Loading...
HomeMy WebLinkAboutCouncil Resolutions 1898 RESOLUTION OF THE CITY OF CENTRAL POINT RESOLUTION NO. taCl '' A RESOLUTION ADOPTING THE LONG TERM FINANCIAL PLAN FOR FISCAL YEARS 2026-27 THROUGH 2035-36 AND ESTABLISHING UTILITY FEE AND RATE INDEXING, RESERVE, COST RECOVERY AND CAPITAL COMMITMENT POLICIES RECITALS: A. Council considered a Long Term Financial Plan for Fiscal Years 2026-27 through 2035-36 (the "Plan"), which is intended to supersede and replace the February 2015 Long Term Financial Plan. The Plan was presented to the Council at public study sessions on August 17 and September 21, 2026. B. The Plan addresses both a staffing restructure to reduce costs and a phased rate package to increase revenue. The Plan is designed to bring the reserve of each operating fund to a six-month standard and to hold it there. C. This Resolution does not establish or increase any fee or rate charged to customers; rather adopts the policies and procedures contained in the Plan. D. The Plan establishes a reserve standard, a cost-of-service indexing process, planned rate increases to be adopted in future years by separate resolution, as well as other priorities. E. The Plan and the policy resolution implement the following elements of the City of Central Point 2040 Strategic Plan: a. Community Investment Goal 1 — Build a strong city that is fiscally sustainable and provides enhanced services. The six-month reserve standard, cost-of-service indexing and the committed capital programs are the instruments of fiscal sustainability the Plan puts in place. b. Community Investment Goal 5, Strategy 2 — Provide regular financial analysis on utility enterprise funds so infrastructure can be adequately maintained, restored, upgraded and expanded. The ten-year projection of the Water, Street and Stormwater Funds, the pavement and stormwater commitments and the annual rate report provide that analysis. c. Responsible Governance Goal 1, Strategy 3 — Maintain a robust financial position; and Goal 2 — Invite public trust. Each year's rate is adopted in public on a published record, and the Plan states its assumptions and reports against them each year. d. Vibrant Economy Goal 1 — Manage growth to provide timely and orderly facilities and services. The growth trigger ties five positions to a commercial- inclusive growth test rather than authorizing them outright. THE CITY OF CENTRAL POINT RESOLVES AS FOLLOWS: SECTION 1. — Long Term Financial Plan adopted The Long Term Financial Plan for Fiscal Years 2026-27 through 2035-36 (the "Plan"), attached as Exhibit A, is adopted as the City's long term financial plan of record. Adoption of the Plan does not adopt any fee, rate or staffing action; each returns to the Council through its own process. In this Resolution, a reference to a section or appendix of the Plan is to Exhibit A; every other reference to a section is to this Resolution. SECTION 2 — Reserve standard The reserve standard for each of the General, Water, Street and Stormwater Funds (the "operating funds") is six months of that fund's operating expenditures. This standard replaces any prior reserve standard expressed as a percentage of revenues. Each operating fund's reserve is measured as provided in the final sentence of Section 5 of this Resolution, and shall also be reported exclusive of amounts restricted by law, including System Development Charge balances. The Building Fund is not subject to this standard until the Council so provides following a building permit fee study. SECTION 3 — Ceiling Threshold The Ceiling Threshold for purposes of the Plan is eight months of a fund's operating expenditures. SECTION 4 — Cost recovery targets Service Recovery target(share of the service's cost for the fiscal year, li measured on the fees as billed; initially calibrated on the FY 2026-27 base year) Police/ public safety 15% Parks maintenance 35% Recreation and community 55% center(fee plus program and rental revenue) Res. No. ) ; (City Council Meeting 11/19/2026) Page 2 SECTION 4.1 — Planned rate path The scheduled steps and dates for the public safety, parks maintenance, recreation, street utility and stormwater fees, and the water rate path, stated in Plan Section 9 and Appendix B, are adopted as the Council's policy for the Plan period, to be enacted for each Adjustment Date by annual resolution and not by this resolution. A departure from the planned path in any year shall be stated in that year's rate resolution with its reason. SECTION 5 — Capital Reserve Fund and System Development Charge Fund The Council establishes under ORS 294.346 a Capital Reserve Fund, with a designation for each of the Water, Street and Stormwater Funds for that system's capital (the water designation including the future reservoir), and a System Development Charge Fund holding SDC receipts and balances. Any Water Fund balance above the standard established in Section 2 of this Resolution transfers to the water designation each year; a street or stormwater transfer is for a named project, not more than the lesser of its unfunded cost and the balance above that standard, and is stated in the rate report. Appropriations from either fund shall be made in the City's budget appropriation resolution and shall name the designation. For purposes of Sections 2 and 3 of this Resolution, a fund's reserve is its restricted and unrestricted balance plus its SDC Fund balance, less Capital Reserve Fund and grant balances. SECTION 6 — Capital and efficiency commitments (1)The City Council, as the City's highest level of decision-making authority, commits Street Fund resources to a pavement maintenance program of not less than $900,000 in fiscal year 2027-28, escalating annually thereafter at the Engineering News-Record construction cost index. Of that amount, approximately $800,000 represents the pavement condition standard established by the City's street condition assessment and the balance is committed to reduction of the deferred pavement maintenance backlog. (2) The City Council commits Stormwater Fund resources to a stormwater master plan capital program of not less than $300,000 in fiscal year 2027-28, escalating annually thereafter at the Engineering News-Record construction cost index. (3)The City Council commits General Fund resources to technology materials and services of not less than $150,000 in fiscal year 2027-28, escalating annually thereafter at the Consumer Price Index for All Urban Consumers (CPI-U), West Region, All Items, as published by the U.S. Bureau of Labor Statistics, for the twelve months ending the preceding March. This commitment is the General Fund headroom identified in the Plan and is committed to efficiency investment rather than to fund balance. Res. No. F}L) ; (City Council Meeting 11/19/2026) Page 3 (4) The City Council commits General Fund resources to the Reserve Fund, for future capital maintenance requirements, of not less than $200,000 in each fiscal year from fiscal year 2027- 28, not escalated. (5) Release. The Council may appropriate less than the amount committed under the foregoing subsections (1), (2), (3) or (4) for a fiscal year only if the ending balance of the affected fund is projected in the proposed budget for that fiscal year to fall below the reserve standard established in Section 2 of this Resolution. Any such reduction shall be stated in the budget message together with the projected reserve position relied upon. (6) A transfer to the Capital Reserve Fund designation for a program counts toward its commitment. These commitments may be modified or rescinded only by subsequent resolution. SECTION 6.1 — Water franchise and debt allocation (1) Effective July 1, 2027, the Water Fund shall pay to the Street Fund an interfund franchise fee of three percent (3.0%) of gross retail water charges, in recognition of the Street Fund's carriage of the water system within the public right-of-way. (2) From fiscal year 2029-30, eighty percent (80%) of the Stormwater Fund's allocated share of debt service on the Banner Bank obligation is reallocated to the Street Fund, on the basis that stormwater conveyance is predominantly located within the public right-of-way and is integral to street drainage. This reallocates an internal cost share and does not alter the City's obligation. SECTION 7 — Downside trigger If actual personnel cost escalation exceeds the rate scheduled for that fiscal year in Plan Section 5.2 by more than 0.75 percentage points, or taxable assessed value added falls more than 20 percent below the amount scheduled for that fiscal year in Plan Section 10.2, in either case for two consecutive fiscal years, staff shall return to the Council with a public safety fee review at the next budget cycle. SECTION 8 — Growth trigger Growth for purposes of the conditioned positions and enhancement funding described in the Plan is measured by taxable assessed value added, commercial square footage permitted and transient lodging tax receipts. Dwelling units permitted shall be reported as an indicator of service demand and shall not by itself satisfy or fail the trigger. The threshold for each measure is stated in Plan Section 10.2. SECTION 9 — Annual rate report The annual rate report required by the Plan shall additionally state the amount appropriated to each program committed under Section 6 of this Resolution against the committed level, and any reduction taken under Section 6(5) of this Resolution with the projected reserve position Res. No. tE. ; (City Council Meeting 11/19/2026) Page 4 relied upon; the Reserve Fund balance and contribution; the transfer to and balance of each designation of the Capital Reserve Fund, the balance of the System Development Charge Fund by system, and each fund's reserve in months both excluding and including its Capital Reserve Fund designation; and the delivery of the attrition-based reorganization against its schedule. SECTION 9A — Biennial budget reconciliation to the Plan (1) With each proposed biennial budget, the Finance Director shall present to the Budget Committee a report comparing,for each fund and each fiscal year of the biennium,the revenues, expenditures, interfund transfers and ending balance proposed with the Plan's projections for those years as most recently restated in the annual rate report; stating each variance, its amount and its reason; and identifying separately any appropriation that exceeds the Plan's projected expenditures for that fund and year, any reduction under Section 6(5)of this Resolution, any fund projected to end a year below the standard in Section 2 or above the threshold in Section 3 of this Resolution, and any revenue assumed above the Plan's projection with its basis. (2) Staff may propose appropriations that exceed the Plan's projections. Each is identified in the report and listed in the budget message, with a statement that the report under this section was received. Approval of the budget by the Budget Committee and its adoption by the Council in the ordinary course under Local Budget Law are the authorization for such an appropriation; no separate action on the Plan is required. Such an appropriation is a departure stated for that budget and does not amend the Plan or this resolution. SECTION 10 — Certifying officer Wherever the Plan or this resolution assigns a certification, audit or reporting duty to the Finance Director, that duty may be performed by the City Manager, the Finance Director, the Assistant City Manager, or a designee of the City Manager. SECTION 11. This Resolution becomes effective immediately upon its passage. PASSED by the Council and signed by me in authentication of its passage this I CI day ofd\)(7,rn\ , 2026. (� A . . Council PresidertRob Hernandez ATTEST: City Recorder Res. No. en.C&) ; (City Council Meeting 11/19/2026) Page 5 CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 CITY COUNCIL • NOVEMBER 19, 2026 Long Term Financial Plan Fiscal Year 2026-27 through Fiscal Year 2035-36 — Adoption Document This is the plan Council adopts as the City's long term financial plan of record, together with the policy resolution adopted with it: the six-month reserve standard, the eight-month ceiling threshold, the cost recovery targets, the capital and Reserve Fund commitments, the water franchise and debt allocation, the growth and downside triggers and the annual rate report. Adopting the plan adopts no fee, rate or staffing action. What follows is the rate ordinance, first reading November 19 and second reading December 10, 2026; the annual rate resolution for the February 20, 2027 bill — the five fees and the water rate — in January 2027, with notice and a hearing; and the first adjusted bill on February 20, 2027. Council adopts each year's rates one year at a time; the plan's rate path is adopted as policy, not as rates. Section 4.5 shows how every fund is indexed, with the arithmetic for each fee on each February bill. Office of the City Manager • 140 South Third Street, Central Point, Oregon 97502 • (541) 664-3321 Figures are planning-level and drawn from CP_LTFP_2026_2036_Model_Rev34.xlsx. Not a legal opinion; staff are not attorneys. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 1 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 What Council is adopting tonight Action Instrument When Adopt the Long Term Financial Plan FY 2026-27 through Resolution, Section 1 November 19—tonight FY 2035-36 as the City's plan of record Adopt the six-month reserve standard, the eight-month Resolution, Sections 2-10 November 19—tonight ceiling threshold, the cost recovery targets (police 15%- 15.9% at$9.14—parks 35%at$5.29, recreation 55%at $4.22, calibrated on base-year cost), the Capital Reserve and SDC Funds, the pavement, stormwater, technology and Reserve Fund commitments, the water franchise and Banner Bank debt allocation, the downside and growth triggers,the annual rate report and the certifying officer Rate ordinance: the standing indexing mechanism, the Ordinance No. First reading tonight; 6.0 percent cap, the ceiling governor, the single annual adding Chapter 3.42 second reading and adjustment date, the no-stacking rule, the annual (Attachment A) adoption December 10, certification and a plan update within three years—the 2026 (effective Jan. 9) limits each year's rate resolution may not exceed Annual rate resolution for the February 20, 2027 bill: the Resolution—annual, January 2027, and every five fixed fees in dollars and the water rate for that year, with public notice and winter thereafter on the certified computation hearing First adjusted bill under the new schedule; every fee Billing February 20, 2027 change thereafter lands on the same date each year Nothing tonight sets a rate. Every fee change returns to Council by resolution, with notice and a public hearing. The policy resolution Council adopts tonight is Attachment 1 to the staff report; it is not reproduced here, so that the record carries one text of it. The rate ordinance (Attachment A) and the annual rate resolution (Attachment C) come to Council on the calendar at the end of this document. The plan sections that follow are the plan of record; the complete plan, with its appendices and the staffing restructure, is available from the City Recorder. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 2 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 1. Executive Summary This plan projects the City's five operating funds and the Capital Improvement Fund across the ten fiscal years FY 2026-27 through FY 2035-36. It succeeds the February 2015 Long Term Financial Plan, honoring that plan's own recommendation that the City refresh its long-term financial analysis every three to five years. Every fund's base year is rebuilt: expenditures at the FY 2026-27 adopted budget and revenues at FY 2025-26 actuals, with personnel corrected. The General Fund base year—$13.91 million of revenue and $13.65 million of expenditure — reflects the best projections of City administration based on current information, and is trued up on the June 30, 2027 year-end financial statements. What the plan concludes • All rate changes land on one date a year. Scheduled steps and the governed annual adjustment both take effect on the February 20 bill, so a customer sees one change per calendar year rather than two. Water moves on the same bill. Council adopts each year's rates — every fee, water included — one year at a time, by resolution. • Personnel escalation is a schedule, not a single rate. Half of all City staff sit below top step, so step progression is front-loaded and decaying. The plan carries 6.87 percent in FY 2026-27 falling to about 5.85 percent by FY 2035-36 —a ten-year average of 6.23 percent— built from the City's own payroll and reconciled four ways to its own records. • The General Fund reaches the six-month standard in FY 2028-29 and holds it through FY 2033-34, reaching 6.13 months, peaking at 6.60 and ending the decade at 5.66. • Cost recovery rises — police from 8.7 to 15 percent of base-year cost, parks from 24 to 35 percent, recreation from 51 to 55 percent—each stated on base-year cost and measured on the fees as actually billed, which are tiered for commercial accounts. Public safety moves $5.00 to $9.14 over three steps; parks reaches $5.29 over three; recreation moves $3.50 to $3.84 and $4.22 over two, and is first indexed on the February 20, 2029 bill. • A planned path of three steps, then a governed annual adjustment— adopted one year at a time. The plan sets out steps in February 2027, 2028 and 2029 for public safety and the utilities, parks included, and after that an adjustment computed by formula. None of it is adopted in advance: each winter Council adopts the coming February's rates by resolution, with notice and a hearing, on the published rate report. The formula and its cap set the limit; Council sets the rate. Section 4.5 works the formula through every fund, with the arithmetic shown. • The combined fixed monthly bill rises from $26.50 to $30.47 in February 2027, an increase of 15.0 percent, then to $35.00 and $40.16. Every year is inside the fifteen percent combined-bill limit. No fund subject to indexing reaches the eight-month ceiling governor. • A water franchise fee of 3.0 percent of gross retail charges begins July 1, 2027, paid by the Water Fund to the Street Fund in recognition of the street system's carriage of the water system in the right-of-way. It funds the pavement program without exhausting water capital. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 3 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document- November 2026 • The street and stormwater steps are committed to capital —the pavement program at about$900,000 a year with the increment directed at a $1.5 million deferred maintenance backlog, and the stormwater master plan at$300,000. The General Fund technology commitment is set at$150,000 a year, and a Reserve Fund contribution for future capital maintenance requirements at$200,000 a year. • The Building Fund remains positive through the decade, ending at 0.2 months. The building permit fee study, recommended for commissioning this fall, sets the fund's long-term footing. • The single most valuable change in this plan is not a rate increase. It is indexing each dedicated fee to the cost of the service it funds instead of to the Consumer Price Index. • The plan's results rest on four conditions, quantified at Section 8: delivery of the attrition-based reorganization, the public safety correction, the overhead recalibration, and growth on the urban growth boundary expansion. Each is reported annually. 3. The Reserve Standard This plan adopts a reserve standard of six months of operating expenditures— 180 days—for the General, Water, Street and Stormwater Funds, replacing the former band expressed as a percentage of revenues. A percentage of revenues answers a solvency question; it does not answer the operating question, which is whether the City can pay its bills in October. Property taxes supply roughly two thirds of General Fund revenue and arrive almost entirely between November 15 and December 10, while payroll and operating costs run evenly from July 1. Audited cash records for FY 2024-25 and FY 2025-26 show the General Fund drawing down 18.9 and 18.8 percent of annual expenditures respectively before the County distribution arrives. A portion of each utility fund's ending balance is system development charge revenue, which ORS 223 restricts to capacity-increasing capital and which cannot be spent on operations: approximately 28 percent of the Water Fund's FY 2035-36 balance, 20 percent of the Street Fund's and 38 percent of the Stormwater Fund's. The General Fund holds none. Reserves are reported both inclusive and exclusive of restricted amounts. 3.1 The ceiling governor Indexing is suspended for any fund whose balance exceeds eight months for two consecutive audited years, and resumes when it does not. Two years rather than one, so that a single one-time event— a grant reimbursement, a debt retirement—does not trip it. The governor is why the additional revenue in this plan is committed rather than accumulated. At the recommended rates, applied to the corrected expenditure base and with capital programs left where they were, the Stormwater Fund would run above eight months in the early years and the Street Fund from FY 2032-33 onward. Both would reach the governor and suspend their own Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 4 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 indexing. Raising the two capital programs addresses it at source. A fund building infrastructure is defensible at a rate hearing; a fund accumulating balance without a purpose is not. With the committed uses in place, no fund subject to indexing exceeds eight months for two consecutive years anywhere in the decade (the Building Fund, on its ORS 455.210 fee track, is outside the governor). 3.2 The Reserve Fund The City maintains a Reserve Fund outside the General Fund as its contingency instrument for future capital maintenance requirements —the rainy-day fund, and the source for unanticipated capital such as heating and cooling replacement or roof repair. The six-month operating standard and the Reserve Fund answer different questions: the standard answers whether the City can pay its bills in October; the Reserve Fund answers what happens when a roof fails. The Reserve Fund balance is approximately$576,000 and is expected to draw down to about $450,000 by June 30, 2027. The $200,000 contribution budgeted for FY 2026-27 is deferred to support the General Fund in its first year. The plan then carries $200,000 in every year from FY 2027-28, unescalated —$1,800,000 across the decade, taking the balance to about $2.25 million before draws. The contribution is committed by resolution alongside the pavement, stormwater and technology commitments and is subject to the same release test: Council may appropriate less in any year the General Fund is projected below six months. 4. Rate Policy: Indexing to the Cost of Service Every dedicated fee in this plan is indexed annually to the cost of the service it funds, rather than to the Consumer Price Index, subject to a cap of 6.0 percent per year and to the ceiling governor. 4.1 Why CPI indexing was not selected The services these fees fund are people. Police, parks, recreation and street operations grow at personnel rates of 4.5 to 6.5 percent; CPI runs at 3. A fee indexed to CPI therefore recovers a smaller share of its service every year, without anyone deciding that it should. The public safety fee recovers 8.7 percent of police cost today; under CPI indexing it would recover about 6.8 percent by FY 2035-36. That decline would not be a policy choice— it would be an artifact of the index, and it is precisely the kind of gradual drift a ten-year plan exists to surface. 4.2 The cap, and the accountability that comes with it A fee that erodes against CPI brings staff back to Council periodically, and that is a form of accountability. Cost indexing keeps that accountability deliberately in three ways: indexing is capped at 6.0 percent a year, the ceiling governor suspends indexing in any fund that runs persistently above its need, and Section 10 requires a one-page annual rate report reporting each fee against its cost index and its recovery ratio. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 5 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 4.3 How the General Fund index is applied The General Fund cost index is 72 percent personnel and 28 percent materials. Because personnel escalation is a schedule, the index is computed annually rather than entered as a constant. It runs from 5.84 percent in FY 2027-28 to 5.05 percent at the horizon and does not reach the 6.0 percent cap in any year. The rate applied in any year is the lesser of the computed cost index and 6.0 percent, and the annual rate report reports the computed index alongside the rate actually applied. The cap is headroom against a year in which personnel escalation runs high, not the operative rate. 4.4 Cost recovery Service Annual cost Fee + program Recovery At the planned fees revenue now Police/public safety $6,484,321 $562,921 8.7% 15%target; 15.9% at $9.14 Parks maintenance $1,332,556 $321,669 24.1% 36.5% at$5.29 Recreation and community center $1,049,211 $536,458 51.1% 57.4% at$4.22; program revenue reported Fee revenue is taken from the utility billing register—public safety$46,910 a month, parks and recreation $53,611 a month together—annualized. The public safety fee is tiered, with four commercial tiers by square footage, so a percentage step on the billed base raises more than the residential rate alone implies: each$1.00 of residential public safety fee is worth about$112,600 a year and each$1.00 of parks or recreation fee about $92,000. Billed amounts are used; collections run slightly below billing. The targets are stated on base-year cost, and the plan says what that means. Each target is a share of FY 2026-27 service cost, the base year of this plan. Because service costs grow while the correction is phased, each fee recovers a smaller share of contemporaneous cost in the year its last step lands, and cost-of-service indexing holds it at roughly that share thereafter. Public safety at$9.14 recovers 15.9 percent of FY 2026-27 police cost and approximately 13.9 percent of FY 2029-30 cost; parks at$5.29 recovers 36.5 percent of base-year cost and about 30 percent by FY 2030-31; recreation at$4.22 recovers 57.4 percent of base-year cost including program revenue — receding toward 15, 35 and 55 as cost grows; indexing holds them there. The audit reports both figures. The public safety fee was established to achieve $1.4 million per biennium —$700,000 a year, or 10.8 percent of police cost. Restoring the fee to that basis is target restoration. The increment from 10.8 to 15.9 percent is a policy choice. On the billed base it carries the General Fund to its standard in FY 2028-29 and holds it through FY 2033-34. Each year's rate resolution is where Council confirms the step for that year. These are not enterprise funds and should not recover 100 percent; the right share depends on who benefits. Roughly 62 percent of recreation recovery is the fee and the remainder is program Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 6 t CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 and rental revenue, so the recreation target is met by the fee and program revenue together, and the annual rate report reports program revenue against the growth needed to hold it. 4.5 How Every Fund Is Indexed — Worked Examples This section takes the indexing rule through every fund the plan touches, one bill at a time, with the arithmetic shown. Every rate in the examples is the rate in the plan's rate ladder at Section 9. The rule in one line New rate = rate in effect x (1 + the lesser of the fee's cost index and 6.0 percent), rounded to the precision of the rate schedule— unless the fee takes a scheduled step that year, in which case it takes the step and not the index. Four further rules surround it. Each is applied the same way every year, and each can be checked by anyone with the published certification: # Step What it does 1 Build the cost index for that Each fee indexes to the cost of the service it funds, not to a general service price index. What sets the rate is that service's own mix of people, purchased water and materials. 2 Apply the lesser of the The cap is headroom against a year in which personnel escalation runs computed index and the 6.0 high. On the plan's schedule the General Fund index peaks at 5.84 percent cap percent and does not reach it; for water it applies every year. 3 No index in a year the fee takes A scheduled step is in lieu of the annual adjustment for that fee in that a scheduled step year. A fee never receives both. 4 Suspend indexing for any fund Two consecutive audited years above the ceiling switch the adjustment above eight months off for that fund until the condition clears. 5 Hold the five fixed fees within 15 The sum of the five fixed monthly fees may not rise more than 15.0 percent combined percent in a single year. Water is volumetric and is reported separately. The cost index formula Each fee's cost index is built from the same three components, weighted by the share each makes up of the cost of that service in the most recently adopted budget: Cost index = (personnel share x personnel escalator) + (purchased water share x wholesale water escalator) + (remaining share x CPI) The purchased water share is zero for every fee except water. The personnel escalator is the plan's schedule at Section 5.2, derived each year from the labor agreements in effect, the PERS employer rate schedule and the City's insurance renewals. CPI is CPI-U, West Region, all items. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 7 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document• November 2026 Fund Fees indexed Index used Weights First indexed General Fund Public safety • parks General Fund cost index 72% personnel • Recreation Feb 20, maintenance • 28% materials 2029; public safety recreation and and parks Feb 20, community center 2030 Street Fund Street utility fee Street operations index, Street personnel Feb 20, 2030 carried at 4.5% and materials shares Stormwater Fund Stormwater fee Stormwater operations Stormwater Feb 20, 2028 index, carried at 4.5% personnel and materials shares Water Fund Water rate Water cost index Purchased water Feb 20, 2030 • personnel • materials Building Fund — Not indexed under this Permit fees are — I plan set under ORS 455.210 through the building permit fee study 1 Capital — No fee Parks SDCs at — Improvement adopted rates Fund Each fee is first indexed on the first February 20 after its last scheduled step. Until then it moves only by its planned step. Example 1 — The General Fund cost index, year by year The General Fund fees index to a single General Fund cost index. Each February bill uses the escalator for the fiscal year in which that February falls. February bill Personnel 72% x 28% x CPI Computed Cap Applied (fiscal year) escalator personnel 3.00% index Feb 2028 (FY 6.94% 5.00% 0.84% 5.84% 6.00% 5.84% 2027-28) Feb 2029 (FY 6.55% 4.72% 0.84% 5.56% 6.00% 5.56% 2028-29) Feb 2030 (FY 6.56% 4.72% 0,84% 5.56% 6.00% 5.56% 2029-30) Feb 2031 (FY 6.01% 4.33% 0.84% 5.17% 6.00% 5.17% 2030-31) For February 2028, written out: 0.72 x 6.94% = 4.997%; 0.28 x 3.00% = 0.840%; 4.997% + 0.840% = 5.837%, which rounds to 5.84 percent. The lesser of 5.84 and 6.00 is 5.84, so 5.84 percent is the Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 8 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 rate applied. At the horizon the same arithmetic gives 0.72 x 5.85% + 0.84% = 5.05 percent. Example 2 - The three General Fund fees, bill by bill Fee Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Public safety (today $6.11 step $7.48 step $9.14 step $9.65 index $10.15 index $5.00) Parks maintenance $3.72 step $4.44 step $5.29 step $5.58 index $5.87 index (today$3.50) Recreation (today$3.50) $3.84 step $4.22 step $4.45 index $4.70 index $4.94 index The index years, worked Fee and bill Calculation New monthly rate Recreation, Feb 20, 2029 $4.22 x 1.0556 = $4.4545 $4.45 Public safety, Feb 20, 2030 $9.14 x 1.0556 =$9.6485 $9.65 Parks maintenance, Feb 20, 2030 $5.29 x 1.0556 =$5.5843 $5.58 Recreation, Feb 20, 2030 $4.45 x 1.0556 =$4.6976 $4.70 Public safety, Feb 20, 2031 $9.65 x 1.0517 = $10.1486 $10.15 Parks maintenance, Feb 20, 2031 $5.58 x 1.0517 =$5.8683 $5.87 Recreation, Feb 20, 2031 $4.70 x 1.0517 =$4.9429 $4.94 Multipliers are shown to four places; each calculation uses the full computed index and the rate in effect on the bill before. What an index year raises The billing register converts a rate change into revenue: each $1.00 of residential public safety fee is worth about$112,600 a year across the tiered base, and each $1.00 of parks or recreation fee about$92,000. February 20, 2030 Increase Annual value FY 2029-30 (5 of 12 bills) Public safety, $9.14 to$9.65 $0.51 $0.51 x $112,600 = $57,426 x 5/12 =$23,928 $57,426 Parks maintenance, $5.29 to$5.58 $0.29 $0.29 x $92,000 = $26,680 x 5/12 =$11,117 $26,680 Recreation, $4.45 to $4.70 $0.25 $0.25 x $92,000 = $23,000 x 5/12 = $9,583 $23,000 A February adjustment reaches five of the fiscal year's twelve billing cycles, so the first fiscal year realizes five twelfths of the annual value and the next fiscal year realizes all of it. Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 9 CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document• November 2026 Example 3 — Street Fund The street fee takes three scheduled steps of 20 percent and is then indexed at the street operations index, carried in the plan at 4.5 percent. Bill How it is set Calculation New monthly rate Today — — $7.00 Feb 20, 2027 Step, +20% $7.00 x 1.20 = $8.40 $8.40 Feb 20, 2028 Step, +20% $8.40 x 1.20 = $10.08 $10.08 Feb 20, 2029 Step, +20% $10.08 x 1.20 =$12.096 $12.10 Feb 20, 2030 Index, 4.5% $12.10 x 1.045 = $12.6445 $12.64 Feb 20, 2031 Index, 4.5% $12.64 x 1.045 =$13.2088 $13.21 4.5 percent is below the 6.0 percent cap, so the computed index governs. The steps are committed to the pavement program by resolution, and the water franchise transfer— 3.0 percent of gross retail water charges from July 1, 2027 — is an interfund payment that never appears on a customer's bill. Example 4 — Stormwater Fund The stormwater fee takes one scheduled step and is indexed from the following February. Bill How it is set Calculation New monthly rate Today — — $7.50 Feb 20, 2027 Step, +12% $7.50 x 1.12 =$8.40 $8.40 Feb 20, 2028 Index, 4.5% $8.40 x 1.045 = $8.778 $8.78 Feb 20, 2029 Index, 4.5% $8.78 x 1.045 = $9.1751 $9.18 Feb 20, 2030 Index, 4.5% $9.18 x 1.045 = $9.5931 $9.59 Feb 20, 2031 Index, 4.5% $9.59 x 1.045 = $10.0216 $10.02 The step proceeds are committed to the stormwater master plan at$300,000 a year. Example 5 — Water Fund Water is billed by volume, so the index applies to the water rate and the bill moves with it. The examples price the benchmark household at its average use of 1,076 cubic feet a month. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 10 CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 Bill How it is set Calculation Monthly water at 1,076 cf Today In force since March — $44.13 2026 Feb 20, 2027 Planned increase, $44.13 x 1.20 =$52.956 $52.96 +20% Feb 20, 2028 Planned increase, $52.96 x 1.18 =$62.4928 $62.49 +18% Feb 20, 2029 No change Not yet at its first indexing date; no $62.49 increase planned Feb 20, 2030 Index, capped at 6.0% $62.49 x 1.06 =$66.2394 $66.24 Feb 20, 2031 Index, capped at 6.0% $66.24 x 1.06 =$70.2144 $70.21 Why the cap applies to water every year Water's cost is mostly water purchased from the Medford Water Commission, whose own projection carries 11 percent a year after March 2028. The water cost index weights that wholesale escalator by its share of water operating cost. With illustrative shares of 60 percent purchased water, 25 percent personnel and 15 percent materials, the February 2030 index would be: Component Share Escalator Contribution Purchased water 60% 11.00% 6.60% Personnel 25% 6.56% 1.64% Materials (CPI) 15% 3.00% 0.45% Computed water cost index 8.69% Rate applied —the lesser of 8.69% and 6.00% the 6.0% cap The shares above illustrate the method; the December certification uses the shares in the adopted budget. The result does not depend on them: even if every non-purchased dollar grew at CPI, the index would exceed 6.0 percent at any purchased-water share above 37.5 percent, because 0.375 x 11.00% + 0.625 x 3.00%= 6.00%. Example 6 — The guardrails, with the arithmetic The 6.0 percent cap Suppose, for illustration, personnel cost escalated 8.50 percent in a year. The General Fund index would compute as 0.72 x 8.50% + 0.28 x 3.00% = 6.12% + 0.84% = 6.96 percent. The cap governs instead: public safety at $9.65 would move to $9.65 x 1.06 = $10.229, or $10.23, rather than $9.65 x 1.0696 = $10.32. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 11 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 No step and index in the same year On the February 20, 2028 bill public safety takes its scheduled step from $6.11 to $7.48 and receives no index. Without the rule the same bill would carry $7.48 x 1.0584 = $7.92. The fifteen percent combined limit on the fixed fees Bill Fixed fees before Limit(x 1.15) Planned fixed fees Feb 20, 2027 $26.50 $26.50 x 1.15 =$30.475 $30.47 Feb 20, 2028 $30.47 $30.47 x 1.15 =$35.04 $35.00 Feb 20, 2029 $35.00 $35.00 x 1.15 = $40.25 $40.16 Feb 20, 2030 $40.16 $40.16 x 1.15 = $46.18 $42.16 Feb 20, 2031 $42.16 $42.16 x 1.15 = $48.48 $44.19 The ceiling governor Suppose, for illustration, the Stormwater Fund's audited reserve balance stood at 8.3 months and then 8.1 months in the two most recent audited years. Both exceed eight, so the stormwater fee would receive no index that February and would remain at the rate in effect. The following year, if either of the two most recent audited years is at or below eight months, indexing resumes. On the plan's projection no indexed fund meets this condition anywhere in the decade, because the additional revenue is committed to capital. Summary — every fee, every February Monthly Today Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Public safety $5.00 S$6.11 S$7.48 S$9.14 I $9.65 I $10.15 Parks maintenance $3.50 S $3.72 S$4.44 S$5.29 I $5.58 I $5.87 Recreation $3.50 S $3.84 S $4.22 I $4.45 I $4.70 I $4.94 Street utility $7.00 S$8.40 S$10.08 S$12.10 I $12.64 I $13.21 Stormwater $7.50 S $8.40 I $8.78 I $9.18 I $9.59 I $10.02 Fixed monthly fees $26.50 $30.47 $35.00 $40.16 $42.16 $44.19 Water at 1,076 cf $44.13 P $52.96 P $62.49 $62.49 C$66.24 C$70.21 Total including water $70.63 $83.43 $97.49 $102.65 $108.40 $114.40 s . scheduled step. I = cost index applied (General Fund 5.84%, 5.56%, 5.56%, 5.17%; street and stormwater 4.5%). P = planned water increase, approved annually. C=water cost index at the 6.0 percent cap. Each year's rates are adopted by Council resolution the preceding winter; nothing in this table is adopted in advance. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 12 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 5. The Base Year and the Cost of Personnel The plan's base year is rebuilt. Expenditures are set to the FY 2026-27 adopted budget and revenues to FY 2025-26 actuals. The General Fund base year—$13.91 million of revenue and $13.65 million of expenditure — reflects the best projections of City administration based on current information, and is trued up on the June 30, 2027 year-end statements (Section 12). The corrections below are carried throughout, including those that move the plan in a conservative direction. Correction Effect Expenditure bases moved to the FY 2025-26 actual spending was lower because of vacant positions. Water adopted budget operations ran 9 percent under budget; stormwater operations 38 percent under. Materials and services Where actual spending exceeded the adopted budget—General Fund corrected in both directions materials and services, by about$645,000—the higher actual figure is carried. Property and liability insurance The$366,000 premium line is carried on its own row escalating at 7.0 percent separated rather than inside materials and services at CPI. Personnel corrected for change See Section 5.1. the budget does not reflect Rate calendar consolidated Steps and indexing both land on the February 20 bill. A February adjustment reaches 5 of the fiscal year's 12 billing cycles, so indexing realizes at five twelfths. State transportation funding Measure 120 failed May 19, 2026. No legislative increase is assumed in any assumption removed scenario. Opening balances set to June Street opens at its unrestricted carryover of$1,705,547; stormwater at its 30, 2026 actual position of negative $9,136. Purchased water on the 26 percent March 2027, 26 percent March 2028 and 11 percent annually Commission's projection thereafter, carried on its own line. The Medford Water Commission conducts a rate analysis each fall and adopts for the following March, so each figure is confirmed before the fiscal year in which it lands. The adopted budget programmed 10 percent; the plan is deliberately more conservative. Debt service on the actual The Washington Federal obligation amortizes out December 1, 2031; Banner amortization Bank runs to December 1, 2036, a year beyond this horizon. Urban renewal carries 37.21 percent of the Washington Federal obligation, about$338,000 a year, through FY 2030-31. Water franchise booked on both 3.0 percent of gross retail water charges from July 1, 2027, charged to the sides Water Fund and credited to the Street Fund. Overhead and internal service Unchanged since FY 2019-21. The plan counts a$400,000 annual cost allocation recalibration. Pavement standard stated as The$800,000 condition standard requires about$400,000 of new money; the incremental balance is already embedded in operations. A further$100,000 a year is directed at the deferred maintenance backlog. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 13 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 5.1 The base-year personnel correction The adopted budget is the right base for a vacancy that gets filled. It is not the right base for a position that has been permanently eliminated, and it needs adjusting where a benefit line is loaded too thin for the salaries it has to carry. The plan corrects both. The police benefit component A supplemental budget increased the police salary appropriation for coverage without a matching change to the benefit appropriation, against a benefit loading that was already thin. Police personnel services Amount Benefit loading carried in the appropriation 68.79% of salary Benefit loading actually running 74.43% of salary Gap 5.65 points Applied to the full salary appropriation of$3,387,360 $191,386 Less overtime relief as staffing reaches full strength about($63,000) CARRIED IN THE PLAN $128,232 The two halves are one event and are carried together. Filling vacant positions is what drives overtime down and benefits up— an overtime hour carries no insurance premium and a filled position carries a whole one. A mid-transition snapshot does not show it, because the salary underrun is the vacancy itself, and it disappears when the vacancy is filled. The range is $66,257 if overtime is eliminated entirely at full staffing and$191,386 if no overtime relief materializes; the plan carries the midpoint on the judgement that overtime moderates at full strength. The band is worth 0.9 months of General Fund reserve end to end. The FY 2027-29 budget is built at the corrected loading. Component Annual Ten years Permanently eliminated positions removed from the adopted ($238,057) ($3,184,618) base 2027-29 replacement staffing added $53,946 $624,387 Police benefit loading at full staffing $128,232 $1,715,429 Management compensation increment, General Fund share $52,748 $610,521 NET GENERAL FUND EFFECT ($3,131) ($234,282) The correction nets to approximately zero, and both halves are read together. The staffing restructure removes $184,111 a year of General Fund cost that no longer exists. The management compensation analysis adds $180,980 a year that does —the police benefit loading and the management compensation increment, the latter measured against the 6 percent management increase the FY 2026-27 budget carries. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 14 CITY OF CENTRAL POINT,OREGON OFFICE OF THE CITY MANAGER Adoption Document • November 2026 Run without the correction altogether, the General Fund ends the decade at 5.57 months against 5.66 with it. The correction is worth making because it puts the right numbers in the right funds. The other funds Fund Annual net Ten years What it does correction Building ($48,159) ($665,430) Permanent reduction in the building program's cost of service. Street ($21,416) ($477,072) Relief to the fund where relief was intended to land. Stormwater $25,297 $26,774 Two dedicated maintenance positions replace fractional shares of senior technical staff. Internal Services ($2,287) — Close to flat; not separately modeled. The FY 2027-29 overhead recalibration reflects the changed composition of the pool. 5.2 The cost of personnel Personnel is most of what the City spends, and how fast it grows governs every other figure in this plan. Human Resources reports that half of all active employees sit below top step. Step progression is therefore the share of payroll still climbing the scale multiplied by the step rate —at 50 percent, roughly two and a half points— and it falls as the current cohort tops out, then settles at whatever separations recreate. A single rate cannot represent that, so the plan carries a schedule. Fiscal year 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36 Represented 50% 53% 40% 45% 28% 32% 36% 35% 31% 31% below top step Management 100% 100% 90% 79% 59% 40% 24% 27% 30% 32% below top step Escalation % 6.87 6.94 6.55 6.56 6.01 5.94 5.88 5.90 5.83 5.85 Ten-year geometric average 6.23 percent. The components: Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 15 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 202.6 Component Rate Basis Contribution Scale movement—represented, bargained to 3.75% 54% of payroll scale July 1 Scale movement—management, CPI capped at 3.00% 36% of payroll 3.0% Scale movement—seasonal, temporary and 3.00% 10%of payroll overtime Blended scale movement 3.405% 82.1% of 2.80% compensation Health and dental premium growth, as budgeted 10.00% 17.9% of 1.79% compensation PERS employer rate trajectory -1 pt/ biennium 57.4% 0.29% FIXED FLOOR 4.87% Step progression—varies by year, see the 0.96 to 2.07% schedule above Represented employees receive 5 percent steps annually on a six-increment ladder, with 6 percent annual separations. Management receives 3 percent steps on the proposed ten-step scale from conversion on January 1, 2027, at an average placement of step 6, with 4 percent separations. Replacement hires enter at the bottom of the ladder. The 10 percent of payroll in seasonal, temporary and overtime pay carries no step ladder. The schedule reconciles four ways to the City's own records. To fourteen years of experience. At 4 percent management separations on a ten-step ladder the steady-state share below top is 36 percent, blending to 4.11 percent management salary growth. The City's fourteen-year actual average is 4.0 percent, held down by exactly that topped-out majority. To the adopted budget. The FY 2026-27 budget carries a 6 percent management increase as its worst case. The schedule gives 6.09 percent for management in year one. The two were built independently. To payroll. The management salary base of$3,308,320 implied by that placeholder reconciles Human Resources' payroll split— 36 percent management, 54 percent represented, 10 percent seasonal and overtime —to the dollar. To the appropriation. The General Fund personnel line of$9,864,685 reconciles at a 71.75 percent citywide benefit loading against a police actual of 74.43 percent, which is where a blend should sit. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 16 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 5.3 Assumptions set by judgement Four inputs rest on judgement rather than measurement and were set by City administration on the conservative side. The plan states what each is worth so that Council can weigh them together. Assumption Carried at Sensitivity Management placement average step 6 of Each step lower adds about 0.15 points to the schedule, or a at conversion 10 fifth of a month of General Fund reserve. The distribution around the average changes timing only, not the total. Assessed value per new $250,000 Set low for a mix of single-family, townhome and multi-family dwelling product. At$300,000 the property tax line is about 9 percent higher over the decade. Police benefit loading midpoint, Band of$66,257 to$191,386, worth 0.9 months end to end. $128,232 Overtime relief at full assumed to The offset inside the benefit loading figure. Tested annually in staffing moderate the rate report rather than assumed forward. Each is set to the conservative side. Council may weigh any of them differently, and the direction of the resulting change is stated above. 5.4 Reorganization savings The plan carries the identified actions in the staffing restructure at Appendix C, priced on confirmed wages and escalated on the personnel schedule, reflecting Council's direction that the Police Department reduction be held to the equivalent of two positions rather than three. General Fund, ten years Identified actions (Appendix C) $8,667,528 Credited to the four non-General funds $1,376,280 The reorganization is a precondition of this plan. Because it is attrition-based it materializes as positions turn over, and it is reported annually against its schedule. Without it the General Fund ends the decade at 1.0 months. The plan assumes this becomes how the City manages attrition rather than a one-time exercise. The savings credited to Building, Water, Stormwater and Street—the Human Resources consolidation's share and the arborist contract's Street share—do not move the General Fund reserve position, but they reduce cost directly in four of the five funds in which rates are adjusted. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 17 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 6. The Scenario Ladder Four scenarios, each adding one instrument to the one before it. Scenario Rates Reorg. The question it answers GF at FY 2035-36 1—Baseline: no action None No The cost of not planning -5.3 months 2—Indexing only Cost indexing, no No How far the prudent default -2.9 months steps gets 3—The package at the As recommended Yes What happens if growth does 4.9 months current development pace not return 5—RECOMMENDED PLAN Scheduled, Yes The plan staff recommends 5.7 months conditioned What Scenario 3 says about growth, stated precisely. Scenario 3 is the recommended package run at 22 dwelling units a year throughout rather than on the 500-unit forecast for the urban growth boundary expansion, with the property tax line held on the forecast. The gap between it and Scenario 5 — about 0.8 months at the horizon — is the growth effect on the unit-driven lines alone; the full effect, including property tax, is stated below. The plan does not require growth in order to remain solvent. Run with property tax held at the current pace of taxable value added ($12.0 million a year) rather than the 500-unit forecast, and with the growth trigger working as designed so that the five conditioned positions are not created, the General Fund holds the six-month standard from FY 2028-29 through the horizon and ends the decade at 6.1 months. The growth trigger is what produces that result, which is why the five positions are conditioned on it rather than authorized outright. If development runs at the current pace throughout, the next plan update is where that is addressed. IThe growth trigger protects the General Fund whether or not growth arrives. With growth, the conditioned positions are funded by the revenue that growth brings; without it, they are not created. Council reads each future authorization against the revenue actually arriving, which the annual rate report reports. Scenario 4—growth restoration carried as a separate rung—is not separately reported, because its value is visible as the gap between Scenarios 3 and 5. Three further scenarios were examined and set aside: rates alone, which cannot close a personnel-driven gap with a single fee instrument; reorganization alone, necessary but not sufficient; and a restructured fund architecture, set aside in favor of the City's current architecture. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 18 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 7. Fund Results Reserves in months of operating expenditures under the Recommended Plan. The standard is six months; the ceiling governor engages above eight. Fiscal year 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36 General Fund 5.3 5.6 6.1 6.6 6.4 6.4 6.3 6.1 5.9 5.7 Water Fund 3.3 6.0 5.9 6.0 6.0 6.0 6.0 6.0 6.0 6.0 Street Fund 7.8 5.4 5.5 5.7 5.4 5.5 5.7 5.9 6.0 6.2 Stormwater 12.4 6.9 5.8 6.1 6.1 6.1 6.2 6.3 6.5 6.8 Fund Building Fund 27.8 23.0 19.5 16.1 13.0 10.1 7.4 4.8 2.4 0.2 Ending fund balances, in thousands of dollars: Fiscal year 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36 General Fund 6,080 6,698 7,675 8,728 9,252 9,708 10,086 10,371 10,556 10,623 Water Fund 1,511 2,966 3,687 4,079 4,424 4,769 5,132 5,519 5,934 6,381 Street Fund 1,947 1,783 1,897 2,086 2,141 2,277 2,460 2,664 2,892 3,142 Stormwater 824 734 653 672 701 740 790 852 927 1,017 Fund Building Fund 1,135 992 895 789 676 556 431 298 159 13 Capital 573 519 500 500 500 500 500 500 500 500 Improvement One month of General Fund expenditures is$1,137,500 in FY 2026-27, rising to$1,876,889 by FY 2035-36. 7.1 General Fund The fund opens at 5.3 months, reaches the standard in FY 2028-29 at 6.13, peaks at 6.60 in FY 2029-30, and ends the decade at 5.66. It holds the six-month standard from FY 2028-29 through FY 2033-34 and remains well below the eight-month ceiling throughout. The correction is phased. The public safety fee moves $5.00 to $6.11 first billed February 20, 2027, to $7.48 in 2028 and to $9.14 in 2029, reaching a 15.9 percent recovery of base-year police cost against a 15 percent target. Parks reaches $5.29 over three steps ending February 20, 2029. Recreation moves to $3.84 in 2027 and $4.22 in 2028. General Fund indexing then governs: recreation from February 2029, and public safety and parks from February 2030, in each case the first adjustment date after that fee's last scheduled step. Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 19 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026 The base is conservative by design. The plan is stated on a FY 2026-27 base of$13.91 million of revenue and $13.65 million of expenditure —the best projections of City administration based on current information (Section 12). On revenue $250,000 higher the fund holds the standard every year from FY 2028-29 and ends at 7.3 months. Four further assumptions are set conservatively at Section 5.3. The June 30, 2027 year-end statements true up the base, and the next plan update carries the result forward. The structural levers available to the next plan cycle —the overhead recalibration and continued attrition management— are taken up in that update. 7.2 Water Fund Water requires no new increase beyond the path the plan already carries— 20 percent in February 2027 and 18 percent in February 2028, each approved annually. It does require the annual cost-of-service adjustment from the February 20, 2030 bill: with the planned increases ending in February 2028 and wholesale cost rising 11 percent a year, the fund ends the decade at negative 3.65 months without it. On the Commission's projection the water cost index exceeds the 6.0 percent cap in every year, so the cap governs (Section 4.5, Example 5). Water is therefore an Applicable Fee in the rate resolution. The 20 percent increase effective March 2026 is in force; the plan carries 20 percent and 18 percent as the next two. Council has approved each water increase annually and will continue to do so: the plan's water path is a projection, and each year's increase is adopted by that year's rate resolution, on the February billing cycle so that a customer's entire utility bill changes once per calendar year. The February date gains the fund about$92,000 in FY 2026-27 and $100,000 in FY 2027-28. Any balance above the six-month standard is transferred to the Capital Reserve Fund. The transfers total $3,618,309 over the decade and pass $3 million in FY 2035-36, on top of the $9,376,459 replacement program kept in the Water Fund —total water capital $12,994,768. The water franchise fee and the reservoir are the same decision viewed twice. From July 1, 2027 the Water Fund pays 3.0 percent of gross retail water charges to the Street Fund — $2,674,286 over the decade — in recognition of the street system's carriage of the water system in the right-of-way. At 3 percent the fund reaches six months in FY 2027-28, holds it within $25,000 every year after, and banks $3.6 million in the reserve. Every point of franchise is roughly$891,000 of water capital transferred to streets over the decade. Cash funding of a reservoir is therefore not available at this rate path. A future reservoir is presently expected to cost$12 to $15 million. The case for debt is strong on principle: a reservoir is a fifty-to-eighty year asset, and cash-funding it charges today's ratepayers the full cost of infrastructure that will serve two more generations of them. The costs are ordinary: interest, issuance cost, coverage requirements that function as a rate floor, and a fixed charge carried through a period when wholesale cost is also rising. Staff recommends Council direct a reservoir cost estimate and a debt financing analysis before the FY 2027-29 budget. Should Council prefer a Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 20 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026 cash or partial-cash strategy, the franchise rate and the annual water rate are the two levers. 7.3 Street Fund The Street Fund is self-supporting on operations and debt service. The plan adds the pavement condition standard, which is the correct way to state the street requirement: it is the cost of the maintenance program. The $800,000 standard is the annual investment required to hold the pavement network at its current condition; roughly half is already embedded in operations, so the incremental new money required is about$400,000 a year, raised to $500,000 to fund the backlog increment. The street steps are +20 percent in each of 2027, 2028 and 2029, and the water franchise is why. The water franchise and the street fee together fund the pavement program. Without the franchise the fund would end the decade at negative 3.8 months. At a 5 percent franchise the Water Fund would not hold its standard; at 3 percent with street steps of +15 percent neither fund would. Three percent with +20 percent steps is the combination at which both funds work: Water holds six months and banks $3.6 million in the reserve, Street runs 5.4 to 6.2 months and ends at its standard. The third step is planned on the assumption that no state transportation funding increase materializes. If the Legislature acts, the appropriate response is to moderate the step at the December review— a state increase of roughly 25 percent would support reducing the third step to about +10 percent. A fee step compounds on the fee base every year afterward while a one-time gas tax uplift is a level shift, so the two are not interchangeable dollar for dollar. State-shared gas tax is $1.59 million of the fund's $3.2 million of year-one revenue, which makes Street the fund most dependent on state-shared revenue. Debt service and the stormwater reallocation Street carries 9.22 percent of the Washington Federal obligation, which amortizes out December 1, 2031, and 40 percent of Banner Bank, which runs to December 1, 2036. From FY 2029-30 Street also assumes 80 percent of the Stormwater Fund's Banner Bank share —$584,009 over seven years— on the basis that stormwater conveyance is predominantly located in the public right-of-way, the collection system is integral to street drainage, and street surface runoff is the load it carries. This reallocates an internal cost share and does not alter the City's obligation; the same money is owed on the same dates. It takes Street's decade debt service to $3,184,615 and returns the Stormwater Fund to its standard. The deferred maintenance backlog The City's street condition assessment identifies a deferred maintenance backlog of approximately $1.5 million. The $800,000 standard holds the network at its current condition; recovering condition already lost is a separate investment, and deferred cost compounds at reconstruction rates rather than maintenance rates. The plan commits $100,000 a year—$1,036,850 over the decade — specifically to backlog reduction. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 21 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026 Escalating at the construction cost index, a $1.5 million backlog would become $2.1 million by FY 2035-36 if nothing were done; the increment reduces it instead to about$930,000. A portion of the recurring street capital program of$2,592,124 also retires backlogged segments through reconstruction, and if roughly one third of that program is directed at deferred segments the backlog is retired inside the plan period with no additional money. The annual rate report reports backlog remaining alongside the pavement program so that the two are read together. The condition assessment is periodic. If a re-assessment calls for a larger annual program, the third street step and the December review are where that is accommodated. 7.4 Stormwater Fund The corrected base sets stormwater operations at the adopted budget rather than at a year's actual spending with vacancies, which ran 38 percent below it; the fund therefore requires a rate action it was not previously shown to need. The +12.0 percent step is planned and its proceeds committed to the master plan. The corrected base removes $147,522 of eliminated positions and reallocates $73,238 of Engineering Technician II time out of the fund, against$246,057 of new dedicated maintenance staffing — a net increase of$25,297 a year. The master plan capital program rises from $250,000 to $300,000 a year, delivering $3,110,549 over the decade, and remains the lever to be moderated at budget review in any year the fund runs below standard. Two things carry the fund. A FEMA reimbursement of$540,000 -$450,000 received in August 2026 and $90,000 to follow— is a recovery of costs already expensed. And the reallocation of 80 percent of its Banner Bank debt share to Street from FY 2029-30 returns it to its standard. It holds six months or within a rounding of it from FY 2029-30 and ends at 6.8. 7.5 Building Fund The fund is dedicated under ORS 455.210 and stands on its own revenue. With permit fees escalating at 6 percent, it remains positive through the horizon at current permit activity, ending FY 2035-36 at about$13,000, or 0.2 months. The base-year correction, the fund's $17,923 share of the Human Resources consolidation and the management compensation increment measured against the budget's actual placeholder together keep the fund positive through the horizon. That is a real and material result, and it belongs to the restructure package. The building permit fee study should be commissioned this fall, scoped against this base, for adoption with the FY 2027-29 budget. Large commercial building permits change this fund's dynamics entirely, and a single major project can carry it for years— which is a reason the study should set a fee structure rather than a fee level. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 22 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 7.6 Capital Improvement Fund The fund opens FY 2026-27 at$970,025 and carries the adopted projects for the year— Don Jones Park ($432,000) and the School District#6 land swap ($58,000) — ending the year at about $573,000. Parks system development charges at adopted rates then sustain a program of $150,000 in FY 2027-28 and about$100,000 to $127,000 a year thereafter—what the receipts allow while the fund holds the $500,000 floor as directed. The decade program is about$1.56 million. As the City builds out, system development charges end, and a parks utility fee is the successor instrument. That analysis is queued for the next plan iteration. 8. What Carries the Plan Four conditions produce the General Fund result, alongside the rate instruments. All figures are General Fund months of reserve at FY 2035-36, ordered by size. Condition With it Without it Worth Delivery of the attrition-based reorganization 5.7 1.0 4.7 months The overhead recalibration ($400,000 a year) 5.7 3.5 2.2 months The phased public safety correction 5.7 3.8 1.9 months Growth on the UGB expansion 5.7 4.9 0.8 months Cost-of-service indexing 5.7 4.9 0.8 months The parks maintenance steps 5.7 5.0 0.6 months The base-year personnel correction 5.66 5.57 0.1 months The reorganization is the largest. Because it is attrition-based it materializes as positions turn over, so delivery is a precondition of this plan, and it is reported annually against its schedule. 8.1 Personnel escalation — the governing assumption The schedule at Section 5.2 is the plan's central case. Its ten-year average is 6.23 percent against a historical and index-based path of 4.5 percent and recent experience near 10. Two features of it concern the management compensation proposal, and both are set out here so that Council can consider them together. The management step-scale conversion The proposal converts the Management Compensation Plan from merit placement within a range to a fixed ten-step scale at 3 percent intervals, with the scale itself moving up to 3 percent on CPI. Every manager has steps ahead of them at conversion, so management salary growth runs 6.09 percent in the first year and decays to 4.0 percent by FY 2035-36. Measured against the merit system as administered — 4.0 percent a year over fourteen years — the conversion is worth about 0.9 months of General Fund reserve at the horizon, all of it in the transition. At steady state it reproduces the historical rate. It is not a structurally more expensive Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 23 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026 system; it is the same system with its discretion removed and its first years front-loaded. The 3 percent scale movement remains discretionary under the proposal, and each year it is withheld reduces personnel escalation by about 0.89 points— more than any single fee step in this plan is worth. That is a meaningful lever and it is recognised as one. Scale movement and compression at the top The represented scale is bargained at 3.75 percent; the management scale is capped at 3.0 percent on CPI. A topped-out represented Grade 9 at$107,100 and a management Grade I top of scale at$107,856 are $756 apart today. On those two rates the represented position passes management in year two and is $9,815 ahead by year ten. This is the same dynamic Section 4.1 identifies in CPI-indexed fees — a cost that grows at personnel rates, indexed to a general price index, loses ground every year—applied to the City's own management group. Scale parity at 3.75 percent would resolve it at a cost of about one month of General Fund reserve. The step interval is not the driver. Staff recommends that the compression study and the step-scale conversion be decided together, with the scale differential on the table, and that the next plan update test the schedule against the adopted structure. 9. The Recommended Rate Package Instrument Today Scheduled steps Destination Indexed to Public safety $5.00 $6.11 -. $7.48 - $9.14 15%of base-year cost police cost(GF index) (2027-29) (15.9%achieved) Parks $3.50 $3.72 -. $4.44 -. $5.29 35% of base-year cost parks maintenance maintenance (2027-29) cost(GF index) Recreation/ $3.50 $3.84 -. $4.22 (2027-28); 55% of base-year cost recreation and center community first indexed February 20, incl. program revenue cost(GF index) center 2029 Street $7.00 $8.40 -. $10.08 -. $12.10 +20.0% each year street operations (2027-29) (4.5%) Stormwater $7.50 $8.40 (2027) +12.0% stormwater operations (4.5%) Water franchise none 3.0% of gross retail from Water Fund to Street — 7/1/2027 Fund FIXED $26.50 $30.47 in 2027 +15.0% MONTHLY FEES (water shown separately) Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 24 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document• November 2026 One rate change per calendar year, and after February 2029 no further scheduled step is proposed in this plan. Public safety, parks and the street fee complete their steps in February 2029; recreation completes its two steps in February 2028 and stormwater its one in February 2027. Every rate applied under the index is the lesser of the computed cost index and 6.0 percent; for the General Fund fees the computed index governs on the schedule, and for water the cap governs every year. In a year an instrument steps, it takes the step and not the index. Every year's rates are adopted by Council, one year at a time. The path below is the plan; it is not adopted in advance. By the first regular Council meeting in December the Finance Director files the annual rate report and certification at Section 10.3—the computed cost index, the 6.0 percent cap, the ceiling governor and the no-stacking rule for each fee, and the resulting limit; and each winter Council adopts the coming February's rates by resolution, with notice and a hearing. The resolution adopts the planned step for that year, or a rate not exceeding the certified limit, and states the reason for any departure from the path. The rate ladder in full Monthly fee Today Feb 20 Feb 20 Feb 20 Feb 20 Feb 20 2027 2028 2029 2030 2031 Public safety $5.00 $6.11 $7.48 $9.14 $9.65 $10.15 Parks maintenance $3.50 $3.72 $4.44 $5.29 $5.58 $5.87 Recreation/community $3.50 $3.84 $4.22 $4.45 $4.70 $4.94 center Street utility $7.00 $8.40 $10.08 $12.10 $12.64 $13.21 Stormwater $7.50 $8.40 $8.78 $9.18 $9.59 $10.02 FIXED MONTHLY FEES $26.50 $30.47 $35.00 $40.16 $42.16 $44.19 Annual change in the combined fixed bill: +15.0%, +14.9%, +14.7%, +5.0%, +4.8%. Every year is inside the fifteen percent combined-bill limit. Read against the single small instrument, each public safety step is about +22 percent, each recreation step about+10 percent, and the parks steps +6.3, +19.4 and +19.1 percent. Each indexed rate is the rate in effect on the prior bill multiplied by one plus the applied index, rounded to the precision of the rate schedule (Section 4.5). Water at the benchmark bill Water is billed by volume and cannot be expressed as a flat monthly charge. The figures below price the household used in the regional cost-of-services comparison at its average use —twelve monthly readings on an actual Central Point residential account, October 2025 through September 2026, averaging 1,076 cubic feet on a 5/8-inch to 3/4-inch meter— at today's rates, which already include the 20 percent increase that took effect in March 2026. Who certifies. Wherever this plan assigns a certification, audit or reporting duty to the Finance Director, that duty may be performed by the City Manager, the Finance Director, the Assistant City Manager, or a designee of the City Manager. Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 25 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026 Water at 1,076 cf Today Feb 20 Feb 20 Feb 20 Feb 20 Feb 20 2027 2028 2029 2030 2031 Water—planned path, then $44.13 $52.96 $62.49 $62.49 $66.24 $70.21 indexed TOTAL INCLUDING WATER $70.63 $83.43 $97.49 $102.65 $108.40 $114.40 The all-in bill is reported alongside the fixed fees. The fixed fees are inside the fifteen percent limit in every year. The all-in bill rises 18.1 percent in February 2027 and 16.9 percent in February 2028, because the planned water increases land on the same bills, and then 5.3 to 5.6 percent a year. Water rises $18.36 by February 2028 against$8.50 for all five fixed fees combined — about 68 percent of what this household will experience over the next two years, driven by the wholesale cost the City pays the Medford Water Commission. Council approves each year's water increase in that year's rate resolution, and the February billing date is part of that action. 10. Triggers and Annual Reporting 10.1 Downside trigger The trigger tests variance from the schedule, not an absolute level. If actual personnel escalation exceeds the rate scheduled for that year at Section 5.2 by more than 0.75 points, or taxable value added falls more than 20 percent below the figure scheduled for that year at Section 10.2, in either case for two consecutive years, a public safety fee review is automatic at the next budget cycle. Timing is the point: a variance identified early requires a materially smaller correction than the same variance identified two years later. 10.2 Growth The City's urban growth boundary expansion — all residential; urban renewal is commercial and is not affected — becomes available for annexation in 2027, and Planning forecasts about 500 dwelling units across the plan. The plan carries that ramp at $250,000 of assessed value per new dwelling on a$1.65 billion roll growing 3 percent under Measure 50. Fiscal year 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36 Dwelling units 22 30 40 50 58 60 60 60 60 60 Taxable value 12.0 14.0 16.5 19.0 21.0 21.5 21.5 21.5 21.5 21.5 added, $M Property tax — 3.85% 3.96% 4.07% 4.13% 4.11% 4.07% 4.03% 3.99% 3.95% growth The property tax line is derived from those three inputs. The$12.0 million baseline backs out of the City's own receipts: FY 2023-25 at$13,765,000 against FY 2025-27 projected at$14,810,000 is 3.73 percent a year, of which 3 percent is Measure 50 growth on existing value and 0.73 percent is new construction. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 26 1 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026 The upside trigger is commercial-inclusive. It measures taxable value added, commercial square footage permitted and transient lodging tax receipts, with dwelling units retained as a service-demand indicator rather than a revenue test. A dwelling-unit test misses commercial development entirely: a year with 22 homes and four commercial projects can exceed a 38-home year on revenue while failing a unit count. The utility account growth index is capped at its 38-unit level, because multi-family product adds units without adding accounts one for one. 10.3 Annual rate report and certification One document, filed by the first regular Council meeting in December and certified by the Finance Director, reporting: each fee's cost index with the calculation shown in the form of Section 4.5, the resulting limit, and the proposed February rate; the combined fixed-fee change against the 15 percent limit; each fee's recovery ratio against its target on the coming year's budgeted cost, with the base-year figure noted; personnel escalation and taxable value added against the schedules at Sections 5.2 and 10.2; every fund's reserve against the six-month standard, its restricted and unrestricted split, and the ceiling test; the amount appropriated to each committed program against its committed level, pavement backlog remaining, the Reserve Fund contribution and the Capital Reserve Fund transfer; and delivery of the reorganization against its schedule. 10.4 The annual rate resolution The rate report is the record on which each year's rates rest, and Council receives it before acting. In December or January Council adopts the coming February's rates—the five fixed fees and the water rate — by resolution, with notice and a public hearing. The report is filed with the City Recorder and referenced by date in the billing record, so that the authority for any given year's rate can be produced on request. Every figure in it can be reproduced from the adopted budget, the bargaining agreements, the PERS rate schedule, the wholesale water rate and the published CPI. One year at a time, and never above the formula. Council has directed that rates be adopted annually rather than several years at once. Each year's resolution adopts the planned step for that year, or a rate not exceeding the prior rate increased by the lesser of the certified cost index and 6.0 percent, and states the reason for any departure from the plan's path. The ordinance holds the guardrails—the formula, the cap, the ceiling governor, the no-stacking rule and the certification — beyond a future resolution's reach; the resolution sets the rate. If no resolution is adopted for a year, the rates in effect continue. The index is computed on the coming year's budget, not on the past. Each year's certified cost index is computed from the budgeted revenues and expenditures for the upcoming fiscal year—the year in which the adjusted rates will be in effect— and the certification answers one question: how do budgeted revenues and expenditures compare with what this plan projected for that year? The first year is the exception: the February 2027 rates are the plan's scheduled steps on the FY 2026-27 base (Section 12), trued up on the June 30, 2027 financial statements before the first index is certified for the February 2028 bill. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 27 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 11. Recommendation Staff recommends that the City Council adopt the Long Term Financial Plan for FY 2026-27 through FY 2035-36 as presented, and: 1. Adopt a reserve standard of six months of operating expenditures for the General, Water, Street and Stormwater Funds, with the eight-month ceiling governor, and identify the Reserve Fund as the City's contingency instrument for future capital maintenance requirements, with contributions of$200,000 in each fiscal year from FY 2027-28 committed by resolution. 2. Adopt the personnel escalation schedule at Section 5.2 as the plan's central case, and direct that it be re-derived from a payroll step count at each plan update rather than carried forward as a rate. 3. Adopt cost-of-service indexing: each dedicated fee indexed annually to the cost of the service it funds, capped at 6.0 percent per year, with the rate applied in any year being the lesser of the computed cost index and 6.0 percent—the rates for each Adjustment Date adopted annually by Council resolution, with notice and hearing, on the certified computation and the annual rate report. 4. Adopt the cost recovery levels at Section 4.4, calibrated on FY 2026-27 base-year cost and measured on the fees as billed — police 15 percent (15.9 achieved at$9.14), parks 35 percent (36.5 achieved at$5.29), recreation and community center 55 percent (57.4 achieved at $4.22) — recognizing that restoration accounts for the first 10.8 points of the police level and the balance is a policy choice. 5. Adopt as the plan's planned rate path, to be enacted one year at a time by annual rate resolution on a single annual date —the February 20 bill —the public safety fee $5.00 to $6.11 in 2027, $7.48 in 2028 and $9.14 in 2029; the parks maintenance fee $3.50 to $3.72, $4.44 and $5.29 across 2027 through 2029; the recreation fee $3.50 to $3.84 in 2027 and $4.22 in 2028, first indexed February 20, 2029; the street utility fee +20.0 percent in each of 2027, 2028 and 2029, the third step moderable at the December review should a state transportation funding increase materialize; the stormwater fee +12.0 percent in 2027; and the water rate adjusted under the index from February 20, 2030, at the lesser of the water cost index and 6.0 percent, with the water increases projected at 20 percent in 2027 and 18 percent in 2028 to be approved annually on the February billing cycle. 6. Establish a water franchise fee of 3.0 percent of gross retail water charges effective July 1, 2027, paid by the Water Fund to the Street Fund. 7. Commit the additional revenue raised by the street and stormwater steps to capital rather than to fund balance — a pavement program of about$900,000 a year, being the $800,000 condition standard plus a$100,000 increment directed at the deferred maintenance backlog, and the stormwater master plan at$300,000 a year—and commit General Fund headroom to technology materials and services at$150,000 a year; direct that each be moderated at budget review in any year its fund runs below the six-month standard. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 28 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 8. Reallocate 80 percent of the Stormwater Fund's share of the Banner Bank obligation to the Street Fund from FY 2029-30, and carry both obligations on their actual amortization. 9. Direct the overhead and internal service cost allocation recalibration, counted in the plan at $400,000 a year. 10. Recognize delivery of the attrition-based reorganization as a precondition of the plan, with annual reporting against its schedule. 11. Direct that the management step-scale conversion and the compression study be brought to Council together, with the differential between the represented and management scale movements identified and priced, and the average placement at conversion confirmed against the assumption at Section 5.3. 12. Authorize five positions —three General Fund, one Water, one Street—conditioned on the growth trigger rather than authorized outright. 13. Adopt the commercial-inclusive growth trigger and the schedule-variance downside trigger at Section 10. 14. Commission the building permit fee study this fall, scoped against the corrected Building Fund base at Section 7.5, for adoption with the FY 2027-29 budget. 15. Direct staff to return with a reservoir cost estimate and a debt financing analysis, including the rate impact of coverage requirements, before the FY 2027-29 budget. 16. Require the annual rate report and certification at Section 10.3, filed each December and received before Council adopts the annual rate resolution, and with each biennial budget a staff report reconciling the proposed budget to this plan (resolution Section 9A). Sixteen items. Two—items 5 and 6—are rate actions; the other fourteen are policy, direction or reporting. 12. Verification and the Base Year Every figure in this plan is drawn from the model of record, CP_LTFP_2026_2036_Model_Rev34.xlsx. The plan's verification register— nineteen items —was worked with Finance, Human Resources, Planning, Police and Public Works and closed on September 4, 2026: fourteen items on data those departments supplied, two on assumptions recorded at Section 5.3, and three by supersession. The model's Street, Stormwater and Building expenditure bases tie to the FY 2026-27 adopted budget, and the opening balance of every fund is set to the June 30, 2026 actuals: General Fund $5,820,093, Water $786,892, Stormwater -$10,679, Building $1,321,838. The FEMA reimbursement is $540,000 —$450,000 received in August 2026 and $90,000 to follow — and the Medford Water Commission wholesale schedule and the water rate path are confirmed as the plan carries them. FY 2026-27 is a full year at the rates in force since March 2026, and the fee lines are set from the billing register. Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 29 CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026 The General Fund base year is City administration's best projection based on current information. The FY 2026-27 General Fund base is carried at $13.91 million of revenue and $13.65 million of expenditure. The fee lines stay on the billing register, the tax, license and charges lines are scaled to the revenue figure, every expenditure line is scaled to the expenditure figure, and later years grow from that first year on the model's own escalators. Every General Fund result in this document is stated on that base. The June 30, 2027 year-end financial statements —the first full year at current rates—true up the base, and the annual rate report reports the result. Three sources of additional strength are not counted in the plan: the lodging tax, expected to grow substantially as hotel development arrives; franchise fees, levied on utilities' gross receipts that are rising faster than the 6 percent the model carries; and the Urban Renewal Agency, whose frozen base is already in the property tax projection and which will carry a growing share of administrative staff cost as the district matures. On a revenue base $250,000 higher the fund holds the standard every year from FY 2028-29 and ends the decade at 7.3 months. This plan is not a legal opinion and is prepared by staff who are not attorneys. Office of the City Manager Office of the Assistant City Manager Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 30 CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 Appendix A — Assumptions at a Glance Every number that drives the ten-year plan. Model Rev 34 • FY 2026-27 General Fund base year $13.91M revenue /$13.65M expenditure, City administration's best projection on current information. Escalation and policy Driver Rate Note Personnel schedule 6.87% in FY 2026-27 to 5.85% Fixed floor 4.87%; the balance is step in FY 2035-36; avg 6.23% progression Materials and services (CPI) 3.0% ENR 3.5%for capital and SDCs Street/stormwater operations 4.5% Also the street and stormwater index Property and liability insurance 7.0% Own line Franchise revenue growth 6.0% Observed 6.8-8.9% GF cost index annual Peaks 5.84%; does not reach the 6.0%cap Water index (from Feb 2030) 6.0% cap governs Water cost index on 11%/yr wholesale exceeds the cap Reserve standard 6 months GF, Water, Street and Stormwater Funds Ceiling governor 8 months Two consecutive audited years suspends indexing The escalation schedule Input Represented Management Positions 58 FTE 22 FTE Scale movement 3.75%bargained ≤3.0%on CPI Ladder 6 increments at 5% 10 steps at 3% Separations 6% 4% Below top step, 7/1/26 50% 100%; avg step 6 Payroll weight 54% 36%+ 10% no ladder Validated four ways: 14-year management actual 4.0%vs 4.11% steady state; the budget's 6% placeholder vs 6.09%; HR's payroll split reconciled to the dollar; the GF appropriation at a 71.75% loading. Base year: FY 2026-27 General Fund at$13.91M revenue/$13.65M expenditure, City administration's best projection on current information, trued up on the June 30, 2027 year-end statements; other funds at the adopted budget and FY 2025-26 actuals. No state transportation increase assumed. Debt on the actual amortization. Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 31 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 The base-year personnel correction — General Fund Component Annual Ten years Eliminated positions removed (238,057) (3,184,618) Replacement staffing added 53,946 624,387 Police benefit loading 128,232 1,715,429 Mgmt comp increment(GF share, at the 6% placeholder) 52,748 610,521 NET (3,131) (234,282) The correction nets to approximately zero and both halves are read together. The restructure removes $184,111 a year of cost that no longer exists; the compensation analysis adds$180,980 that does. Other funds Base correction Reorg. share Building (48,159)/yr 17,924/yr Street (21,416)/yr 35,682-72,372/yr Stormwater 25,297/yr 17,924/yr Water — 17,924/yr Internal Services (2,287)/yr not modeled Reorganization — General Fund, ten years Item Amount Identified actions, on the schedule 8,667,528 Credited to the four other funds 1,376,280 Delivery is a precondition of the plan. Attrition-based, so it materializes as positions turn over; reported annually against schedule. Growth Year Units Year Units FY 2026-27 22 FY 2030-31 58 FY 2027-28 30 and after 60 FY 2028-29 40 Plan total 500 FY 2029-30 50 AV per dwelling $250,000 UGB expansion, residential, annexable 2027. Property tax derived from units on a$1.65B roll at 3%under Measure 50; current taxable value added$12.0M. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 32 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026 Water — the most consequential inputs Input Assumption Water rate path 20% (Mar 2026, in force); 20% and 18% planned, each approved annually Timing Every increase on the February 20 bill, adopted the preceding winter MWC wholesale 26% Mar 2027, 26% Mar 2028, 11%/yr— MWC's own projection Indexing From the Feb 20, 2030 bill at the lesser of the water cost index and 6.0%; the cap governs. Without it the fund ends at-3.65 months Franchise to Street 3.0%of gross retail from 7/1/2027—$2,674,286 decade Surplus above six months To the Capital Reserve Fund (water)—$3,618,309 System replacement $9,376,459; total water capital$12,994,768 Reservoir $12-15M; debt financing analysis recommended Committed uses Program Was Now Decade Technology M&S (GF) - $150,000 $1,523,866 Pavement—total program $800,000 -$900,000 backlog increment — $100,000 $1,036,850 Stormwater master plan $250,000 $300,000 $3,110,549 Reserve Fund $200,000 $200,000 a year from FY $1,800,000 2027-28 Pavement backlog $1.5M —retired inside the plan if about a third of recurring capital is reconstruction. Stormwater's Banner Bank share 80% reallocated to Street from FY 2029-30. What carries the General Fund Condition With Without Attrition-based reorganization 5.7 1.0 Overhead recalibration ($400,000/yr) 5.7 3.5 Public safety correction 5.7 3.8 Growth on the UGB expansion 5.7 4.9 Cost-of-service indexing 5.7 4.9 Parks steps 5.7 5.0 FEMA$540,000-$450,000 received August 2026, $90,000 to follow. On General Fund revenue$250,000 above the base year the fund ends at 7.3 months. Building remains positive through the decade; the permit fee study sets its long-term fee structure. Rates are adopted one year at a time by annual resolution. Wholesale update(November 2026): since the model closed,the Medford Water Commission has adopted wholesale increases of 24.3 percent for 2027 and 14.7 percent for 2028, both below the 26 percent the plan carries. The plan's water projection is therefore conservative;the difference is reported in the first annual rate report. No change to the planned retail path is proposed. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 33 CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 Appendix B — The Rate Package One rate change a year— every fee, every date, water included. Model Rev 34. Monthly fee Today Feb 20, Feb 20, Feb 20, Feb 20, Feb 20, 2027 2028 2029 2030 2031 Public safety $5.00 $6.11 $7.48 $9.14 $9.65 $10.15 Parks maintenance $3.50 $3.72 $4.44 $5.29 $5.58 $5.87 Recreation/community $3.50 $3.84 $4.22 $4.45 $4.70 $4.94 center Street utility $7.00 $8.40 $10.08 $12.10 $12.64 $13.21 Stormwater $7.50 $8.40 $8.78 $9.18 $9.59 $10.02 FIXED MONTHLY FEES $26.50 $30.47 $35.00 $40.16 $42.16 $44.19 Water at 1,076 cf—billed by $44.13 $52.96 $62.49 $62.49 $66.24 $70.21 volume TOTAL INCLUDING WATER $70.63 $83.43 $97.49 $102.65 $108.40 $114.40 Change in the fixed monthly — +15.0% +14.9% +14.7% +5.0% +4.8% bill Every cell shows the actual rate on that date. In a year an instrument steps, it takes the step and not the index. Each year's rates—every fee, water included—are adopted by Council resolution the preceding winter, with notice and a hearing, on the annual rate report; nothing in this table is adopted in advance. The 3.0%water franchise (Water Fund to Street Fund, from 7/1/2027) is not a customer charge and does not appear on the bill. All dates are billing dates; the cycle runs the 21st to the 20th. Recreation takes two steps ($3.84, $4.22) and is first indexed on the February 20, 2029 bill. About the water line Water is billed by volume, so it is not a flat monthly fee. These figures are the average of twelve monthly readings on an actual residential account (Oct 2025 - Sep 2026), 1,076 cubic feet a month, at today's rates, which include the 20% adopted for March 2026. The plan projects water increases of 20 percent for February 2027 and 18 percent for February 2028 to cover wholesale cost; Council has approved each water increase annually and will continue to, on the February billing cycle. From February 20, 2030 water is adjusted under the index at the lesser of the water cost index and the 6.0 percent cap; on the Commission's wholesale projection the cap governs. Without that adjustment the Water Fund ends the decade at negative 3.65 months. Water rises $18.36 by February 2028 against$8.50 for all five fixed fees combined — about 68% of what a household experiences, driven by the wholesale cost the City pays the Medford Water Commission and approved year by year. Wholesale update (November 2026): since the model closed, the Medford Water Commission has adopted wholesale increases of 24.3 percent for 2027 and 14.7 percent for 2028, both below the 26 percent the plan carries. The plan's water projection is therefore conservative; the difference is reported in the first annual rate report. No change to the planned retail path is proposed. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 34 CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document• November 2026 What the steps deliver Service Recovery now At the planned fee Fee Steps Police/public safety 8.7% 15.9% (target 15%) $9.14 three Parks maintenance 24.1% 36.5% $5.29 three Recreation and community center 51.1% 57.4% $4.22 two Recovery is measured on the fees as billed: public safety is tiered (four commercial tiers), so$9.14 residential- equivalent recovers 15.9%of base-year police cost, and each $1.00 of residential fee is worth about$112,600 a year. Because cost grows while the correction is phased, the fee recovers about 13.9%of contemporaneous police cost when the last step lands; the annual rate report reports both figures. On the base year the fees land above target and recede toward 15/35/55 as cost grows. The General Fund reaches six months in FY 2028-29 and ends at 5.7. Where the street and stormwater money goes: pavement$800K-.-$900K a year against a$1.5M backlog; stormwater master plan $250K-$300K; technology $150K from General Fund headroom; Reserve Fund $200K a year from FY 2027-28. Each is moderated at budget review in any year its fund runs below standard. Three points that frame the package • Part of the public safety correction is a restoration. The fee was established to achieve $1.4M per biennium — 10.8% of police cost. Restoring it to that basis is target restoration; the increment from 10.8% to 15% is a policy choice, and it is what carries the General Fund to the standard. • One date, one change. Consolidating onto one February date does not change the cumulative bill — it changes when a customer sees it, once a year rather than twice. On the all-in bill that is +18.1% in February 2027 and +16.9% in February 2028, driven by the planned water increases; the five fixed fees stay within the 15% limit every year. • Council adopts every year's rates, one year at a time. Each December the rate report is filed and certified; each winter Council adopts the coming February's rates by resolution with a hearing. The formula and the 6.0% cap set the limit; Council sets the rate. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 35 CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026 The staffing restructure in brief The cost side of the same plan, informational here. The Police Department change is made administratively; the others return to Council through the FY 2027-29 budget process, two by Council resolution. The full memorandum is Appendix C; the position map is Appendix D. -10 +3 -7 Positions eliminated January 2026— Positions created, all of them at entry Net reduction in the size of the June 2029 level organization 5 0 -2 Positions carried in the plan from FY Of them authorized outright—all five Where the organization stands even at 2030-31 are conditioned full restoration How the ten positions leave Route Positions What it means Retirement or departure already 8 The position is not refilled. The work is absorbed, occurred or known reorganized, or purchased under contract. Service change 2 Police service delivery is modified to produce these savings, as agreed by the City Manager and Police Chief. The only staff reductions in the package. The Council chose fewer staff reductions over more savings Council held the Police Department reduction to the equivalent of two positions rather than three, forgoing roughly $1.1 million of savings across the decade; the plan still reaches its reserve standard. The City Manager and Police Chief have administrative discretion over the change. What it saves Fund FY 2027-28 FY 2028-29 2027-29 biennium General Fund—police, parks, recreation, $470,361 $785,221 $1,255,582 administration Building, Water, Stormwater, Street and Internal $92,688 $145,949 $238,637 Services All funds $563,049 $931,170 $1,494,219 Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 36 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 About $8.7 million to the General Fund over ten years The financial plan counts these savings, and counts on them. They are what keeps the General Fund at its standard — not what allows anything new. Without the staffing changes the General Fund ends the decade at 1.0 months of reserve rather than near six. General Fund, ten years Identified actions, escalated on the schedule $8,667,528 Credited to the four other funds $1,376,280 t What residents will notice This is the same service from a smaller, more capable staff— and in a few places service reduces. Area What changes Police Department service The clearest reduction in the package. Service delivery changes are set by delivery agreement between the City Manager and the Police Chief, who will report the detail to Council. f Urban forestry Tree work becomes a contracted service. Response is scheduled rather than immediate. Building permit support The Building program loses half a support position. Planning and mapping Shared across two functions. Turnaround will lengthen. support Park planning Absorbed by existing staff who are compensated for it. Complex projects lean more on consultants. Safety program Moves from a dedicated manager back to Public Works and Police within existing staff hours. Stormwater field maintenance Increases—two dedicated maintenance positions replace fractional shares of senior staff. Where a function reduces, Council and residents hear it from us directly. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 37 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 202.6 Attachment B — Policy resolution The policy resolution adopted with this plan is Resolution No. , Attachment 1 to the November 19, 2026 staff report, on file with the City Recorder. It is not reproduced here, so that the plan record carries one text of the resolution — the one Council adopts. Exhibit A to the resolution is this document. The resolution adopts this plan as the City's long term financial plan of record and establishes, as Council policy: the six-month reserve standard for the General, Water, Street and Stormwater Funds and the eight-month ceiling threshold; the cost recovery targets; the planned rate path at Section 9 and Appendix B, enacted one year at a time by annual resolution; the Capital Reserve Fund and the System Development Charge Fund; the pavement, stormwater, technology and Reserve Fund commitments; the water franchise and Banner Bank debt allocation; the downside and growth triggers; the annual rate report and the biennial budget reconciliation; and the certifying officer. Adoption of the plan adopts no fee, rate or staffing action; each returns to the Council through its own process. The rate ordinance (Attachment A — Ordinance No. , adding Chapter 3.42, Fee and Rate Indexing, to the Municipal Code and amending Chapters 3.25, 3.26, 3.27, 11.16, 11.20 and 13.04) carries the indexing machinery —the cost index, the 6.0 percent cap, the ceiling governor, the no- stacking rule and the annual certification — and comes to Council for first reading the same evening; it also directs the City Manager to present an update of the plan within three years (Section 3.42.100). Each year's rates are set by the annual rate resolution (Attachment C) with notice and a public hearing. Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 38 CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026 The calendar The calendar is built back from the first adjusted bill on February 20, 2027. When Action Instrument September 2026 Council study session. The plan, the staffing restructure and the — rate package are presented together. Informational; no action is taken. November 19, 2026 Council adopts the plan and the financial policies; first reading Resolution; of the rate ordinance the same evening Attachment A December 2026 First rate report and certification filed and received Plan §10.3 December 10, 2026 Second reading and adoption; effective January 9, 2027. Attachment A January 2027 Rate resolution adopted with notice and hearing; billing system Attachment C configured; customer notice January 21, 2027 Volumetric water rate applies to service from this date — February 20, 2027 First bill carrying every adjusted rate — Fall 2026, separately Building permit fee study commissioned—its own ORS - 455.210 notice and hearing track, not part of this package Two instruments, each with its own job The ordinance carries the machinery—the formula, the 6.0 percent cap, the ceiling governor, the no-stacking rule and the annual certification — so that the guardrails are harder to remove than the rates are to adjust; it also directs the City Manager to present an update of the plan within three years. The policy resolution adopted tonight carries the planned rate path and the policy settings. Each year's annual rate resolution sets the rate. Office of the City Manager • 140 South Third Street, Central Point, Oregon 97502 • (541) 664-3321 • Figures are planning-level and drawn from CP_LTFP_2026_2036_Model_Rev34.xlsx. Not a legal opinion; staff are not attorneys. Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 39