HomeMy WebLinkAboutDCP052013CENTRAL
POINT
Members: Hank Williams
Allen Broderick
Bruce Dingler
David Douglas
Ellie George
Kelly Geiger
Rick Samuelson
Staff Liaison: Chris Clayton
City of Central Point
Development Commission
Study Session
Monday, May 20, 2013
6:00 P.M.
Central Point
Council Chambers
140 S. 3rd Street
Central Point, Oregon
Meeting time, date, or location may be subject to change. Please contact the City Recorder at
541- 423 -1026 for additional information.
I. MEETING CALLED TO ORDER -6:00 p.m.
II. ROLL CALL
III. DISCUSSIONITEMS
A. Urban Renewal Plan Amendments (Staff)
B. Urban Renewal District Development Activity (Staff)
C. Project Priorities (Commission Discussion)
IV. ADJOURNEMENT
STAFF REPORT
CENTRAL
POINT
MEMORANDUM
May 20, 2013
Study Session
TO:
Development Commission
City Manager, Chris Clayton
Community Development Director, Tom Humphrey
FROM:
Don Burt, Planning Manager
STUDY SESSION DISCUSSION ITEMS:
Planning Department
Tom T mphrey,AICP,
Community Development Director/
There are three general items scheduled for discussion. The first is a brief overview of pending
amendments to the urban renewal plan, then an update on development activity within the urban renewal
district, and a discussion by the Commission of urban renewal project prioritization. The following is an
overview of each discussion item.
I. Urban Renewal Plan Amendments. There are two minor administrative amendments
that need to be made to the urban renewal plan and report. These amendments are
scheduled for formal consideration at the June 20, 2013 Development Commission
meeting. The amendments are
a. Base Value. Asa result in the timing of approval of the urban renewal plan it is
necessary to amend the base value noted in the urban renewal plan
($143,844,146). The revised base value is $139,787,170. The urban renewal plan
needs to be adjusted to reflect the revised base value.
b. Urban Renewal District Boundaries. At the time of adoption of the urban
renewal boundaries a small parcel (.25 acres) was identified as having been
annexed into the City (Attachment 1). It has come to our attention that the
property was never annexed. Consequently, it needs to be removed from the urban
renewal district. This will be accomplished by adopting a revised legal description
and map (Section 1.4 Legal Boundary Description)..
2. Urban Renewal District Development Activity. Over the course of the past year three
new commercial (taxable) private sector projects have developed within the urban
renewal district, having a total estimated construction value of SzIMO 00. The value of
these projects will be captured by the assessor and used in calculating TV 13 -14 tax
increment revenue (est. tax increment revenue $50,000)
Page I of 13
There has occurred an additional $4,600,000 of estimated tax exempt construction. The
value of the projects will not be used to calculate tax increment revenue.
There are other commercial projects pending that will further add to the urban renewal
district's incremental value during the coming year (est. construction value $2,200,000).
3. Project Priorities (Five -Year Development Program). Over the course of the next 25-
years the Commission has identified fifteen (15) projects to be completed as part of the
urban renewal program (Attachment 2), at a cost not to exceed $43,177,530 (future value)
in tax increment revenue. The urban renewal plan lists the projects, but does not prioritize
the projects, or their implementation schedule. It is the objective of the meeting to begin
discussion of project prioritizing and implementation.
In discussing project prioritization there is a hierarchy of considerations ranging from
general concepts such as the mission, goals and objectives of the urban renewal plan to
the more absolute such as the timing and availability of funding, and an understanding of
the steps necessary to prepare a project for construction. In Attachment 3 you will find
the mission and goals of the urban renewal plan, and in Attachment 4 is an estimated five
year revenue schedule from the urban renewal plan.
It is expected that the Commission will need several study sessions to develop a project
prioritization schedule.
Step 1: General Project Ranking
Step 2: Project Components and Costs
Step 3: Draft Five -Year Development Program
The end product of the Commission's discussion will be captured in a Five -Year
Development Program (Step 3), which is a formal document reviewed and approved
annually by the Commission. During each annual review the Development Program will
be updated as necessary to meet the needs of the Commission and availability of funding.
Projects in the Development Program are organized into four categories as follows
A Projects - Projects committed to by contractual or other
formal arrangement and are funded to completion.
B Projects - Projects that are entering into the construction
design and engineering phase, but are not yet funded for
construction.
C Projects - Projects that are in the concept design phase to
determine feasibility.
D Projects - Projects to be discussed.
Projects A D are reflected in the Commission's annual budget, with the expectation that
they will be implemented. D Projects are not reflected in the budget, but are intended for
discussion by the Commission and possible future re- designation as a C Project.
The following is an example of a project description in the Development Program
illustrating the progression of a project from concept to construction.
Page 2 of 13
EAST PINE STREET CORRIDOR PLAN
Project Status: D
Project Desa iption: Review and approve the recently completed East Pine Street Corridor Plan
and forward a recommendation to the City Council for their action. Approval of the Plan will
formalize agreement on the basic type of streetscape opportunities for East Pine Street.
Related Urban Renewal Projects:
Project No. 1, Downtown Area Streetscape Improvements
Project No. 5, Intersection Signalization
Project No. 7, Underground Existing Pole Mounted Utility Systems
Estimated Project Cost: $xx,000
Source of Funding:
Central Point Development Commission - $xx,000
City of Central Point $0
Other - $0
Pal tnerships:
Schedule:
Funding: XX -XX
Contract Award: November 20XX
Contract Completion: June 20XX
EAST PINE STREET STREETSCAPE, PRELIMINARYDESIGN (Downtown)
Project Status: C
Project Des( iption: Prepare preliminary engineer plans for the design and construction of
streetscape improvements from the Railroad tracks to Seventh Street. Design would include
streetscape improvements, signal modification, and necessary undergrounding of existing
overhead utilities.
Related Urban Renew al Projects:
Project No. 1, Downtown Area Streetscape Improvements
Project No. 5, Intersection Signalization
Project No. 7, Underground Existing Pole Mounted Utility Systems
Estimated Project Cost: $xx,000
Source of Funding:
Central Point Development Commission - $xx,000
City of Central Point $0
Other - $0
Page 3 of 13
Pm7nerships:
Schedule:
Funding: FYXX -XX
Contract Award: November 20XX
Contract Completion: June 20XX
EAST PINE STREET STREETSCAPE, FINAL DESIGN AND CONSTRUCTION (RR-
Xing to Third Street)
Project Status: B - A
Project Des( iption: Prepare engineer plans and cost estimate for the design and construction of
streetscape improvements from the Railroad tracks to Third Street in accordance with approve
preliminary design. Pending cost verification let for bid, award bid, commence construction.
Related Urban Renew al Projects:
Project No. t, Downtown Area Streetscape Improvements
Project No. 5, Intersection Signalization
Project No. 7, Underground Existing Pole Mounted Utility Systems
Estimated Project Cost: $xx,000
Source of Funding:
Central Point Development Commission - $xx,000
City of Central Point $0
Other - $0
Pm7nerships:
Schedule:
Funding: FYXX -XX
Contract Award: November 20XX
Contract Completion: June 20XX
Page 4 of 13
ATTACHMENT 1: URBAN RENEWAL BOUNDARY MAP
0i
CENTRAL
POINT
EXHIBIT 2 - Graphic Description of Urban Renewal Area
ruDAOEPD
q
w�.PRIDL o.A.A.
,xG
RE
• *'.
o • %'=.iiiiiiiiiii
%' S •• •.�
Fn
'• F
_ •••I
•+
"ta
•..
TAY— R % u�q
eo � Sys
A�,
ii, n aaux
PL
m
N %
Q
•��9•'•t9��^
�ES� �� muo �re�
Uo
_
nvO.WPv
. Eweno..�
A
1-1—Al
r +[
j•••I
�
R
koSEVALLE. C.
11..1.11 -1
Exhibit 2
Urban Renewal Boundary
Page 5 of 13
ATTACHMENT 2: URBAN RENEWAL PROJECTS:
The primary purpose of each project is to encourage and facilitate private investment in
the Urban Renewal Area, targeting the elimination of blight related conditions. The
following discusses the relationship between each project in Table 4.01 and existing
conditions within the Urban Renewal Area
DOWNTOWN CORE AREA STREETSCAPE IMPROVEMENTS
($5,792,291). The streetscape system within the Downtown Core Area (Figure
6, Downtown Core Area) is substandard with regard to pedestrian, bicycle,
and handicapped access, and as such are inadequate considering the retail and
commercial character of the downtown. For a main street the sidewalks in the
Downtown Core Area are narrow and cluttered with a variety of obstructions
making use of the sidewalks difficult, as well as aesthetically unappealing.
The purpose of this project is to improve not only the function of the
streetscape, but also the areas aesthetic appeal, both of which are necessary to
compete with newer commercial areas for private investment.
Implementation of this project will be accomplished through the preparation
of a master streetscape plan for the Downtown Core Area addressing the
design and establishment of standards for curb and gutter, sidewalks,
crosswalks, street trees, tree grates, street lights, plazas, gateways, comer
extensions, and street furniture.
2. EAST PINE STREET IMPROVEMENTS, EAST OF 10TH STREET
($3,617,240). Based on prior traffic studies there has been identified the need
for substantial improvements to East Pine Street between Peninger Road and
Hamrick Road. These improvements include the widening and additional
signalization for this section of East Pine Street. Much of the area served by
this section of East Pine Street is vacant commercial property, the
development of which is dependent on these improvements.
3. NEIGHBORHOOD SIDEWALKS, STREET LIGHTING, AND
ALLEYS ($1,484,750). Both the Northside Neighborhood and the Southside
Neighborhood (Figure 2, Urban Renewal Boundary and Planning Sub Areas)
are older residential areas, platted as far back as 1887. The streetscape system
in these areas is substandard including the absence of sidewalks, limited street
lighting and other pedestrian amenities characteristic of newer residential
neighborhoods. Consequently, the general curb appeal for these
neighborhoods is disadvantaged by the lack of such streetscape amenities as
sidewalks, street trees, and lighting. The installation of sidewalks and street
lights on all residential streets, and the pavement of alleys within the
Northside Neighborhood and Southside Neighborhood will assist in the
stabilization of both neighborhoods' aesthetic and property values.
4. HWY. 99 CORRIDOR IMPROVEMENTS ($1,163,462). Similar to the
Downtown Core Area Streetscape project, the objective of the Hwy. 99
Improvement project is to improve the overall safety and aesthetics of the
Hwy. 99 corridor. As a primary gateway to the City of Central Point Hwy. 99
has a significant impact on the City's image. Improve Front Street from the
proposed Twin Creeks railroad crossing south to Bush Street to arterial street
standards in accordance with an approved master street plan for Hwy. 99,
including, but not limited to travel lane reconfiguration, curb and gutter,
sidewalks, street lights, traffic signals, pedestrian lights, street trees and tree
grates, traffic signals, gateways, plazas, crosswalks, and landscaping.
Page 6 of 13
5. INTERSECTION SIGNALIZATION ($3,573,373). In conjunction with
Projects I, 13 and 4 there will be a need to install/upgrade/modify specific
traffic signals. These signal improvements are necessary for safety reasons
and to maintain an acceptable level of service necessary to accommodate
development within and adjacent to the Urban Renewal Area. The proposed
signal locations are
a. Twin Creeks Dr. install new railroad crossing and signalize
intersection at Hwy. 99 and Twin Creeks Dr. and new railroad
crossing at Twin Creeks Dr. Improvements shall include, but not be
limited to easement acquisition, curb and gutter, street surface
improvement, railroad crossing signalization, Hwy. 99 signalization,
sidewalks, street lights, and landscaping.
b. Pine St. and Second St. add new signals;
c. Pine St. and Sixth St. add new signals;
d. Pine St. and Fourth St. remove existing signal;
e. Pine St. and Gehhard Road extension add a new signal;
f Pine St. and Penninger Rd. modify /remove signal; and
g. Hwy. 99 and Fire District No. 3 Station add emergency signal.
6. OFF - STREET PARKING FACILITIES ($277,809). The City owns two
unimproved public parking lots within the Downtown area. Because of the
condition of these parking lots they are both an aesthetic and air quality
nuisance. All public parking constructed under the provisions of this Section
shall comply with the objectives and policies of the City of Central Point
Transportation System Plan and with the applicable standards as set forth in
the Land Development Code.
The construction of the parking lots listed below shall be consistent with an
approved plan for downtown parking. During the planning and design phase
of the parking facility the Central Point Development Commission will have
prepared a written parking analysis to define the service area, determine the
demand for parking within the service area, the parking mix (leased vs. free),
operating costs, and parking duration (long -term vs. short- term).
a. Oak Street Facility. Design and construct a parking facility on the
southeast corner of Oak Street and Third Street.
b. Manzanita Street Facility. Design and construct a parking facility on
the southeast corner of Manzanita Street and First St.
7. UNDERGROUND EXISTING POLE MOUNTED UTILITY SYSTEMS
($3,400,000). A major consideration to the beautification of the Within the
Downtown Core area, and along Hwy. 99 underground existing overhead
utilities.
8. GEBARD RD. EXTENSION ($1,500,000). Extend Gebard Rd. from E. Pine
St. as a collector street, north to the City limits in accordance with the City's
Transportation System plan. This project was identified in the East Pine Street
Traffic Study as a necessary improvement to relieve traffic congestion on East
Pine Street, thereby allowing the development.
Page 7 of 13
9. PFAFF PARK RENOVATION ($144,525). Pfaff Park is centrally located
within the Urban Renewal Area and is in need of improvements, making it
more useful and accessible to the surrounding neighborhoods. The proposed
renovations include new landscaping, restroom facilities, playground
equipment, and lighting. This is in addition to perimeter sidewalks provided
by Project No. 6.
10. FREEMAN ROAD UPGRADE TO COLLECTOR STREET
STANDARDS ($737,136). Freeman Road serves as an easterly border to the
Urban Renewal Area. Currently, Freeman Road is a substandard street
functioning as a collector. It is two -lanes in width with no curb, gutter,
sidewalk, bike lanes, or street lights. Freeman Road also functions as Transit
Route 40. Under current conditions Freeman Road is unsafe for pedestrian,
bicycle and transit use. The objective of this project is to upgrade Freeman
Road from Oak Street to Hopkins Road to collector street standards, making it
a safe and aesthetically attractive street.
11. SOUTH PENINGER ROAD EXTENSION ($9,628,036). Extend Peninger
Road south across Bear Creek to collector street standards to intersect with
Hamrick Road. Improvements will include right -of -way acquisition, bridge
crossing and bike lanes. This project was identified in the East Pine Street
Traffic Study as a necessary improvement to relieve traffic congestion on East
Pine Street, thereby allowing the development.
12. MISCELLANEOUS PUBLIC WORKS ($1,340,789). Throughout the
Urban Renewal Area, particularly in the Downtown, Northside, and Southside
neighborhoods, there is a need to upgrade existing public facilities, such as
water, storm drainage, etc., to serve existing and future development in the
Urban Renewal Area. Throughout the life of the Urban Renewal Plan, the
Central Point Development Commission, consistent with their priorities and
financial resources, may assume the costs, or share of the costs, of engineering
and constructing public works projects within the Urban Renewal Area as
necessary to further the objectives of the Urban Renewal Plan. Such projects
may include the installation or reconstruction of the following:
a. Storm Drains;
b. Sanitary Sewers;
c. Water Mains and Fire Hydrants;
d. Curbs and Gutters;
e. Sidewalks, including landscaping within right -of -way;
f Street Work; and
g. Alley Paving.
13. CITY OF CENTRAL POINT COMMUNITY CENTER ($1,076,326). The
City of Central Point has identified a need for a community center. Because of
the central location of the Urban Renewal Area to the Central Point
community, location of the community center within the Urban Renewal Area
is being considered. A community center would serve as a major use within
the Urban Renewal Area generating additional economic activity. This project
is intended to proportionately assist in the design and development of a
community center within the Urban Renewal Area based on the community
center's benefit to the Urban Renewal Area. Prior to any financial
Page 8 of 13
participation in the community center it will be necessary that the Central
Point Development Commission determine the percentage benefit of the
community center to the Urban Renewal Area.
14. ECONOMIC DEVELOPMENT INCENTIVE PROGRAMS ($6,000,000).
In an effort to facilitate private investment in the Urban Renewal Area in
conjunction with the Urban Renewal Plan's projects I through 13 the Central
Point Development Commission will design and make available incentives the
will encourage private sector investment in the Urban renewal Area. Prepare
and implement economic development incentive programs that encourage
residential and commercial development /redevelopment within the Area.
15. FIRE SAFETY ($1,010,518). As a result of the Urban Renewal Area's
revitalization in residential and commercial structures it will be necessary to
increase capital investment in fire safety equipment sufficient to maintain
acceptable levels of fire safety service. This project anticipates, and provides
funds, for the addition of fire safety equipment. The specific need and timing
for such equipment will be coordinate with Fire District No. 3.
Page 9 of 13
ATTACHMENT 3: MISSION, GOALS, AND OBJECTIVES
1.5.1 Mission Statement
It is the mission of the Central Point Development Commission to eliminate blight and
depreciating property values within the urban renewal district. This mission will be
accomplished through the preparation and implementation of an urban renewal plan that
maximizes both public and private investments within the Urban Renewal Area,
investments that are designed to target, facilitate and strengthen the economic and
aesthetic vitality of the Urban Renewal Area as the City's traditional mixed -use urban
core.
1.5.2 Goals and Objectives
To accomplish its mission the Central Point Development Commission will develop and
implement an urban renewal plan known as the Downtown and East Pine Street Corridor
Revitalization Plan, the goals and objectives of which are to
A. Resolve the problems created by existing blighted conditions in the Area so that
unused and underused properties can be placed in productive condition and
utilized at their highest and best use in accordance with the City of Central Point
Comprehensive Plan.
B. Provide programs for the development, redevelopment, and rehabilitation of
property in the Area in ways that will:
Re- enforce the pedestrian and mixed -use character of the downtown, and
insure a more attractive, functional and economically viable urban core
consistent with the goals and objectives of the Greater Bear Creek Malley
Regional Plan;
ii. Encourage job creation through the expansion of existing businesses and
the development of new businesses within the Urban Renewal Area;
iii. Increase property values so that the Urban Renewal Area will contribute
its fair share to the costs of public services provided by the City and other
affected taxing districts; and
iv. Conserve and place into productive use historically significant places and
properties.
C. Respond to the needs and the concerns of all people of the City of Central Point
with respect to revitalization of the Area as expressed in the City's strategic plan
Central Point Forward, Fair City Vision 2020 and the City of Central Point
Comprehensive Plan.
D. Encourage the maximum amount of public involvement and citizen's
participation in the implementation of the Urban Renewal Plan by:
i. Explaining and discussing the details of the Urban Renewal process:
a.To the public at town hall type gatherings;
b. To invite special interest groups, public service
organizations, public bodies and the general public to Central Point
Development Commission meetings;
Page 10 of 13
c.To include urban renewal activities and updates in the City's
periodic newsletters; and
d. To cooperate with the news media to discuss the Urban
Renewal Plan and process.
ii. Meeting with the nine (9) affected taxing bodies to explain the long -term
benefits of the Urban Renewal program and its relationship to their fiscal
concerns, and
iii. Being available to discuss the details of the Urban Renewal Plan with
service, professional, fraternal and labor organizations.
E. To provide an adequate amount of properly located off - street parking in the
downtown area including a plan and program to effectively pay for, manage, and
maintain such parking;
F. To create positive linkages among the five sub areas of the Urban Renewal Area;
the Downtown Area, Hwy. 99 Corridor, Northside Neighborhood, Southside
Neighborhood, and East Pine Street Area;
G. To cooperate and coordinate with the Rogue Valley Transit District in their efforts
to improve transportation services in the Urban Renewal Area;
H. To develop, and implement, a plan for the undergrounding of present overhead
utilities that are located in areas of maximum pedestrian activity;
I. To cooperate and coordinate with the program to improve Bear Creek and the
Bear Creek Greenway and to recognize the positive values and benefits that the
Bear Creek Greenway can have in contributing to the revitalization of the Urban
Renewal Area.
J. To improve the visual appearance, capacity and traffic flow of Hwy. 99 and East
Pine Street and other streets within the Urban Renewal Area that carry the major
share of vehicular and pedestrian traffic;
K. To cooperate with property owners in the rehabilitation of their buildings and
property;
L. To install, in areas of maximum pedestrian concentration, coordinated street
furniture, night lighting and landscaping within the Downtown Core Area;
M. To assure, through the construction /installation, or replacement that publicly
owned utilities such as water, storm drains, and sanitary sewers, are adequate in
capacity to service the needs of all uses within the urban renewal district; and
N. To leverage the Agency's financial resources to the maximum extent possible
with other public and private investment and other public and private funding
sources.
1.5.3 Relationship to the Strategic Plan
This Plan is intended to further the objectives of the City's strategic planning goals,
strategies and actions as set forth in Central Point Forward, Fair City Vision 2020[, as it
City Coo,,cil RC,.II n.r N. 1143
Page I I of 13
exists on the effective date of this Urban Renewal Plan, or as it may be amended from
tune to tune, which is hereby incorporated by reference as if it were included in full.
Page 12 of 13
ATTACHMENT 4: FIVE YEAR FUNDING SCHEDULE
Fiscal Year
Annual TI Proceeds
Loans
Projects & Activities
2013 -14
549,744
5125,000
5115,000
2014 -15
5170,917
-
5125,000
2015 -16
5331,032
-
5260,000
2016 -17
5463,442
-
5390,000
2017 -18
5596,868
S5,000,000
53,000,000
TOTAL
$1,612,001