FY 2011-12 and ending in FY 2036-37;
4. Is financially feasible based on projected increases in the Urban Renewal Area’s assessed value;
the increases in assessed value are based on the successful implementation of the proposed
projects;
5. Will have a minimal impact on affected taxing districts during the duration of the Urban Renewal
Plan, which will be significantly off-set upon conclusion of the Urban Renewal Plan; and
6. The Urban Renewal Plan is consistent with the City’s Comprehensive Plan.
Pending final discussion of the proposed project list (Section 1.6, page 14) the Urban renewal Plan is
complete and ready to forward to the City council.
ISSUES:
As the Development Commission reviews the draft Urban Renewal Plan specific attention should be
given to:
1. Proposed boundary (Exhibit 2 of Plan, page 71);
2. Mission, Goals, and Objectives (Section 1.5, page 11);
3. Proposed Projects and Activities (Section 1.6, page 14);
Page 2 of 2
4. Maximum Indebtedness (Section 1.7, page 22)
5. Duration of the Plan (Section 1.13, page 25); and
6. Financial Feasibility (Section 2.7, page 63).
The above represent the most substantial components of the Plan. Other sections are less policy and more
administrative in nature. The Plan now includes a Report section. The Report contains all the technical
and background information on which the Plan is based. The information in the Report section has been
discussed with the Commission throughout development of the Plan. By ORS 457 the Report section is
mandatory.
EXHIBITS/ATTACHMENTS:
Attachment “A” – Downtown and East Pine Street Corridor Revitalization Plan and Report (dated
December 6, 2011)
Attachment “B” – Findings of Comprehensive Plan Compliance (to be distributed at meeting)
Attachment “C” – Resolution forwarding the Urban Renewal Plan to the City Council
ACTION:
Consider 12/6/11 draft Urban Renewal Plan and recommendation to the City Council.
RECOMMENDATION:
Approve Resolution forwarding the Urban Renewal Plan to the City Council.
ATTACHMENT “A”
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 2 of 83
TABLE OF CONTENTS
ACKNOWLEDGEMENTS .....................................................................................................................5
SUMMARY .........................................................................................................................................6
PART I. THE EAST PINE STREET CORRIDOR REVITALIZATION PLAN .........................................................8
Section 1.1 Introduction ............................................................................................................................ 8
Section 1.2 City and Agency Relationship ................................................................................................. 8
Section 1.3 Definitions .............................................................................................................................. 8
Section 1.4 Legal Boundary Description .................................................................................................. 11
1.4.1 Written Description of Urban Renewal Area .............................................................................. 11
1.4.2 Graphic Description of the Urban Renewal Area ....................................................................... 11
Section 1.5 Mission Statement, Goals And Objectives ........................................................................... 11
1.5.1 Mission Statement ...................................................................................................................... 11
1.5.2 Goals and Objectives .................................................................................................................. 11
1.5.3 Relationship to the Strategic Plan .............................................................................................. 13
1.5.4 Consistency with the Comprehensive Plan ................................................................................ 13
1.5.5 Compliance with the Land Development Code .......................................................................... 13
Section 1.6 Urban Renewal Activities...................................................................................................... 13
1.6.1 Urban Renewal Projects and Activities ....................................................................................... 13
1.6.2 Acquisition of Real Property ....................................................................................................... 17
1.6.3 Procedures for Identifying Property to be Acquired .................................................................. 18
1.6.4 Property Acquisition for Unspecified Purposes .......................................................................... 18
1.6.5 Relocation Activities ................................................................................................................... 19
1.6.6 Property Disposition and Redeveloper Responsibilities ............................................................. 19
1.6.7 Owner Participation .................................................................................................................... 20
1.6.8 Administrative Activities and Services to the Board ................................................................... 20
1.6.9 Economic Incentive Programs .................................................................................................... 21
Section 1.7 Maximum Indebtedness And Financing Maximum Indebtedness ....................................... 21
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 3 of 83
1.7.1 Self Liquidation of Costs of Urban Renewal Indebtedness (Tax Increment Financing) 9 ............ 22
1.7.2 Prior Indebtedness ...................................................................................................................... 22
1.7.3 Annual Budget ............................................................................................................................ 22
Section 1.8 Annual Financial Statement Required .................................................................................. 22
Section 1.9 Citizen Participation.............................................................................................................. 23
Section 1.10 Non-Discrimination ............................................................................................................. 23
Section 1.11 Recording of Plan ................................................................................................................ 23
Section 1.12 Procedures for Amendments to the Urban Renewal Plan ................................................. 23
1.12.1 Minor Changes .......................................................................................................................... 24
1.12.2 Amendments to the Comprehensive Plan or any Implementing Ordinances .......................... 24
1.12.3 Substantial Changes .................................................................................................................. 24
Section 13 Duration and Validity of Approved Urban Renewal Plan ...................................................... 25
PART II. DOWNTOWN & EAST PINE STREET CORRIDOR REVITALIZATION REPORT ................................. 26
SECTION 2.1 INTRODUCTION ............................................................................................................... 26
SECTION 2.2 CURRENT CONDITIONS AND IMPACTS ........................................................................... 26
2.2.1 PHYSICAL CONDITIONS .............................................................................................................. 26
2.2.2. SOCIAL AND DEMOGRAPHIC CONDITIONS ................................................................................ 38
2.2.3. ECONOMIC CONDITIONS ........................................................................................................... 42
2.2.4 FISCAL IMPACT OF THE URBAN RENEWAL PLAN IN LIGHT OF ADDED SERVICES OR INCREASED
POPULATION ........................................................................................................................................ 48
SECTION 2.3 URBAN RENEWAL AREA SELECTION ................................................................................. 50
SECTION 2.4 PROJECT SELECTION ......................................................................................................... 51
2.4.1 URBAN RENEWAL PROJECTS AND RELATIONSHIP TO BLIGHT MITIGATION .............................. 52
SECTION 2.5 PROJECT COSTS, FUNDING, COMPLETION, AND MAXIMUM INDEBTEDNESS.................. 55
2.5.1 PROJECT COSTS ........................................................................................................................... 56
2.5.2 MAXIMUM INDEBTEDNESS ........................................................................................................ 57
2.5.3 PROJECT COMPLETION DATES ................................................................................................... 57
2.5.4 INDEX TO ADJUST PROJECT AND ACTIVITY DOLLAR VALUES ..................................................... 60
SECTION 2.6 ESTIMATED TAX INCREMENT REVENUE AND DEBT RETIREMENT .................................... 60
SECTION 2.7 FINANCIAL ANALYSIS ......................................................................................................... 63
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 4 of 83
SECTION 2.8 A FISCAL IMPACT STATEMENT .......................................................................................... 63
SECTION 2.9 RELOCATION REPORT ........................................................................................................ 66
2.9.1 PROPERTIES REQUIRING RELOCATION ...................................................................................... 66
2.9.2 DESCRIPTION OF RELOCATION METHODS ................................................................................. 66
2.9.3 ENUMERATION OF HOUSING UNITS REQUIRING RELOCATION ................................................ 67
APPENDIX ........................................................................................................................................ 68
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 5 of 83
ACKNOWLEDGEMENTS
CENTRAL POINT DEVELOPMENT COMMISSION BOARD OF DIRECTORS
HANK WILLIAMS, MAYOR
BRUCE DINGLER, PRESIDENT
ALLEN BRODERICK CAROL FISHER
KELLY GEIGER ELLIE GEORGE
KAY HARRISON
URBAN RENEWAL STAFF:
URBAN RENEWAL DIRECTOR/CITY MANAGER: PHIL MESSINA
URBAN RENEWAL MANAGER/ASSISTANT CITY MANAGER: CHRIS CLAYTON
PREPARED BY:
CITY OF CENTRAL POINT COMMUNITY DEVELOPMENT DEPARTMENT:
COMMUNITY DEVELOPMENT DIRECTOR: TOM HUMPHREY, AICP
PLANNING MANAGER: DON BURT , AICP, EDFP
COMMUNITY PLANNER: CONNIE CLUNE
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 6 of 83
EXECUTIVE SUMMARY
The Downtown and East Pine Street Corridor Revitalization Program (the “Program”) is an urban renewal
plan for the City of Central Point. The Program is presented in two parts – Part I, The Downtown and
East Pine Street Corridor Revitalization Plan (the “Plan”), and Part II, The Downtown and East Pine Street
Corridor Revitalization Report (the “Report”). The Program has been prepared by the Central Point
Development Commission, an urban renewal agency for the City of Central Point, pursuant to the
provisions of Chapter 457 of the Oregon Revised Statutes, the Oregon Constitution and all other
applicable state and local laws.
The goals, projects and activities presented in the Program are designed to reinforce the City’s
commitment to the revitalization of the Downtown area as set forth in Central Point Forward, Fair City
2020 – A City Wide Strategic Plan. The underlying objective of the Program is to identify projects and
provide a consistent long-term source of funding (tax increment financing) sufficient to encourage and
leverage private sector reinvestment in the Urban Renewal Area, thereby eliminating blighted
conditions.
The Program targets a single geographic area of 446.3 acres located entirely within the incorporated City
of Central Point. Most of the area is represented by the original Town of Central Point platted in 1887.
Consequently, much of the development within the Urban Renewal Area occurred in the late 1800s and
early to mid 1900s.
The presence of blight is best summarized in the Downtown area’s growth in assessed value. Over the
past five years the City’s average assessed value has increased by 4.6%. During that same period the
designated Urban Renewal Area has averaged an annual growth rate of less than 1.6%. For FY 2011-12
the assessed value for the Urban Renewal Area ($131,424,5281) actually declined by 1.5%. Given the
rate of growth in assessed valuation the Urban Renewal Area relies on other geographic areas to
maintain a constant level of public services.
To encourage and leverage private sector investment the Program identifies fifteen (15) projects that
are considered key to the revitalization of the Urban Renewal Area. These projects have an estimated
total cost of $67,295,7852 and are planned to be completed over a period of twenty-five (25) years. Of
the total project costs the Urban Renewal Agency will be responsible for $43,177,530 (Maximum
Indebtedness). The Urban Renewal Agency will use tax increment financing as its primary revenue
source for funding the Program. The financial feasibility of the Program has been addressed in the
Report section of the Program3, and determined to be feasible.
The Program’s4 fiscal impact on affected taxing districts has been addressed, and the cost to each
affected taxing district estimated. Considering the average annual growth rate of the Urban Renewal
area’s assessed value the fiscal impact to affected taxing districts is minimal, particularly when the 25-
year duration of the Program is considered. It has also been noted in the Program that some of the
designated projects will benefit property outside the Urban Renewal Area, which will increase the
assessed value of the affected taxing districts, further off-setting estimated fiscal impacts. It is estimated
that by the end of FY 2037-38 an estimated $321,473,429 in incremental assessed value will be released,
resulting in the distribution of $4,446,230 in tax revenue. By FY 2039-40 it is estimated that all affected
1 Jackson County Assessor’s Office, 2011-12
2 Measured in 2011 dollars
3 Section 2.7
4 Section 2.8
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 7 of 83
taxing districts will have reached a break-even point, recapturing any lost revenue. More importantly,
the Urban Renewal Area will be a fiscally stronger and more livable environment, generating increased
tax revenues for many years.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 8 of 83
PART I.
THE EAST PINE STREET CORRIDOR REVITALIZATION PLAN
SECTION 1.1 INTRODUC TION
Central Point’s Downtown area represents the historic core of the City. As such, many of the buildings
and infrastructure were built in the late 1800s and early to mid -1900s. Consequently, much of the
Downtown’s buildings and infrastructure are tired, “use challenged”, meaning that many of the
structures and uses have a difficult time competing with newer commercial and residential areas for the
necessary private sector investment needed to remain competitive. This inability to compete has
resulted in the occurrence of blighting conditions throughout the Urban Renewal Area.
The presence of blighting conditions is best summarized in the Downtown area’s assessed value. Over
the past five years the City’s average assessed value has increased by 4.6% on an annual basis, while the
Urban Renewal Area has averaged only 1.6% annually. For fiscal year 2011-12 the assessed value for the
Urban renewal Area actually declined by 1.5%. In response to the Area’s declining condition the City has
prepared the Downtown and East Pine Street Corridor Revitalization Plan, an Urban Renewal Plan for the
City of Central Point (the Plan).
The preparation of the Downtown and East Pine Street Corridor Revitalization Program (the “Program”)
was encouraged by a number of recent events, including the Great Recession of 2008, adoption of the
Greater Bear Creek Valley Regional Plan, and Central Point Forward, Fair City 2020 – A City Wide
Strategic Plan. Collectively, these events reinforced and refined the City’s preferred future growth
pattern, with the downtown area serving as the City’s urban center.
SECTION 1.2 CITY AND AGENCY RELATIONSHIP
The City Council of the City of Central Point on April 14, 2011, by Ordinance Number 1950, declared that
blighted areas exist within the City and that there is a need for an urban renewal agency to function
within the City. The City Council, by the approval of Ordinance Number 1950, and in accordance with
the provisions of ORS 457.045 (3), created the Central Point Development Commission, and appointed a
Board of Directors consisting of the City Council. Pursuant to ORS 457.035, the Central Point
Development Commission is, “…a public body corporate and politic…” The relationship between the
City of Central Point, an Oregon Municipal Corporation, and the Central Point Development Commission,
a public body corporate and politic, shall be as contemplated by Chapter 457 of the Oregon Revised
Statutes. Nothing contained in this Plan, including the City’s supplying of services or personnel, and the
budgeting requirements of this Plan shall in any way be construed as departing from or disturbing the
relationship contemplated by Chapter 457 of the Oregon Revised Statutes.
SECTION 1.3 DEFINITIONS
As used in this Plan, unless the context requires otherwise, the following definitions shall apply:
1. AGENCY, the Central Point Development Commission which, in accordance with the
provisions of Chapter 457 of the Oregon Revised Statutes is the urban renewal agency of the
City of Central Point, Jackson County, Oregon.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 9 of 83
2. AGENCY BOARD or COMMISSION, the Board of Directors of the Central Point Development
Commission.
3. AREA, the geographic area of the City that encompasses the Downtown and East Pine Street
Corridor Revitalization Area, prepared in accordance with all applicable provisions of ORS
Chapter 457.
4. BASE VALUE. The assessed value of the Urban Renewal Area at time of adoption of the Plan
and as determined by the Jackson County Assessor’s office.
5. BASE YEAR. The fiscal year that the Base Value was established.
6. BOARD OF COUNTY COMMISSIONERS, the governing body of Jackson County.
7. BLIGHTED AREAS, areas which by reason of deterioration, faulty planning, inadequate
or improper facilities, deleterious land use or the existence of unsafe structures, or
any combination of these factors, are detrimental to the safety, health or welfare of the
community. A blighted area is characterized by the existence of one or more of the
following conditions:
A. The existence of buildings and structures, used or intended to be used for living,
commercial, industrial or other purposes, or any combination of those uses, which are
unfit or unsafe to occupy for those purposes because of any one or a combination of the
following conditions:
i. Defective design and quality of physical construction;
ii. Faulty interior arrangement and exterior spacing;
iii. Overcrowding and a high density of population;
iv. Inadequate provision for ventilation, light, sanitation, open spaces and recreation
facilities; or
v. Obsolescence, deterioration, dilapidation, mixed character or shifting of uses;
B. An economic dislocation, deterioration or disuse of property resulting from faulty
planning;
C. The division or subdivision and sale of property or lots or irregular form and shape and
inadequate size or dimensions for property usefulness and development;
D. The layout of property or lots in disregard of contours, drainage and other physical
characteristics of the terrain and surrounding conditions;
E. The existence of inadequate streets and other rights-of-way, open spaces and utilities;
F. The existence of property or lots or other areas which are subject to inundation by water;
G. A prevalence of depreciated values, impaired investments and social and economic
maladjustments to such an extent that the capacity to pay taxes is reduced and tax
receipts are inadequate for the cost of public services rendered;
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 10 of 83
H. A growing or total lack of proper utilization of areas, resulting in a stagnant and
unproductive condition of land potentially useful and valuable for contributing to the
public health, safety and welfare; or
I. A loss of population and reduction of proper utilization of the area that causes further
deterioration and added costs to the taxpayer for the creation of new public facilities and
services elsewhere.
8. CITY, the City of Central Point, Jackson County, Oregon.
9. DOWNTOWN, as used in this Plan, means that geographic area of the City of Central Point,
which is included in the Downtown Revitalization Area -- an urban renewal area -- and which
is more fully described in Section 300 and Exhibits 1 and 2 of this Plan.
10. CITY COUNCIL or COUNCIL, the governing body of the City of Central Point.
11. COMPREHENSIVE PLAN, the Comprehensive Plan of the City of Central Point including all of
its policies, procedures and implementing provisions.
12. COUNTY, Jackson County, Oregon.
13. EXHIBIT, an attachment, either narrative or graphic, to this Urban Renewal Plan.
14. ORS, Oregon Revised Statutes (State Law). ORS 457 is the chapter which regulates the
renewal of blighted areas within the State of Oregon.
15. PLAN, the Downtown and East Pine Street Corridor Revitalization Plan, an Urban Renewal
Plan of the City of Central Point, Oregon.
16. PROGRAM, Part 1 of the Plan.
17. REDEVELOPER, a party who acquires real property from the Central Point Development
Commission for the purposes of developing or redeveloping such property in conformity
with the provision of the Plan.
18. REVITALIZATION PLAN, the Downtown and East Pine Street Corridor Revitalization Plan, an
Urban Renewal Plan of the City of Central Point.
19. STATE, the State of Oregon, including its various departments, divisions and agencies.
20. TAX INCREMENT FINANCING, a method of financing indebtedness incurred by the Board of
Directors of the Central Point Development Commission in preparing and implementing the
Plan. Such tax increment method is authorized by ORS Sections 457.420 through 457.450
and provides that the tax proceeds, if any, realized from an increase in the taxable assessed
value of real and personal property within the Revitalization Area above that existing on the
County tax roll last equalized prior to the effective date of the Central Point City Council
Ordinance approving the Urban Renewal Plan shall be paid into a special fund of the
Agency’s Commission of Directors. Such special fund shall be used to pay the principal and
interest on indebtedness incurred by the Commission in financing or refinancing the
preparation and implementation of the approved Urban Renewal Plan including the
administration of the Commission’s activities.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 11 of 83
21. TAXING BODY, the City of Central Point, Jackson County, Jackson County Education Service
District, Jackson County Vector Control, Jackson County Soil Conservation, Rogue Valley
Transit District, Rogue Community College, Fire District No. 3, and Central Point School
District No. 6, each of which levies ad valorem taxes within the boundaries of the Urban
Renewal Area.
22. URBAN RENEWAL AREA, the geographic area of the City that encompasses the Downtown
and East Pine Street Corridor Revitalization Area, an urban renewal district prepared in
accordance with all applicable provisions of ORS Chapter 457.
23. URBAN RENEWAL LAW, Chapter 457 of the Oregon Revised Statutes as it exists on the
effective date of this Urban Renewal Plan or as it may be amended from time-to-time by
action of the Oregon Legislature.
24. URBAN RENEWAL PLAN, the Plan for the Downtown and East Pine Street Corridor
Revitalization Plan – An Urban Renewal Plan for the City of Central Point, Oregon.
SECTION 1.4 LEGAL BOUNDARY DESCRIPTION
The Urban Renewal Area contains 446.3 acres, accounting for 15.5% of the City’s total acreage. The legal
description and illustration of the boundary of the Urban Renewal Area is described as follows:
1.4.1 WRITTEN DESCRIPTION OF URBAN RENEWAL AREA
A written narrative of the Urban Renewal Plan Area is presented as Exhibit 1 (Appendix), a
Narrative Description of Urban Renewal Area.
1.4.2 GRAPHIC DESCRIPTION OF THE URBAN RENEWAL AREA
A map of the Urban Renewal Area is presented in Exhibit 2 (Appendix), a graphic (Map)
illustration of the Urban Renewal Area.
SECTION 1.5 MISSION STATEMENT, GOALS AND OBJECTIVES
1.5.1 MISSION STATEMENT
It is the mission of the Central Point Development Commission to eliminate blight and
depreciating property values within the urban renewal district. This will be accomplished
through the preparation and implementation of an urban renewal program that maximizes both
public and private investments that target, facilitate and strengthen the economic and aesthetic
vitality of the Urban Renewal Area as the City’s traditional mixed-use urban core.
1.5.2 GOALS AND OBJECTIVES
To accomplish its mission the Development Commission will develop and implement an urban
renewal program known as the Downtown and East Pine Street Corridor Revitalization Plan, the
goals and objectives of which are to:
A. Resolve the problems created by existing blighted conditions in the Area so that unused and
underused properties can be placed in productive condition and utilized at their highest and
best use in accordance with the City of Central Point Comprehensive Plan.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 12 of 83
B. Provide programs for the development, redevelopment, and rehabilitation of property in
the Area in ways that will:
i. Re-enforce the pedestrian and mixed-use character of the downtown, and insure a
more attractive, functional and economically viable urban core consistent with the
goals and objectives of the Greater Bear Creek Valley Regional Plan;
ii. Encourage job creation through the expansion of existing businesses and the
development of new businesses within the Urban Renewal Area;
iii. Increase property values so that the Urban Renewal Area will contribute its fair
share to the costs of public services provided by the City and other affected taxing
districts; and
iv. Conserve and place into productive use historically significant places and properties.
C. Respond to the needs and the concerns of all people of the City of Central Point with respect
to revitalization of the Area as expressed in the City’s strategic plan Central Point Forward,
Fair City Vision 2020 and the City of Central Point Comprehensive Plan.
D. Encourage the maximum amount of public involvement and citizen’s participation in the
formation and implementation of the Urban Renewal Plan by:
i. Explaining and discussing the details of the Urban Renewal process:
a. To the public at town hall type gatherings;
b. To invite special interest groups, public service organizations, public bodies
and the general public to Commission meetings;
c. To include urban renewal activities and updates in the City’s periodic
newsletters; and
d. To cooperate with the news media to discuss the Urban Renewal Plan and
process.
ii. Meeting with the nine affected taxing bodies to explain the long-term benefits of
the Urban Renewal program and its relationship to their fiscal concerns, and
iii. Being available to discuss the details of the Urban Renewal Plan with service,
professional, fraternal and labor organizations.
E. To provide an adequate amount of properly located off-street parking in the downtown area
including a plan and program to effectively pay for, manage, and maintain such parking;
F. To create positive linkages among the five sub areas of the Urban Renewal Area; the
Downtown, Hwy. 99 Corridor, Northside Neighborhood, Southside Neighborhood, and East
Pine Street Area;
G. To cooperate and coordinate with the Rogue Valley Transit District in their efforts to
improve transportation services in the Urban Renewal Area;
H. To develop, and implement, a plan for the undergrounding of present overhead utilities that
are located in areas of maximum pedestrian activity;
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 13 of 83
I. To cooperate and coordinate with the program to improve Bear Creek and the Bear Creek
Greenway and to recognize the positive values and benefits that these improvements will
have on the revitalization of the Urban Renewal Area.
J. To improve the visual appearance, capacity and traffic flow of East Pine Street and other
streets within the Urban Renewal Area that carry the major share of vehicular and
pedestrian traffic;
K. To cooperate with property owners in the rehabilitation of their buildings and property;
L. To install coordinated street furniture, night lighting and landscaping within the Downtown
Core Area in areas of maximum pedestrian concentration;
M. To assure, through the construction/installation, or replacement that publicly owned
utilities such as water, storm drains, and sanitary sewers, are adequate in capacity to service
the needs of all uses within the urban renewal district; and
N. To leverage the Agency’s financial resources to the maximum extent possible with other
public and private investment and other public and private funding sources.
1.5.3 RELATIONSHIP TO THE STRATEGIC PLAN
This Plan is intended to further the objectives of the City’s strategic planning goals, strategies
and actions as set forth in Central Point Forward, Fair City Vision 20205 as it exists on the
effective date of this Urban Renewal Plan, or as it may be amended from time to time, and is
hereby incorporated by reference as if it were included in full.
1.5.4 CONSISTENCY WITH THE COMPREHENSIVE PLAN
This Plan has been prepared in conformity with the City’s adopted Comprehensive Plan
including its goals, policies, procedures and implementing provisions, or as it may be amended
from time to time, and is hereby incorporated by reference as if it were included in full.
1.5.5 COMPLIANCE WITH THE LAND DEVELOPMENT CODE
The use and development of all land within the Urban Renewal Area shall comply with the City’s
Land Development Code and all other, codes, policies, regulations, including the “Downtown
Revitalization Plan”, and all other applicable Federal State, and County regulations, as they exist
on the effective date of this Urban Renewal Plan or as they may be amended from time to time,
are incorporated hereby by reference as if they were included in full.
SECTION 1.6 URBAN RENEWAL ACTIVITIES
To achieve the goals and objectives of this Plan the following activities may be undertaken by the
Commission, or caused to be undertaken by others, in accordance with applicable Federal, State, County
and City laws, policies and procedures and in compliance with the provisions of this Plan. The
Commission’s responsibility for all activities identified in the Plan is subject to the availability of
appropriate funding.
5 City Council Resolution No. 1143
1.6.1 URBAN RENEWAL PROJEC TS AND ACTIVITIES
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 14 of 83
A. The following projects and activities are deemed necessary to:
i. Eliminate blighting conditions and influences;
ii. Reverse presently depreciating property values;
iii. Make the Area attractive for the stabilization, expansion, rehabilitation or
redevelopment of existing businesses, industries and housing;
iv. Create a physical, visual and economic environment that will attract new, job
producing development of the Area’s vacant land; and to
v. Further the objectives of the Urban Renewal Plan as set forth in Section 1.5,
Mission Statement, Goals and Objectives.
B. All public improvements herein proposed shall be constructed in conformance with the
approved standards and policies of the City of Central Point.
C. With funds available to it, the Central Point Development Commission may fund in full, in
part, a proportionate share of, or cause to be funded, the following numbered projects and
activities:
1. DOWNTOWN AREA STREETSCAPE IMPROVEMENTS. Within Downtown Core Area
(Appendix, Figure 2) improve streetscapes on the primary pedestrian streets.
Streetscape improvements may include curb and gutter, sidewalks, crosswalks,
street trees, tree grates, street lights, plazas, gateways, and street furniture. All
streetscape improvements shall be constructed in accordance with an approved
streetscape master plan for the area illustrated in Part 2, Figure 6, Downtown Core
Area.
2. EAST PINE STREET IMPROVEMENTS. Improve the streetscape along that section of
East Pine Street between the Downtown Area and Hamrick Road. Streetscape
improvements may include curb and gutter, sidewalks, crosswalks, street trees, tree
grates, street lights, plazas, gateways, portal signage on I-5, and street furniture. All
streetscape improvements shall be constructed in accordance with an approved
streetscape master plan East Pine Street.
3. NEIGHBORHOOD SIDEWALKS AND STREET LIGHTING. Install sidewalks on
residential streets in the Northside and Southside Neighborhoods illustrated in (Part
2, Figure 2, Urban Renewal Boundary and Planning Sub Areas). All sidewalk
improvements shall be made in accordance with city sidewalk standards and may
include street lighting, and street trees.
4. HWY. 99 CORRIDOR IMPROVEMENTS. Improve Hwy. 99 (Front Street) streetscape
from the proposed Twin Creeks railroad crossing south to Bush Street. Streetscape
improvements may include curb and gutter, sidewalks, street trees, tree grates,
street lights, plazas, gateways, cross-walks and street furniture. All streetscape
improvements shall be made in accordance with an approved streetscape master
plan for the area.
5. INTERSECTION SIGNALIZATION. Install/upgrade/modify traffic signals at the
following intersection:
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 15 of 83
a. Twin Creeks RR-Xing. Install new signalized intersection at Hwy. 99 and
Twin Creeks Dr. and new railroad crossing at Twin Creeks Dr. Improvements
shall include, but not be limited to easement acquisition, curb and gutter,
street surface improvement, railroad crossing signalization, Hwy. 99
signalization, sidewalks, street lights, and landscaping;
b. Downtown Core Area Signals, add new signals and modify others within the
Downtown Core Area as per the approved East Pine Street Corridor
Refinement Plan;
c. Hwy. 99 and Fire District 3 Station, to improve the safety of emergency
vehicle egress install an emergency signal on Hwy. 99;
d. Pine St. and Peninger, modify existing signal in accordance with Interchange
Access Management Plan 33;
e. Pine St. and Gebhard Extension, add new signals at future intersection of
Gebhard Rd. and E. Pine Street.
6. OFF-STREET PARKING FACILITIES. All public parking constructed under the
provisions of this Section shall comply with the objectives and policies of the City of
Central Point Comprehensive Plan and the City of Central Point Transportation
System Plan as applies to the Downtown, and with the applicable standards set
forth in the Land Development Code.
a. Oak Street Parking Facility. Design and construct a parking facility on the
northwest corner of Oak Street and Third Street.
b. Manzanita Street Parking Facility. Design and construct a parking facility
on the southeast corner of Manzanita Street and First St.
7. UNDERGROUND EXISTING POLE MOUNTED UTILITY SYSTEMS. Within the
Downtown Core Area, and along Hwy. 99 underground existing overhead utilities in
accordance with an approved comprehensive underground utility plan.
8. GEBHARD ROAD EXTENSION TO COLLECTOR STREET STANDARDS. Extension of
Gebard Road to local collector street standards from the northerly limits of the
Urban Renewal Area to East Pine Street.
9. PFAFF PARK RENOVATION. Renovate Pfaff Park including new landscaping,
restroom facilities, playground equipment, and lighting.
10. FREEMAN ROAD UPGRADE TO COLLECTOR STREET STANDARDS. Between Oak St.
and Hopkins Road rebuild Freeman Road to collector street standards, including
curb, gutter, sidewalks, street lights, traffic control devices, and street trees.
11. PENINGER ROAD SOUTHERLY EXTENSION. Extend Peninger Road south across Bear
Creek to collector street standards to intersect with Hamrick; including intersection
signal modifications at East Pine Street and Peninger, southerly bridge crossing and
bike lanes. The specifics and timing of this project shall be based on a transportation
analysis prior to commencement of construction.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 16 of 83
12. MISCELLANEOUS PUBLIC WORKS. Throughout the life of this Urban Renewal
Program, the Commission, consistent with their priorities and financial resources,
may assume the costs, or share of the costs, of engineering and constructing public
works projects within the Urban Renewal Area to further the objectives of this
Urban Renewal Plan. Such projects may include the installation or reconstruction of
the following:
a. Storm Drains;
b. Sanitary Sewers;
c. Water Mains and Fire Hydrants;
d. Curbs or Curbs and Gutters;
e. Sidewalks, including Irrigated Tree Plantings;
f. Street Work; and
g. Alley Paving.
13. CITY OF CENTRAL POINT COMMUNITY CENTER. Assist with the feasibility analysis,
site and architectural design, land acquisition, and construction of a community
center within the Area. The Agency’s participation in the development of a
community center shall be limited to the percentage of the total design and
development costs, including land acquisition that can be reasonably attributed to
serving the Area.
14. FIRE SAFETY. New Fire equipment to service growth within Urban Renewal Area.
The Commission will coordinate and enter into a written agreement with Fire
District No.3 regarding the timing of implementation of this project.
15. ECONOMIC DEVELOPMENT INCENTIVE PROGRAM. The Commission may establish
incentive programs to encourage commercial and residential development within
the Urban Renewal Area. The economic incentive programs may be in the form of
grants, or loans. Prior to the establishment of any economic incentive program the
Commission shall prepare and adopt an economic development incentive program
defining:
a. Criteria for eligibility;
b. Terms and conditions of the program;
c. Loan procedures for recycling the funds as loan obligations are
paid;
d. Procedures where loan payments are not paid or paid in an untimely
manner;
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 17 of 83
e. Procedures and conditions for which deferred payment loans may
be offered;
f. Procedures for administering and servicing the program; and
g. Such other procedures and conditions which the Commission deems
necessary.
1.6.2 ACQUISITION OF REAL PROPERTY
A. Intent
It is the intent of this Plan to authorize the Commission of the Urban Renewal Agency to acquire
property within the Urban Renewal Area by any legal means to achieve the objectives of this
Plan, and specifically, for any of the purposes listed in Subsection 1.6.2(B), Purpose of Property
Acquisition.
B. Purpose of Property Acquisition.
Property acquisition, including limited interest acquisition is hereby made a part of this Plan and
may be used by the Commission to achieve the objectives of this Plan based on any one of the
following criteria:
1. Where existing conditions do not permit practical or feasible rehabilitation of a
structure, by its owner, and it is determined by the Commission that acquisition of
such properties and demolition or rehabilitation of the improvements thereon are
necessary to remove substandard and blighting conditions;
2. Where detrimental land uses or conditions such as incompatible uses, or adverse
influences from noise, smoke or fumes exist, or where there exists over-crowding,
excessive dwelling unit density or conversions to incompatible types of uses, and it
is determined by the Commission that acquisition of such properties and the
rehabilitation or demolition of the improvements are necessary to remove blighting
influences;
3. Where it is determined by the Commission that the property is needed to provide
public improvements and facilities as follows:
Right-of-way acquisition for; streets, alleys, bicycle paths, or pedestrian ways
(sidewalks).
Facilities for the benefit of the public which are to be developed by the
Commission, the City, or any other public entity;
Property acquisition for public, off-street parking facilities; or
Where the owner of real property within the boundaries of the Urban Renewal
Area wishes to convey title of such property by legal means, including by gift.
Where it is determined by the Commission that a substantial public interest or
the objectives of this Plan can be furthered by assembling property for
development or redevelopment by a party other than the owners of record of
such property, the Commission may acquire such property.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 18 of 83
C. Property Which May Be Acquired
At the time of adoption of this Plan no properties have been designated for acquisition. As a
minor amendment, and as part of an existing project, the Commission may designate property
to be acquired subject to compliance with Section 1.6.3, Procedures for Identifying Property to
be Acquired.
1.6.3 PROCEDURES FOR IDENTIFYING PROPERTY TO BE ACQUIRED
Project activities listed in Section 1.6, Urban Renewal Activities, may require acquisition of
property not identified by the Commission as of the effective date of this Plan. However, should
such action be required by the Commission, the following procedures shall be undertaken prior
to such property acquisition:
A. First the Commission shall determine the properties which may be acquired.
B. The Commission, or its designated representative, shall then contact the owner or owners
of both properties at the address shown on the most current tax roll to inform the owners
of the Commission’s interest in acquiring their property and the reasons for such interest.
C. The Commission, at a regularly scheduled meeting, shall discuss the results of the contact
with the owner of the affected property and determine whether or not to proceed with the
acquisition process.
D. If it is in the Commission’s determination to proceed with the acquisition process, they shall
set a time and place for a public hearing on the matter. The owners of the property which
may be acquired shall be notified of such public hearing by registered mail, return receipt
requested.
E. At the public hearing, the Commission shall explain the public purpose, public interest or the
plan objectives that would be furthered by such property acquisition. The Commission shall
then receive comment from the affected property owner, if any, and from the public at
large.
F. After the owners and public have been heard, their comments shall be considered by the
Commission. The Commission, by resolution shall then make a finding, based on the
reasons for the acquisition, the content of the owners and public testimony whether or not
to proceed with the acquisition.
G. If the Commission’s finding and determination is to proceed with the acquisition process,
the Commission, by resolution, shall cause a minor change to this Plan to be prepared in
conformance with Section 1.12.1, Minor Changes. Such change shall consist of a map or
maps and a legal description of the property to be acquired including a copy of the
Commission’s finding described in subsection “F” above. The change shall be assigned an
appropriate exhibit number and incorporated as part of this Urban Renewal Plan.
H. The Commission shall then proceed with the acquisition process.
1.6.4 PROPERTY ACQUISITION FOR UNSPECIFIED PURPOSES
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 19 of 83
If property acquisition, other than for the projects or activities identified in Section 1.6, Urban
Renewal Activities, is considered by the Commission, such property acquisition shall be treated
as a minor amendment within the meaning of Section 1.12.1, Minor Changes.
1.6.5 RELOCATION ACTIVITIES
If in the implementation of this Plan, persons or businesses should be displaced by action of the
Commission, the Commission shall provide assistance to such persons or businesses to be
displaced. Displaced persons or businesses will be contacted to determine their individual
relocation needs. They will be provided information on available space and will be given
assistance in moving. All relocation activities will be undertaken and relocation payments made
in accordance with the requirements of ORS 281.045 – 281.105. Payments made to persons
displaced from dwellings will be assured that they will have available to them habitable, safe,
and sanitary dwellings at costs or rents within their financial reach. Payment for moving
expense will be made to occupants displaced.
Prior to the Commission acquiring any property which will cause households, businesses,
industries, offices or other occupants to be displaced, the Commission will prepare, adopt and
maintain a Relocation Policy, an outline of which is set forth herein as Exhibit “4“ of Part 2. Such
policy will be available to interested parties at the Agency’s office and will set forth the
relocation program and procedures, including eligibility for and amounts of relocation
payments, services available and other relevant matters.
1.6.6 PROPERTY DISPOSITION AND REDEVELOPER RESPONSI BILITIES
A. PROPERTY DISPOSITION. The Commission is authorized to dispose of, sell, lease, exchange,
subdivide, transfer, assign, pledge or encumber by mortgage, deed of trust, or otherwise
any interest in real property which has been acquired by them in accordance with the
provisions of this Plan and with the terms and conditions set forth in a Disposition and
Development Agreement or other legal instrument as determined by the Commission.
All real property acquired by the Commission in the Urban Renewal Area, if any, shall be
used or disposed of for development consistent with the goals and objectives of the Urban
renewal Plan and with all applicable codes, ordinances, policies, plans and procedures of the
City. The Commission shall obtain fair re-use value for the specific uses to be permitted on
the real property. Real property acquired by the Commission may be disposed of without
consideration (cost) to any other public entity in accordance with this Plan. All persons and
entities obtaining property from the Commission shall use the property for the purposes
consistent with the goals and objectives designated in Section 1.5.2, Goals and Objectives,
of this Plan, and shall commence and complete development of the property within a period
of time which the Commission fixes as reasonable, and shall comply with other conditions
which the Commission deems necessary to carry out the goals and objectives of this Plan as
stated in Section 1.5, Mission Statement, Goals and Objectives. Real property shall not be
disposed of for the purpose of speculation.
The Commission shall provide adequate safeguards to ensure that the provisions of this Plan
will be carried out to prevent the recurrence of blight. All real property owned or leased by
parties, shall be made subject to the provisions, and the goals and objectives, of this Plan.
Leases, deeds, contracts, agreements, documents and declarations of restrictions by the
Commission may contain restrictions, covenants, covenants running with the land, rights or
reverter, conditions precedent or subsequent, equitable servitudes, or any other provisions
necessary to carry out this Plan.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 20 of 83
B. REDEVELOPER’S OBLIGATION.
Any redeveloper and his/her successors or assigns within the Urban Renewal Area, in
addition to the other controls and obligations stipulated and required of the Redeveloper by
the provisions of this Plan, shall also be obligated by the following requirements:
1. The Redeveloper shall obtain necessary approvals of proposed developments from all
Federal, State and/or local agencies that may have jurisdiction on properties and
facilities to be developed or redeveloped within the Urban Renewal Area;
2. The Redeveloper shall develop or redevelop such property in accordance with the land-
use provisions and other requirements specified in this Plan;
3. The Redeveloper shall submit all plans and specifications for construction of
improvements on the land to the Commission or such of its agents as the Commission
may designate for review prior to distribution to appropriate reviewing bodies as
required by the City.
4. The Redeveloper shall commence and complete the development of such property for
the use provided in this Plan within a reasonable period of time as determined by the
Commission;
5. The Redeveloper shall not effect or execute any agreement, lease, conveyance, or other
instrument whereby the real property or part thereof is restricted upon the basis of age,
race, color, religion, sex, marital status, or national origin in the sale, lease or occupancy
thereof;
6. The Redeveloper shall accept all conditions and agreements as may be required by the
Commission. In return for receiving assistance from the Commission, if any, the
Commission may required the redeveloper to execute a development agreement
acceptable to the Commission as a condition of the Commission providing assistance;
and
7. The Redeveloper shall maintain property under his/her ownership within the area in a
clean, neat and safe condition.
1.6.7 OWNER PARTICIPATION
Property owners within the Urban Renewal Area proposing to improve their properties and
receiving financial and/or technical assistance from the Commission shall do so in accordance
with all applicable provisions of this Plan and with all applicable codes, ordinances, policies,
plans and procedures of the City.
1.6.8 ADMINISTRATIVE ACTIVITIES AND SERVICES TO THE BOARD
A. The Board may hire its own staff or it may obtain its administrative support staff from the City
on such terms and conditions as the Board and the City may agree. The costs of Agency staffing
shall be agreed to annually by the City and made a part of the annual budget proposal of the
Board.
B. The Board may retain and budget for the services of independent professionals, and or firms for
services necessary to implement the projects and activities of the Plan. These services may
includes, but are not limited to:
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 21 of 83
i. Legal Counsel, including bond counsel;
ii. Professional studies for marketing, economic feasibility;
iii. Preparation of design, architectural, engineering, landscape, or other plans related to
the study and planning;
iv. Preparation of construction plans and documents ;
v. Accounting and/or auditing services;
vi. Licensed real estate professionals for real property appraisals, acquisition, disposition,
or negotiating services; and
vii. Professional services related to bond issuance and financing.
C. The Board may prepare and adopt design standards, guidelines and implementation procedures
as necessary to compliance with the goals and objectives of the Plan and any supporting plans.
D. The Board may invest its reserve funds in interest bearing accounts or securities consistent with
the provisions of City, State, and Federal law.
E. The Board may borrow money, accept advances, loans or grants from any legal source, issue
urban renewal bonds, and receive tax increment proceeds as provided for in Section 1.7 of this
Plan. Regardless of the form of borrowing of funds, the approval of such borrowing shall comply
with the provisions of the Board’s adopted Rules of Procedures and all applicable legal
requirements.
F. Without limiting any other provision, power or authorization of this Plan, the Agency’s Board
shall have all of the powers and responsibilities allowed under the provisions of ORS 457.
1.6.9 ECONOMIC DEVELOPMENT INCENTIVE PROGRAMS
Subject to compliance with Section 1.6.1(C)(15), Economic Development Incentive Program.
SECTION 1.7 MAXIMUM INDEBTEDNESS AND FINANCING MAXIMUM
INDEBTEDNESS
In accordance with ORS 457.190(3)(c)(A) the initial maximum amount of indebtedness that may be
incurred throughout the duration of this Plan, commencing with fiscal year 2011-12 through fiscal year
2036-2037, is $43,177,5306. The initial maximum indebtedness shall be increased each year in
accordance with Section 2.5.4, Index to Adjust Project and Activity Dollar Values, of the Report, ENR
Index for adjusting project cost estimates7.
The Directors of the Urban Renewal Agency may borrow money and accept advances, grants and any
other legal form of financial assistance from the federal government, State, City, County, or other public
6 Measured in terms of 2011 dollars
7 ORS 457.190(4)(d)
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
DRAFT 12-06-2011
Page 22 of 83
body, or from any legal source, public or private, for purposes of undertaking and carrying out this Plan,
or may otherwise obtain financing as authorized by ORS Chapter 457.
1.7.1 SELF LIQUIDATION OF COSTS OF URBAN RENEW AL INDEBTEDNESS
(TAX INCREMENT FINAN CING)
The projects may be financed, in whole or in part, by self-liquidation of the costs of urban
renewal activities as provided in ORS 457.420 through 457.460. The ad valorem taxes, levied by
a taxing body upon the taxable real and personal property situated in the Urban Renewal Area,
shall be divided as provided in ORS 457.440. That portion of the taxes representing the levy
against the increase, in the assessed value of property located in the urban renewal areas, or
part thereof, over the assessed value specified in the certificate filed under ORS 457.430, shall,
after collection by the tax collector, be paid into a special fund of the Directors of the Urban
Renewal Agency and shall be used to pay the principal and interest on any indebtedness
incurred by the Directors to finance or refinance this Plan and any projects or activities
authorized and undertaken pursuant to the provisions of this Plan.
The tax increment financing process, pursuant to ORS 457.420 through 457.460, shall be
terminated no later than Fiscal Year 2036-37. However, the tax increment collection process
may be terminated prior to Fiscal Year 2036-37 should debts of the Agency be retired earlier.
Based on the most accurate estimates of Program costs and income, the tax increment process
will cover a period of 25 years, commencing in Fiscal Year 2011-12 and terminating on June 30,
2037. Over the course of the Program’s duration it is estimated that tax increment collections
will be $51,970,747, which is sufficient to cover the maximum amount of indebtedness
designated for the Program.
Should the terminal year of tax increment proceeds collection be greater than the amount of
debt to be retired, the surplus amount of such tax increment proceeds shall be prorated back to
the affected taxing bodies as required by ORS 457.450(3).
1.7.2 PRIOR INDEBTEDNESS
Any indebtedness permitted by law and incurred by the Commission, or the City of Central Point
in connection with preplanning for this Urban Renewal Plan may be repaid from Commission
funds when and if such funds are available.
1.7.3 ANNUAL BUDGET
The Agency shall adopt and use a fiscal year ending June 30 accounting period. By July 1 of each
year the Commission shall adopt a budget in conformance with the provisions of ORS 294 and
ORS 457.460 which shall describe its source of revenue, proposed expenditures and activities.
The Agency shall submit its proposed budget to the Urban Renewal Agency’s Budget Committee
for its review and approval and the Commission shall not undertake any activities nor expend
any funds except as provided in the approved budget.
SECTION 1.8 ANNUAL FINANCIAL STATEMENT REQUIRED
The Commission, by January 31 of each year, Shall have prepared a financial statement8 containing:
8 ORS 457.460
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 23 of 83
DRAFT 12-06-2011
A. The amount of money actually received during the preceding fiscal year under subsection (4) of
ORS 457.420 to 457.460 and from indebtedness incurred under ORS 457.420 to 457.460;
B. The purpose and amounts for which any money received under 457.420 to 457.460 and from
indebtedness incurred under ORS 457.420 to 457.460 were expanded during the preceding
fiscal year;
C. An estimate of monies to be received during the current fiscal year under ORS 457.420 to
457.460 and from indebtedness incurred under ORS 457.420 to 457.460;
D. A budget setting forth the purposes and estimated amounts for which the monies which have
been or will be received under ORS 457.420 to 457.460 and from indebtedness incurred under
ORS 457.420 to 457.460 are to be expended during the current fiscal year; and
E. An analysis of the impact, if any, of carrying out the urban renewal plan on the tax collections
for the preceding year for all taxing bodies included under ORS 457.430.
F. If the January 31 deadline to meet the provisions of ORS Section 457.460 is changed by the
legislature, the Agency will conform to the new date to prepare the required statement.
The statement required by subsection 801 shall be filed with the City Council and notice shall be
published in the “Central Point Mail Tribune”, a newspaper of general circulation in the City, that the
statement has been prepared and is on file with the City and with the Urban Renewal Agency and the
information contained in the statement is available to all interested persons. The notice shall be
published once a week for not less than two successive weeks before March 1 of the year for which the
statement is required. The notice shall summarize the information required under paragraphs A
through D of subsection 1.8, Annual Financial Statement Required, and shall set forth in full the
information required under paragraph E of subsection 1.8.
SECTION 1.9 CITIZEN PARTICIPATION
The activities and projects identified in this Plan, the development of subsequent plans, procedures,
activities and regulations, and the adoption of amendments to this Plan shall be undertaken with the
participation of citizens, owners and tenants as individuals and organizations who reside within or who
have financial interest within the Downtown Revitalization Area and with the general citizens of the City.
SECTION 1.10 NON-DISCRIMINATION
In the preparation, adoption and implementation of this Plan, no public official or private party shall
take any action or cause any persons, group or organization to be discriminated against on the basis of
age, race, color, religion, sex, marital status or national origin.
SECTION 1.11 RECORDING OF PLAN
A copy of the City Council’s Non-Emergency Ordinance approving this Plan under ORS 457.095 shall be
sent by the Council to the Commission of Directors of the Urban Renewal Agency. Following receipt of
such Ordinance, this Plan shall be recorded by the Commission with the Recording Officer of Jackson
County.
SECTION 1.12 PROCEDURES FOR AMENDMENTS TO THE URBAN
RENEWAL PLAN
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 24 of 83
DRAFT 12-06-2011
The Plan is a living document subject to periodic review and evaluation over the course of its duration. It
is fully expected that the plan will require periodic amendment as necessary for clarification purposes
and as necessary to address changing conditions. Where, in the judgment of the Commission the
proposed modification will substantially change the Plan, the modification must be duly approved by the
City Council in the same manner as the original Plan and in accordance with the requirements of State
and local law. The provisions of ORS 457.095 and ORS 457.220 and of Section 1.12.3, Substantial
Changes, of this Plan shall apply.
The various types of Plan changes, clarifications, modifications or amendments and the official actions
which shall be taken prior to their implementation; are as follows:
1.12.1 MINOR CHANGES
Minor changes shall not change any provision of this Plan which would modify the goals and
objectives or basic procedural requirements, planning or engineering principles of this Plan.
Such minor changes may include:
A. Clarification of language or the State Legislature’s changes in ORS Chapter and Section
references;
B. Clarification of written or graphic Exhibits to this Plan;
C. Modification in the location and scope of project improvements authorized by this Plan,
resulting from detailed architectural, engineering or planning analysis.
D. The identification of property to be acquired as provided for in Sections 1.6.3, Procedures
for Identifying Property to be Acquired, of this Plan.
E. Such minor changes shall be made only by a duly approved resolution of the Commission in
which the details of the minor change shall be described.
1.12.2 AMENDMENTS TO THE COMPREHENSIVE PLAN OR ANY
IMPLEMENTING ORDINANCES
From time to time during the implementation of this Urban Renewal Plan, the Planning
Commission and City Council of the City of Central Point may approve amendments or
modifications to the City’s Comprehensive Plan or to the codes, policies, procedures or
ordinances which are established to implement such Comprehensive Plan. Further, the City
Council may from time to time amend or approve new Building, Health Safety and other codes
which affect the implementation of this Urban Renewal Plan.
A. When such amendments, modifications or approvals have been officially adopted by the
City Council, such amendments, modifications or approvals--which affect the provisions of
this Urban Renewal Plan--shall, by this reference become a part of the Plan as if such
amendments, modifications or approvals were herein stated in full.
B. The City Council shall forward to the Commission copies of such Council actions as are
herein above described and the Commission shall prepare and approve a resolution
recognizing that such City Council amendments, modifications or approvals are to be
considered as minor changes to this Urban Renewal Plan as provided in Section 1.12.1,
Minor Changes, above.
1.12.3 SUBSTANTIAL CHANGES
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 25 of 83
DRAFT 12-06-2011
Such substantial changes, if any, shall be approved by the City Council in the same manner as
the Council’s approval of the original plan and in compliance with the provisions of ORS 457.095
and ORS 457.220.
Substantial changes shall include the following:
A. Extension of the time period for collecting tax increment proceeds as provided in Subsection
1.7.1, Self Liquidation of Costs of Urban Renewal Indebtedness, of this Plan;
B. An increase of land area to the boundaries of the Urban Renewal Plan in excess of that
allowed by ORS 457.220(3);
C. An increase in the effective period of this Plan as set forth in Section 1.13, Duration and
Validity of Approved Urban Renewal Plan.
SECTION 13 DURATION AND VALIDITY OF APPROVED URBAN
RENEWAL PLAN
This Plan shall remain in full force and effect until June 30, 2037, or until the maximum amount of
indebtedness as set forth in Section 1.7, Maximum Indebtedness and Financing Maximum Indebtedness,
has been reached and all related debt service retired, whichever comes first.
Should a court of competent jurisdiction find any word, clause, sentence, section or part of this Plan to
be invalid, the remaining words, clauses, sentences, sections or parts shall be unaffected by such finding
and shall remain in full force and effect for the duration of the Plan.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 26 of 83
DRAFT 12-06-2011
PART II.
DOWNTOWN & EAST PINE STREET CORRIDOR REVITALIZATION
REPORT
SECTION 2.1 INTRODUCTION
Oregon’s Urban Renewal Law, ORS 457.085, establishes minimum requirements for an urban renewal
plan. One of the requirements is that an urban renewal plan be accompanied by a written report. The
report is required to address nine (9) specific elements9. In compliance with Urban Renewal Law this
document addresses each element and will be referred to as Part 2 of the City of Central Point
Downtown and East Pine Street Corridor Revitalization Plan (the “Report”).
All definitions set forth in Section 1.3, Definitions, of the Urban Renewal Plan shall have the same
meaning and use in this Report as they have in the Urban Renewal Plan.
SECTION 2.2 CURRENT CONDITIONS AND IMPACTS
This section describes the “. . . physical, social and economic conditions in the urban renewal areas of
the plan and the expected impact, including the fiscal impact, of the plan in light of added services or
increased population”.
2.2.1 PHYSICAL CONDITIONS
The current physical conditions of the Urban Renewal Area are best described by the boundaries
of the Urban Renewal Area and the current land use, zoning, physical condition of structures
and infrastructure within the Urban Renewal Area.
A. URBAN RENEWAL BOUNDARIES
Most of the Urban Renewal Area is represented by the original Plat of Central Point dated
1887, which two years later on February 26, 1889 became the Town of Central Point. Over
the years the City’s growth has rippled out in a concentric pattern retaining the original
town center as the City’s core area.
Today the Urban Renewal Area, at 446.30 acres; accounts for 15.5% of the City’s total land
area. The Urban Renewal Area, as a percentage of the City, is within the maximum allowable
percentage (25%) of the City’s total acreage10. The boundary of the Urban Renewal Area is
illustrated in Figure 1. The formal description of the Urban Renewal Area is presented in
Exhibits 1 and 2 in the Appendix.
For planning purposes the Urban Renewal Area has been divided in to five sub areas,
illustrated in Figure 2. Each sub area has unique physical characteristics and blight related
conditions, which will be addressed later in this section. Table 2.1 identifies the gross
acreages of the Urban Renewal District, each sub area, and the City.
9 ORS 457.085(3)
10 ORS 457.420 (2)(a)(B)
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 27 of 83
DRAFT 12-06-2011
B. CURRENT USE OF LAND
The current land uses within the Urban Renewal Area are described in Table 2.2. Excluding
public right-of-way (30%), the predominant use of land in the Urban Renewal Area is
residential (27%), followed by commercial (16%) and vacant (12%) lands. With the exception
of the residential and the commercial categories, the percentage land use distribution
within the Urban Renewal Area is similar to that of the City in general. This distribution
comparison is illustrated in Table 2.2.
The Urban Renewal Areas higher
commercial percentage (42%) of all
commercially zoned lands is not
unusual considering the Urban
Renewal Area’s downtown
orientation, and the infrastructure
needs that are challenging
development of the commercial lands
within the East Pine Street Corridor
sub area. For the same reason that the
commercial land uses are over
represented, the Urban Renewal
Area’s residential land uses are under-
represented.
A better understanding of the land use
distribution within the Urban Renewal
Area is provided in Tables 2.3 through 2.7. These five tables summarize the land use
categories for each of the sub areas. For the Northside and Southside Neighborhoods the
dominant land use is residential, while the Hwy. 99 and East Pine Street Corridors are
primarily commercial/industrial. The Downtown is considered mixed-use with a balance
between residential and commercial ruses.
Table 2.2
URBAN RENEWAL AREA MAJOR LAND USE
Urban Renewal Area City
Land Use Acres Percent of
URA
Land Use
Rank
Percent of
City
Percent of
City
Land Use
Rank
Vacant 53.60 12% 4 18% 10% 3
Residential 119.40 27% 2 9% 48% 1
Commercial 73.42 16% 3 42% 6% 4
Industrial 26.00 6% 5 18% 5% 6
Civic 18.82 4% 7 18% 4% 7
Parks & Open Space 20.67 5% 6 13% 6% 5
Public Right-of-Way 134.30 30% 1 22% 21% 2
Total 446.30 100% 15.5% 100%
Source: City of Central Point Community Development Department, 10/11
C. ZONING CLASSIFICATION
Figure 3, Urban Renewal Boundary Zoning, illustrates the distribution of lands by zoning
classification and Table 2.8 identifies the acreage distribution by zoning classification. The
Urban Renewal Area is predominantly residentially zoned (45%), closely followed by
commercial zoning (41%). As would be expected the residential zoning is concentrated in
the Northside and Southside Neighborhoods. The land use and zoning are well aligned with
Table 2.1
URBAN RENEWAL AREA AND SUB AREA ACREAGE
Sub Area Gross
Acres
Percentage of
Urban
Renewal Area
A Downtown 82.7 19%
B Northside Neighborhood 81.4 18%
C Southside Neighborhood 105.3 24%
D Highway 99 Corridor 90.4 20%
E East Pine Street Corridor 86.5 19%
Total Urban Renewal Area 446.3 100%
Total City Area 2,880.28 15.5%
Source: City of Central Point Community Development Department
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 28 of 83
DRAFT 12-06-2011
the Comprehensive Plan land use designations, with only isolated areas of non-conformity.
The use, development, or redevelopment of all property within the Urban Renewal Area is
subject to compliance with the Central Point Comprehensive Plan and all implementing
ordinances, codes, policies and regulations as they exist on the date of approval of the
Urban Renewal Plan, or as they may be amended from time-to-time.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 29 of 83
DRAFT 12-06-2011
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 30 of 83
DRAFT 12-06-2011
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 31 of 83
DRAFT 12-06-2011
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 32 of 83
DRAFT 12-06-2011
Table 2.4
NORTHSIDENEIGHBORHOOD MAJOR LAND USE
Use Acres Percent of
Sub Area
Land Use
Rank
Vacant 2.25 2.77% 3
Residential 45.19 55.54% 1
Commercial 0.35 0.43% 4
Industrial 0.00 0.00% -
Civic 0.00 0.00% -
Parks 0.00 0.00% -
Utility 0.00 0.00% -
Right-of-Way 33.58 41.27% 2
Total 81.37 100%
Source: City of Central Point Community Development
Department
Table 2.3
DOWNTOWN SUB AREA MAJOR LAND USE
Use Acres Percent of
Sub Area
Land Use
Rank
Vacant 1.96 2.37% 5
Residential 21.38 25.84% 2
Commercial 20.62 24.93% 3
Industrial 0.00 0.00% -
Civic 5.84 7.06% 4
Parks 1.52 1.84% 6
Utility 0.00 0.00% -
Right-of-Way 31.42 37.97% 1
Total 82.74 100%
Source: City of Central Point Community Development
Department
Table 2.5
SOUTHSIDE NEIGHBORHOOD MAJOR LAND USE
Use Acres Percent of
Sub Area
Land Use
Rank
Vacant 1.03 0.98% 6
Residential 51.46 48.88% 1
Commercial 8.26 7.85% 4
Industrial 0.00 0.00% -
Civic 11.70 11.11% 3
Parks 2.31 2.91% 5
Utility 0.00 0.00% -
Right-of-Way 30.52 28.99% 2
Total 105.28 100%
Source: City of Central Point Community Development
Department
Table 2.6
HWY. 99 CORRIDOR MAJOR LAND USE
Use Acres Percent of
Sub Area
Land Use
Rank
Vacant 16.41 18.16% 3
Residential 1.37 1.51% 6
Commercial 30.20 33.42% 1
Industrial 6.86 7.59% 4
Civic 1.28 1.42% 7
Parks 5.93 6.56% 5
Utility 0.33 0.37% 8
Right-of-Way 27.99 37.97% 2
Total 90.37 100%
Source: City of Central Point Community Development
Department
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 33 of 83
DRAFT 12-06-2011
D. CONDITION OF STRUCTURES
Much of the Urban Renewal Area is represented by the City’s original town plat, with most of
the development occurring in the late 1800s and early 1900s (Figure 4, Historic Subdivisions).
The average structure within the Urban Renewal Area is 59 years old, with many in excess of 100
years old (13%).
The condition of the structures within the Urban Renewal Area was field surveyed in October
2011. Based on the field survey and Real Market Value information from the County Assessor’s
Office the condition of each structure was evaluated. Table 2.9 identifies structures by condition
and land use. Each structure was judged and classified into one of three categories as follows:
1. New buildings, near-new buildings or older buildings which have been subjected to a high
degree of maintenance and care, and essentially comply with basic provisions of the City’s
and Oregon’s Building Codes.
2. Older buildings which exhibit certain code deficiencies, but with reasonable rehabilitation
effort and continuing maintenance, could serve their owners for at least an additional 40
years, particularly those buildings which appear to be feasible for economic rehabilitation.
3. Older buildings exhibiting deficiencies; which to correct, would require substantial
investment by their owners to the degree that rehabilitation may be inappropriate and
uneconomic. Typically, the real market improvement value of these buildings was
significantly (25%) below the real market value of the land
Within the Urban Renewal Area there are 839 structures, 11% were judged to be in
Condition “A”, 84% in Condition “B”, and 17% Condition “C”. Of the 839 structures 665 are
residential structures housing 1,033 residential dwelling units. Of the residential structures
8% were judged to be in Condition “A”, 67% in Condition “B”, and 25% Condition “C”.
Table 2.7
EAST PINE STREET COORIDOR MAJOR LAND USE
Use Acres Percent of
Sub Area
Land Use
Rank
Vacant 31.95 37.47% 1
Residential 0.00 0.00% -
Commercial 13.99 16.41% 3
Industrial 19.14 22.45% 2
Civic 0.00 0.00% -
Parks 10.91 12.79% 5
Utility 0.00 0.00% -
Right-of-Way 9.28 10.88% 4
Total 85.27 100%
Source: City of Central Point Community Development
Department
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 34 of 83
DRAFT 12-06-2011
Table 2.8
URBAN RENEWAL ZONING
Zoning
Urban Renewal Area Sub Areas
Urban
Renewal
District
Acres
Percent of
Urban
Renewal
District
Downtown Northside Southside Hwy. 99
Corridor
East Pine
Street
Corridor
Bear Creek
Greenway
10.9 2% - - - - 13%
R-1-6 52.4 12% - - 15% - -
R-2 56.3 13% 3% 58% 7% - -
R-3 56.3 13% 16% 28% 20% - -
MMR 14.1 3% - 11% - 6% -
HMR 31.0 7% 30% - - 7% -
TOTAL
RESIDENTIAL
210.1 47% 49% 97% 42% 13% -
C-2(M) 14.1 3% - - 13% - -
EC (TOD) 31.7 7% 15% - - 21% -
GC (TOD) 62.7 14% 3% 3% 3% 58% -
C-4 76.2 17% 27% - - - 63%
TOTAL
COMMERCIAL
184.7 41% 44% 3% 26% 79% 63%
M-2 21.5 5% - - - - 25%
Civic 6.2 1% 4% 4% - 2% -
Parks & Open
Space
12.9 3% 3% - 4% 8% -
TOTAL 446.3 100% 100% 100% 100% 100% 100%
Source: City of Central Point Community Development Department
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 35 of 83
DRAFT 12-06-2011
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 36 of 83
DRAFT 12-06-2011
Table 2.9
CONDITION OF STRUCTURES BY USE
Condition of Structures
A B C Total No.
Dwelling
Units
Land Use Category No. % No. % No. % No. %
TOTAL RESIDENTIAL 51 8% 329 51% 280 41% 660
Single-Family 28 4% 45
Duplex 9 1% 67
Multiple-Family 14 2% 22
Mobile Home Park 0 0%
TOTAL COMMERCIAL 25 17% 48 29% 92 56%
Office 9 6%
Service/Financial 3 1%
Retail 9 6% 2
Mixed Use 4 3%
INDUSTRIAL 1 14% 0 0% 3 60%
Light Industrial 1 14%
PUBLIC 6 46%
Schools 1 100%
Government 5 45%
QUASI-PUBLIC 4 36%
Church 4 4
Lodge 0
PUBLIC UTILITY 0
Office, etc. 0
Rail Road 0
TOTALS 87 387 368 843
E. INFRASTRUCTURE
Those parts of the Urban Renewal Area west of I-5 are part of the original city and some of the
City’s oldest subdivisions dating back to the late 1800s and early 1900s (Figure 4, Historic
Subdivisions). Consequently, most of the Area’s publicly owned utility systems are very old, but
in reasonably sound condition. However, updating, modifications and selected replacement of
infrastructure will be needed throughout the duration of this Plan, particularly as needed to
serve planned higher density development. This is most critical in Downtown Core Area and the
Northside and Southside Neighborhoods, where intensification of residential and commercial
development are encouraged, and the existing infrastructure is very old.
On the east side of I-5 the infrastructure within the Urban Renewal Area is new and only
requires extensions as the area develops. The need for infrastructure improvements is based on
consultations with the particular service district/department and prior studies completed by the
City.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 37 of 83
DRAFT 12-06-2011
The following summarizes the Urban Renewal Area’s infrastructure needs necessary to mitigate
blighting conditions and support the revitalization of the Urban Renewal Area:
WATER DISTRIBUTION SYSTEM
As a result of the water system’s age there is a need for replacement and capacity
improvements. The City’s Public Works Department estimates that approximately
$1,250,000 (2011 dollars) will be needed over the next 25 years to upgrade the water
system in the Urban Renewal Area. The identified need is based on the City of Central
Point’s 2010 Water System Master Plan.
SANITARY SEWER SYSTEM
The sewer system, particularly in the Downtown and Northside and Southside
Neighborhoods, are old. It is expected that upgrading of the system will be required
throughout the duration of this Plan, particularly as needed to accommodate
redevelopment. Most of the sanitary sewer system projects will occur in the Downtown,
Northside, and Southside sub areas.
STORM DRAINAGE SYSTEM
In general, the storm drainage system within the Urban Renewal Area is very old, but
well maintained and functioning satisfactorily. However, as a result of revisions in the
FEMA maps there is a need to upgrade the storm drainage system within the
Downtown, Hwy. 99 Corridor, Northside, and Southside sub areas to mitigate potential
flooding. During the next 25 years, other portions of the system will require upgrading.
The identified need is based on the City of Central Point’s 2008 Storm Drainage Master
Plan.
STREETS
As a result of the historic character of much of the Urban Renewal Area and access
limitations to I-5, the street system within the Urban Renewal Area is in need of
upgrading and capacity expansion. This is particularly true with respect to the single
modal character of much of the street system within the Urban Renewal Area. Many of
the streets lack adequate transit, pedestrian and bicycle improvements.
The City’s street needs for the Urban Renewal Area are documented in the
Comprehensive Plan’s Transportation System Plan. The following studies were used in
identifying street improvements necessary to adequately serve both the Urban Renewal
Area and the City:
The East Pine Street Transportation Plan, 2004
The East Pine Street Corridor Refinement Plan, 2012
The I-5 Interchange 33 Access Management Plan, 2012
Many of the Urban Renewal Area’s street curbs, gutters and sidewalks are broken and in
need of replacement or repair. Many of the streets within the Northside and Southside
sub areas do not have sidewalks, and East Pine Street through the Downtown is narrow
and contains numerous obstacles to pedestrian use.
Much of the development in the East Pine Street sub area is dependent on major
improvements to increase the capacity of East Pine Street, many of which are beyond
the financial ability of any single project.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 38 of 83
DRAFT 12-06-2011
2.2.2. SOCIAL AND DEMOGRAPHIC CONDITIONS
A. POPULATION
The 2010 U.S. Census identified 2,428 people residing within the Urban Renewal Area,
representing 14% of the City’s total population of 17,169. Table 2.10 describes the age
distribution of the City’s population and compares it with County and the State. The
2010 median age of the City’s population was lower than the State’s, 36.5 vs. 38.4 years.
For the Urban Renewal Area the median age was 33.6 years.
Table 2.10
POPULATION AGE DISTRIBUTION WITHIN THE URBAN RENEWAL AREA, CITY OF CENTRAL POINT AND
OREGON, 2010
Census of Population by Age
Urban Renewal Area City of Central Point State of Oregon
Age No. % No. % No. %
Under 5 Years 184 8% 1,286 7% 237,556 6%
5 to 9 157 6% 1,187 7% 237,214 6%
10 to 14 150 6% 1,284 7% 242,533 6%
15 to 24 358 15% 2,181 13% 507,908 13%
25 to34 365 15% 2,292 13% 524,144 14%
35 to 44 283 12% 2,323 14% 499,525 13%
45 to 54 334 14% 2,228 13% 539,075 14%
55 to 64 273 11% 1,842 11% 509,566 13%
65 to 74 159 7% 1,316 8% 290,041 8%
75 to 84 122 5% 905 5% 165,620 4%
85 Years + 43 2% 325 2% 77,872 2%
Median Age 33.6 36.5 38.4
2010 Total Population 2,428 100% 100% 100%
Source: 2010 U.S. Census
Table 2.11 identifies Central Point’s population growth from 1900 to 2010 and compares
it with the population growth in Jackson County and the State. From 2000 to 2010, the
City’s growth rate (129%) exceeded by a factor of three the population growth of the
County (39%) and the State (35%).
B. HOUSING
The Urban Renewal Area population is housed in 1,014 dwelling units, for an average of
2.4 persons per dwelling unit at an average gross density of 5.35 units per acre. The
City’s average household size is 2.6711 at an average gross density of 3.5 units per acre.
The City of Central Point is included in the Greater Bear Creek Valley Regional Plan
(Regional Plan). The Regional Plan projects that by 2037 the City’s population will reach
29,600. This represents a population increase of 12,430 over the next 25 years. Of this
amount the Urban Renewal Area is planning on capturing 8% of this growth for a
population increase in the Urban Renewal Area population of 995. The targeted new
11 City of Central Point Comprehensive Plan, Population Element
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 39 of 83
DRAFT 12-06-2011
population, at an average household size of 2.5, will require the construction of 398 new
dwelling units within the Urban Renewal Area.
Currently, within the Urban renewal Area there are approximately 10 acres of vacant
residential land, which at current zoning can accommodate 248 dwelling units. The
balance of the targeted residential units (150 dwelling units) will come from
redevelopment of existing residential properties in the Northside Neighborhood and the
Southside Neighborhood. Together these two sub areas account for most of the Urban
Renewal Area’s residential lands, much of which is zoned R-2, but is developed at R-1
standards.
Table 2.12
Vacant Residential Land Development
Potential Zoning
District
Vacant
Acres
Average
Density
(DUs/Acre)
No. DUs
R-2 0.46 7.9 3
R-1-6 0.23 4.8 2
R-1-8 0.00 4.3 0
R-3 1.29 8.2 10
Mixed Use 7.30 40.0 233
Totals 9.70 248
Source: City of Central Point Community Development Department
C. HOUSEHOLD INCOME
The 2009 American Community Survey figures show that the median household income
for the City of Central Point was $55,236 vs. $49,033 for the State as a whole.
Table 2.11
POPULATION GROWTH FOR CENTRAL POINT, JACKSON COUNTY, AND OREGON Central Point Jackson County Oregon
Year Population % Change % of
County
Population % Change % of
State
Population % Change
1900 322 - 2% 13,698 3% 413,536
1910 761 136% 3% 25,756 88% 4% 672,765 63%
1920 582 -24% 3% 20,405 -21% 3% 783,389 16%
1930 821 41% 2% 32,918 61% 3% 953,786 22%
1940 906 10% 3% 36,213 10% 3% 1,089,684 14%
1950 1,667 84% 3% 58,510 62% 4% 1,521,341 40%
1960 2,289 37% 3% 73,962 26% 4% 1,768,687 16%
1970 4,004 75% 4% 94,533 28% 5% 2,091,533 18%
1980 6,357 59% 5% 132,456 40% 5% 2,633,156 26%
1990 7,512 18% 5% 146,389 11% 5% 2,842,321 8%
2000 12,493 66% 7% 181,273 24% 5% 3,421,399 20%
2010 17,169 129% 8% 203,206 39% 5% 3,831,074 35%
Source: U.S. Census
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 40 of 83
DRAFT 12-06-2011
Household income figures for the Urban Renewal Area are not available. The Urban
Renewal Area is within Census Tract 10, which had a 2009 median income of $50,926.
However, Census Tract 10 represents an area that includes not only the Urban Renewal
Area but much of the City and surrounding county lands. Consequently, the median
income information does not accurately represent the Urban Renewal Area’s household
income. A review of poverty levels in the City of Central Point provides insights into
household income levels within the Urban Renewal Area.
Based on the percentage of households below poverty level the annual incomes
available to households and families within the Urban Renewal Area are considerably
lower than for the City as a whole. As illustrated in Figure 5, Urban Renewal Boundary
and Household Poverty, the Urban Renewal Area contains a large percentage of the
City’s households with incomes below poverty level. The household (family of 4) poverty
level is defined as $22,350 (total yearly income)12.
D. UNEMPLOYMENT
Unemployment data for the City of Central Point is not available. In September 2011
the unemployment rates for Jackson County and the State of Oregon were 11.6% and
9.6% respectively (Table 2.13). The Jackson County consistently has a higher
unemployment rates than the State and the State is consistently higher than the nation.
Table 2.13
JACKSON COUNTY, OREGON, AND U.S. UNEMPLOYMENT RATES, 2011
Jackson County State of Oregon United States
11.6% 9.6% 9.1%
12 2011 HHS Poverty Guidelines, U.S. Department of Health and Human Services
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 41 of 83
DRAFT 12-06-2011
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 42 of 83
DRAFT 12-06-2011
2.2.3. ECONOMIC CONDITIONS
A general indicator of the Urban Renewal Area’s economic condition is readily expressed in its
assessed value history vs. that of the underlying taxing districts. The impact of the recent Great
Recession (2007-09) on assessed values, both within and outside the Urban Renewal Area, can
be seen in the later years as the annual rate of growth in assessed values is increasing, but at a
decreasing rate. The following sections discuss both the assessed value history of the Urban
renewal Area and the underlying taxing districts.
A. ASSESSED VALUE OF URBAN RENEWAL AREA
The fiscal year 2011-12 assessed value for the Urban Renewal Area was $131,424,528. This
amount accounted for13.1% of the City total assessed value, and is within the 25%
maximum authorized in ORS 457.420 (2)(b)(A). The $131,424,528 will serve as the Urban
Renewal Area’s Base Value. Throughout the duration of the Urban Renewal Plan any
increases in the assessed value within the Urban Renewal Area above the Base Value will be
used to finance implementation of the Urban Renewal Plan, while the affected taxing
districts will continue to receive tax proceeds for the Base Year figure.
Table 2.14 compares the growth in the Urban Renewal Area’s assessed value (AV) from 2007
through 2012 to that of the City (net of the Urban Renewal Area). From 2007 through 2012
the average rate of growth in the City’s assessed value was 4.8%, while that of the Urban
Renewal Area was only 1.6%. For FY2011-12 the total assessed value for the Urban Renewal
Area actually declined (see Table 2.14). If the Urban Renewal Area were included in the
City’s assessed value the average annual rate of growth in the City’s assessed value would
drop to 4.3%.
As illustrated in Table 2.14, the assessed value of the Urban Renewal Area is significantly
less than the rest of the City (Table 2.16) and between 2011 and 2012 has declined by 1.6%.
Without the injection of the public improvements proposed in the Urban Renewal Plan, this
declining trend will continue and a transfer in the taxing burden will continue to other areas
of the City--particularly the residential sectors.
Assuming an average inflation rate of 3% the Urban Renewal Area has been unable to
maintain the cost of services, relying on the rest of the City to cover any shortfall.
Table 2.15 tracks changes in the Urban Renewal Area’s assessed value by land use category.
The most significant decline has occurred in the Commercial and Industrial land use
categories, with Residential experiencing less than 1% growth.
B. HISTORIC ASSESSED VALUE AND TAX RATES OF AFFECTED TAXING
DISTRICTS
Tables 2.16 through 2.24 identify the historical AV, annual change, tax rates and tax
proceeds for the affected taxing districts for the period 199813 through 2011-12. As
illustrated in the Tables 2.16 through 2.24 the past fifteen years has witnessed both highs
and lows in annual AV growth, averaging in excess of 5% for most taxing districts.
TABLE 2.14
13 First fiscal year after Measure 50 tax assessment changes.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 43 of 83
DRAFT 12-06-2011
HISTORY OF ASSESSED PROPERTY VALUES, CITY OF CENTRAL POINT vs. URBAN RENEWAL AREA
City of Central Point Urban Renewal Area
Fiscal Year Net Assessed Value Annual
Growth Rate
Net Assessed Value Annual
Growth Rate
2006-07 $ 717,261,552 - $ 121,560,032 - 3,749,449
2007-08 $ 771,793,754 7.6% $ 127,684,191 5.0%
4,020,576 2008-09 $ 818,399,033 6.0% $ 130,825,533 2.5%
4,242,939 2009-10 $ 856,508,631 4.7% $ 131,489,250 0.5%
4,416,252 2010-11 $ 887,825,065 3.7% $ 133,371,628 1.4%
4,564,647 2011-12 $ 904,609,548 1.9% $ 131,424,528 (1.5%)
4,630,969 Average 4.8% 1.6%
Source: Jackson County Tax Assessor and City of Central Point Community Development Department
Table 2.15
HISTORY OF ASSESSED VALUE WITHIN URBAN RENEWAL AREA BY LAND USE CATEGORY, 2007 THROUGH 2012
Land Use
Category
FY2006-07 FY2007-08 FY2008-09 FY2009-10 FY2010-11 FY2011-12 % Change
FY2010-12
Vacant $5,853,919 $10,716,090 $7,851,660 $7,466,970 $7,227,870 $7,087,880 (1.9%)
Residential $69,775,220 $71,859,076 $73,185,594 $75,136,260 $75,535,158 $76,005,118 0.6%
Commercial $43,216,592 $42,351,992 $46,930,469 $45,981,490 $47,754,890 $45,692,820 (4.3%)
Industrial $2,273,461 $2,319,623 $2,406,470 $2,439,680 $2,374,950 $2,169,430 (8.6%)
Quasi-Public $431,980 $428,290 $441,960 $445,190 $468,820 $459,340 (2.0%)
Public Utility $8,860 $9,120 $9,380 $9,660 $9,940 $9,940 0%
TOTAL $121,560,032 $127,684,191 $130,825,533 $131,489,250 $133,371,628 $131,424,528 (1.6%)
Source: City of Central Point Community Development Department and Jackson County Assessors Office
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 44 of 83
DRAFT 12-06-2011
TABLE 2.16
CITY OF CENTRAL POINT, HISTORY OF ASSESSED PROPERTY VALUES, TAX RATES, AND TAX
PROCEEDS
Fiscal Year Net Assessed Value Annual
Growth Rate
Tax Rate Per
$1,000
Rate Generated Tax
Proceeds
1997-98 $ 372,108,000 - $ 5.83 $ 2,169,390
1998-99 $ 392,047,000 5.4% $ 5.83 $ 2,285,634
1999-00 $ 431,004,000 9.9% $ 5.83 $ 2,512,753
2000-01 $ 485,499,000 12.6% $ 5.83 $ 2,829,876
2001-02 $ 544,037,650 12.1% $ 4.47 $ 2,431,794
2002-03 $ 595,772,030 9.5% $ 4.47 $ 2,663,041
2003-04 $ 653,586,907 9.7% $ 4.47 $ 2,921,468
2004-05 $ 715,171,267 9.4% $ 4.47 $ 3,196,744
2005-06 $ 771,105,471 7.8% $ 4.47 $ 3,446,764
2006-07 $ 831,821,584 8.8% $ 4.47 $ 3,749,449
2007-08 $ 899,477,945 7.2% $ 4.47 $ 4,020,576
2008-09 $ 949,224,566 5.5% $ 4.47 $ 4,242,939
2009-10 $ 987,997,881 4.1% $ 4.47 $ 4,416,252
2010-11 $ 1,021,196,693 3.4% $ 4.47 $ 4,564,647
2011-12 $ 1,036,034,076 1.5% $ 4.47 $ 4,630,969
Average 9.6% $ 4.83
Source: Jackson County Tax assessor and City of Central Point Community Development Department
TABLE 2.17
JACKSON COUNTY, HISTORY OF ASSESSED PROPERTY VALUES, TAX RATES, AND TAX PROCEEDS
Fiscal Year Net Assessed Value Annual
Growth Rate
Tax Rate Per
$1,000
Rate Generated Tax
Proceeds
1997-98 $ 8,039,161,498 - $ 1.97 $ 15,800,972
1998-99 $ 8,413,039,772 4.7% $ 1.97 $ 16,535,830
1999-00 $ 8,954,010,340 6.4% $ 2.01 $ 17,996,665
2000-01 $ 9,497,826,006 6.1% $ 2.28 $ 21,653,144
2001-02 $ 10,086,117,049 6.2% $ 2.39 $ 24,136,078
2002-03 $ 10,583,879,844 4.9% $ 2.38 $ 25,177,992
2003-04 $ 11,144,084,790 5.3% $ 2.50 $ 27,914,818
2004-05 $ 11,765,900,908 5.6% $ 2.47 $ 29,091,190
2005-06 $ 12,442,593,882 5.8% $ 2.27 $ 28,234,734
2006-07 $ 13,231,616,506 6.3% $ 2.24 $ 29,661,315
2007-08 $ 13,981,517,900 5.7% $ 2.25 $ 31,505,952
2008-09 $ 14,634,957,230 4.7% $ 2.34 $ 34,294,095
2009-10 $ 15,648,051,136 6.9% $ 2.37 $ 37,045,196
2010-11 $ 15,981,129,412 2.1% $ 2.33 $ 37,197,677
2011-12 $ 16,449,455,277 2.9% $ 2.08 $ 34,134,265
Average 5.4% $ 2.26
Source: Jackson County Tax assessor and City of Central Point Community Development Department
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 45 of 83
DRAFT 12-06-2011
TABLE 2.18
VECTOR CONTROL , HISTORY OF ASSESSED PROPERTY VALUES, TAX RATES, AND TAX PROCEEDS
Fiscal Year Net Assessed Value Annual
Growth Rate
Tax Rate Per
$1,000
Rate Generated Tax
Proceeds
1997-98 $ 8,039,161,498 - $ 0.04 $ 338,449
1998-99 $ 8,413,039,772 4.7% $ 0.04 $ 354,189
1999-00 $ 8,954,010,340 6.4% $ 0.04 $ 384,127
2000-01 $ 9,497,826,006 6.1% $ 0.04 $ 407,457
2001-02 $ 10,086,117,049 6.2% $ 0.04 $ 432,694
2002-03 $ 10,583,879,844 4.9% $ 0.04 $ 454,048
2003-04 $ 11,144,084,790 5.3% $ 0.04 $ 478,081
2004-05 $ 11,765,900,908 5.6% $ 0.04 $ 504,757
2005-06 $ 12,442,593,882 5.8% $ 0.04 $ 533,787
2006-07 $ 13,231,616,506 6.3% $ 0.04 $ 567,636
2007-08 $ 13,981,517,900 5.7% $ 0.04 $ 599,807
2008-09 $ 14,634,957,230 4.7% $ 0.04 $ 627,840
2009-10 $ 15,648,051,136 6.9% $ 0.04 $ 671,301
2010-11 $ 15,981,129,412 2.1% $ 0.04 $ 685,590
2011-12 $ 16,449,455,277 2.9% $ 0.04 $ 664,558
Average 5.4% $ 0.04
Source: Jackson County Tax assessor and City of Central Point Community Development Department
TABLE 2.19
EDUCATION SERVICE DISTRICT, HISTORY OF ASSESSED PROPERTY VALUES, TAX RATES, AND TAX
PROCEEDS
Fiscal Year Net Assessed Value Annual
Growth Rate
Tax Rate Per
$1,000
Rate Generated Tax
Proceeds
1997-98 $ 8,039,161,498 - $ 0.35 $ 2,779,942
1998-99 $ 8,413,039,772 4.7% $ 0.35 $ 2,909,229
1999-00 $ 8,954,010,340 6.4% $ 0.35 $ 3,155,393
2000-01 $ 9,497,826,006 6.1% $ 0.35 $ 3,347,034
2001-02 $ 10,086,117,049 6.2% $ 0.35 $ 3,554,348
2002-03 $ 10,583,879,844 4.9% $ 0.35 $ 3,729,759
2003-04 $ 11,144,084,790 5.3% $ 0.35 $ 3,927,175
2004-05 $ 11,765,900,908 5.6% $ 0.35 $ 4,146,303
2005-06 $ 12,442,593,882 5.8% $ 0.35 $ 4,384,770
2006-07 $ 13,231,616,506 6.3% $ 0.35 $ 4,662,822
2007-08 $ 13,981,517,900 5.7% $ 0.35 $ 4,927,087
2008-09 $ 14,634,957,230 4.7% $ 0.35 $ 5,157,359
2009-10 $ 15,648,051,136 6.9% $ 0.35 $ 5,514,373
2010-11 $ 15,981,129,412 2.1% $ 0.35 $ 5,631,750
2011-12 $ 16,449,455,277 2.9% $ 0.35 $ 5,769,788
Average 5.3% $ 0.35
Source: Jackson County Tax assessor and City of Central Point Community Development Department
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 46 of 83
DRAFT 12-06-2011
TABLE 2.21
ROGUE COMMUNITY COLLEGE, HISTORY OF ASSESSED PROPERTY VALUES, TAX RATES, AND TAX
PROCEEDS
Fiscal Year Net Assessed Value Annual
Growth Rate
Tax Rate Per
$1,000
Rate Generated Tax
Proceeds
1997-98 $ 8,039,161,498 - $ 0.50 $ 4,051,737
1998-99 $ 8,413,039,772 4.7% $ 0.50 $ 4,240,172
1999-00 $ 8,954,010,340 6.4% $ 0.51 $ 4,591,617
2000-01 $ 9,497,826,006 6.1% $ 0.51 $ 4,870,485
2001-02 $ 10,086,117,049 6.2% $ 0.51 $ 5,172,161
2002-03 $ 10,583,879,844 4.9% $ 0.51 $ 5,427,414
2003-04 $ 11,144,084,790 5.3% $ 0.51 $ 5,714,687
2004-05 $ 11,765,900,908 5.6% $ 0.51 $ 6,033,544
2005-06 $ 12,442,593,882 5.8% $ 0.51 $ 6,380,562
2006-07 $ 13,231,616,506 6.3% $ 0.51 $ 6,785,173
2007-08 $ 13,981,517,900 5.7% $ 0.51 $ 7,169,722
2008-09 $ 14,634,957,230 4.7% $ 0.51 $ 7,504,806
2009-10 $ 15,648,051,136 6.9% $ 0.51 $ 8,024,321
2010-11 $ 15,981,129,412 2.1% $ 0.51 $ 8,195,123
2011-12 $ 16,449,455,277 2.9% $ 0.62 $ 10,187,148
Average 5.3% $ 0.52
Source: Jackson County Tax assessor and City of Central Point Community Development Department
TABLE 2.20
SOIL & WATER CONSERVATION HISTORY OF ASSESSED PROPERTY VALUES, TAX RATES, AND TAX
PROCEEDS
Fiscal Year Net Assessed Value Annual
Growth Rate
Tax Rate Per
$1,000
Rate Generated Tax
Proceeds
1997-98 - - - $ 338,449
1998-99 - - - $ 354,189
1999-00 - - - $ 384,127
2000-01 - - - $ 407,457
2001-02 - - - $ 432,694
2002-03 - - - $ 454,048
2003-04 - - - $ 478,081
2004-05 - - - $ 504,757
2005-06 - - - $ 533,787
2006-07 - - - $ 567,636
2007-08 $ 13,981,517,900 - $ 0.05 $ 599,807
2008-09 $ 14,634,957,230 4.7% $ 0.05 $ 627,840
2009-10 $ 15,648,051,136 6.9% $ 0.05 $ 671,301
2010-11 $ 15,981,129,412 2.1% $ 0.05 $ 685,590
2011-12 $ 16,449,455,277 2.9% $ 0.05 $ 822,473
Average 4.3% $ 0.05
Source: Jackson County Tax assessor and City of Central Point Community Development Department
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 47 of 83
DRAFT 12-06-2011
TABLE 2.22
ROGUE VALLEY TRANSIT DISTRICT, HISTORY OF ASSESSED PROPERTY VALUES, TAX RATES, AND
TAX PROCEEDS
Fiscal Year Net Assessed Value Annual
Growth Rate
Tax Rate Per
$1,000
Rate Generated Tax
Proceeds
1997-98 $ 6,132,841,620 - $ 0.17 $ 1,062,208
1998-99 $ 6,417,976,832 4.6% $ 0.17 $ 1,111,594
1999-00 $ 6,831,409,297 6.4% $ 0.18 $ 1,210,526
2000-01 $ 7,281,156,848 6.6% $ 0.18 $ 1,290,221
2001-02 $ 7,711,453,216 5.9% $ 0.18 $ 1,366,470
2002-03 $ 8,093,483,788 5.0% $ 0.18 $ 1,434,165
2003-04 $ 8,505,757,597 5.1% $ 0.18 $ 1,507,220
2004-05 $ 8,913,599,738 4.8% $ 0.18 $ 1,579,490
2005-06 $ 9,416,325,079 5.6% $ 0.18 $ 1,668,573
2006-07 $ 10,003,654,409 6.2% $ 0.18 $ 1,772,648
2007-08 $ 10,575,618,155 5.7% $ 0.18 $ 1,874,000
2008-09 $ 11,075,152,342 4.7% $ 0.18 $ 1,962,517
2009-10 $ 11,883,536,537 7.3% $ 0.18 $ 2,105,763
2010-11 $ 12,126,517,275 2.0% $ 0.18 $ 2,148,819
2011-12 $ 12,520,903,116 3.3% $ 0.18 $ 2,218,704
Average 5.2% $ 0.18
Source: Jackson County Tax assessor and City of Central Point Community Development Department
TABLE 2.23
CENTRAL POINT SCHOOL DISTRICT NO. 6, HISTORY OF ASSESSED PROPERTY VALUES, TAX RATES,
AND TAX PROCEEDS
Fiscal Year Net Assessed Value Annual
Growth Rate
Tax Rate Per
$1,000
Rate Generated Tax
Proceeds
1997-98 $ 3,592,453,064 - $ 5.13 $18,423,896
1998-99 $ 3,763,261,313 4.8% $ 5.23 $19,668,309
1999-00 $ 3,977,056,893 5.7% $ 5.24 $20,828,245
2000-01 $ 4,222,036,153 6.2% $ 5.18 $21,857,059
2001-02 $ 1,232,482,601 -70.8% $ 4.41 $ 5,439,439
2002-03 $ 1,311,460,541 6.4% $ 5.91 $ 7,755,978
2003-04 $ 1,390,673,479 6.0% $ 6.05 $ 8,412,184
2004-05 $ 1,476,983,621 6.2% $ 5.81 $ 8,587,183
2005-06 $ 1,562,389,666 5.8% $ 5.74 $ 8,972,804
2006-07 $ 1,667,846,046 6.7% $ 5.76 $ 9,603,458
2007-08 $ 1,760,209,780 5.5% $ 5.72 $ 10,075,441
2008-09 $ 1,849,047,473 5.0% $ 5.73 $ 10,589,496
2009-10 $ 2,168,572,508 17.3% $ 5.57 $ 12,068,106
2010-11 $ 2,181,909,096 0.6% $ 5.60 $ 12,207,837
2011-12 $ 2,215,710,700 1.5% $ 5.67 $ 12,573,050
Average 6.1% $ 4.83
Source: Jackson County Tax assessor and City of Central Point Community Development Department
Notes 1 Calculated from 2002-2012
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 48 of 83
DRAFT 12-06-2011
TABLE 2.24
FIRE DISTRICT NO. 3, HISTORY OF ASSESSED PROPERTY VALUES, TAX RATES, AND TAX PROCEEDS
Fiscal Year Net Assessed Value Annual
Growth Rate
Tax Rate Per
$1,000
Rate Generated Tax
Proceeds
1997-98 $ 1,514,163,768 - $ 2.07 $ 3,134,319
1998-99 $ 1,549,869,225 2.4% $ 2.07 $ 3,207,208
1999-00 $ 1,636,959,745 5.6% $ 2.02 $ 3,308,370
2000-01 $ 1,761,494,295 7.6% $ 1.96 $ 3,458,114
2001-02 $ 1,880,867,920 6.8% $ 2.69 $ 5,059,534
2002-03 $ 2,004,804,393 6.6% $ 2.99 $ 5,994,365
2003-04 $ 2,128,668,120 6.2% $ 3.12 $ 6,640,167
2004-05 $ 2,273,993,637 6.8% $ 3.12 $ 7,093,496
2005-06 $ 2,462,253,348 8.3% $ 3.12 $ 7,680,753
2006-07 $ 2,668,956,501 8.4% $ 3.12 $ 8,325,543
2007-08 $ 2,812,352,578 5.4% $ 3.12 $ 8,772,853
2008-09 $ 2,973,076,275 5.7% $ 3.12 $ 9,274,214
2009-10 $ 3,569,331,147 20.1% $ 3.12 $ 11,134,172
2010-11 $ 3,605,600,896 1.0% $ 3.12 $ 11,247,311
2011-12 $ 3,654,905,277 1.4% $ 3.12 $ 11,401,112
Average 6.6% $ 2.79
Source: Jackson County Tax assessor and City of Central Point Community Development Department
TABLE 2.25
AVERAGE ANNUAL TAX RATES OF AFFECTED TAXING DISTRICTS
($1,000/AV)
AFFECTED TAX DISTRICTS 1998 to 2012 ASSESSED
VALUE City of Central Point $4.83
Jackson County $2.26
Fire District No. 3 $2.79
Rogue Valley Transit District $0.18
Vector Control $0.04
Water Conservation $0.05
School District No. 6 $5.52
Rogue Community College $0.52
Education Service District $0.35
Total Average Tax Rate $16.50
Source: Jackson County Tax assessor and City of Central Point Community
Development Department.
2.2.4 FISCAL IMPACT OF THE URBAN RENEWAL PLAN IN LIGHT OF ADDED
SERVICES OR INCREASED POPULATION
The Urban Renewal Plan is based on improvements as prescribed in Section 1.6, Urban Renewal
Activities, of the Plan that will encourage and leverage private investment in housing and
commercial development as follows:
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 49 of 83
DRAFT 12-06-2011
RESIDENTIAL DEVELOPMENT
To accommodate the anticipated population growth allocated to the Urban Renewal
Area an estimated 398 new residential units will be constructed by the private sector. It
is estimated that this new residential development will add approximately $45,000,000
to the Urban Renewal Area’s assessed value.
COMMERCIAL DEVELOPMENT
Based on the availability of vacant and redevelopment property it is estimated that the
Urban Renewal Area will realize approximately $133,000,000 in new and remodel
private sector commercial development.
The projects and activities identified in the Plan with an estimated cost of $67,508,618.
Over the course of the Urban Renewal Plan’s duration it is estimated that total
implementation costs will be $88,910,099. This figure includes the cost of all projects
and activities (Maximum Indebtedness), and financing costs.
Improvements to the Urban Renewal Area’s infrastructure should reduce the City’s
operation and maintenance costs presently experienced and encourage new private
sector investment, resulting in increases in the Urban Renewal Area’s assessed values.
Rehabilitation and redevelopment of older buildings and making possible the private
sector’s development of new facilities on the area’s vacant land should substantially
improve the area’s assessed value allowing all affected taxing districts a broader
economic base on which to levy taxes when the tax increment process is terminated.
Table 2.26 identifies the Urban Renewal Area’s 2011-12 AV as a percentage of each of
the affected taxing districts. The taxing districts most impacted by the Urban Renewal
Plan, in order of impact, are; the City of Central Point (13.61%), School District No. 6
(6.15%), and Fire District No. 3 (3.73%). For all other tax districts the Urban Renewal
Area’s Base Value is less than 1% of their total assessed value.
Since the Urban Renewal Area is predominantly zoned for commercial land uses, the
affect on the Area’s population is only minimum--(see below). However, increased
retail, office and service development is expected to provide job opportunities for many
TABLE 2.26
PERCENTAGE OF URBAN RENEWAL AREA ASSESSED VALUE ($136,370,248) OF EACH TAX
DISTRICT
Affected Tax Districts 2011-12 Total
Assessed Value
Percentage in
Urban Renewal
Area
City of Central Point $1,021,196,693 13.61%
Jackson County $15,981,129,412 0.83%
Fire District No. 3 $3,605,600,896 3.73%
Rogue Valley Transit District $12,126,517,275 1.09%
Vector Control $15,981,129,412 0.83%
Water Conservation $15,981,129,412 0.83%
School District No. 6 $2,181,919,096 6.15%
Rogue Community College $15,981,129,412 0.83%
Education Service District $15,981,129,412 0.83%
Source: City of Central Point Community Development Department
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 50 of 83
DRAFT 12-06-2011
of the City’s unemployed and under employed. It is not anticipated that the Renewal
Program, in itself, will attract a significant additional population to the City.
SECTION 2.3 URBAN RENEWAL AREA SELECTION
Urban Renewal Law requires that this Report explain the “. . . reasons for the selection of each
urban renewal area in the plan14”. The Urban Renewal Area is a single geographic area (Figure
1, Urban renewal Boundary). For planning and discussion purposes it has been divided into five
distinct sub areas (Figure 2, Urban Renewal Boundary and Planning Subareas). The Urban
renewal Area accounts for 446.3 acres, representing the core of the City, both historically and
geographically, which are the underlying reasons for selection of the lands comprising the Urban
Renewal Area.
Historically, most of the Urban Renewal Area is represented by the original Town of Central
Point, founded in 1889. Figure 4, Historic Subdivisions, illustrates the age of the built Urban
Renewal Area lands. In general, much of the Urban Renewal Area is over 100 years old. With this
age comes blight related conditions such as antiquated infrastructure, older substandard
buildings, a decline in the ability to compete with and attract new development, all of which
collectively leads to a decline in private investment.
Geographically, the City’s growth has followed a generally concentric pattern, retaining the
Urban Renewal Area as the City’s core. In the long run this geographic attribute is a definite
asset in the future of the City as it continues to grow. Having a well defined urban core that is
historic, attractive, functional, and easily accessible to all citizens; can only improve the City’s
overall livability.
The reasoning for selection of the lands within the Urban Renewal Area can be further
supported based on the conditions of each of the five sub areas in the Urban Renewal Area.
DOWNTOWN (82.74 ACRES)
This sub area is the older historic commercial center of the City, with East Pine Street
serving as both a downtown main street, and the City’s primary east/west arterial
thoroughfare. This sub area is challenged by many of the factors that affect all older
downtowns, including the need to redefine its purpose, lack of pedestrian amenities,
older buildings and infrastructure, and lack of both private and public investment.
Goal: to improve the area as the City’s historic mixed-use urban core, with a strong
pedestrian character and multi-modal emphasis.
HWY. 99 CORRIDOR (90.37 ACRES)
This sub area is the old Hwy. 99 commercial strip serving as the City’s north/south
arterial thoroughfare. This sub area is an older auto dominated commercial strip with
very few amenities for bicycle and pedestrian use. As a main thoroughfare through the
City it is lacking in safe vehicular ingress/egress, pedestrian/bicycle safety, and aesthetic
appeal.
Goal: to improve quality of area as a gateway to Central Point and the Downtown.
SOUTHSIDE NEIGHBORHOOD (105.28 ACRES)
14 ORS 457.085(3)(b)
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 51 of 83
DRAFT 12-06-2011
This sub area is one of the original residential neighborhoods of the City. The Southside
neighborhood was platted in 1887, almost two years prior to incorporation of the Town
of Central Point. This sub area is lacking in pedestrian improvements, and is in need of
infrastructure modernization and residential re-investment strategies. Along the
southern boundary of this sub area there is an older commercial area (old hospital) that
needs revitalization and integration into the neighborhood.
Goal: to improve the area as an attractive high density residential neighborhood to the
Downtown.
NORTHSIDE NEIGHBORHOOD (81.37 ACRES)
This sub area is also part of the original Central Point plat (1887) and is an older
residential neighborhood north of the Downtown. The predominant land use in the
Northside Neighborhood is single-family detached, but now zoned for duplex (R-2). The
area is lacking in pedestrian improvements, and is in need of infrastructure
modernization, and residential re-investment strategies.
Goal: to strengthen the residential character of this neighborhood.
EAST PINE STREET CORRIDOR (86.54 ACRES)
This sub area includes the commercial area east of the I-5 Interchange No. 33 and is
dominated by vacant commercial lands. Development of this sub area is challenged by
the need for major transportation improvements to both the regional and local street
network. The needed improvements are beyond the financial scope of any single
project.
Goal: to improve the area as the easterly gateway to the City and the Downtown.
In summary, the selection of the lands within the Urban Renewal Area is based on the following
considerations:
A. The presence of blighted conditions as described in Section 2.2, Current Conditions,
of this Report;
B. The need to create an environment that will attract private investment in the Area;
C. The need to renew and redevelop the public infrastructure in a manner that
encourages and leverages private investment in the Area; and
D. The revitalization of the Urban Renewal Area in such a manner as to facilitate and
strengthen the economic and aesthetic vitality of the Urban Renewal Area as the
City’s traditional mixed-use urban core through the attraction and maximization of
public and private investments.
Together, the historic and geographic nature of the Urban Renewal Area, along with the specific
condition and needs of each sub area, serves as the reasoning for selection of the boundaries of
the Urban Renewal Area.
SECTION 2.4 PROJECT SELECTION
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 52 of 83
DRAFT 12-06-2011
Urban Renewal Law requires that this Report discuss the “. . . relationship between each project
to be undertaken under the plan and the existing conditions in the urban renewal area.15” The
listed projects and activities were selected to target the elimination of an existing blight
condition, or a condition that is an underlying cause of blight, in a manner consistent with the
goal of each sub area and the Mission, Goals and Objectives of the Urban Renewal Plan.
2.4.1 URBAN RENEWAL PROJECTS AND RELATIONSHIP TO BLIGHT
MITIGATION
The Urban Renewal Plan identifies fifteen (15) projects. Those projects are listed in Table 4.01.
Table 4.01
URBAN RENEWAL PLAN PROJECTS AND ACTIVITIES
Project No. Project Description
1 Downtown Core Area Streetscape Improvements
2 East Pine Street Improvements, East of 10th Street
3 Neighborhood Sidewalks, Street Lighting, and Alleys
4 Hwy. 99 Corridor Improvements
5 Intersection Signalization
6 Off-Street Parking
7 Underground Existing Pole Mounted Utility Systems
8 Gebard Road Extension
9 Pfaff Park Renovation
10 Freeman Road Upgrade to Collector Street Standards
11 Peninger Road Southerly Extension
12 Miscellaneous Public Works
13 City of Central Point Community Center
14 Economic Development Incentive Program
15 Fire Safety
The primary purpose of each project is to encourage and facilitate private investment in the
Urban Renewal Area, targeting the elimination of blight related conditions. The following
discusses the relationship between each project in Table 4.01 and existing conditions within the
Urban Renewal Area:
1. DOWNTOWN CORE AREA STREETSCAPE IMPROVEMENTS. The streetscape system
within the Downtown Core Area (Figure 6, Downtown Core Area) is substandard
with regard to pedestrian, bicycle, and handicapped access, and as such are
inadequate considering the retail and commercial character of the downtown. For a
main street the sidewalks in the Downtown Core Area are narrow and cluttered
with a variety of obstructions making use of the sidewalks difficult, as well as
aesthetically unappealing. The purpose of this project is to improve not only the
function of the streetscape, but also the areas aesthetic appeal, both of which are
necessary to compete with newer commercial areas for private investment.
15 ORS 457.085(3)(c)
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 53 of 83
DRAFT 12-06-2011
Implementation of this project will be accomplished through the preparation of a
master streetscape plan for the Downtown Core Area addressing the design and
establishment of standards for curb and gutter, sidewalks, crosswalks, street trees,
tree grates, street lights, plazas, gateways, corner extensions, and street furniture.
2. EAST PINE STREET IMPROVEMENTS, EAST OF 10TH STREET. Based on prior traffic
studies there has been identified the need for substantial improvements to East
Pine Street between Peninger Road and Hamrick Road. These improvements include
the widening and additional signalization for this section of East Pine Street. Much
of the area served by this section of East Pine Street is vacant commercial property,
the development of which is dependent on these improvements.
3. NEIGHBORHOOD SIDEWALKS, STREET LIGHTING, AND ALLEYS. Both the Northside
Neighborhood and the Southside Neighborhood (Figure 2, Urban Renewal Boundary
and Planning Sub Areas) are older residential areas, platted as far back as 1887. The
streetscape system in these areas is substandard including the absence of sidewalks,
limited street lighting and other pedestrian amenities characteristic of newer
residential neighborhoods. Consequently, the general curb appeal for these
neighborhoods is disadvantaged by the lack of such streetscape amenities as
sidewalks, street trees, and lighting. The installation of sidewalks and street lights on
all residential streets, and the pavement of alleys within the Northside
Neighborhood and Southside Neighborhood will assist in the stabilization of both
neighborhoods’ aesthetic and property values.
4. HWY. 99 CORRIDOR IMPROVEMENTS. Similar to the Downtown Core Area
Streetscape project, the objective of the Hwy. 99 Improvement project is to improve
the overall safety and aesthetics of the Hwy. 99 corridor. As a primary gateway to
the City of Central Point Hwy. 99 has a significant impact on the City’s image.
Improve Front Street from the proposed Twin Creeks railroad crossing south to Bush
Street to arterial street standards in accordance with an approved master street
plan for Hwy. 99, including, but not limited to travel lane reconfiguration, curb and
gutter, sidewalks, street lights, traffic signals, pedestrian lights, street trees and tree
grates, traffic signals, gateways, plazas, crosswalks, and landscaping.
5. INTERSECTION SIGNALIZATION. In conjunction with Projects 1, 2, 3 and 4 there will
be a need to install/upgrade/modify specific traffic signals. These signal
improvements are necessary for safety reasons and to maintain an acceptable level
of service necessary to accommodate development within and adjacent to the
Urban Renewal Area. The proposed signal locations are:
a. Twin Creeks Dr. install new railroad crossing and signalize intersection at
Hwy. 99 and Twin Creeks Dr. and new railroad crossing at Twin Creeks Dr.
Improvements shall include, but not be limited to easement acquisition,
curb and gutter, street surface improvement, railroad crossing signalization,
Hwy. 99 signalization, sidewalks, street lights, and landscaping.
b. Pine St. and Second St. add new signals;
c. Pine St. and Sixth St. add new signals;
d. Pine St. and Fourth St. remove existing signal;
e. Pine St. and Gebhard Road extension add a new signal;
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 54 of 83
DRAFT 12-06-2011
f. Pine St. and Penninger Rd. modify/remove signal; and
g. Hwy. 99 and Fire District No. 3 Station add emergency signal.
6. OFF-STREET PARKING FACILITIES. The City owns two unimproved public parking lots
within the Downtown area. Because of the condition of these parking lots they are
both an aesthetic and air quality nuisance. All public parking constructed under the
provisions of this Section shall comply with the objectives and policies of the City of
Central Point Transportation System Plan and with the applicable standards as set
forth in the Land Development Code.
The construction of the parking lots listed below shall be consistent with an
approved plan for downtown parking. During the planning and design phase of the
parking facility the Commission will have prepared a written parking analysis to
define the service area, determine the demand for parking within the service area,
the parking mix (leased vs. free), operating costs, and parking duration (long-term
vs. short-term).
a. Oak Street Facility. Design and construct a parking facility on the southeast
corner of Oak Street and Third Street.
b. Manzanita Street Facility. Design and construct a parking facility on the
southeast corner of Manzanita Street and First St.
7. UNDERGROUND EXISTING POLE MOUNTED UTILITY SYSTEMS. A major
consideration to the beautification of the Within the Downtown Core area, and
along Hwy. 99 underground existing overhead utilities.
8. GEBARD RD. EXTENSION. Extend Gebard Rd. from E. Pine St. as a collector street,
north to the City limits in accordance with the City’s Transportation System plan.
This project was identified in the East Pine Street Traffic Study as a necessary
improvement to relieve traffic congestion on East Pine Street, thereby allowing the
development.
9. PFAFF PARK RENOVATION. Pfaff Park is centrally located within the Urban Renewal
Area and is in need of improvements, making it more useful and accessible to the
surrounding neighborhoods. The proposed renovations include new landscaping,
restroom facilities, playground equipment, and lighting. This is in addition to
perimeter sidewalks provided by Project No. 6.
10. FREEMAN ROAD UPGRADE TO COLLECTOR STREET STANDARDS. Freeman Road
serves as an easterly border to the Urban Renewal Area. Currently, Freeman Road is
a substandard street functioning as a collector. It is two-lanes in width with no curb,
gutter, sidewalk, bike lanes, or street lights. Freeman Road also functions as Transit
Route 40. Under current conditions Freeman Road is unsafe for pedestrian, bicycle
and transit use. The objective of this project is to upgrade Freeman Road from Oak
Street to Hopkins Road to collector street standards, making it a safe and
aesthetically attractive street.
11. SOUTH PENINGER ROAD EXTENSION. Extend Peninger Road south across Bear
Creek to collector street standards to intersect with Hamrick Road. Improvements
will include right-of-way acquisition, bridge crossing and bike lanes. This project was
identified in the East Pine Street Traffic Study as a necessary improvement to relieve
traffic congestion on East Pine Street, thereby allowing the development.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 55 of 83
DRAFT 12-06-2011
12. MISCELLANEOUS PUBLIC WORKS. Throughout the Urban Renewal Area, particularly
in the Downtown, Northside, and Southside neighborhoods, there is a need to
upgrade existing public facilities, such as water, storm drainage, etc., to serve
existing and future development in the Urban Renewal Area. Throughout the life of
the Urban Renewal Plan, the Commission, consistent with their priorities and
financial resources, may assume the costs, or share of the costs, of engineering and
constructing public works projects within the Urban Renewal Area as necessary to
further the objectives of the Urban Renewal Plan. Such projects may include the
installation or reconstruction of the following:
a. Storm Drains;
b. Sanitary Sewers;
c. Water Mains and Fire Hydrants;
d. Curbs and Gutters;
e. Sidewalks, including landscaping within right-of-way;
f. Street Work; and
g. Alley Paving.
13. CITY OF CENTRAL POINT COMMUNITY CENTER. The City of Central Point has
identified a need for a community center. Because of the central location of the
Urban Renewal Area to the Central Point community, location of the community
center within the Urban Renewal Area is being considered. A community center
would serve as a major use within the Urban Renewal Area generating additional
economic activity. This project is intended to proportionately assist in the design
and development of a community center within the Urban Renewal Area based on
the community center’s benefit to the Urban Renewal Area. Prior to any financial
participation in the community center it will be necessary that the Commission
determine the percentage benefit of the community center to the Urban Renewal
Area.
14. ECONOMIC DEVELOPMENT INCENTIVE PROGRAMS. In an effort to facilitate private
investment in the Urban Renewal Area in conjunction with the Urban Renewal
Plan’s projects 1 through 13 the Commission will design and make available
incentives the will encourage private sector investment in the Urban renewal Area.
Prepare and implement economic development incentive programs that encourage
residential and commercial development/redevelopment within the Area.
15. FIRE SAFETY. As a result of the Urban Renewal Area’s revitalization in residential
and commercial structures it will be necessary to increase capital investment in fire
safety equipment sufficient to maintain acceptable levels of fire safety service. This
project anticipates, and provides funds, for the addition of fire safety equipment.
The specific need and timing for such equipment will be coordinate with Fire District
No. 3.
SECTION 2.5 PROJECT COSTS, FUNDING, COMPLETION, AND
MAXIMUM INDEBTEDNESS
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 56 of 83
DRAFT 12-06-2011
Urban Renewal law requires that this Report address the “. . . estimated project and activity
costs and sources of moneys to pay such costs.16”
2.5.1 PROJECT COSTS
Table 5.1 identifies the estimated cost of the urban renewal projects and activities, and their
revenue sources. The total estimated cost of all projects and activities, including administration,
is $67,295,785. The source of funding for these projects and activities will come from tax
increment revenue ($43,177,530) and other sources such as system development fees, grants,
and developer participation ($24,118,255).
The administration costs for materials and administrative services have been estimated at
approximately 6% of total project cost. Over the duration of the Urban Renewal Plan (25 years)
it is estimated that $2,431,278 will be needed for materials and administrative services.
Administrative services include such services as legal, accounting and annual audits, general
administration, bond counsel, general consulting services, etc.
These costs are stated in 2011 dollars and are based on prior engineered studies prepared by
the City. Included in the cost of each project are design services, legal services related to the
project, construction costs, and construction management.
16 ORS 457.085(3)(d)
Table 5.1
URBAN RENEWAL PROJECTS AND COST ESTIMATES, 2011-37
Project No. Project Description Estimated
Total Project
Cost
Agency Funding Other Funding
1 Downtown Core Area Streetscape Improvements $7,197,511 $5,792,291 $1,405,220
2 East Pine Street Improvements $5,564,984 $3,617,240 $1,947,744
3 Neighborhood Sidewalks, Street Lighting, and
Alleys
$2,121,071 $1,484,750 $636,321
4 Hwy. 99 Corridor Improvements $1,939,104 $1,163,462 $775,642
5 Intersection Signalization $5,104,818 $3,573,373 $1,531,445
6 Off-Street Parking $555,617 $277,809 $277,809
7 Underground Existing Pole Mounted Utility
Systems
$4,000,000 $3,400,000 $600,000
8 Gebard Road Extension $2,500,000 $1,500,000 $1,000,000
9 Pfaff Park Renovation $206,464 $144,525 $61,939
10 Freeman Road Upgrade to Collector Street
Standards
$1,474,271 $737,136 $737,136
11 Peninger Road Southerly Extension $16,046,726 $9,628,036 $6,418,690
12 Miscellaneous Public Works $2,234,648 $1,340,789 $893,859
13 City of Central Point Community Enter $4,305,303 $1,076,326 $3,338,977
14 Economic Development Incentive Program $6,000,000 $6,000,000 $0.00
15 Fire Safety $5,613,990 $1,010,518 $4,603,472
TOTAL PROJECT COSTS $64,864,507 $40,746,252 $20,795,988
OPERATING COSTS (6% of Total Project Cost) $2,431,278 $2,431,278 -
TOTAL PROGRAM COSTS $67,295,785 $43,177,530 $24,118,255
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 57 of 83
DRAFT 12-06-2011
2.5.2 MAXIMUM INDEBTEDNESS
In accordance with ORS 457.190 the Urban Renewal Plan has set a Maximum Indebtedness of
$43,177,530. Each year the Agency will adjust the Maximum Indebtedness per ORS
457.190(4)(d). The adjustment will be based on the Engineering News Record Construction Cost
Index as presented in Section 2.5.4, Index to Adjust Project and Activity Dollar Values, of this
Report.
Table 5.2
MAXIMUM INDEBTEDNESS
Projects and Activities $40,746,252
Administrative Costs $ 2,431,278
Maximum Indebtedness $43,177,530
2.5.3 PROJECT COMPLETION DATES
The completion of each project will be a function of the availability of tax increment revenue
and other revenue sources. Based on the availability of tax increment revenue (see Section 2.7,
Financial Analysis, for discussion, Table 7.1) it is estimated that there will be sufficient revenue
to complete all projects and activities no later than June 30, 2037.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 58 of 83
DRAFT 12-06-2011
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Table 5.4
HISTORIC COMBINED TAX RATES BY TAXING AUTHORITY, 1997-2012
Fiscal
Year
City of
Central
Point
Jackson
County
Fire
District
No. 3
Rogue
Valley
Transit
District
Vector
Control
Soil
Conservation
Total
Non-
Schools
School
District
No. 6
Education
Service
District
Rogue
Community
College
Total
Schools
TOTAL
Non-
School
and
School
1997-98 $5.83 $1.97 $2.07 $0.17 $0.04 - $10.08 $5.13 $0.35 $0.50 $5.98 $16.06
1998-99 $5.83 $1.97 $2.07 $0.17 $0.04 - $10.08 $5.13 $0.35 $0.50 $6.08 $16.16
1999-00 $5.83 $2.01 $2.02 $0.18 $0.04 - $10.08 $5.24 $0.35 $0.51 $6.10 $16.18
2000-01 $5.83 $2.28 $1.96 $0.18 $0.04 - $10.29 $5.18 $0.35 $0.51 $6.04 $16.34
2001-02 $4.47 $2.39 $2.69 $0.18 $0.04 - $9.77 $4.41 $0.35 $0.51 $5.28 $15.05
2002-03 $4.47 $2.38 $2.99 $0.18 $0.04 - $10.06 $5.91 $0.35 $0.51 $6.78 $16.84
2003-04 $4.47 $2.50 $3.12 $0.18 $0.04 - $10.31 $6.05 $0.35 $0.51 $6.91 $17.23
2004-05 $4.47 $2.47 $3.12 $0.18 $0.04 - $10.28 $5.81 $0.35 $0.51 $6.68 $16.96
2005-06 $4.47 $2.27 $3.12 $0.18 $0.04 - $10.08 $5.74 $0.35 $0.51 $6.61 $16.69
2006-07 $4.47 $2.24 $3.12 $0.18 $0.04 - $10.05 $5.76 $0.35 $0.51 $6.62 $16.67
2007-08 $4.47 $2.25 $3.12 $0.18 $0.04 $0.05 $10.11 $5.72 $0.35 $0.51 $6.59 $16.70
2008-09 $4.47 $2.34 $3.12 $0.18 $0.04 $0.05 $10.20 $5.73 $0.35 $0.51 $6.59 $16.79
2009-10 $4.47 $2.37 $3.12 $0.18 $0.04 $0.05 $10.23 $5.57 $0.35 $0.51 $6.43 $16.66
2010-11 $4.47 $2.33 $3.12 $0.18 $0.04 $0.05 $10.19 $5.60 $0.35 $0.51 $6.46 $16.65
2011-12 $4.47 $2/26 $3.12 $0.17 $0.04 $0.05 $9.93 $5.67 $0.35 $0.62 $6.65 $16.58
AVERAGE $4.83 $2.26 $2.79 $0.18 $0.04 $0.05 $10.12 $5.52 $0.35 $0.52 $6.39 $16.50
Source: Jackson County Assessors Office
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
2.5.4 INDEX TO ADJUST PROJECT AND ACTIVITY DOLLAR VALUES
The project and activities costs presented in the Urban Renewal Program are stated in terms of
June 2011 dollar values. It is expected that the cost of implementing the Urban Renewal Plan
over time will either increase, or decrease throughout the duration of this Plan as a function of
changes in the cost of construction. To account for increased costs this section will provides a
methodology for adjusting the Plan’s implementation costs. Further, it is the intent of this
section to establish a methodology that complies with ORS 457.190(4)(d).
The ENR index for Construction is published weekly by:
Engineering News Record
McGraw-Hill, Publisher
1221 Avenue of the Americas
New York, New York 10020
Phone: (212) 512-2000
No later than July 30th of each year the Agency shall calculate the outstanding cost of each
project and increase, or decrease, all outstanding costs based on the following methodology:
The Engineering News Record (ENR) for Construction Costs
Seattle (Northwest) will be used to adjust the June 2011
dollar figure to establish project and activities dollar values
for subsequent years. The ENR Construction Index for June
1, 2011 was 9104. Annually, for the month of June of
subsequent years, the outstanding construction cost
estimates for each project shall be adjusted by using the
ENR Index for Construction reported for June of each
subsequent year. The Agency shall modify, by resolution,
Table 8.1 for each affected project.
An example of how the indexing process is herein intended
to function, using March 2010 and June 2011 figures, is as follows:
Under this example, there is an increase in construction costs of 3.4% between June 2010 and
June 2011. In 2010 for each $1,000 in project cost the adjusted 2011 value would increase to
$1,033.96.
SECTION 2.6 ESTIMATED TAX INCREMENT REVENUE AND DEBT
RETIREMENT
Urban Renewal Law requires that this Report provide an estimate of the “. . . amount of money required
in each urban renewal area under ORS 457.420 to 457.460 and the anticipated year in which
indebtedness will be retired or otherwise provided for under ORS 457.420 to 457.460.17” The tax
increment revenue to the Agency was estimated based on the following inputs:
1. Ballot Measure 5 Growth Rate. It is estimated that over the duration of the Urban Renewal Plan
that the average Ballot Measure 5 growth rate will be 2.5% vs. the maximum allowed 3%.
Currently, the average annual growth of assessed value within the Urban Renewal Area is less
than 1.6%.
17 ORS 457.095(3)(f)
Index Point Change
June 2011 Index = 9104
June 2010 Index = 8805
Change in Index = 299
Percentage Change in Index
Change in Index = 299
June 2010 Index / 8805
Percentage Change in Index = 3.4%
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 61 of 83
DRAFT 12-06-2011
2. Population Growth. As a result of the revitalization strategies of the Urban Renewal Plan it is
estimated that throughout the duration of the Urban Renewal Plan 8% of all new residential
development in the City will occur within the Urban Renewal Area, and that 50% of all
commercial development will occur within the Urban Renewal Area. Both the number of
housing units and commercial square footage were based on population growth as projected in
the Comprehensive Plan’s Population Element.
3. Consolidated Tax Rate. Table 5.4 contains a history of the tax rates for each affected taxing
district from 1997-98 to 2011-12. Although the historical average is $16.50/$1,000, projections
for future tax increment revenue are based on a more conservation $15.15/$1,000 of assessed
value. The $15.15 consolidated rate was derived from the base rate of each affected taxing
district.
4. Urban Renewal Plan Duration. The Urban Renewal Plan is expected to have a 25 year duration
beginning in fiscal year 2011-12 and ending on June 30, 2037. All projects and activities will be
completed and all Agency indebtedness retired no later than June 30, 2037.
Table 6.1 identifies the estimated annual and cumulative amounts of tax increment revenue
($51,970,747) that will be available to the Urban Renewal Agency throughout the duration of the Plan.
Tax increment proceeds are expected to be distributed to the Urban Renewal Agency beginning in FY
2012-13 and be terminated at the end of FY 2036-37.
The Urban Renewal Agency’s authorized maximum indebtedness to implement the provisions of the
Urban Renewal Plan is $43,177,530. Funds available to the Urban Renewal Agency are estimated to be:
Tax Increment Revenue $51,970,747
Interest on Funds $ 198,429
Other Income (Loans/Grants/Other) $21,278,639
TOTAL FUNDS AVAILABLE: $ 81,965,648
These funds will be used to leverage the maximum indebtedness of $43,177,530 to complete all projects
and activities by the Fiscal Year 2036-37. After Fiscal Year 2036-37 should there be a surplus of tax
increment proceeds, ORS 457.450(3) requires that surplus funds, if any, will be turned over to the
County for distribution, prorated, to the affected taxing districts.
The generation of $50,567,108 in tax increment revenue will require, based on the projected combined
tax rate, an increase in the assessed value of the Urban Renewal Area from a Base Year (FY 2011-12) AV
of $131,424,528 to an AV of $435,123,339 for an increase of $303,698,811. If the improvements
proposed in the Urban Renewal Plan were not implemented, most of this increase would not be
possible.
All projects and activities will be completed and all incurred debt repaid no later than Fiscal Year 2036-
37 at which time tax increment collections will be reduced to a level sufficient to pay only outstanding
debt service obligations. When the tax increment process is terminated at the end of fiscal year 2036-
37, the balance of the increase in AV will be available to each of the affected taxing districts. During the
estimated 25-year period in which the tax increment process will be in place, the affected taxing districts
will continue to receive property taxes from the estimated Base Year assessed value of $131,424,528.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Table 6.1
PROJECTED URBAN RENEWAL AREA ASSESSED VALE AND TAX INCREMENT REVENUE
Fiscal Year Assessed Value Base Value Incremental Value Combined Tax
Rate
Annual Tax
Increment Revenue
2011-12 $131,424,528 $131,424,528 - $15.15 -
2012-13 $134,710,141 $131,424,528 $3,285,613 $15.15 $49,744
2013-14 $142,713,477 $131,424,528 $11,288,949 $15.15 $170,915
2014-15 $153,289,282 $131,424,528 $21,864,754 $15.15 $331,032
2015-16 $162,034,979 $131,424,528 $30,610,451 $15.15 $463,442
2016-17 $170,847,746 $131,424,528 $39,423,218 $15.15 $596,868
2017-18 $182,295,549 $131,424,528 $50,871,021 $15.15 $770,187
2018-19 $191,779,034 $131,424,528 $60,354,506 $15.15 $913,767
2019-20 $203,993,711 $131,424,528 $72,569,183 $15.15 $1,098,697
2020-21 $216,663,658 $131,424,528 $85,239,130 $15.15 $1,290,520
2021-22 $226,958,822 $131,424,528 $95,531,294 $15.15 $1,446,344
2022-23 $237,581,075 $131,424,528 $106,156,547 $15.15 $1,607,210
2023-24 $248,547,746 $131,424,528 $117,123,218 $15.15 $1,773,246
2024-25 $259,877,001 $131,424,528 $128,452,473 $15.15 $1,944,770
2025-26 $271,565,273 $131,424,528 $140,410,745 $15.15 $2,121,731
2026-27 $283,305,763 $131,424,528 $151,881,235 $15.15 $2,299,482
2027-28 $296,564,973 $131,424,528 $165,140,445 $15.15 $2,500,226
2028-29 $310,256,712 $131,424,528 $178,832,184 $15.15 $2,707,519
2029-30 $324,404,424 $131,424,528 $192,979,896 $15.15 $2,921,716
2030-31 $338,994,245 $131,424,528 $207,569,717 $15.15 $3,142,606
2031-32 $353,809,871 $131,424,528 $222,385,343 $15.15 $3,366,914
2032-33 $369,096,935 $131,424,528 $237,672,407 $15.15 $3,598,360
2033-34 $384,867,225 $131,424,528 $253,442,697 $15.15 $3,837,122
2034-35 $401,120,188 $131,424,528 $269,695,660 $15.15 $4,083,192
2035-36 $417,893,155 $131,424,528 $286,468,627 $15.15 $4,337,135
2036-37 $435,123,339 $131,424,528 $303,698,811 $15.15 $4,598,000
TOTAL TAX INCREMENT REVENUE $51,970,747
Source: City of Central Point Community Development Department
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
SECTION 2.7 FINANCIAL ANALYSI S
Urban Renewal Law requires that this Report include a “. . . financial analysis of the plan with sufficient
information to determine feasibility.18” The Urban Renewal Plan’s financial feasibility is demonstrated in
Table 7.1 where annual sources of revenue and expenses are identified, including financing
opportunities and debt service costs. The primary revenue source for urban renewal is tax increment
revenue, and the ability of tax increment revenue to support and leverage debt. Previously, in Section
2.6, Estimated Tax Increment Revenue and Debt Retirement, the estimated increase in assessed value
and annual tax increment revenue resulting from implementation of the Urban Renewal Plan was
identified, while in Section 2.5, Project Costs, Funding, Completion, and Maximum Indebtedness, total
Urban Renewal Program costs were identified.
With no urban renewal program to correct the problems discussed in this report, the cost to provide
services within the Urban Renewal Area can most definitely be expected to rise in relationship to
property values - particularly in the Downtown Core Area and the Northside Neighborhood, and the
South Side Neighborhood.
As with other cities which have implemented and completed urban renewal programs, the program
does stimulate new development and renovation of existing property. In the process it creates
significant amounts of new taxable assessed value. Most of this new assessed value would not exist if
not for the Urban Renewal Program.
SECTION 2.8 A FISCAL IMPACT STATEMENT
As required by Urban Renewal law this section addresses the need for a “. . . fiscal impact statement
that estimates the impact of the tax increment
financing, both until and after the indebtedness is
repaid, upon all entities levying taxes upon property in
the urban renewal area.19” The Urban Renewal Plan’s
fiscal impact is based on the loss and/or gain of tax
revenue that each affected taxing district will
experience throughout the duration (indebtedness
period) of the Plan, and immediately after closure of
the Urban Renewal Plan (post indebtedness).
Applying this average growth rate to each of the taxing
districts throughout the duration of the Urban
Renewal Plan yields a consolidated loss (all affected
taxing districts) in tax revenue of $11,802,104. The
fiscal impact to each taxing district is identified in
Table 8.2. Also shown in Table 8.2 is the percentage of
the Urban Renewal Area’s assessed value to that of the
affected taxing district.
2.8.1 FISCAL IMPACT FY 2011-37
During the Plan’s duration it is expected that the affected taxing districts will be fiscally
impacted as a result of the Urban Renewal Plan. The Urban Renewal Plan will not affect current
or future tax rates, but will negatively affect growth in the assessed value available to the taxing
districts. The loss in assessed value was calculated based on the loss of tax revenue from the
incremental assessed value increases between FY 2011-12 and FY 2036-37, which was based on
18 ORS 457.095(3)(g)
19 ORS 457.095(3)(h)
Table 8.1
HISTORIC ASSESSED VALUE GROW IN URBAN
RENEWAL AREA, 2007-2012
Fiscal Year Assessed Value % Change
from Prior
Year 2006-07 $121,560,032 -
2007-08 $127,684,191 5.04%
2008-09 $130,825,533 2.46%
2009-10 $131,489,250 0.51%
2010-11 $133,371,628 1.43%
2011-12 $131,424,528 -1.46%
ANNUAL AVERAGE 1.60%
Source: City of Central Point Community
Development Department and Jackson County
Assessor’s Office
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 64 of 83
DRAFT 12-06-2011
the average annual growth rate (1.6%) in assessed value for the Urban Renewal Area since FY
2006-07 (see Table 8.1)20.
Source: City of Central Point Community Development Department, Jackson County Assessor’s Office
2.8.2 POST INDEBTEDNESS FI SCAL IMPACT
Beginning in FY2037-38 the affected taxing districts will realize increases in tax revenue as they
recapture the Urban Renewal District’s Incremental Value, which as a result of the Urban
Renewal Program will have increased to $303,698,811. Beginning in fiscal year 2037-38 an
estimated $321,473,429 in incremental assessed value will be released, resulting in the
distribution of an estimated $4,446,230 in tax revenue. The distribution of the recaptured
property tax revenue to each of the affected taxing districts is shown in Table 8.3. As illustrated
in Table 8.3 it is projected that by fiscal year 2039-40 (breakeven point) all affected taxing
districts will have recovered their fiscal impact as identified in Table 8.2.
The net fiscal impact of the Urban Renewal Plan results in the positive long-term fiscal
strengthening of not only of the Urban Renewal Area, but also of each affected taxing district.
The fiscal benefits illustrated in Table 8.3 would not be possible without the public and private
investment in the Urban Renewal Area resulting from Implementation of this Plan.
Although not calculated in the above fiscal impact analysis it is worth noting that the Urban
renewal Program will also have a positive “spin-off” on the assessed value of areas adjacent to
the Urban Renewal Area. As an example, the construction of the Hwy. 99 railroad crossing and
intersection (Project No. 5a) will facilitate the continued development of the Twin Creeks TOD,
most of which is outside of the Urban Renewal Area. Similarly the improvements to East Pine
Street east of I-5 (Projects 2 and 11) will facilitate the continued commercial development of
property adjacent to and east of the Urban Renewal Area.
20 Annual assessment information for the Urban Renewal Area only available since FY 2006-07.
Table 8.2
URBAN RENEWAL FISCAL IMPACT ON AFFECTED TAXING DISTRICTS
Taxing District 2011-12 Tax
District Assessed
Value
2011-12 URA
Assessed Value
% of
District
Assessed
Value in
URA
25 Year
District Tax
Revenue Loss
City of Central Point $1,036,034,076 $131,424,528 12.7% $3,435,140
Jackson County $16,449,455,277 $131,424,528 0.8% $1,544,660
Fire District No. 3 $3,654,905,277 $131,424,528 3.6% $2,397,681
Rogue Valley Transit District $12,520,903,116 $131,424,528 1.0% $138,328
Vector Control $16,449,455,277 $131,424,528 0.8% $30,740
Water Conservation $16,449,455,277 $131,424,528 0.80% $38,424
School District No. 6 $2,215,710,700 $131,424,528 5.9% $3,389,030
Rogue Community College $16,449,455,277 $131,424,528 0.8% $391,929
Education Service District $16,449,455,277 $131,424,528 0.8% $268,971
TOTAL FISCAL IMPACT TO ALL TAXING DISTRICTS $11,634,902
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Table 7.1
CITY OF CENTRAL POINT URBAN RENEWAL PROGRAM
ESTIMATED SOURCES OF URBAN RENEWAL AGENCY'S FUNDS AND ANNUAL DISPOSITION OF SUCH FUNDS,
FISCAL YEARS 2013-2037 (Measured in Current Dollars, 2011)
1
Fiscal Year
Tax
Increment
Year Annual TI Proceeds
Debt Service
Ratio (DSR)Loans1,6
Interest on
Contingency
Balance2 Other Income7
Total Funds
Available3
Projects and
Activities
Personnel
Services
Materials and
Services Annual Debt Service
Debt Service
Reserve (10%)4 Total Costs
Contingency
Balance Forward5
2011-12
2012-13 1 49,744$ - 125,000$ -$ -$ 174,744$ 115,000$ $ 4,600 $ 2,300 $ 40,362 $ - 162,262$ $ 12,483
2013-14 2 170,915$ - -$ 250$ -$ 183,647$ 125,000$ $ 5,000 $ 2,500 $ 40,362 $ - 172,862$ $ 10,786
2014-15 3 331,032$ - -$ 216$ -$ 342,034$ 260,000$ $ 10,400 $ 5,200 $ 40,362 $ - 315,962$ $ 26,072
2015-16 4 463,442$ - -$ 521$ -$ 490,036$ 390,000$ $ 15,600 $ 7,800 $ 40,362 $ - 453,762$ $ 36,274
2016-17 5 596,868$ 1.30 5,000,000$ 725$ -$ 5,633,867$ 3,000,000$ $ 120,000 $ 60,000 $ 458,758 $ 500,000 4,138,758$ $ 1,495,109
2017-18 6 770,187$ 1.84 -$ 39,902$ -$ 2,305,199$ 1,625,000$ $ 65,000 $ 32,500 $ 418,397 $ - 2,140,897$ $ 164,302
2018-19 7 913,767$ 2.18 -$ 3,286$ -$ 1,081,355$ 575,000$ $ 23,000 $ 11,500 $ 418,397 $ - 1,027,897$ $ 53,459
2019-20 8 1,098,697$ 2.63 -$ 1,069$ -$ 1,153,225$ 635,000$ $ 25,400 $ 12,700 $ 418,397 $ - 1,091,497$ $ 61,728
2020-21 9 1,290,520$ 1.30 6,500,000$ 1,235$ -$ 7,853,483$ 4,250,000$ $ 170,000 $ 85,000 $ 996,376 $ 650,000 6,151,376$ $ 1,702,107
2021-22 10 1,446,344$ 1.45 -$ 47,042$ -$ 3,195,493$ 1,900,000$ $ 76,000 $ 38,000 $ 996,376 $ - 3,010,376$ $ 185,117
2022-23 11 1,607,210$ 1.61 -$ 3,702$ -$ 1,796,030$ 690,000$ $ 27,600 $ 13,800 $ 996,376 $ - 1,727,776$ $ 68,254
2023-24 12 1,773,246$ 1.27 4,000,000$ 1,365$ -$ 5,842,864$ 3,000,000$ $ 120,000 $ 60,000 $ 1,394,878 $ 400,000 4,974,878$ $ 867,986
2024-25 13 1,944,770$ 1.39 -$ 25,360$ -$ 2,838,116$ 1,255,000$ $ 50,200 $ 25,100 $ 1,394,878 $ - 2,725,178$ $ 112,937
2025-26 14 2,121,731$ 1.52 -$ 2,259$ -$ 2,236,927$ 725,000$ $ 29,000 $ 14,500 $ 1,394,878 $ - 2,163,378$ $ 73,548
2026-27 15 2,299,482$ 1.65 -$ 1,471$ -$ 2,374,501$ 845,000$ $ 33,800 $ 16,900 $ 1,394,878 $ - 2,290,578$ $ 83,923
2027-28 16 2,500,226$ 1.29 4,250,000$ 1,678$ -$ 6,835,828$ 2,600,000$ $ 104,000 $ 52,000 $ 1,945,273 $ 425,000 5,126,273$ $ 1,709,555
2028-29 17 2,707,519$ 1.39 -$ 42,691$ -$ 4,459,765$ 2,175,000$ $ 87,000 $ 43,500 $ 1,945,273 $ - 4,250,773$ $ 208,992
2029-30 18 2,921,716$ 1.50 -$ 4,180$ -$ 3,134,888$ 1,025,000$ $ 41,000 $ 20,500 $ 1,945,273 $ - 3,031,773$ $ 103,115
2030-31 19 3,142,606$ 1.62 -$ 2,062$ -$ 3,247,782$ 1,125,000$ $ 45,000 $ 22,500 $ 1,945,273 $ - 3,137,773$ $ 110,010
2031-32 20 3,366,914$ 1.73 -$ 2,200$ -$ 3,479,124$ 1,325,000$ $ 53,000 $ 26,500 $ 1,945,273 $ - 3,349,773$ $ 129,351
2032-33 21 3,598,360$ 1.85 -$ 2,587$ -$ 3,730,298$ 1,540,000$ $ 61,600 $ 30,800 $ 1,945,273 $ - 3,577,673$ $ 152,625
2033-34 22 3,837,122$ 1.97 -$ 3,053$ -$ 3,992,800$ 1,750,000$ $ 70,000 $ 35,000 $ 1,945,273 $ - 3,800,273$ $ 192,527
2034-35 23 4,083,192$ 2.10 -$ 3,851$ -$ 4,279,570$ 2,025,000$ $ 81,000 $ 40,500 $ 1,945,273 $ - 4,091,773$ $ 187,797
2035-36 24 4,337,135$ 2.23 -$ 3,756$ -$ 4,528,688$ 2,250,000$ $ 90,000 $ 45,000 $ 1,945,273 $ - 4,330,273$ $ 198,415
2036-37 25 3,194,361$ 2.15 -$ 3,968$ 1,975,000$ 5,371,744$ 5,525,000$ $ 224,730 $ 110,500 $ 1,486,515 $ (1,975,000)5,371,745$ $ (0)
Totals 50,567,108$ 19,875,000$ 198,429$ 1,975,000$ 80,562,009$ 40,730,000$ 1,632,930$ 814,600$ 29,438,008$ -$ 72,615,538$ 7,946,471$
TOTAL FUNDS AVAILABLE 80,562,009$ TOTAL DISPOSITION OF FUNDS 80,562,009
Notes:
1 Loan interest rate calculated at 5.5%. Timing based on attaining a debt service ratio of 1.3 or better.
2 Calculated at 2% of prior year Contingency Balance Forward.
3 Includes Contingency Balance Forward from prior year. In final year includes Debt Service Reserves Totals.
4 Based on 10% of loan amount, carried through life of loan and used for final loan payment.
5 Averages approximately 15% of Total Costs.
6 Based on required debt service ratio of 1.3 or greater.
AVAILABILITY OF FUNDS DISPOSITION OF FUNDS
BASE YEAR
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Table 8.3
POST INDEBTEDNESS FISCAL IMPACT AND BREAKEVEN POINT
Taxing District Total Fiscal
Impact
FY2037-38
Revenue Gain
on
Incremental
Value
Breakeven
Point in
Years
City of Central Point $3,435,140 $1,146,659 3.0
Jackson County $1,544,660 $515,612 3.0
Fire District No. 3 $2,397,681 $1,022,997 2.4
Rogue Valley Transit District $138,328 $57,865 2.4
Vector Control $30,740 $12,859 2.4
Water Conservation $38,424 $16,074 2.4
School District No. 6 $3,389,030 $1,417,698 2.4
Rogue Community College $391,929 $163,951 2.4
Education Service District $268,971 $112,516 2.4
TOTAL $11,634,902 $5,458,338 2.62
Source: City of Central Point Community Development Department, Jackson County
Assessor’s Office
SECTION 2.9 RELOCATION REPORT
Because of the ability of the Commission to acquire property Urban Renewal Law requires “. . . a
relocation report which shall include:
A. An analysis of existing residents or businesses required to relocate permanently or
temporarily as a result of agency actions under ORS 457.170;
B. A description of the methods to be used for the temporary or permanent relocation of
persons living in, and businesses situated in, the urban renewal area in accordance with
ORS 35.500 to 35.530; and
C. An enumeration, by cost range, of the existing housing units in the urban renewal areas
of the plan to be destroyed or altered and new units to be added.21”
2.9.1 PROPERTIES REQUIRING RELOCATION
At this time the Commission does not expect to acquire occupied properties. However, should
the Commission, in the implementation of the Urban Renewal Plan, determine that acquisition
of occupied property is necessary; then the Commission shall comply with the relocation
requirements of the Urban Renewal Plan, Section 1.6.5, Relocation Activities.
2.9.2 DESCRIPTION OF RELOCATION METHOD S
ORS 457 requires that relocation assistance to occupied property be provided by the Urban
Renewal Agency. Accordingly, subsection 1.6.5, Relocation Activities, of the Urban Renewal Plan
requires the relocation provisions of ORS 281.045.106 be met and that relocation payments be
made as provided by ORS 281.060.
21 ORS 457.095(3)(i)
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 67 of 83
DRAFT 12-06-2011
2.9.3 ENUMERATION OF HOUSING UNITS REQ UIRING RELOCATION
At the time of adoption of this Plan no residential properties have been designated for
acquisition. If at such time the Urban Renewal Plan is amended to acquire property requiring
residential relocation, then the Commission shall amend this section to include an enumeration
of the dwelling units to be demolished and replacement strategies.
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
APPENDIX
EXHIBIT 1. Narrative Description of Urban Renewal Area
EXHIBIT 2. Graphic Description of Urban Renewal Area
EXHIBIT 3. Urban Renewal Area Tax Lot Inventory, December 2011
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 69 of 83
DRAFT 12-06-2011
EXHIBIT 1 – Narrative Description of Urban Renewal Area
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 70 of 83
DRAFT 12-06-2011
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 71 of 83
DRAFT 12-06-2011
EXHIBIT 2 – Graphic Description of Urban Renewal Area
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 72 of 83
DRAFT 12-06-2011
EXHIBIT 3 – URBAN RENEWAL AREA TAX LOT INVENTORY, December 2011
No. Map Number Account Number No. Map Number
Account
Number
1 372W02D1000 10132000
45 372W02CB4000 10132839
2 372W02CA200 10132344
46 372W02CB4100 10132847
3 372W02CA300 10132351
47 372W02CB4200 10132853
4 372W02CA700 10132393
48 372W02CB4300 10132861
5 372W02CA800 10132407
49 372W02CB4400 10132870
6 372W02CB100 10132415
50 372W02CB4500 10132888
7 372W02CB300 10132440
51 372W02CB4600 10132896
8 372W02CB400 10132456
52 372W02CB4700 10132901
9 372W02CB500 10132464
53 372W02CB4800 10132910
10 372W02CB600 10132472
54 372W02CB4900 10132928
11 372W02CB700 10132481
55 372W02CB5000 10132936
12 372W02CB800 10132499
56 372W02CB5100 10132944
13 372W02CB900 10132504
57 372W02CB5200 10132951
14 372W02CB901 10132512
58 372W02CB5300 10132969
15 372W02CB1000 10132521
59 372W02CB5400 10132977
16 372W02CB1200 10132547
60 372W02CB5402 10132985
17 372W02CB1300 10132553
61 372W02CB5500 10132993
18 372W02CB1400 10132561
62 372W02CB5600 10133004
19 372W02CB1500 10132570
63 372W02CB5700 10133012
20 372W02CB1600 10132588
64 372W02CB5800 10133021
21 372W02CB1700 10132596
65 372W02CB5900 10133039
22 372W02CB1800 10132601
66 372W02CB6000 10133047
23 372W02CB1900 10132610
67 372W02CB6100 10133053
24 372W02CB2000 10132628
68 372W02CB6200 10133061
25 372W02CB2100 10132636
69 372W02CB6300 10133070
26 372W02CB2200 10132644
70 372W02CB6401 10133088
27 372W02CB2300 10132651
71 372W02CB6500 10133096
28 372W02CB2400 10132669
72 372W02CB6600 10133101
29 372W02CB2401 10132677
73 372W02CB6700 10133110
30 372W02CB2500 10132685
74 372W02CB6800 10133128
31 372W02CB2600 10132693
75 372W02CB6900 10133136
32 372W02CB2700 10132707
76 372W02CB7000 10133144
33 372W02CB2800 10132715
77 372W02CB7101 10133169
34 372W02CB2900 10132723
78 372W02CB7201 10133185
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 73 of 83
DRAFT 12-06-2011
35 372W02CB3000 10132731
79 372W02CB7301 10133209
36 372W02CB3100 10132740
80 372W02CB7600 10133233
37 372W02CB3200 10132756
81 372W02CB7700 10133241
38 372W02CB3300 10132764
82 372W02CB7800 10133258
39 372W02CB3400 10132772
83 372W02CB7900 10133266
40 372W02CB3500 10132781
84 372W02CB8000 10133274
41 372W02CB3600 10132799
85 372W02CB8200 10133291
42 372W02CB3700 10132804
86 372W02CC100 10133306
43 372W02CB3800 10132812
87 372W02CC101 10133314
44 372W02CB3900 10132821
88 372W02CC200 10133322
89 372W02CC201 10133331
135 372W02CC5100 10133825
90 372W02CC300 10133349
136 372W02CC5200 10133833
91 372W02CC400 10133355
137 372W02CC5400 10133841
92 372W02CC500 10133363
138 372W02CC5500 10133858
93 372W02CC600 10133371
139 372W02CC5600 10133866
94 372W02CC700 10133380
140 372W02CC5700 10133874
95 372W02CC800 10133398
141 372W02CC5800 10133882
96 372W02CC900 10133401
142 372W02CC6300 10133891
97 372W02CC1000 10133410
143 372W02CC6400 10133906
98 372W02CC1100 10133428
144 372W02CC6500 10133914
99 372W02CC1200 10133436
145 372W02CC6600 10133922
100 372W02CC1300 10133444
146 372W02CC6700 10133931
101 372W02CC1400 10133451
147 372W02CC6900 10133955
102 372W02CC1500 10133469
148 372W02CC7200 10133980
103 372W02CC1600 10133477
149 372W02CC7300 10133998
104 372W02CC1700 10133485
150 372W02CC7400 10134001
105 372W02CC1800 10133493
151 372W02CC7500 10134019
106 372W02CC1900 10133509
152 372W02CC7600 10134027
107 372W02CC2200 10133517
153 372W02CC7700 10134035
108 372W02CC2300 10133525
154 372W02CC7800 10134043
109 372W02CC2500 10133541
155 372W02CC7900 10134050
110 372W02CC2600 10133558
156 372W02CC8100 10134076
111 372W02CC2700 10133566
157 372W02CC8200 10134084
112 372W02CC2800 10133574
158 372W02CC8300 10134092
113 372W02CC2900 10133582
159 372W02CC8400 10134108
114 372W02CC3000 10133591
160 372W02CC8500 10134116
115 372W02CC3100 10133606
161 372W02CC8600 10134124
116 372W02CC3200 10133614
162 372W02CC8700 10134132
117 372W02CC3300 10133622
163 372W02CC8800 10134141
118 372W02CC3301 10133631
164 372W02CC8900 10134157
119 372W02CC3400 10133649
165 372W02CC9000 10134165
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 74 of 83
DRAFT 12-06-2011
120 372W02CC3500 10133655
166 372W02CC9100 10134173
121 372W02CC3600 10133663
167 372W02CC9200 10134181
122 372W02CC3700 10133671
168 372W02CC9300 10134190
123 372W02CC3800 10133680
169 372W02CC9400 10134205
124 372W02CC3900 10133698
170 372W02CC9500 10134213
125 372W02CC4000 10133701
171 372W02CC9600 10134221
126 372W02CC4001 10133710
172 372W02CC9700 10134230
127 372W02CC4100 10133728
173 372W02CC9701 10134248
128 372W02CC4300 10133744
174 372W02CC9800 10134254
129 372W02CC4400 10133751
175 372W02CC10000 10134262
130 372W02CC4500 10133769
176 372W02CC10100 10134271
131 372W02CC4600 10133777
177 372W02CC10200 10134289
132 372W02CC4700 10133785
178 372W02CC10300 10134297
133 372W02CC4900 10133809
179 372W02CC10400 10134302
134 372W02CC5000 10133817
180 372W02CC10500 10134311
181 372W02CC10600 10134329
227 372W02CD3700 10134790
182 372W02CC10700 10134337
228 372W02CD3800 10134805
183 372W02CC10701 10134345
229 372W02CD3900 10134813
184 372W02CC10801 10134351
230 372W02CD4000 10134821
185 372W02CC10900 10134360
231 372W02CD4100 10134830
186 372W02CC11000 10134378
232 372W02CD4200 10134848
187 372W02CC11100 10134386
233 372W02CD4300 10134854
188 372W02CC11300 10134394
234 372W02CD4400 10134862
189 372W02CC11400 10134408
235 372W02CD4500 10134871
190 372W02CC11500 10134416
236 372W02CD4600 10134889
191 372W02CC11600 10134424
237 372W02CD4700 10134897
192 372W02CC11700 10134432
238 372W02CD4800 10134902
193 372W02CD100 10134441
239 372W02CD4900 10134911
194 372W02CD200 10134457
240 372W02CD5000 10134929
195 372W02CD300 10134465
241 372W02CD5100 10134937
196 372W02CD400 10134473
242 372W02CD5200 10134945
197 372W02CD500 10134481
243 372W02CD5300 10134951
198 372W02CD600 10134490
244 372W02CD5400 10134960
199 372W02CD700 10134505
245 372W02CD5500 10134978
200 372W02CD800 10134513
246 372W02CD5600 10134986
201 372W02CD900 10134521
247 372W02CD5700 10134994
202 372W02CD1000 10134530
248 372W02CD5800 10135005
203 372W02CD1100 10134548
249 372W02CD5900 10135013
204 372W02CD1200 10134554
250 372W02CD6000 10135021
205 372W02CD1300 10134562
251 372W02CD6100 10135030
206 372W02CD1400 10134571
252 372W02CD6101 10135048
207 372W02CD1500 10134589
253 372W02CD6300 10135054
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 75 of 83
DRAFT 12-06-2011
208 372W02CD1600 10134597
254 372W02CD6400 10135062
209 372W02CD1700 10134602
255 372W02CD6500 10135071
210 372W02CD1800 10134611
256 372W02CD6600 10135089
211 372W02CD1900 10134629
257 372W02CD6700 10135097
212 372W02CD2000 10134637
258 372W02CD6800 10135102
213 372W02CD2100 10134645
259 372W02CD6900 10135111
214 372W02CD2200 10134651
260 372W02CD7000 10135129
215 372W02CD2300 10134660
261 372W02CD7100 10135137
216 372W02CD2400 10134678
262 372W02CD7200 10135145
217 372W02CD2500 10134686
263 372W02CD7201 10135151
218 372W02CD2600 10134694
264 372W02CD7300 10135160
219 372W02CD2900 10134716
265 372W02CD7301 10135178
220 372W02CD3000 10134724
266 372W02CD7400 10135186
221 372W02CD3100 10134732
267 372W02CD7500 10135194
222 372W02CD3200 10134741
268 372W02CD7600 10135200
223 372W02CD3300 10134757
269 372W02CD7700 10135218
224 372W02CD3400 10134765
270 372W02CD7800 10135226
225 372W02CD3500 10134773
271 372W02CD7900 10135234
226 372W02CD3600 10134781
272 372W02CD8000 10135242
273 372W02CD8100 10135259
319 372W03DA9300 10139368
274 372W03B1501 10138396
320 372W03DA9400 10139376
275 372W03DA5000 10138921
321 372W03DA9500 10139384
276 372W03DA5100 10138939
322 372W03DA9600 10139392
277 372W03DA5200 10138947
323 372W03DA9700 10139406
278 372W03DA5300 10138953
324 372W03DA9800 10139414
279 372W03DA5400 10138961
325 372W03DA9900 10139422
280 372W03DA5500 10138970
326 372W03DA10000 10139431
281 372W03DA5600 10138988
327 372W03DA10100 10139449
282 372W03DA5700 10138996
328 372W03DA10200 10139455
283 372W03DA5800 10139009
329 372W03DA10300 10139463
284 372W03DA5900 10139017
330 372W03DA10400 10139471
285 372W03DA6000 10139025
331 372W03DA10500 10139480
286 372W03DA6100 10139033
332 372W03DA10600 10139498
287 372W03DA6200 10139041
333 372W03DA10700 10139503
288 372W03DA6300 10139058
334 372W03DA10800 10139511
289 372W03DA6400 10139066
335 372W03DA10900 10139520
290 372W03DA6500 10139074
336 372W03DA10901 10139538
291 372W03DA6600 10139082
337 372W03DA10902 10139546
292 372W03DA6700 10139091
338 372W03DA10903 10139552
293 372W03DA6800 10139106
339 372W03DA11000 10139561
294 372W03DA6900 10139114
340 372W03DA11100 10139579
295 372W03DA7000 10139122
341 372W03DA11200 10139587
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 76 of 83
DRAFT 12-06-2011
296 372W03DA7100 10139131
342 372W03DA11300 10139595
297 372W03DA7200 10139149
343 372W03DA11400 10139601
298 372W03DA7300 10139155
344 372W03DA11500 10139619
299 372W03DA7400 10139163
345 372W03DA11600 10139627
300 372W03DA7500 10139171
346 372W03DA11700 10139635
301 372W03DA7600 10139180
347 372W03DA11800 10139643
302 372W03DA7700 10139198
348 372W03DA11900 10139650
303 372W03DA7800 10139203
349 372W03DA12000 10139668
304 372W03DA7900 10139211
350 372W03DA12100 10139676
305 372W03DA8000 10139220
351 372W03DA12200 10139684
306 372W03DA8100 10139238
352 372W03DA12300 10139692
307 372W03DA8200 10139246
353 372W03DA12400 10139706
308 372W03DA8300 10139252
354 372W03DA12401 10139714
309 372W03DA8400 10139261
355 372W03DB300 10139731
310 372W03DA8500 10139279
356 372W03DB400 10139749
311 372W03DA8600 10139287
357 372W03DB500 10139755
312 372W03DA8700 10139295
358 372W03DB600 10139763
313 372W03DA8701 10139301
359 372W03DB700 10139771
314 372W03DA8800 10139319
360 372W03DB800 10139780
315 372W03DA8900 10139327
361 372W03DB801 10139798
316 372W03DA9000 10139335
362 372W03DC100 10139803
317 372W03DA9100 10139343
363 372W03DC200 10139811
318 372W03DA9200 10139350
364 372W03DC300 10139820
365 372W03DC400 10139846
411 372W03DD1500 10140329
366 372W03DC401 10139852
412 372W03DD1501 10140337
367 372W03DC402 10139861
413 372W03DD1502 10140345
368 372W03DC500 10139879
414 372W03DD1503 10140351
369 372W03DC600 10139895
415 372W03DD1600 10140360
370 372W03DC700 10139901
416 372W03DD1800 10140378
371 372W03DC900 10139919
417 372W03DD1801 10140386
372 372W03DC1000 10139927
418 372W03DD1900 10140394
373 372W03DC1100 10139935
419 372W03DD2000 10140408
374 372W03DC1200 10139943
420 372W03DD2100 10140416
375 372W03DC1300 10139950
421 372W03DD2200 10140424
376 372W03DC1400 10139968
422 372W03DD2300 10140432
377 372W03DC1500 10139976
423 372W03DD2400 10140441
378 372W03DC1501 10139984
424 372W03DD2500 10140457
379 372W03DC1600 10139992
425 372W03DD2501 10140465
380 372W03DC1700 10140001
426 372W03DD2700 10140473
381 372W03DC1800 10140019
427 372W03DD2800 10140481
382 372W03DC1900 10140027
428 372W03DD2900 10140490
383 372W03DC2000 10140035
429 372W03DD3000 10140505
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 77 of 83
DRAFT 12-06-2011
384 372W03DC2100 10140043
430 372W03DD3100 10140513
385 372W03DC2101 10140050
431 372W03DD3200 10140521
386 372W03DC2200 10140068
432 372W03DD3301 10140530
387 372W03DC2300 10140076
433 372W03DD3400 10140548
388 372W03DC2400 10140084
434 372W03DD3500 10140554
389 372W03DC2500 10140092
435 372W03DD3600 10140562
390 372W03DC2800 10140108
436 372W03DD3601 10140571
391 372W03DC2900 10140116
437 372W03DD3700 10140589
392 372W03DC3000 10140124
438 372W03DD3800 10140597
393 372W03DC3100 10140132
439 372W03DD3900 10140602
394 372W03DC3200 10140141
440 372W03DD4000 10140611
395 372W03DC3302 10140157
441 372W03DD4100 10140629
396 372W03DC3400 10140165
442 372W03DD4200 10140637
397 372W03DD100 10140181
443 372W03DD4300 10140645
398 372W03DD200 10140190
444 372W03DD4400 10140651
399 372W03DD300 10140205
445 372W03DD4500 10140660
400 372W03DD400 10140213
446 372W03DD4501 10140678
401 372W03DD500 10140221
447 372W03DD4600 10140686
402 372W03DD600 10140230
448 372W03DD4700 10140694
403 372W03DD700 10140248
449 372W03DD4800 10140708
404 372W03DD800 10140254
450 372W03DD4900 10140716
405 372W03DD900 10140262
451 372W03DD5000 10140724
406 372W03DD1000 10140271
452 372W03DD5100 10140732
407 372W03DD1100 10140289
453 372W03DD5200 10140741
408 372W03DD1200 10140297
454 372W03DD5300 10140757
409 372W03DD1300 10140302
455 372W03DD5400 10140765
410 372W03DD1400 10140311
456 372W03DD5600 10140781
457 372W03DD5700 10140790
503 372W03DD10100 10141309
458 372W03DD5800 10140805
504 372W03DD10200 10141317
459 372W03DD5900 10140813
505 372W03DD10300 10141325
460 372W03DD6000 10140821
506 372W03DD10400 10141333
461 372W03DD6100 10140830
507 372W03DD10500 10141341
462 372W03DD6200 10140848
508 372W03DD10600 10141358
463 372W03DD6300 10140854
509 372W03DD10700 10141366
464 372W03DD6500 10140862
510 372W03DD10800 10141374
465 372W03DD6600 10140871
511 372W03DD10900 10141382
466 372W03DD6700 10140889
512 372W03DD11000 10141391
467 372W03DD6800 10140897
513 372W03DD11100 10141404
468 372W03DD6900 10140902
514 372W03DD11200 10141412
469 372W03DD6901 10140911
515 372W03DD11300 10141421
470 372W03DD7000 10140929
516 372W03DD11400 10141439
471 372W03DD7100 10140937
517 372W03DD11401 10141447
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 78 of 83
DRAFT 12-06-2011
472 372W03DD7101 10140945
518 372W03DD11500 10141453
473 372W03DD7200 10140951
519 372W03DD11700 10141496
474 372W03DD7300 10140960
520 372W03DD11800 10141501
475 372W03DD7400 10140978
521 372W10AA2600 10141510
476 372W03DD7500 10140986
522 372W10AA2500 10141528
477 372W03DD7600 10140994
523 372W10AA2200 10141551
478 372W03DD7700 10141007
524 372W10AA900 10141569
479 372W03DD7800 10141015
525 372W10AA1000 10141577
480 372W03DD7900 10141023
526 372W10AA1100 10141585
481 372W03DD7901 10141031
527 372W10AA1300 10141593
482 372W03DD8000 10141040
528 372W10AA1200 10141609
483 372W03DD8001 10141056
529 372W10AA1400 10141617
484 372W03DD8100 10141064
530 372W10AA1500 10141633
485 372W03DD8200 10141072
531 372W10AA1600 10141641
486 372W03DD8300 10141081
532 372W10AA1700 10141658
487 372W03DD8400 10141099
533 372W10AA1800 10141666
488 372W03DD8500 10141104
534 372W10AA1900 10141674
489 372W03DD8600 10141112
535 372W10AA2000 10141682
490 372W03DD8700 10141121
536 372W10AA2100 10141691
491 372W03DD8800 10141139
537 372W10AA2900 10141704
492 372W03DD8900 10141147
538 372W10AA2800 10141712
493 372W03DD9000 10141153
539 372W10AA2700 10141721
494 372W03DD9100 10141161
540 372W10AA3000 10141739
495 372W03DD9200 10141170
541 372W10AA3300 10141747
496 372W03DD9300 10141188
542 372W10AA3400 10141753
497 372W10AA5400 10141210
543 372W10AA3600 10141770
498 372W10AA600 10141236
544 372W10AA3700 10141788
499 372W10AA800 10141269
545 372W10AA4100 10141796
500 372W10AA300 10141277
546 372W10AA4200 10141801
501 372W10AA200 10141285
547 372W10AA4400 10141828
502 372W10AA100 10141293
548 372W10AA4500 10141836
549 372W10AA4000 10141844
595 372W11BA819 10145074
550 372W10AA3900 10141851
596 372W11BA820 10145082
551 372W10AA3800 10141869
597 372W11BA821 10145091
552 372W10AA4600 10141877
598 372W11BA900 10145122
553 372W10AA5100 10141885
599 372W11BA1000 10145131
554 372W10AA5200 10141893
600 372W11BA1100 10145149
555 372W10AA6100 10141925
601 372W11BA1200 10145155
556 372W10AA6000 10141933
602 372W11BA1300 10145163
557 372W10AA6200 10141941
603 372W11BA1400 10145171
558 372W10AA6400 10141958
604 372W11BA1500 10145180
559 372W10AA6600 10141966
605 372W11BA1600 10145198
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 79 of 83
DRAFT 12-06-2011
560 372W10AA6500 10141974
606 372W11BA1700 10145203
561 372W10AA6800 10141982
607 372W11BA1800 10145211
562 372W10AA6700 10141991
608 372W11BA2000 10145220
563 372W10AB400 10142192
609 372W11BA2100 10145238
564 372W10AB500 10142208
610 372W11BA2200 10145246
565 372W10AA5800 10142257
611 372W11BA2400 10145252
566 372W10AA5900 10142265
612 372W11BA2401 10145261
567 372W10AB1000 10142273
613 372W11BA2402 10145279
568 372W10AA6900 10143024
614 372W11BA2500 10145287
569 372W10AD200 10143032
615 372W11BA2600 10145295
570 372W10AD300 10143041
616 372W11BA2700 10145301
571 372W11BA100 10144825
617 372W11BA2701 10145319
572 372W11BA200 10144833
618 372W11BA2800 10145327
573 372W11BA300 10144841
619 372W11BA2900 10145335
574 372W11BA500 10144858
620 372W11BA3000 10145343
575 372W11BA600 10144866
621 372W11BA3100 10145350
576 372W11BA700 10144874
622 372W11BA3200 10145368
577 372W11BA800 10144882
623 372W11BA3300 10145376
578 372W11BA801 10144891
624 372W11BA3301 10145384
579 372W11BA802 10144906
625 372W11BA3400 10145392
580 372W11BA803 10144914
626 372W11BA3500 10145406
581 372W11BA804 10144922
627 372W11BB100 10145414
582 372W11BA805 10144931
628 372W11BB200 10145422
583 372W11BA806 10144949
629 372W11BB300 10145431
584 372W11BA807 10144955
630 372W11BB400 10145449
585 372W11BA808 10144963
631 372W11BB500 10145455
586 372W11BA809 10144971
632 372W11BB1000 10145503
587 372W11BA810 10144980
633 372W11BB1500 10145546
588 372W11BA812 10145009
634 372W11BB1600 10145552
589 372W11BA813 10145017
635 372W11BB1700 10145561
590 372W11BA814 10145025
636 372W11BB1800 10145579
591 372W11BA815 10145033
637 372W11BB1900 10145587
592 372W11BA816 10145041
638 372W11BB2000 10145595
593 372W11BA817 10145058
639 372W11BB2100 10145601
594 372W11BA818 10145066
640 372W11BB2101 10145619
641 372W11BB2200 10145627
687 372W11BB6400 10146089
642 372W11BB2300 10145635
688 372W11BB6401 10146097
643 372W11BB2400 10145643
689 372W11BB6500 10146102
644 372W11BB2500 10145650
690 372W11BB6600 10146111
645 372W11BB2600 10145668
691 372W11BB6700 10146129
646 372W11BB2700 10145676
692 372W11BB6800 10146137
647 372W11BB2800 10145684
693 372W11BB6900 10146145
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 80 of 83
DRAFT 12-06-2011
648 372W11BB2900 10145692
694 372W11BB7000 10146151
649 372W11BB3000 10145706
695 372W11BB7100 10146160
650 372W11BB3100 10145714
696 372W10AA4900 10146178
651 372W11BB3200 10145722
697 372W11BB7300 10146186
652 372W11BB3201 10145731
698 372W11BB7400 10146194
653 372W11BB3202 10145749
699 372W11BB7500 10146200
654 372W11BB3300 10145755
700 372W11BB7600 10146218
655 372W11BB3400 10145763
701 372W11BB7700 10146226
656 372W11BB3500 10145771
702 372W11BB7800 10146234
657 372W11BB3600 10145780
703 372W11BB7900 10146242
658 372W11BB3700 10145798
704 372W11BB8000 10146259
659 372W11BB3800 10145803
705 372W11BB8100 10146267
660 372W10AA4700 10145811
706 372W11BB8200 10146275
661 372W10AA4800 10145820
707 372W11BB8201 10146283
662 372W11BB4000 10145838
708 372W11BB8300 10146291
663 372W11BB4100 10145846
709 372W11BC7900 10146307
664 372W11BB4200 10145852
710 372W11BC100 10146315
665 372W11BB4300 10145861
711 372W11BC200 10146323
666 372W11BB4400 10145879
712 372W11BC300 10146331
667 372W11BB4500 10145887
713 372W11BC400 10146340
668 372W11BB4600 10145895
714 372W11BC500 10146356
669 372W11BB4700 10145901
715 372W11BC600 10146364
670 372W11BB4800 10145919
716 372W11BC700 10146372
671 372W11BB4900 10145927
717 372W11BC800 10146381
672 372W11BB5000 10145935
718 372W11BC900 10146399
673 372W11BB5100 10145943
719 372W11BC1000 10146402
674 372W11BB5200 10145950
720 372W11BC1100 10146411
675 372W11BB5300 10145968
721 372W11BC1190 10146429
676 372W11BB5400 10145976
722 372W11BC1200 10146437
677 372W11BB5500 10145984
723 372W11BC1300 10146445
678 372W11BB5600 10145992
724 372W11BC1400 10146451
679 372W11BB5700 10146005
725 372W11BC1500 10146460
680 372W11BB5800 10146013
726 372W11BC1600 10146478
681 372W11BB5900 10146021
727 372W11BC1700 10146486
682 372W11BB6000 10146030
728 372W11BC1800 10146494
683 372W11BB6100 10146048
729 372W11BC1900 10146500
684 372W11BB6101 10146054
730 372W11BC2000 10146518
685 372W11BB6300 10146062
731 372W11BC2400 10146534
686 372W11BB6301 10146071
732 372W11BC2500 10146542
733 372W11BC2600 10146559
779 372W11BD2900 10147010
734 372W11BC2700 10146567
780 372W11BD3000 10147028
735 372W11BC2800 10146575
781 372W11BD3100 10147036
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 81 of 83
DRAFT 12-06-2011
736 372W11BC2900 10146583
782 372W11BD3200 10147044
737 372W11BC3000 10146591
783 372W11BD3300 10147051
738 372W11BC3100 10146607
784 372W11BD3500 10147069
739 372W11BC3200 10146615
785 372W11BC2200 10178960
740 372W11BC3300 10146623
786 372W11BC5300 10179641
741 372W11BC3400 10146631
787 372W11BC5200 10179658
742 372W11BC3500 10146640
788 372W11BC4800 10179666
743 372W11BC3600 10146656
789 372W11BC5000 10179674
744 372W11BC3700 10146664
790 372W11BC4700 10179682
745 372W11BC3800 10146672
791 372W11BC5800 10179704
746 372W11BC3900 10146681
792 372W01C2600 10195599
747 372W11BC4100 10146699
793 372W01C2700 10195604
748 372W11BC4200 10146702
794 372W01C2800 10195612
749 372W11BC4300 10146711
795 372W01C2900 10195621
750 372W11BC4400 10146729
796 372W01C3000 10195639
751 372W11BD100 10146737
797 372W01C3100 10195647
752 372W11BD200 10146745
798 372W01C3200 10195653
753 372W11BD300 10146751
799 372W01C3400 10195670
754 372W11BD400 10146760
800 372W01C3500 10195688
755 372W11BD600 10146778
801 372W01C3600 10195696
756 372W11BD700 10146786
802 372W02D100 10195947
757 372W11BD800 10146794
803 372W02D2100 10195953
758 372W11BD900 10146800
804 372W02D2200 10195961
759 372W11BD1000 10146818
805 372W02D400 10195970
760 372W11BD1100 10146826
806 372W02D2000 10196091
761 372W11BD1200 10146834
807 372W02D1800 10196114
762 372W11BD1300 10146842
808 372W03DB200 10196976
763 372W11BD1400 10146859
809 372W03DC3600 10197030
764 372W11BD1500 10146867
810 372W03DC3700 10197054
765 372W11BD1600 10146875
811 372W03DC3800 10197062
766 372W11BD1700 10146883
812 372W11A101 10202413
767 372W11BD1800 10146891
813 372W11BC4500 10202691
768 372W11BD1900 10146907
814 372W11BC4600 10202705
769 372W11BD2000 10146915
815 372W11BC6100 10204350
770 372W11BD2001 10146923
816 372W11BC5100 10204431
771 372W11BD2100 10146931
817 372W11BC5700 10204463
772 372W11BD2200 10146940
818 372W11BC6000 10204471
773 372W11BD2300 10146956
819 372W11BC5900 10204480
774 372W11BD2400 10146964
820 372W11BC6200 10204498
775 372W11BD2500 10146972
821 372W02CC8901 10545766
776 372W11BD2600 10146981
822 372W10AA500 10553195
777 372W11BD2700 10146999
823 372W03DD11001 10553201
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 82 of 83
DRAFT 12-06-2011
778 372W11BD2800 10147001
824 372W11BC5500 10553908
825 372W11BA1801 10560661
871 372W03DD4601 10701749
826 372W03DA10701 10561376
872 372W11BC4401 10702021
827 372W02CD4801 10561722
873 372W11BA2501 10702048
828 372W10AA4300 10561731
874 372W11BA2502 10702054
829 372W11BA701 10564584
875 372W11BC5301 10705457
830 372W11BA702 10567127
876 372W11BC5302 10714077
831 372W11BA703 10567135
877 372W11BC5303 10714085
832 372W11BA704 10567143
878 372W11BB201 10780820
833 372W11BA705 10567150
879 372W10AA700 10784970
834 372W11BA706 10567168
880 372W02CC11301 10785023
835 372W02CC8401 10572173
881 372W11BC2300 10788314
836 372W11BD2901 10575584
882 372W02D2001 10799161
837 372W02CB7202 10576661
883 372W11BA2403 10818471
838 372W02CB1101 10580117
884 372W11BD601 10818837
839 372W10AA6300 10582955
885 372W02CB2101 10832401
840 372W11BA1501 10582963
886 372W02CB2102 10832410
841 372W11BD2201 10583852
887 372W03DA10801 10856429
842 372W11BD2003 10584437
888 372W02D1902 10887809
843 372W11BD2004 10585000
889 372W02D2901 10887817
844 372W03DC2801 10588439
890 372W02D2401 10887825
845 372W03DD1601 10589890
891 372W02D2301 10887833
846 372W11BB7701 10590682
892 372W02CD8200 10931124
847 372W11BD3501 10593241
893 372W03DB701 10932488
848 372W02CC8101 10598060
894 372W02CB3701 10944044
849 372W11BB7201 10599901
895 372W11BA3101 10953481
850 372W03DA11901 10602388
896 372W02CB2103 10968183
851 372W11BD101 10620968
897 372W02D1904 10977240
852 372W03DD9402 10621013
898 372W03DB802 10977381
853 372W03DD9403 10622920
899 372W03DB803 10977382
854 372W03DD4901 10625382
900 372W03DB804 10977383
855 372W03DD2701 10625404
901 372W03DB805 10977384
856 372W10AA400 10626119
902 372W03DB806 10977385
857 372W02CB1601 10628998
903 372W03DB807 10977386
858 372W03DA7001 10633158
904 372W03DB808 10977387
859 372W10AA5700 10639308
905 372W03DB809 10977388
860 372W02CB7304 10639752
906 372W03DB810 10977389
861 372W02CB7305 10639761
907 372W03DB811 10977390
862 372W02CB7306 10639779
908 372W03DB812 10977391
863 372W02CB7303 10639787
909 372W03DB813 10977392
864 372W03DD9301 10645403
910 372W10AA5101 10978854
865 372W10AA5000 10646347
911 372W10AA5201 10978855
City of Central Point
Downtown & East Pine Street Corridor Revitalization Program
Page 83 of 83
DRAFT 12-06-2011
866 372W10AA5300 10646353
912 372W03DA10602 10980137
867 372W10AD100 10646361
913 372W02CC1301 10980876
868 372W10AA3100 10665381
914 372W02CC1302 10980877
869 372W03DC2103 10677176
915 372W02CC1303 10980878
870 372W03DD11600 10687925
916 372W02CB3601 10980885
917 372W11BA1401 10981059
933 372W02CB303 10985018
918 372W11BA1402 10981060
934 372W02CB2201 10985019
919 372W11BB1001 10982198
935 372W03DC3303 10985506
920 372W11BB8301 10982199
936 372W03DB900 10985507
921 372W02CB3602 10982729
937 372W02D2101 10985650
922 372W03DA12101 10982730
938 372W03CA1000 10985723
923 372W02D2002 10982850
939 372W03CA900 10985724
924 372W02D2003 10982852
940 372W03CA1600 10985725
925 372W02D2004 10982853
941 372W03CA1500 10985726
926 372W03DD2001 10983530
942 372W02CA101 10988049
927 372W03DD2002 10983531
943 372W11BA901 10988130
928 372W03DD2003 10983532
944 372W10AD101 10988131
929 372W03DA7501 10984657
945 372W10AA6401 10995696
930 372W03DD4001 10984704
946 372W10AA6402 10995697
931 372W02CB301 10985016
932 372W02CB302 10985017
Development Commission Resolution No. 2012 - 01
Pg. 1
RESOLUTION NO. 2012 – 01
of the
CENTRAL POINT DEVELOPMENT COMMISSION
FORWARDING TO THE CITY COUNCIL A RECOMMENDATION TO ADOPT THE
DOWNTOWN AND EAST PINE STREET CORRIDOR REVITALIZATION PLAN,
AN URBAN RENEWAL PLAN AND PROGRAM OF THE
CITY OF CENTRAL POINT, OREGON
RECITALS:
A. The Central Point Development Commission, a duly appointed urban renewal
agency (the “Agency”) has completed the Downtown and East Pine Street Corridor
Revitalization Plan (the “Plan”), an urban renewal plan for the City of Central Point.
B. The Plan and its accompanying Report have been prepared in conformity with the
requirements of ORS 457.085 and with public involvement in all stages of the
development of the Plan.
C. The Plan and Report was distributed to the governing body of each taxing district
affected by the Plan, with an invitation to meet and discuss the plan, or forward
comments on the Plan, and all comments received by the Agency have been responded
to and included in the Plan.
D. On December 6, 2011, the Planning Commission after review and discussion
adopted Resolution No. 784 recommending to the City Council approval of the Plan.
E. The Agency finds that the Plan is complete and should be adopted and approved
based on the following findings:
i) The urban renewal area described in the Downtown and East Pine Street
Corridor Revitalization Plan is blighted.
ii) Rehabilitation and redevelopment is necessary to protect the public health,
safety, or welfare of the City of Central Point.
iii) The Downtown and East Pine Street Corridor Revitalization Plan conforms to the
City’s Comprehensive Plan.
iv) The Downtown and East Pine Street Corridor Revitalization Plan as proposed
does not require the acquisition of real property, or the displacement of persons.
ATTACHMENT C
Development Commission Resolution No. 2012 - 01
Pg. 2
v) The adoption and carrying out of the Downtown and East Pine Street Corridor
Revitalization Plan is economically sound and feasible.
vi) The Agency hereby incorporates by reference the Downtown and East Pine
Street Corridor Revitalization Plan, attached to this Resolution as Exhibit “A”, as
support for the above stated findings.
vii) The Agency further relies on Planning Commission Resolution No. 784, the
public hearing and the entire record before the Agency in this matter, which is
incorporated by reference.
THE CENTRALPOINT DEVELOPMENT COMMISSION RESOLVES: that the
Downtown and East Pine Street Corridor Revitalization Plan and Report, attached to
this Resolution as Exhibit “A” and included herein pursuant to the provisions of ORS
457, meets all requirements of ORS 457 and by this Resolution forwards a favorable
recommendation to the City Council to adopt the Downtown and East Pine Street
Corridor Revitalization Plan and Report.
Passed by the Agency and signed by me in authentication of its passage this _____
day of January, 2012.
__________________________
Chair, Mayor Hank Williams
ATTEST:
_____________________________
City Recorder