HomeMy WebLinkAboutCouncil Resolutions 1898 RESOLUTION OF THE CITY OF CENTRAL POINT
RESOLUTION NO. taCl ''
A RESOLUTION ADOPTING THE LONG TERM FINANCIAL PLAN FOR FISCAL YEARS 2026-27
THROUGH 2035-36 AND ESTABLISHING UTILITY FEE AND RATE INDEXING, RESERVE, COST
RECOVERY AND CAPITAL COMMITMENT POLICIES
RECITALS:
A. Council considered a Long Term Financial Plan for Fiscal Years 2026-27 through
2035-36 (the "Plan"), which is intended to supersede and replace the February 2015
Long Term Financial Plan. The Plan was presented to the Council at public study
sessions on August 17 and September 21, 2026.
B. The Plan addresses both a staffing restructure to reduce costs and a phased rate
package to increase revenue. The Plan is designed to bring the reserve of each
operating fund to a six-month standard and to hold it there.
C. This Resolution does not establish or increase any fee or rate charged to customers;
rather adopts the policies and procedures contained in the Plan.
D. The Plan establishes a reserve standard, a cost-of-service indexing process, planned
rate increases to be adopted in future years by separate resolution, as well as other
priorities.
E. The Plan and the policy resolution implement the following elements of the City of
Central Point 2040 Strategic Plan:
a. Community Investment Goal 1 — Build a strong city that is fiscally
sustainable and provides enhanced services. The six-month reserve standard,
cost-of-service indexing and the committed capital programs are the
instruments of fiscal sustainability the Plan puts in place.
b. Community Investment Goal 5, Strategy 2 — Provide regular financial
analysis on utility enterprise funds so infrastructure can be adequately
maintained, restored, upgraded and expanded. The ten-year projection of
the Water, Street and Stormwater Funds, the pavement and stormwater
commitments and the annual rate report provide that analysis.
c. Responsible Governance Goal 1, Strategy 3 — Maintain a robust financial
position; and Goal 2 — Invite public trust. Each year's rate is adopted in
public on a published record, and the Plan states its assumptions and reports
against them each year.
d. Vibrant Economy Goal 1 — Manage growth to provide timely and orderly
facilities and services. The growth trigger ties five positions to a commercial-
inclusive growth test rather than authorizing them outright.
THE CITY OF CENTRAL POINT RESOLVES AS FOLLOWS:
SECTION 1. — Long Term Financial Plan adopted
The Long Term Financial Plan for Fiscal Years 2026-27 through 2035-36 (the "Plan"), attached as
Exhibit A, is adopted as the City's long term financial plan of record. Adoption of the Plan does
not adopt any fee, rate or staffing action; each returns to the Council through its own process. In
this Resolution, a reference to a section or appendix of the Plan is to Exhibit A; every other
reference to a section is to this Resolution.
SECTION 2 — Reserve standard
The reserve standard for each of the General, Water, Street and Stormwater Funds (the
"operating funds") is six months of that fund's operating expenditures. This standard replaces
any prior reserve standard expressed as a percentage of revenues. Each operating fund's reserve
is measured as provided in the final sentence of Section 5 of this Resolution, and shall also be
reported exclusive of amounts restricted by law, including System Development Charge balances.
The Building Fund is not subject to this standard until the Council so provides following a building
permit fee study.
SECTION 3 — Ceiling Threshold
The Ceiling Threshold for purposes of the Plan is eight months of a fund's operating expenditures.
SECTION 4 — Cost recovery targets
Service Recovery target(share of the service's cost for the fiscal year,
li measured on the fees as billed; initially calibrated on the FY 2026-27
base year)
Police/ public safety 15%
Parks maintenance 35%
Recreation and community 55%
center(fee plus program
and rental revenue)
Res. No. ) ; (City Council Meeting 11/19/2026) Page 2
SECTION 4.1 — Planned rate path
The scheduled steps and dates for the public safety, parks maintenance, recreation, street utility
and stormwater fees, and the water rate path, stated in Plan Section 9 and Appendix B, are
adopted as the Council's policy for the Plan period, to be enacted for each Adjustment Date by
annual resolution and not by this resolution. A departure from the planned path in any year shall
be stated in that year's rate resolution with its reason.
SECTION 5 — Capital Reserve Fund and System Development Charge Fund
The Council establishes under ORS 294.346 a Capital Reserve Fund, with a designation for each
of the Water, Street and Stormwater Funds for that system's capital (the water designation
including the future reservoir), and a System Development Charge Fund holding SDC receipts and
balances. Any Water Fund balance above the standard established in Section 2 of this Resolution
transfers to the water designation each year; a street or stormwater transfer is for a named
project, not more than the lesser of its unfunded cost and the balance above that standard, and
is stated in the rate report. Appropriations from either fund shall be made in the City's budget
appropriation resolution and shall name the designation. For purposes of Sections 2 and 3 of this
Resolution, a fund's reserve is its restricted and unrestricted balance plus its SDC Fund balance,
less Capital Reserve Fund and grant balances.
SECTION 6 — Capital and efficiency commitments
(1)The City Council, as the City's highest level of decision-making authority, commits Street Fund
resources to a pavement maintenance program of not less than $900,000 in fiscal year 2027-28,
escalating annually thereafter at the Engineering News-Record construction cost index. Of that
amount, approximately $800,000 represents the pavement condition standard established by
the City's street condition assessment and the balance is committed to reduction of the deferred
pavement maintenance backlog.
(2) The City Council commits Stormwater Fund resources to a stormwater master plan capital
program of not less than $300,000 in fiscal year 2027-28, escalating annually thereafter at the
Engineering News-Record construction cost index.
(3)The City Council commits General Fund resources to technology materials and services of not
less than $150,000 in fiscal year 2027-28, escalating annually thereafter at the Consumer Price
Index for All Urban Consumers (CPI-U), West Region, All Items, as published by the U.S. Bureau
of Labor Statistics, for the twelve months ending the preceding March. This commitment is the
General Fund headroom identified in the Plan and is committed to efficiency investment rather
than to fund balance.
Res. No. F}L) ; (City Council Meeting 11/19/2026) Page 3
(4) The City Council commits General Fund resources to the Reserve Fund, for future capital
maintenance requirements, of not less than $200,000 in each fiscal year from fiscal year 2027-
28, not escalated.
(5) Release. The Council may appropriate less than the amount committed under the foregoing
subsections (1), (2), (3) or (4) for a fiscal year only if the ending balance of the affected fund is
projected in the proposed budget for that fiscal year to fall below the reserve standard
established in Section 2 of this Resolution. Any such reduction shall be stated in the budget
message together with the projected reserve position relied upon.
(6) A transfer to the Capital Reserve Fund designation for a program counts toward its
commitment. These commitments may be modified or rescinded only by subsequent resolution.
SECTION 6.1 — Water franchise and debt allocation
(1) Effective July 1, 2027, the Water Fund shall pay to the Street Fund an interfund franchise fee
of three percent (3.0%) of gross retail water charges, in recognition of the Street Fund's carriage
of the water system within the public right-of-way.
(2) From fiscal year 2029-30, eighty percent (80%) of the Stormwater Fund's allocated share of
debt service on the Banner Bank obligation is reallocated to the Street Fund, on the basis that
stormwater conveyance is predominantly located within the public right-of-way and is integral
to street drainage. This reallocates an internal cost share and does not alter the City's obligation.
SECTION 7 — Downside trigger
If actual personnel cost escalation exceeds the rate scheduled for that fiscal year in Plan Section
5.2 by more than 0.75 percentage points, or taxable assessed value added falls more than 20
percent below the amount scheduled for that fiscal year in Plan Section 10.2, in either case for
two consecutive fiscal years, staff shall return to the Council with a public safety fee review at
the next budget cycle.
SECTION 8 — Growth trigger
Growth for purposes of the conditioned positions and enhancement funding described in the
Plan is measured by taxable assessed value added, commercial square footage permitted and
transient lodging tax receipts. Dwelling units permitted shall be reported as an indicator of
service demand and shall not by itself satisfy or fail the trigger. The threshold for each measure
is stated in Plan Section 10.2.
SECTION 9 — Annual rate report
The annual rate report required by the Plan shall additionally state the amount appropriated to
each program committed under Section 6 of this Resolution against the committed level, and
any reduction taken under Section 6(5) of this Resolution with the projected reserve position
Res. No. tE. ; (City Council Meeting 11/19/2026) Page 4
relied upon; the Reserve Fund balance and contribution; the transfer to and balance of each
designation of the Capital Reserve Fund, the balance of the System Development Charge Fund
by system, and each fund's reserve in months both excluding and including its Capital Reserve
Fund designation; and the delivery of the attrition-based reorganization against its schedule.
SECTION 9A — Biennial budget reconciliation to the Plan
(1) With each proposed biennial budget, the Finance Director shall present to the Budget
Committee a report comparing,for each fund and each fiscal year of the biennium,the revenues,
expenditures, interfund transfers and ending balance proposed with the Plan's projections for
those years as most recently restated in the annual rate report; stating each variance, its amount
and its reason; and identifying separately any appropriation that exceeds the Plan's projected
expenditures for that fund and year, any reduction under Section 6(5)of this Resolution, any fund
projected to end a year below the standard in Section 2 or above the threshold in Section 3 of
this Resolution, and any revenue assumed above the Plan's projection with its basis.
(2) Staff may propose appropriations that exceed the Plan's projections. Each is identified in the
report and listed in the budget message, with a statement that the report under this section was
received. Approval of the budget by the Budget Committee and its adoption by the Council in the
ordinary course under Local Budget Law are the authorization for such an appropriation; no
separate action on the Plan is required. Such an appropriation is a departure stated for that
budget and does not amend the Plan or this resolution.
SECTION 10 — Certifying officer
Wherever the Plan or this resolution assigns a certification, audit or reporting duty to the Finance
Director, that duty may be performed by the City Manager, the Finance Director, the Assistant
City Manager, or a designee of the City Manager.
SECTION 11. This Resolution becomes effective immediately upon its passage.
PASSED by the Council and signed by me in authentication of its passage this I CI day
ofd\)(7,rn\ , 2026.
(� A . .
Council PresidertRob Hernandez
ATTEST:
City Recorder
Res. No. en.C&) ; (City Council Meeting 11/19/2026) Page 5
CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
CITY COUNCIL • NOVEMBER 19, 2026
Long Term Financial Plan
Fiscal Year 2026-27 through Fiscal Year 2035-36 — Adoption Document
This is the plan Council adopts as the City's long term financial plan of record, together with the
policy resolution adopted with it: the six-month reserve standard, the eight-month ceiling threshold,
the cost recovery targets, the capital and Reserve Fund commitments, the water franchise and
debt allocation, the growth and downside triggers and the annual rate report. Adopting the plan
adopts no fee, rate or staffing action. What follows is the rate ordinance, first reading November 19
and second reading December 10, 2026; the annual rate resolution for the February 20, 2027 bill
— the five fees and the water rate — in January 2027, with notice and a hearing; and the first
adjusted bill on February 20, 2027. Council adopts each year's rates one year at a time; the plan's
rate path is adopted as policy, not as rates.
Section 4.5 shows how every fund is indexed, with the arithmetic for each fee on each February bill.
Office of the City Manager • 140 South Third Street, Central Point, Oregon 97502 • (541) 664-3321
Figures are planning-level and drawn from CP_LTFP_2026_2036_Model_Rev34.xlsx. Not a legal opinion; staff
are not attorneys.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 1
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
What Council is adopting tonight
Action Instrument When
Adopt the Long Term Financial Plan FY 2026-27 through Resolution, Section 1 November 19—tonight
FY 2035-36 as the City's plan of record
Adopt the six-month reserve standard, the eight-month Resolution, Sections 2-10 November 19—tonight
ceiling threshold, the cost recovery targets (police 15%-
15.9% at$9.14—parks 35%at$5.29, recreation 55%at
$4.22, calibrated on base-year cost), the Capital Reserve
and SDC Funds, the pavement, stormwater, technology
and Reserve Fund commitments, the water franchise and
Banner Bank debt allocation, the downside and growth
triggers,the annual rate report and the certifying officer
Rate ordinance: the standing indexing mechanism, the Ordinance No. First reading tonight;
6.0 percent cap, the ceiling governor, the single annual adding Chapter 3.42 second reading and
adjustment date, the no-stacking rule, the annual (Attachment A) adoption December 10,
certification and a plan update within three years—the 2026 (effective Jan. 9)
limits each year's rate resolution may not exceed
Annual rate resolution for the February 20, 2027 bill: the Resolution—annual, January 2027, and every
five fixed fees in dollars and the water rate for that year, with public notice and winter thereafter
on the certified computation hearing
First adjusted bill under the new schedule; every fee Billing February 20, 2027
change thereafter lands on the same date each year
Nothing tonight sets a rate. Every fee change returns to Council by resolution, with
notice and a public hearing.
The policy resolution Council adopts tonight is Attachment 1 to the staff report; it is not reproduced here, so that
the record carries one text of it. The rate ordinance (Attachment A) and the annual rate resolution (Attachment
C) come to Council on the calendar at the end of this document. The plan sections that follow are the plan of
record; the complete plan, with its appendices and the staffing restructure, is available from the City Recorder.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 2
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
1. Executive Summary
This plan projects the City's five operating funds and the Capital Improvement Fund across the ten
fiscal years FY 2026-27 through FY 2035-36. It succeeds the February 2015 Long Term Financial
Plan, honoring that plan's own recommendation that the City refresh its long-term financial
analysis every three to five years.
Every fund's base year is rebuilt: expenditures at the FY 2026-27 adopted budget and revenues at
FY 2025-26 actuals, with personnel corrected. The General Fund base year—$13.91 million of
revenue and $13.65 million of expenditure — reflects the best projections of City administration
based on current information, and is trued up on the June 30, 2027 year-end financial statements.
What the plan concludes
• All rate changes land on one date a year. Scheduled steps and the governed annual
adjustment both take effect on the February 20 bill, so a customer sees one change per
calendar year rather than two. Water moves on the same bill. Council adopts each year's rates
— every fee, water included — one year at a time, by resolution.
• Personnel escalation is a schedule, not a single rate. Half of all City staff sit below top step,
so step progression is front-loaded and decaying. The plan carries 6.87 percent in FY 2026-27
falling to about 5.85 percent by FY 2035-36 —a ten-year average of 6.23 percent— built from
the City's own payroll and reconciled four ways to its own records.
• The General Fund reaches the six-month standard in FY 2028-29 and holds it through FY
2033-34, reaching 6.13 months, peaking at 6.60 and ending the decade at 5.66.
• Cost recovery rises — police from 8.7 to 15 percent of base-year cost, parks from 24 to 35
percent, recreation from 51 to 55 percent—each stated on base-year cost and measured on
the fees as actually billed, which are tiered for commercial accounts. Public safety moves $5.00
to $9.14 over three steps; parks reaches $5.29 over three; recreation moves $3.50 to $3.84 and
$4.22 over two, and is first indexed on the February 20, 2029 bill.
• A planned path of three steps, then a governed annual adjustment— adopted one year at
a time. The plan sets out steps in February 2027, 2028 and 2029 for public safety and the
utilities, parks included, and after that an adjustment computed by formula. None of it is adopted
in advance: each winter Council adopts the coming February's rates by resolution, with notice
and a hearing, on the published rate report. The formula and its cap set the limit; Council
sets the rate. Section 4.5 works the formula through every fund, with the arithmetic shown.
• The combined fixed monthly bill rises from $26.50 to $30.47 in February 2027, an increase
of 15.0 percent, then to $35.00 and $40.16. Every year is inside the fifteen percent combined-bill
limit. No fund subject to indexing reaches the eight-month ceiling governor.
• A water franchise fee of 3.0 percent of gross retail charges begins July 1, 2027, paid by
the Water Fund to the Street Fund in recognition of the street system's carriage of the water
system in the right-of-way. It funds the pavement program without exhausting water capital.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 3
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document- November 2026
• The street and stormwater steps are committed to capital —the pavement program at
about$900,000 a year with the increment directed at a $1.5 million deferred maintenance
backlog, and the stormwater master plan at$300,000. The General Fund technology
commitment is set at$150,000 a year, and a Reserve Fund contribution for future capital
maintenance requirements at$200,000 a year.
• The Building Fund remains positive through the decade, ending at 0.2 months. The building
permit fee study, recommended for commissioning this fall, sets the fund's long-term footing.
• The single most valuable change in this plan is not a rate increase. It is indexing each
dedicated fee to the cost of the service it funds instead of to the Consumer Price Index.
• The plan's results rest on four conditions, quantified at Section 8: delivery of the
attrition-based reorganization, the public safety correction, the overhead recalibration, and
growth on the urban growth boundary expansion. Each is reported annually.
3. The Reserve Standard
This plan adopts a reserve standard of six months of operating expenditures— 180 days—for
the General, Water, Street and Stormwater Funds, replacing the former band expressed as a
percentage of revenues. A percentage of revenues answers a solvency question; it does not
answer the operating question, which is whether the City can pay its bills in October.
Property taxes supply roughly two thirds of General Fund revenue and arrive almost entirely
between November 15 and December 10, while payroll and operating costs run evenly from July 1.
Audited cash records for FY 2024-25 and FY 2025-26 show the General Fund drawing down 18.9
and 18.8 percent of annual expenditures respectively before the County distribution arrives.
A portion of each utility fund's ending balance is system development charge revenue, which ORS
223 restricts to capacity-increasing capital and which cannot be spent on operations: approximately
28 percent of the Water Fund's FY 2035-36 balance, 20 percent of the Street Fund's and 38
percent of the Stormwater Fund's. The General Fund holds none. Reserves are reported both
inclusive and exclusive of restricted amounts.
3.1 The ceiling governor
Indexing is suspended for any fund whose balance exceeds eight months for two consecutive
audited years, and resumes when it does not. Two years rather than one, so that a single one-time
event— a grant reimbursement, a debt retirement—does not trip it.
The governor is why the additional revenue in this plan is committed rather than
accumulated.
At the recommended rates, applied to the corrected expenditure base and with capital programs
left where they were, the Stormwater Fund would run above eight months in the early years and the
Street Fund from FY 2032-33 onward. Both would reach the governor and suspend their own
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 4
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
indexing.
Raising the two capital programs addresses it at source. A fund building infrastructure is defensible
at a rate hearing; a fund accumulating balance without a purpose is not. With the committed uses in
place, no fund subject to indexing exceeds eight months for two consecutive years anywhere in the
decade (the Building Fund, on its ORS 455.210 fee track, is outside the governor).
3.2 The Reserve Fund
The City maintains a Reserve Fund outside the General Fund as its contingency instrument for
future capital maintenance requirements —the rainy-day fund, and the source for unanticipated
capital such as heating and cooling replacement or roof repair. The six-month operating standard
and the Reserve Fund answer different questions: the standard answers whether the City can pay
its bills in October; the Reserve Fund answers what happens when a roof fails.
The Reserve Fund balance is approximately$576,000 and is expected to draw down to about
$450,000 by June 30, 2027. The $200,000 contribution budgeted for FY 2026-27 is deferred to
support the General Fund in its first year. The plan then carries $200,000 in every year from FY
2027-28, unescalated —$1,800,000 across the decade, taking the balance to about $2.25 million
before draws.
The contribution is committed by resolution alongside the pavement, stormwater and technology
commitments and is subject to the same release test: Council may appropriate less in any year the
General Fund is projected below six months.
4. Rate Policy: Indexing to the Cost of Service
Every dedicated fee in this plan is indexed annually to the cost of the service it funds, rather than to
the Consumer Price Index, subject to a cap of 6.0 percent per year and to the ceiling governor.
4.1 Why CPI indexing was not selected
The services these fees fund are people. Police, parks, recreation and street operations grow at
personnel rates of 4.5 to 6.5 percent; CPI runs at 3. A fee indexed to CPI therefore recovers a
smaller share of its service every year, without anyone deciding that it should. The public safety fee
recovers 8.7 percent of police cost today; under CPI indexing it would recover about 6.8 percent by
FY 2035-36. That decline would not be a policy choice— it would be an artifact of the index, and it
is precisely the kind of gradual drift a ten-year plan exists to surface.
4.2 The cap, and the accountability that comes with it
A fee that erodes against CPI brings staff back to Council periodically, and that is a form of
accountability. Cost indexing keeps that accountability deliberately in three ways: indexing is
capped at 6.0 percent a year, the ceiling governor suspends indexing in any fund that runs
persistently above its need, and Section 10 requires a one-page annual rate report reporting
each fee against its cost index and its recovery ratio.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 5
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
4.3 How the General Fund index is applied
The General Fund cost index is 72 percent personnel and 28 percent materials. Because personnel
escalation is a schedule, the index is computed annually rather than entered as a constant. It runs
from 5.84 percent in FY 2027-28 to 5.05 percent at the horizon and does not reach the 6.0 percent
cap in any year. The rate applied in any year is the lesser of the computed cost index and 6.0
percent, and the annual rate report reports the computed index alongside the rate actually
applied. The cap is headroom against a year in which personnel escalation runs high, not the
operative rate.
4.4 Cost recovery
Service Annual cost Fee + program Recovery At the planned fees
revenue now
Police/public safety $6,484,321 $562,921 8.7% 15%target; 15.9% at
$9.14
Parks maintenance $1,332,556 $321,669 24.1% 36.5% at$5.29
Recreation and community center $1,049,211 $536,458 51.1% 57.4% at$4.22;
program revenue
reported
Fee revenue is taken from the utility billing register—public safety$46,910 a month, parks and recreation
$53,611 a month together—annualized. The public safety fee is tiered, with four commercial tiers by square
footage, so a percentage step on the billed base raises more than the residential rate alone implies: each$1.00
of residential public safety fee is worth about$112,600 a year and each$1.00 of parks or recreation fee about
$92,000. Billed amounts are used; collections run slightly below billing.
The targets are stated on base-year cost, and the plan says what that means.
Each target is a share of FY 2026-27 service cost, the base year of this plan. Because service
costs grow while the correction is phased, each fee recovers a smaller share of contemporaneous
cost in the year its last step lands, and cost-of-service indexing holds it at roughly that share
thereafter. Public safety at$9.14 recovers 15.9 percent of FY 2026-27 police cost and
approximately 13.9 percent of FY 2029-30 cost; parks at$5.29 recovers 36.5 percent of base-year
cost and about 30 percent by FY 2030-31; recreation at$4.22 recovers 57.4 percent of base-year
cost including program revenue — receding toward 15, 35 and 55 as cost grows; indexing holds
them there. The audit reports both figures.
The public safety fee was established to achieve $1.4 million per biennium —$700,000 a year, or
10.8 percent of police cost. Restoring the fee to that basis is target restoration. The increment from
10.8 to 15.9 percent is a policy choice. On the billed base it carries the General Fund to its standard
in FY 2028-29 and holds it through FY 2033-34. Each year's rate resolution is where Council
confirms the step for that year.
These are not enterprise funds and should not recover 100 percent; the right share depends on
who benefits. Roughly 62 percent of recreation recovery is the fee and the remainder is program
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 6
t
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
and rental revenue, so the recreation target is met by the fee and program revenue together, and
the annual rate report reports program revenue against the growth needed to hold it.
4.5 How Every Fund Is Indexed — Worked Examples
This section takes the indexing rule through every fund the plan touches, one bill at a time, with the
arithmetic shown. Every rate in the examples is the rate in the plan's rate ladder at Section 9.
The rule in one line
New rate = rate in effect x (1 + the lesser of the fee's cost index and 6.0 percent), rounded
to the precision of the rate schedule— unless the fee takes a scheduled step that year,
in which case it takes the step and not the index.
Four further rules surround it. Each is applied the same way every year, and each can be checked
by anyone with the published certification:
# Step What it does
1 Build the cost index for that Each fee indexes to the cost of the service it funds, not to a general
service price index. What sets the rate is that service's own mix of people,
purchased water and materials.
2 Apply the lesser of the The cap is headroom against a year in which personnel escalation runs
computed index and the 6.0 high. On the plan's schedule the General Fund index peaks at 5.84
percent cap percent and does not reach it; for water it applies every year.
3 No index in a year the fee takes A scheduled step is in lieu of the annual adjustment for that fee in that
a scheduled step year. A fee never receives both.
4 Suspend indexing for any fund Two consecutive audited years above the ceiling switch the adjustment
above eight months off for that fund until the condition clears.
5 Hold the five fixed fees within 15 The sum of the five fixed monthly fees may not rise more than 15.0
percent combined percent in a single year. Water is volumetric and is reported separately.
The cost index formula
Each fee's cost index is built from the same three components, weighted by the share each makes
up of the cost of that service in the most recently adopted budget:
Cost index = (personnel share x personnel escalator) + (purchased water share x
wholesale water escalator) + (remaining share x CPI)
The purchased water share is zero for every fee except water. The personnel escalator is the plan's
schedule at Section 5.2, derived each year from the labor agreements in effect, the PERS employer
rate schedule and the City's insurance renewals. CPI is CPI-U, West Region, all items.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 7
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document• November 2026
Fund Fees indexed Index used Weights First indexed
General Fund Public safety • parks General Fund cost index 72% personnel • Recreation Feb 20,
maintenance • 28% materials 2029; public safety
recreation and and parks Feb 20,
community center 2030
Street Fund Street utility fee Street operations index, Street personnel Feb 20, 2030
carried at 4.5% and materials
shares
Stormwater Fund Stormwater fee Stormwater operations Stormwater Feb 20, 2028
index, carried at 4.5% personnel and
materials shares
Water Fund Water rate Water cost index Purchased water Feb 20, 2030
• personnel •
materials
Building Fund — Not indexed under this Permit fees are —
I plan set under ORS
455.210 through
the building
permit fee study
1 Capital — No fee Parks SDCs at —
Improvement adopted rates
Fund
Each fee is first indexed on the first February 20 after its last scheduled step. Until then it moves
only by its planned step.
Example 1 — The General Fund cost index, year by year
The General Fund fees index to a single General Fund cost index. Each February bill uses the
escalator for the fiscal year in which that February falls.
February bill Personnel 72% x 28% x CPI Computed Cap Applied
(fiscal year) escalator personnel 3.00% index
Feb 2028 (FY 6.94% 5.00% 0.84% 5.84% 6.00% 5.84%
2027-28)
Feb 2029 (FY 6.55% 4.72% 0.84% 5.56% 6.00% 5.56%
2028-29)
Feb 2030 (FY 6.56% 4.72% 0,84% 5.56% 6.00% 5.56%
2029-30)
Feb 2031 (FY 6.01% 4.33% 0.84% 5.17% 6.00% 5.17%
2030-31)
For February 2028, written out: 0.72 x 6.94% = 4.997%; 0.28 x 3.00% = 0.840%; 4.997% + 0.840%
= 5.837%, which rounds to 5.84 percent. The lesser of 5.84 and 6.00 is 5.84, so 5.84 percent is the
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 8
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
rate applied. At the horizon the same arithmetic gives 0.72 x 5.85% + 0.84% = 5.05 percent.
Example 2 - The three General Fund fees, bill by bill
Fee Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031
Public safety (today $6.11 step $7.48 step $9.14 step $9.65 index $10.15 index
$5.00)
Parks maintenance $3.72 step $4.44 step $5.29 step $5.58 index $5.87 index
(today$3.50)
Recreation (today$3.50) $3.84 step $4.22 step $4.45 index $4.70 index $4.94 index
The index years, worked
Fee and bill Calculation New monthly rate
Recreation, Feb 20, 2029 $4.22 x 1.0556 = $4.4545 $4.45
Public safety, Feb 20, 2030 $9.14 x 1.0556 =$9.6485 $9.65
Parks maintenance, Feb 20, 2030 $5.29 x 1.0556 =$5.5843 $5.58
Recreation, Feb 20, 2030 $4.45 x 1.0556 =$4.6976 $4.70
Public safety, Feb 20, 2031 $9.65 x 1.0517 = $10.1486 $10.15
Parks maintenance, Feb 20, 2031 $5.58 x 1.0517 =$5.8683 $5.87
Recreation, Feb 20, 2031 $4.70 x 1.0517 =$4.9429 $4.94
Multipliers are shown to four places; each calculation uses the full computed index and the rate in effect on the
bill before.
What an index year raises
The billing register converts a rate change into revenue: each $1.00 of residential public safety fee
is worth about$112,600 a year across the tiered base, and each $1.00 of parks or recreation fee
about$92,000.
February 20, 2030 Increase Annual value FY 2029-30 (5 of 12 bills)
Public safety, $9.14 to$9.65 $0.51 $0.51 x $112,600 = $57,426 x 5/12 =$23,928
$57,426
Parks maintenance, $5.29 to$5.58 $0.29 $0.29 x $92,000 = $26,680 x 5/12 =$11,117
$26,680
Recreation, $4.45 to $4.70 $0.25 $0.25 x $92,000 = $23,000 x 5/12 = $9,583
$23,000
A February adjustment reaches five of the fiscal year's twelve billing cycles, so the first fiscal year
realizes five twelfths of the annual value and the next fiscal year realizes all of it.
Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 9
CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document• November 2026
Example 3 — Street Fund
The street fee takes three scheduled steps of 20 percent and is then indexed at the street
operations index, carried in the plan at 4.5 percent.
Bill How it is set Calculation New monthly rate
Today — — $7.00
Feb 20, 2027 Step, +20% $7.00 x 1.20 = $8.40 $8.40
Feb 20, 2028 Step, +20% $8.40 x 1.20 = $10.08 $10.08
Feb 20, 2029 Step, +20% $10.08 x 1.20 =$12.096 $12.10
Feb 20, 2030 Index, 4.5% $12.10 x 1.045 = $12.6445 $12.64
Feb 20, 2031 Index, 4.5% $12.64 x 1.045 =$13.2088 $13.21
4.5 percent is below the 6.0 percent cap, so the computed index governs. The steps are committed
to the pavement program by resolution, and the water franchise transfer— 3.0 percent of gross
retail water charges from July 1, 2027 — is an interfund payment that never appears on a
customer's bill.
Example 4 — Stormwater Fund
The stormwater fee takes one scheduled step and is indexed from the following February.
Bill How it is set Calculation New monthly rate
Today — — $7.50
Feb 20, 2027 Step, +12% $7.50 x 1.12 =$8.40 $8.40
Feb 20, 2028 Index, 4.5% $8.40 x 1.045 = $8.778 $8.78
Feb 20, 2029 Index, 4.5% $8.78 x 1.045 = $9.1751 $9.18
Feb 20, 2030 Index, 4.5% $9.18 x 1.045 = $9.5931 $9.59
Feb 20, 2031 Index, 4.5% $9.59 x 1.045 = $10.0216 $10.02
The step proceeds are committed to the stormwater master plan at$300,000 a year.
Example 5 — Water Fund
Water is billed by volume, so the index applies to the water rate and the bill moves with it. The
examples price the benchmark household at its average use of 1,076 cubic feet a month.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 10
CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
Bill How it is set Calculation Monthly water at
1,076 cf
Today In force since March — $44.13
2026
Feb 20, 2027 Planned increase, $44.13 x 1.20 =$52.956 $52.96
+20%
Feb 20, 2028 Planned increase, $52.96 x 1.18 =$62.4928 $62.49
+18%
Feb 20, 2029 No change Not yet at its first indexing date; no $62.49
increase planned
Feb 20, 2030 Index, capped at 6.0% $62.49 x 1.06 =$66.2394 $66.24
Feb 20, 2031 Index, capped at 6.0% $66.24 x 1.06 =$70.2144 $70.21
Why the cap applies to water every year
Water's cost is mostly water purchased from the Medford Water Commission, whose own
projection carries 11 percent a year after March 2028. The water cost index weights that wholesale
escalator by its share of water operating cost. With illustrative shares of 60 percent purchased
water, 25 percent personnel and 15 percent materials, the February 2030 index would be:
Component Share Escalator Contribution
Purchased water 60% 11.00% 6.60%
Personnel 25% 6.56% 1.64%
Materials (CPI) 15% 3.00% 0.45%
Computed water cost index 8.69%
Rate applied —the lesser of 8.69% and 6.00%
the 6.0% cap
The shares above illustrate the method; the December certification uses the shares in the adopted budget. The
result does not depend on them: even if every non-purchased dollar grew at CPI, the index would exceed 6.0
percent at any purchased-water share above 37.5 percent, because 0.375 x 11.00% + 0.625 x 3.00%= 6.00%.
Example 6 — The guardrails, with the arithmetic
The 6.0 percent cap
Suppose, for illustration, personnel cost escalated 8.50 percent in a year. The General Fund index
would compute as 0.72 x 8.50% + 0.28 x 3.00% = 6.12% + 0.84% = 6.96 percent. The cap governs
instead: public safety at $9.65 would move to $9.65 x 1.06 = $10.229, or $10.23, rather than $9.65
x 1.0696 = $10.32.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 11
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
No step and index in the same year
On the February 20, 2028 bill public safety takes its scheduled step from $6.11 to $7.48 and
receives no index. Without the rule the same bill would carry $7.48 x 1.0584 = $7.92.
The fifteen percent combined limit on the fixed fees
Bill Fixed fees before Limit(x 1.15) Planned fixed fees
Feb 20, 2027 $26.50 $26.50 x 1.15 =$30.475 $30.47
Feb 20, 2028 $30.47 $30.47 x 1.15 =$35.04 $35.00
Feb 20, 2029 $35.00 $35.00 x 1.15 = $40.25 $40.16
Feb 20, 2030 $40.16 $40.16 x 1.15 = $46.18 $42.16
Feb 20, 2031 $42.16 $42.16 x 1.15 = $48.48 $44.19
The ceiling governor
Suppose, for illustration, the Stormwater Fund's audited reserve balance stood at 8.3 months
and then 8.1 months in the two most recent audited years. Both exceed eight, so the stormwater
fee would receive no index that February and would remain at the rate in effect. The following year,
if either of the two most recent audited years is at or below eight months, indexing resumes. On the
plan's projection no indexed fund meets this condition anywhere in the decade, because the
additional revenue is committed to capital.
Summary — every fee, every February
Monthly Today Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031
Public safety $5.00 S$6.11 S$7.48 S$9.14 I $9.65 I $10.15
Parks maintenance $3.50 S $3.72 S$4.44 S$5.29 I $5.58 I $5.87
Recreation $3.50 S $3.84 S $4.22 I $4.45 I $4.70 I $4.94
Street utility $7.00 S$8.40 S$10.08 S$12.10 I $12.64 I $13.21
Stormwater $7.50 S $8.40 I $8.78 I $9.18 I $9.59 I $10.02
Fixed monthly fees $26.50 $30.47 $35.00 $40.16 $42.16 $44.19
Water at 1,076 cf $44.13 P $52.96 P $62.49 $62.49 C$66.24 C$70.21
Total including water $70.63 $83.43 $97.49 $102.65 $108.40 $114.40
s . scheduled step. I = cost index applied (General Fund 5.84%, 5.56%, 5.56%, 5.17%; street and stormwater
4.5%). P = planned water increase, approved annually. C=water cost index at the 6.0 percent cap. Each year's
rates are adopted by Council resolution the preceding winter; nothing in this table is adopted in advance.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 12
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
5. The Base Year and the Cost of Personnel
The plan's base year is rebuilt. Expenditures are set to the FY 2026-27 adopted budget and
revenues to FY 2025-26 actuals. The General Fund base year—$13.91 million of revenue and
$13.65 million of expenditure — reflects the best projections of City administration based on current
information, and is trued up on the June 30, 2027 year-end statements (Section 12). The corrections
below are carried throughout, including those that move the plan in a conservative direction.
Correction Effect
Expenditure bases moved to the FY 2025-26 actual spending was lower because of vacant positions. Water
adopted budget operations ran 9 percent under budget; stormwater operations 38 percent
under.
Materials and services Where actual spending exceeded the adopted budget—General Fund
corrected in both directions materials and services, by about$645,000—the higher actual figure is
carried.
Property and liability insurance The$366,000 premium line is carried on its own row escalating at 7.0 percent
separated rather than inside materials and services at CPI.
Personnel corrected for change See Section 5.1.
the budget does not reflect
Rate calendar consolidated Steps and indexing both land on the February 20 bill. A February adjustment
reaches 5 of the fiscal year's 12 billing cycles, so indexing realizes at five
twelfths.
State transportation funding Measure 120 failed May 19, 2026. No legislative increase is assumed in any
assumption removed scenario.
Opening balances set to June Street opens at its unrestricted carryover of$1,705,547; stormwater at its
30, 2026 actual position of negative $9,136.
Purchased water on the 26 percent March 2027, 26 percent March 2028 and 11 percent annually
Commission's projection thereafter, carried on its own line. The Medford Water Commission conducts a
rate analysis each fall and adopts for the following March, so each figure is
confirmed before the fiscal year in which it lands. The adopted budget
programmed 10 percent; the plan is deliberately more conservative.
Debt service on the actual The Washington Federal obligation amortizes out December 1, 2031; Banner
amortization Bank runs to December 1, 2036, a year beyond this horizon. Urban renewal
carries 37.21 percent of the Washington Federal obligation, about$338,000 a
year, through FY 2030-31.
Water franchise booked on both 3.0 percent of gross retail water charges from July 1, 2027, charged to the
sides Water Fund and credited to the Street Fund.
Overhead and internal service Unchanged since FY 2019-21. The plan counts a$400,000 annual
cost allocation recalibration.
Pavement standard stated as The$800,000 condition standard requires about$400,000 of new money; the
incremental balance is already embedded in operations. A further$100,000 a year is
directed at the deferred maintenance backlog.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 13
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
5.1 The base-year personnel correction
The adopted budget is the right base for a vacancy that gets filled. It is not the right base for a
position that has been permanently eliminated, and it needs adjusting where a benefit line is loaded
too thin for the salaries it has to carry. The plan corrects both.
The police benefit component
A supplemental budget increased the police salary appropriation for coverage without a matching
change to the benefit appropriation, against a benefit loading that was already thin.
Police personnel services Amount
Benefit loading carried in the appropriation 68.79% of salary
Benefit loading actually running 74.43% of salary
Gap 5.65 points
Applied to the full salary appropriation of$3,387,360 $191,386
Less overtime relief as staffing reaches full strength about($63,000)
CARRIED IN THE PLAN $128,232
The two halves are one event and are carried together. Filling vacant positions is what drives
overtime down and benefits up— an overtime hour carries no insurance premium and a filled
position carries a whole one. A mid-transition snapshot does not show it, because the salary
underrun is the vacancy itself, and it disappears when the vacancy is filled.
The range is $66,257 if overtime is eliminated entirely at full staffing and$191,386 if no overtime relief
materializes; the plan carries the midpoint on the judgement that overtime moderates at full strength. The band
is worth 0.9 months of General Fund reserve end to end. The FY 2027-29 budget is built at the corrected
loading.
Component Annual Ten years
Permanently eliminated positions removed from the adopted ($238,057) ($3,184,618)
base
2027-29 replacement staffing added $53,946 $624,387
Police benefit loading at full staffing $128,232 $1,715,429
Management compensation increment, General Fund share $52,748 $610,521
NET GENERAL FUND EFFECT ($3,131) ($234,282)
The correction nets to approximately zero, and both halves are read together.
The staffing restructure removes $184,111 a year of General Fund cost that no longer exists. The
management compensation analysis adds $180,980 a year that does —the police benefit loading
and the management compensation increment, the latter measured against the 6 percent
management increase the FY 2026-27 budget carries.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 14
CITY OF CENTRAL POINT,OREGON OFFICE OF THE CITY MANAGER Adoption Document • November 2026
Run without the correction altogether, the General Fund ends the decade at 5.57 months against
5.66 with it. The correction is worth making because it puts the right numbers in the right funds.
The other funds
Fund Annual net Ten years What it does
correction
Building ($48,159) ($665,430) Permanent reduction in the building program's cost of
service.
Street ($21,416) ($477,072) Relief to the fund where relief was intended to land.
Stormwater $25,297 $26,774 Two dedicated maintenance positions replace fractional
shares of senior technical staff.
Internal Services ($2,287) — Close to flat; not separately modeled. The FY 2027-29
overhead recalibration reflects the changed composition
of the pool.
5.2 The cost of personnel
Personnel is most of what the City spends, and how fast it grows governs every other figure in this
plan. Human Resources reports that half of all active employees sit below top step. Step
progression is therefore the share of payroll still climbing the scale multiplied by the step rate —at
50 percent, roughly two and a half points— and it falls as the current cohort tops out, then settles
at whatever separations recreate. A single rate cannot represent that, so the plan carries a
schedule.
Fiscal year 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36
Represented 50% 53% 40% 45% 28% 32% 36% 35% 31% 31%
below top
step
Management 100% 100% 90% 79% 59% 40% 24% 27% 30% 32%
below top
step
Escalation % 6.87 6.94 6.55 6.56 6.01 5.94 5.88 5.90 5.83 5.85
Ten-year geometric average 6.23 percent. The components:
Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 15
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 202.6
Component Rate Basis Contribution
Scale movement—represented, bargained to 3.75% 54% of payroll
scale July 1
Scale movement—management, CPI capped at 3.00% 36% of payroll
3.0%
Scale movement—seasonal, temporary and 3.00% 10%of payroll
overtime
Blended scale movement 3.405% 82.1% of 2.80%
compensation
Health and dental premium growth, as budgeted 10.00% 17.9% of 1.79%
compensation
PERS employer rate trajectory -1 pt/ biennium 57.4% 0.29%
FIXED FLOOR 4.87%
Step progression—varies by year, see the 0.96 to 2.07%
schedule above
Represented employees receive 5 percent steps annually on a six-increment ladder, with 6 percent annual
separations. Management receives 3 percent steps on the proposed ten-step scale from conversion on January
1, 2027, at an average placement of step 6, with 4 percent separations. Replacement hires enter at the bottom
of the ladder. The 10 percent of payroll in seasonal, temporary and overtime pay carries no step ladder.
The schedule reconciles four ways to the City's own records.
To fourteen years of experience. At 4 percent management separations on a ten-step ladder the
steady-state share below top is 36 percent, blending to 4.11 percent management salary growth.
The City's fourteen-year actual average is 4.0 percent, held down by exactly that topped-out
majority.
To the adopted budget. The FY 2026-27 budget carries a 6 percent management increase as its
worst case. The schedule gives 6.09 percent for management in year one. The two were built
independently.
To payroll. The management salary base of$3,308,320 implied by that placeholder reconciles
Human Resources' payroll split— 36 percent management, 54 percent represented, 10 percent
seasonal and overtime —to the dollar.
To the appropriation. The General Fund personnel line of$9,864,685 reconciles at a 71.75
percent citywide benefit loading against a police actual of 74.43 percent, which is where a blend
should sit.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 16
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
5.3 Assumptions set by judgement
Four inputs rest on judgement rather than measurement and were set by City administration on the
conservative side. The plan states what each is worth so that Council can weigh them together.
Assumption Carried at Sensitivity
Management placement average step 6 of Each step lower adds about 0.15 points to the schedule, or a
at conversion 10 fifth of a month of General Fund reserve. The distribution around
the average changes timing only, not the total.
Assessed value per new $250,000 Set low for a mix of single-family, townhome and multi-family
dwelling product. At$300,000 the property tax line is about 9 percent
higher over the decade.
Police benefit loading midpoint, Band of$66,257 to$191,386, worth 0.9 months end to end.
$128,232
Overtime relief at full assumed to The offset inside the benefit loading figure. Tested annually in
staffing moderate the rate report rather than assumed forward.
Each is set to the conservative side. Council may weigh any of them differently, and the direction of
the resulting change is stated above.
5.4 Reorganization savings
The plan carries the identified actions in the staffing restructure at Appendix C, priced on confirmed
wages and escalated on the personnel schedule, reflecting Council's direction that the Police
Department reduction be held to the equivalent of two positions rather than three.
General Fund, ten years
Identified actions (Appendix C) $8,667,528
Credited to the four non-General funds $1,376,280
The reorganization is a precondition of this plan. Because it is attrition-based it materializes as
positions turn over, and it is reported annually against its schedule. Without it the General Fund
ends the decade at 1.0 months. The plan assumes this becomes how the City manages attrition
rather than a one-time exercise.
The savings credited to Building, Water, Stormwater and Street—the Human Resources consolidation's share
and the arborist contract's Street share—do not move the General Fund reserve position, but they reduce cost
directly in four of the five funds in which rates are adjusted.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 17
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
6. The Scenario Ladder
Four scenarios, each adding one instrument to the one before it.
Scenario Rates Reorg. The question it answers GF at FY
2035-36
1—Baseline: no action None No The cost of not planning -5.3 months
2—Indexing only Cost indexing, no No How far the prudent default -2.9 months
steps gets
3—The package at the As recommended Yes What happens if growth does 4.9 months
current development pace not return
5—RECOMMENDED PLAN Scheduled, Yes The plan staff recommends 5.7 months
conditioned
What Scenario 3 says about growth, stated precisely.
Scenario 3 is the recommended package run at 22 dwelling units a year throughout rather than on
the 500-unit forecast for the urban growth boundary expansion, with the property tax line held on
the forecast. The gap between it and Scenario 5 — about 0.8 months at the horizon — is the
growth effect on the unit-driven lines alone; the full effect, including property tax, is stated below.
The plan does not require growth in order to remain solvent. Run with property tax held at the
current pace of taxable value added ($12.0 million a year) rather than the 500-unit forecast, and
with the growth trigger working as designed so that the five conditioned positions are not created,
the General Fund holds the six-month standard from FY 2028-29 through the horizon and ends
the decade at 6.1 months. The growth trigger is what produces that result, which is why the five
positions are conditioned on it rather than authorized outright. If development runs at the current
pace throughout, the next plan update is where that is addressed.
IThe growth trigger protects the General Fund whether or not growth arrives.
With growth, the conditioned positions are funded by the revenue that growth brings; without it, they
are not created. Council reads each future authorization against the revenue actually arriving,
which the annual rate report reports.
Scenario 4—growth restoration carried as a separate rung—is not separately reported, because its value is
visible as the gap between Scenarios 3 and 5. Three further scenarios were examined and set aside: rates
alone, which cannot close a personnel-driven gap with a single fee instrument; reorganization alone, necessary
but not sufficient; and a restructured fund architecture, set aside in favor of the City's current architecture.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 18
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
7. Fund Results
Reserves in months of operating expenditures under the Recommended Plan. The standard is six
months; the ceiling governor engages above eight.
Fiscal year 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36
General Fund 5.3 5.6 6.1 6.6 6.4 6.4 6.3 6.1 5.9 5.7
Water Fund 3.3 6.0 5.9 6.0 6.0 6.0 6.0 6.0 6.0 6.0
Street Fund 7.8 5.4 5.5 5.7 5.4 5.5 5.7 5.9 6.0 6.2
Stormwater 12.4 6.9 5.8 6.1 6.1 6.1 6.2 6.3 6.5 6.8
Fund
Building Fund 27.8 23.0 19.5 16.1 13.0 10.1 7.4 4.8 2.4 0.2
Ending fund balances, in thousands of dollars:
Fiscal year 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36
General Fund 6,080 6,698 7,675 8,728 9,252 9,708 10,086 10,371 10,556 10,623
Water Fund 1,511 2,966 3,687 4,079 4,424 4,769 5,132 5,519 5,934 6,381
Street Fund 1,947 1,783 1,897 2,086 2,141 2,277 2,460 2,664 2,892 3,142
Stormwater 824 734 653 672 701 740 790 852 927 1,017
Fund
Building Fund 1,135 992 895 789 676 556 431 298 159 13
Capital 573 519 500 500 500 500 500 500 500 500
Improvement
One month of General Fund expenditures is$1,137,500 in FY 2026-27, rising to$1,876,889 by FY 2035-36.
7.1 General Fund
The fund opens at 5.3 months, reaches the standard in FY 2028-29 at 6.13, peaks at 6.60 in FY
2029-30, and ends the decade at 5.66. It holds the six-month standard from FY 2028-29 through
FY 2033-34 and remains well below the eight-month ceiling throughout.
The correction is phased. The public safety fee moves $5.00 to $6.11 first billed February 20, 2027,
to $7.48 in 2028 and to $9.14 in 2029, reaching a 15.9 percent recovery of base-year police cost
against a 15 percent target. Parks reaches $5.29 over three steps ending February 20, 2029.
Recreation moves to $3.84 in 2027 and $4.22 in 2028. General Fund indexing then governs:
recreation from February 2029, and public safety and parks from February 2030, in each case the
first adjustment date after that fee's last scheduled step.
Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 19
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026
The base is conservative by design.
The plan is stated on a FY 2026-27 base of$13.91 million of revenue and $13.65 million of
expenditure —the best projections of City administration based on current information
(Section 12). On revenue $250,000 higher the fund holds the standard every year from FY
2028-29 and ends at 7.3 months. Four further assumptions are set conservatively at Section
5.3. The June 30, 2027 year-end statements true up the base, and the next plan update
carries the result forward.
The structural levers available to the next plan cycle —the overhead recalibration and continued
attrition management— are taken up in that update.
7.2 Water Fund
Water requires no new increase beyond the path the plan already carries— 20 percent in February
2027 and 18 percent in February 2028, each approved annually. It does require the annual
cost-of-service adjustment from the February 20, 2030 bill: with the planned increases ending in
February 2028 and wholesale cost rising 11 percent a year, the fund ends the decade at negative
3.65 months without it. On the Commission's projection the water cost index exceeds the 6.0
percent cap in every year, so the cap governs (Section 4.5, Example 5). Water is therefore an
Applicable Fee in the rate resolution. The 20 percent increase effective March 2026 is in force; the
plan carries 20 percent and 18 percent as the next two. Council has approved each water increase
annually and will continue to do so: the plan's water path is a projection, and each year's increase
is adopted by that year's rate resolution, on the February billing cycle so that a customer's entire
utility bill changes once per calendar year. The February date gains the fund about$92,000 in FY
2026-27 and $100,000 in FY 2027-28.
Any balance above the six-month standard is transferred to the Capital Reserve Fund.
The transfers total $3,618,309 over the decade and pass $3 million in FY 2035-36, on top of the
$9,376,459 replacement program kept in the Water Fund —total water capital $12,994,768.
The water franchise fee and the reservoir are the same decision viewed twice.
From July 1, 2027 the Water Fund pays 3.0 percent of gross retail water charges to the Street Fund
— $2,674,286 over the decade — in recognition of the street system's carriage of the water system
in the right-of-way. At 3 percent the fund reaches six months in FY 2027-28, holds it within $25,000
every year after, and banks $3.6 million in the reserve. Every point of franchise is roughly$891,000 of
water capital transferred to streets over the decade.
Cash funding of a reservoir is therefore not available at this rate path. A future reservoir is presently
expected to cost$12 to $15 million. The case for debt is strong on principle: a reservoir is a
fifty-to-eighty year asset, and cash-funding it charges today's ratepayers the full cost of
infrastructure that will serve two more generations of them. The costs are ordinary: interest,
issuance cost, coverage requirements that function as a rate floor, and a fixed charge carried
through a period when wholesale cost is also rising. Staff recommends Council direct a reservoir
cost estimate and a debt financing analysis before the FY 2027-29 budget. Should Council prefer a
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 20
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026
cash or partial-cash strategy, the franchise rate and the annual water rate are the two levers.
7.3 Street Fund
The Street Fund is self-supporting on operations and debt service. The plan adds the pavement
condition standard, which is the correct way to state the street requirement: it is the cost of the
maintenance program. The $800,000 standard is the annual investment required to hold the
pavement network at its current condition; roughly half is already embedded in operations, so the
incremental new money required is about$400,000 a year, raised to $500,000 to fund the backlog
increment.
The street steps are +20 percent in each of 2027, 2028 and 2029, and the water franchise is
why.
The water franchise and the street fee together fund the pavement program. Without the franchise
the fund would end the decade at negative 3.8 months. At a 5 percent franchise the Water Fund
would not hold its standard; at 3 percent with street steps of +15 percent neither fund would. Three
percent with +20 percent steps is the combination at which both funds work: Water holds six
months and banks $3.6 million in the reserve, Street runs 5.4 to 6.2 months and ends at its standard.
The third step is planned on the assumption that no state transportation funding increase
materializes. If the Legislature acts, the appropriate response is to moderate the step at the
December review— a state increase of roughly 25 percent would support reducing the third step to
about +10 percent. A fee step compounds on the fee base every year afterward while a one-time
gas tax uplift is a level shift, so the two are not interchangeable dollar for dollar. State-shared gas
tax is $1.59 million of the fund's $3.2 million of year-one revenue, which makes Street the fund
most dependent on state-shared revenue.
Debt service and the stormwater reallocation
Street carries 9.22 percent of the Washington Federal obligation, which amortizes out December 1,
2031, and 40 percent of Banner Bank, which runs to December 1, 2036. From FY 2029-30 Street
also assumes 80 percent of the Stormwater Fund's Banner Bank share —$584,009 over seven
years— on the basis that stormwater conveyance is predominantly located in the public
right-of-way, the collection system is integral to street drainage, and street surface runoff is the load
it carries. This reallocates an internal cost share and does not alter the City's obligation; the same
money is owed on the same dates. It takes Street's decade debt service to $3,184,615 and returns
the Stormwater Fund to its standard.
The deferred maintenance backlog
The City's street condition assessment identifies a deferred maintenance backlog of approximately
$1.5 million. The $800,000 standard holds the network at its current condition; recovering condition
already lost is a separate investment, and deferred cost compounds at reconstruction rates rather
than maintenance rates. The plan commits $100,000 a year—$1,036,850 over the decade —
specifically to backlog reduction.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 21
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026
Escalating at the construction cost index, a $1.5 million backlog would become $2.1 million by FY
2035-36 if nothing were done; the increment reduces it instead to about$930,000. A portion of the
recurring street capital program of$2,592,124 also retires backlogged segments through
reconstruction, and if roughly one third of that program is directed at deferred segments the backlog
is retired inside the plan period with no additional money. The annual rate report reports backlog
remaining alongside the pavement program so that the two are read together.
The condition assessment is periodic. If a re-assessment calls for a larger annual program, the third street step
and the December review are where that is accommodated.
7.4 Stormwater Fund
The corrected base sets stormwater operations at the adopted budget rather than at a year's actual
spending with vacancies, which ran 38 percent below it; the fund therefore requires a rate action it
was not previously shown to need.
The +12.0 percent step is planned and its proceeds committed to the master plan.
The corrected base removes $147,522 of eliminated positions and reallocates $73,238 of
Engineering Technician II time out of the fund, against$246,057 of new dedicated maintenance
staffing — a net increase of$25,297 a year. The master plan capital program rises from $250,000
to $300,000 a year, delivering $3,110,549 over the decade, and remains the lever to be moderated
at budget review in any year the fund runs below standard.
Two things carry the fund. A FEMA reimbursement of$540,000 -$450,000 received in August
2026 and $90,000 to follow— is a recovery of costs already expensed. And the reallocation of 80
percent of its Banner Bank debt share to Street from FY 2029-30 returns it to its standard. It holds
six months or within a rounding of it from FY 2029-30 and ends at 6.8.
7.5 Building Fund
The fund is dedicated under ORS 455.210 and stands on its own revenue. With permit fees
escalating at 6 percent, it remains positive through the horizon at current permit activity, ending FY
2035-36 at about$13,000, or 0.2 months.
The base-year correction, the fund's $17,923 share of the Human Resources consolidation and the
management compensation increment measured against the budget's actual placeholder together
keep the fund positive through the horizon. That is a real and material result, and it belongs to the
restructure package.
The building permit fee study should be commissioned this fall,
scoped against this base, for adoption with the FY 2027-29 budget. Large commercial building
permits change this fund's dynamics entirely, and a single major project can carry it for years—
which is a reason the study should set a fee structure rather than a fee level.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 22
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
7.6 Capital Improvement Fund
The fund opens FY 2026-27 at$970,025 and carries the adopted projects for the year— Don
Jones Park ($432,000) and the School District#6 land swap ($58,000) — ending the year at about
$573,000. Parks system development charges at adopted rates then sustain a program of
$150,000 in FY 2027-28 and about$100,000 to $127,000 a year thereafter—what the receipts
allow while the fund holds the $500,000 floor as directed. The decade program is about$1.56
million. As the City builds out, system development charges end, and a parks utility fee is the
successor instrument. That analysis is queued for the next plan iteration.
8. What Carries the Plan
Four conditions produce the General Fund result, alongside the rate instruments. All figures are
General Fund months of reserve at FY 2035-36, ordered by size.
Condition With it Without it Worth
Delivery of the attrition-based reorganization 5.7 1.0 4.7 months
The overhead recalibration ($400,000 a year) 5.7 3.5 2.2 months
The phased public safety correction 5.7 3.8 1.9 months
Growth on the UGB expansion 5.7 4.9 0.8 months
Cost-of-service indexing 5.7 4.9 0.8 months
The parks maintenance steps 5.7 5.0 0.6 months
The base-year personnel correction 5.66 5.57 0.1 months
The reorganization is the largest. Because it is attrition-based it materializes as positions turn over,
so delivery is a precondition of this plan, and it is reported annually against its schedule.
8.1 Personnel escalation — the governing assumption
The schedule at Section 5.2 is the plan's central case. Its ten-year average is 6.23 percent against
a historical and index-based path of 4.5 percent and recent experience near 10. Two features of it
concern the management compensation proposal, and both are set out here so that Council can
consider them together.
The management step-scale conversion
The proposal converts the Management Compensation Plan from merit placement within a range to
a fixed ten-step scale at 3 percent intervals, with the scale itself moving up to 3 percent on CPI.
Every manager has steps ahead of them at conversion, so management salary growth runs 6.09
percent in the first year and decays to 4.0 percent by FY 2035-36.
Measured against the merit system as administered — 4.0 percent a year over fourteen years —
the conversion is worth about 0.9 months of General Fund reserve at the horizon, all of it in the
transition. At steady state it reproduces the historical rate. It is not a structurally more expensive
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 23
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026
system; it is the same system with its discretion removed and its first years front-loaded.
The 3 percent scale movement remains discretionary under the proposal, and each year it is
withheld reduces personnel escalation by about 0.89 points— more than any single fee step in this
plan is worth. That is a meaningful lever and it is recognised as one.
Scale movement and compression at the top
The represented scale is bargained at 3.75 percent; the management scale is capped at 3.0
percent on CPI. A topped-out represented Grade 9 at$107,100 and a management Grade I top of
scale at$107,856 are $756 apart today. On those two rates the represented position passes
management in year two and is $9,815 ahead by year ten.
This is the same dynamic Section 4.1 identifies in CPI-indexed fees — a cost that grows at
personnel rates, indexed to a general price index, loses ground every year—applied to the City's
own management group. Scale parity at 3.75 percent would resolve it at a cost of about one month
of General Fund reserve. The step interval is not the driver.
Staff recommends that the compression study and the step-scale conversion be decided together,
with the scale differential on the table, and that the next plan update test the schedule against the
adopted structure.
9. The Recommended Rate Package
Instrument Today Scheduled steps Destination Indexed to
Public safety $5.00 $6.11 -. $7.48 - $9.14 15%of base-year cost police cost(GF index)
(2027-29) (15.9%achieved)
Parks $3.50 $3.72 -. $4.44 -. $5.29 35% of base-year cost parks maintenance
maintenance (2027-29) cost(GF index)
Recreation/ $3.50 $3.84 -. $4.22 (2027-28); 55% of base-year cost recreation and center
community first indexed February 20, incl. program revenue cost(GF index)
center 2029
Street $7.00 $8.40 -. $10.08 -. $12.10 +20.0% each year street operations
(2027-29) (4.5%)
Stormwater $7.50 $8.40 (2027) +12.0% stormwater
operations (4.5%)
Water franchise none 3.0% of gross retail from Water Fund to Street —
7/1/2027 Fund
FIXED $26.50 $30.47 in 2027 +15.0%
MONTHLY
FEES (water
shown
separately)
Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 24
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document• November 2026
One rate change per calendar year, and after February 2029 no further scheduled step is proposed
in this plan. Public safety, parks and the street fee complete their steps in February 2029;
recreation completes its two steps in February 2028 and stormwater its one in February 2027.
Every rate applied under the index is the lesser of the computed cost index and 6.0 percent; for the
General Fund fees the computed index governs on the schedule, and for water the cap governs
every year. In a year an instrument steps, it takes the step and not the index.
Every year's rates are adopted by Council, one year at a time.
The path below is the plan; it is not adopted in advance. By the first regular Council meeting in
December the Finance Director files the annual rate report and certification at Section 10.3—the
computed cost index, the 6.0 percent cap, the ceiling governor and the no-stacking rule for each
fee, and the resulting limit; and each winter Council adopts the coming February's rates by
resolution, with notice and a hearing. The resolution adopts the planned step for that year, or a rate
not exceeding the certified limit, and states the reason for any departure from the path.
The rate ladder in full
Monthly fee Today Feb 20 Feb 20 Feb 20 Feb 20 Feb 20
2027 2028 2029 2030 2031
Public safety $5.00 $6.11 $7.48 $9.14 $9.65 $10.15
Parks maintenance $3.50 $3.72 $4.44 $5.29 $5.58 $5.87
Recreation/community $3.50 $3.84 $4.22 $4.45 $4.70 $4.94
center
Street utility $7.00 $8.40 $10.08 $12.10 $12.64 $13.21
Stormwater $7.50 $8.40 $8.78 $9.18 $9.59 $10.02
FIXED MONTHLY FEES $26.50 $30.47 $35.00 $40.16 $42.16 $44.19
Annual change in the combined fixed bill: +15.0%, +14.9%, +14.7%, +5.0%, +4.8%. Every year is inside the
fifteen percent combined-bill limit. Read against the single small instrument, each public safety step is about
+22 percent, each recreation step about+10 percent, and the parks steps +6.3, +19.4 and +19.1 percent.
Each indexed rate is the rate in effect on the prior bill multiplied by one plus the applied index, rounded to the
precision of the rate schedule (Section 4.5).
Water at the benchmark bill
Water is billed by volume and cannot be expressed as a flat monthly charge. The figures below
price the household used in the regional cost-of-services comparison at its average use —twelve
monthly readings on an actual Central Point residential account, October 2025 through September
2026, averaging 1,076 cubic feet on a 5/8-inch to 3/4-inch meter— at today's rates, which already
include the 20 percent increase that took effect in March 2026.
Who certifies. Wherever this plan assigns a certification, audit or reporting duty to the Finance
Director, that duty may be performed by the City Manager, the Finance Director, the Assistant City
Manager, or a designee of the City Manager.
Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 25
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026
Water at 1,076 cf Today Feb 20 Feb 20 Feb 20 Feb 20 Feb 20
2027 2028 2029 2030 2031
Water—planned path, then $44.13 $52.96 $62.49 $62.49 $66.24 $70.21
indexed
TOTAL INCLUDING WATER $70.63 $83.43 $97.49 $102.65 $108.40 $114.40
The all-in bill is reported alongside the fixed fees.
The fixed fees are inside the fifteen percent limit in every year. The all-in bill rises 18.1 percent in
February 2027 and 16.9 percent in February 2028, because the planned water increases land on
the same bills, and then 5.3 to 5.6 percent a year.
Water rises $18.36 by February 2028 against$8.50 for all five fixed fees combined — about 68
percent of what this household will experience over the next two years, driven by the wholesale
cost the City pays the Medford Water Commission. Council approves each year's water increase in
that year's rate resolution, and the February billing date is part of that action.
10. Triggers and Annual Reporting
10.1 Downside trigger
The trigger tests variance from the schedule, not an absolute level. If actual personnel escalation
exceeds the rate scheduled for that year at Section 5.2 by more than 0.75 points, or taxable value
added falls more than 20 percent below the figure scheduled for that year at Section 10.2, in either
case for two consecutive years, a public safety fee review is automatic at the next budget cycle.
Timing is the point: a variance identified early requires a materially smaller correction than the
same variance identified two years later.
10.2 Growth
The City's urban growth boundary expansion — all residential; urban renewal is commercial and is
not affected — becomes available for annexation in 2027, and Planning forecasts about 500
dwelling units across the plan. The plan carries that ramp at $250,000 of assessed value per new
dwelling on a$1.65 billion roll growing 3 percent under Measure 50.
Fiscal year 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36
Dwelling units 22 30 40 50 58 60 60 60 60 60
Taxable value 12.0 14.0 16.5 19.0 21.0 21.5 21.5 21.5 21.5 21.5
added, $M
Property tax — 3.85% 3.96% 4.07% 4.13% 4.11% 4.07% 4.03% 3.99% 3.95%
growth
The property tax line is derived from those three inputs. The$12.0 million baseline backs out of the City's own
receipts: FY 2023-25 at$13,765,000 against FY 2025-27 projected at$14,810,000 is 3.73 percent a year, of
which 3 percent is Measure 50 growth on existing value and 0.73 percent is new construction.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 26
1
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026
The upside trigger is commercial-inclusive.
It measures taxable value added, commercial square footage permitted and transient lodging tax
receipts, with dwelling units retained as a service-demand indicator rather than a revenue test. A
dwelling-unit test misses commercial development entirely: a year with 22 homes and four
commercial projects can exceed a 38-home year on revenue while failing a unit count. The utility
account growth index is capped at its 38-unit level, because multi-family product adds units without
adding accounts one for one.
10.3 Annual rate report and certification
One document, filed by the first regular Council meeting in December and certified by the Finance
Director, reporting: each fee's cost index with the calculation shown in the form of Section 4.5, the
resulting limit, and the proposed February rate; the combined fixed-fee change against the 15
percent limit; each fee's recovery ratio against its target on the coming year's budgeted cost, with
the base-year figure noted; personnel escalation and taxable value added against the schedules
at Sections 5.2 and 10.2; every fund's reserve against the six-month standard, its restricted and
unrestricted split, and the ceiling test; the amount appropriated to each committed program against
its committed level, pavement backlog remaining, the Reserve Fund contribution and the Capital
Reserve Fund transfer; and delivery of the reorganization against its schedule.
10.4 The annual rate resolution
The rate report is the record on which each year's rates rest, and Council receives it before acting.
In December or January Council adopts the coming February's rates—the five fixed fees and the
water rate — by resolution, with notice and a public hearing. The report is filed with the City
Recorder and referenced by date in the billing record, so that the authority for any given year's rate
can be produced on request. Every figure in it can be reproduced from the adopted budget, the
bargaining agreements, the PERS rate schedule, the wholesale water rate and the published CPI.
One year at a time, and never above the formula.
Council has directed that rates be adopted annually rather than several years at once. Each year's
resolution adopts the planned step for that year, or a rate not exceeding the prior rate increased by
the lesser of the certified cost index and 6.0 percent, and states the reason for any departure from
the plan's path. The ordinance holds the guardrails—the formula, the cap, the ceiling governor,
the no-stacking rule and the certification — beyond a future resolution's reach; the resolution sets
the rate. If no resolution is adopted for a year, the rates in effect continue.
The index is computed on the coming year's budget, not on the past.
Each year's certified cost index is computed from the budgeted revenues and expenditures for the
upcoming fiscal year—the year in which the adjusted rates will be in effect— and the certification
answers one question: how do budgeted revenues and expenditures compare with what this plan
projected for that year? The first year is the exception: the February 2027 rates are the plan's
scheduled steps on the FY 2026-27 base (Section 12), trued up on the June 30, 2027 financial
statements before the first index is certified for the February 2028 bill.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 27
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
11. Recommendation
Staff recommends that the City Council adopt the Long Term Financial Plan for FY 2026-27
through FY 2035-36 as presented, and:
1. Adopt a reserve standard of six months of operating expenditures for the General, Water,
Street and Stormwater Funds, with the eight-month ceiling governor, and identify the Reserve
Fund as the City's contingency instrument for future capital maintenance requirements, with
contributions of$200,000 in each fiscal year from FY 2027-28 committed by resolution.
2. Adopt the personnel escalation schedule at Section 5.2 as the plan's central case, and direct
that it be re-derived from a payroll step count at each plan update rather than carried forward
as a rate.
3. Adopt cost-of-service indexing: each dedicated fee indexed annually to the cost of the service it
funds, capped at 6.0 percent per year, with the rate applied in any year being the lesser of the
computed cost index and 6.0 percent—the rates for each Adjustment Date adopted annually
by Council resolution, with notice and hearing, on the certified computation and the annual
rate report.
4. Adopt the cost recovery levels at Section 4.4, calibrated on FY 2026-27 base-year cost and
measured on the fees as billed — police 15 percent (15.9 achieved at$9.14), parks 35 percent
(36.5 achieved at$5.29), recreation and community center 55 percent (57.4 achieved at
$4.22) — recognizing that restoration accounts for the first 10.8 points of the police level and
the balance is a policy choice.
5. Adopt as the plan's planned rate path, to be enacted one year at a time by annual rate
resolution on a single annual date —the February 20 bill —the public safety fee $5.00 to
$6.11 in 2027, $7.48 in 2028 and $9.14 in 2029; the parks maintenance fee $3.50 to $3.72,
$4.44 and $5.29 across 2027 through 2029; the recreation fee $3.50 to $3.84 in 2027 and
$4.22 in 2028, first indexed February 20, 2029; the street utility fee +20.0 percent in each of
2027, 2028 and 2029, the third step moderable at the December review should a state
transportation funding increase materialize; the stormwater fee +12.0 percent in 2027; and the
water rate adjusted under the index from February 20, 2030, at the lesser of the water cost
index and 6.0 percent, with the water increases projected at 20 percent in 2027 and 18
percent in 2028 to be approved annually on the February billing cycle.
6. Establish a water franchise fee of 3.0 percent of gross retail water charges effective July 1,
2027, paid by the Water Fund to the Street Fund.
7. Commit the additional revenue raised by the street and stormwater steps to capital rather than
to fund balance — a pavement program of about$900,000 a year, being the $800,000
condition standard plus a$100,000 increment directed at the deferred maintenance backlog,
and the stormwater master plan at$300,000 a year—and commit General Fund headroom to
technology materials and services at$150,000 a year; direct that each be moderated at budget
review in any year its fund runs below the six-month standard.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 28
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
8. Reallocate 80 percent of the Stormwater Fund's share of the Banner Bank obligation to the
Street Fund from FY 2029-30, and carry both obligations on their actual amortization.
9. Direct the overhead and internal service cost allocation recalibration, counted in the plan at
$400,000 a year.
10. Recognize delivery of the attrition-based reorganization as a precondition of the plan, with
annual reporting against its schedule.
11. Direct that the management step-scale conversion and the compression study be brought to
Council together, with the differential between the represented and management scale
movements identified and priced, and the average placement at conversion confirmed against
the assumption at Section 5.3.
12. Authorize five positions —three General Fund, one Water, one Street—conditioned on the
growth trigger rather than authorized outright.
13. Adopt the commercial-inclusive growth trigger and the schedule-variance downside trigger at
Section 10.
14. Commission the building permit fee study this fall, scoped against the corrected Building Fund
base at Section 7.5, for adoption with the FY 2027-29 budget.
15. Direct staff to return with a reservoir cost estimate and a debt financing analysis, including the
rate impact of coverage requirements, before the FY 2027-29 budget.
16. Require the annual rate report and certification at Section 10.3, filed each December and
received before Council adopts the annual rate resolution, and with each biennial budget a
staff report reconciling the proposed budget to this plan (resolution Section 9A).
Sixteen items. Two—items 5 and 6—are rate actions; the other fourteen are policy, direction or reporting.
12. Verification and the Base Year
Every figure in this plan is drawn from the model of record,
CP_LTFP_2026_2036_Model_Rev34.xlsx. The plan's verification register— nineteen items —was
worked with Finance, Human Resources, Planning, Police and Public Works and closed on
September 4, 2026: fourteen items on data those departments supplied, two on assumptions
recorded at Section 5.3, and three by supersession.
The model's Street, Stormwater and Building expenditure bases tie to the FY 2026-27 adopted
budget, and the opening balance of every fund is set to the June 30, 2026 actuals: General Fund
$5,820,093, Water $786,892, Stormwater -$10,679, Building $1,321,838. The FEMA
reimbursement is $540,000 —$450,000 received in August 2026 and $90,000 to follow — and the
Medford Water Commission wholesale schedule and the water rate path are confirmed as the plan
carries them. FY 2026-27 is a full year at the rates in force since March 2026, and the fee lines are
set from the billing register.
Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 29
CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026
The General Fund base year is City administration's best projection based on current
information.
The FY 2026-27 General Fund base is carried at $13.91 million of revenue and $13.65 million of
expenditure. The fee lines stay on the billing register, the tax, license and charges lines are scaled
to the revenue figure, every expenditure line is scaled to the expenditure figure, and later years
grow from that first year on the model's own escalators. Every General Fund result in this document
is stated on that base. The June 30, 2027 year-end financial statements —the first full year at
current rates—true up the base, and the annual rate report reports the result.
Three sources of additional strength are not counted in the plan: the lodging tax, expected to grow
substantially as hotel development arrives; franchise fees, levied on utilities' gross receipts that are
rising faster than the 6 percent the model carries; and the Urban Renewal Agency, whose frozen
base is already in the property tax projection and which will carry a growing share of administrative
staff cost as the district matures. On a revenue base $250,000 higher the fund holds the standard
every year from FY 2028-29 and ends the decade at 7.3 months.
This plan is not a legal opinion and is prepared by staff who are not attorneys.
Office of the City Manager
Office of the Assistant City Manager
Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 30
CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
Appendix A — Assumptions at a Glance
Every number that drives the ten-year plan. Model Rev 34 • FY 2026-27 General Fund base year
$13.91M revenue /$13.65M expenditure, City administration's best projection on current
information.
Escalation and policy
Driver Rate Note
Personnel schedule 6.87% in FY 2026-27 to 5.85% Fixed floor 4.87%; the balance is step
in FY 2035-36; avg 6.23% progression
Materials and services (CPI) 3.0% ENR 3.5%for capital and SDCs
Street/stormwater operations 4.5% Also the street and stormwater index
Property and liability insurance 7.0% Own line
Franchise revenue growth 6.0% Observed 6.8-8.9%
GF cost index annual Peaks 5.84%; does not reach the 6.0%cap
Water index (from Feb 2030) 6.0% cap governs Water cost index on 11%/yr wholesale
exceeds the cap
Reserve standard 6 months GF, Water, Street and Stormwater Funds
Ceiling governor 8 months Two consecutive audited years suspends
indexing
The escalation schedule
Input Represented Management
Positions 58 FTE 22 FTE
Scale movement 3.75%bargained ≤3.0%on CPI
Ladder 6 increments at 5% 10 steps at 3%
Separations 6% 4%
Below top step, 7/1/26 50% 100%; avg step 6
Payroll weight 54% 36%+ 10% no ladder
Validated four ways: 14-year management actual 4.0%vs 4.11% steady state; the budget's 6% placeholder vs
6.09%; HR's payroll split reconciled to the dollar; the GF appropriation at a 71.75% loading. Base year: FY
2026-27 General Fund at$13.91M revenue/$13.65M expenditure, City administration's best projection on
current information, trued up on the June 30, 2027 year-end statements; other funds at the adopted budget
and FY 2025-26 actuals. No state transportation increase assumed. Debt on the actual amortization.
Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 31
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
The base-year personnel correction — General Fund
Component Annual Ten years
Eliminated positions removed (238,057) (3,184,618)
Replacement staffing added 53,946 624,387
Police benefit loading 128,232 1,715,429
Mgmt comp increment(GF share, at the 6% placeholder) 52,748 610,521
NET (3,131) (234,282)
The correction nets to approximately zero and both halves are read together. The restructure removes
$184,111 a year of cost that no longer exists; the compensation analysis adds$180,980 that does.
Other funds Base correction Reorg. share
Building (48,159)/yr 17,924/yr
Street (21,416)/yr 35,682-72,372/yr
Stormwater 25,297/yr 17,924/yr
Water — 17,924/yr
Internal Services (2,287)/yr not modeled
Reorganization — General Fund, ten years
Item Amount
Identified actions, on the schedule 8,667,528
Credited to the four other funds 1,376,280
Delivery is a precondition of the plan. Attrition-based, so it materializes as positions turn over; reported annually
against schedule.
Growth
Year Units Year Units
FY 2026-27 22 FY 2030-31 58
FY 2027-28 30 and after 60
FY 2028-29 40 Plan total 500
FY 2029-30 50 AV per dwelling $250,000
UGB expansion, residential, annexable 2027. Property tax derived from units on a$1.65B roll at 3%under
Measure 50; current taxable value added$12.0M.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 32
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026
Water — the most consequential inputs
Input Assumption
Water rate path 20% (Mar 2026, in force); 20% and 18% planned, each approved annually
Timing Every increase on the February 20 bill, adopted the preceding winter
MWC wholesale 26% Mar 2027, 26% Mar 2028, 11%/yr— MWC's own projection
Indexing From the Feb 20, 2030 bill at the lesser of the water cost index and 6.0%; the
cap governs. Without it the fund ends at-3.65 months
Franchise to Street 3.0%of gross retail from 7/1/2027—$2,674,286 decade
Surplus above six months To the Capital Reserve Fund (water)—$3,618,309
System replacement $9,376,459; total water capital$12,994,768
Reservoir $12-15M; debt financing analysis recommended
Committed uses
Program Was Now Decade
Technology M&S (GF) - $150,000 $1,523,866
Pavement—total program $800,000 -$900,000
backlog increment — $100,000 $1,036,850
Stormwater master plan $250,000 $300,000 $3,110,549
Reserve Fund $200,000 $200,000 a year from FY $1,800,000
2027-28
Pavement backlog $1.5M —retired inside the plan if about a third of recurring capital is reconstruction.
Stormwater's Banner Bank share 80% reallocated to Street from FY 2029-30.
What carries the General Fund
Condition With Without
Attrition-based reorganization 5.7 1.0
Overhead recalibration ($400,000/yr) 5.7 3.5
Public safety correction 5.7 3.8
Growth on the UGB expansion 5.7 4.9
Cost-of-service indexing 5.7 4.9
Parks steps 5.7 5.0
FEMA$540,000-$450,000 received August 2026, $90,000 to follow. On General Fund revenue$250,000
above the base year the fund ends at 7.3 months. Building remains positive through the decade; the permit fee
study sets its long-term fee structure. Rates are adopted one year at a time by annual resolution.
Wholesale update(November 2026): since the model closed,the Medford Water Commission has adopted wholesale increases
of 24.3 percent for 2027 and 14.7 percent for 2028, both below the 26 percent the plan carries. The plan's water projection is
therefore conservative;the difference is reported in the first annual rate report. No change to the planned retail path is proposed.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 33
CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
Appendix B — The Rate Package
One rate change a year— every fee, every date, water included. Model Rev 34.
Monthly fee Today Feb 20, Feb 20, Feb 20, Feb 20, Feb 20,
2027 2028 2029 2030 2031
Public safety $5.00 $6.11 $7.48 $9.14 $9.65 $10.15
Parks maintenance $3.50 $3.72 $4.44 $5.29 $5.58 $5.87
Recreation/community $3.50 $3.84 $4.22 $4.45 $4.70 $4.94
center
Street utility $7.00 $8.40 $10.08 $12.10 $12.64 $13.21
Stormwater $7.50 $8.40 $8.78 $9.18 $9.59 $10.02
FIXED MONTHLY FEES $26.50 $30.47 $35.00 $40.16 $42.16 $44.19
Water at 1,076 cf—billed by $44.13 $52.96 $62.49 $62.49 $66.24 $70.21
volume
TOTAL INCLUDING WATER $70.63 $83.43 $97.49 $102.65 $108.40 $114.40
Change in the fixed monthly — +15.0% +14.9% +14.7% +5.0% +4.8%
bill
Every cell shows the actual rate on that date. In a year an instrument steps, it takes the step and not the index.
Each year's rates—every fee, water included—are adopted by Council resolution the preceding winter, with
notice and a hearing, on the annual rate report; nothing in this table is adopted in advance. The 3.0%water
franchise (Water Fund to Street Fund, from 7/1/2027) is not a customer charge and does not appear on the bill.
All dates are billing dates; the cycle runs the 21st to the 20th. Recreation takes two steps ($3.84, $4.22) and is
first indexed on the February 20, 2029 bill.
About the water line
Water is billed by volume, so it is not a flat monthly fee. These figures are the average of twelve
monthly readings on an actual residential account (Oct 2025 - Sep 2026), 1,076 cubic feet a
month, at today's rates, which include the 20% adopted for March 2026.
The plan projects water increases of 20 percent for February 2027 and 18 percent for February
2028 to cover wholesale cost; Council has approved each water increase annually and will
continue to, on the February billing cycle. From February 20, 2030 water is adjusted under the
index at the lesser of the water cost index and the 6.0 percent cap; on the Commission's wholesale
projection the cap governs. Without that adjustment the Water Fund ends the decade at negative
3.65 months.
Water rises $18.36 by February 2028 against$8.50 for all five fixed fees combined — about 68% of
what a household experiences, driven by the wholesale cost the City pays the Medford Water
Commission and approved year by year.
Wholesale update (November 2026): since the model closed, the Medford Water Commission has adopted wholesale
increases of 24.3 percent for 2027 and 14.7 percent for 2028, both below the 26 percent the plan carries. The plan's
water projection is therefore conservative; the difference is reported in the first annual rate report. No change to the
planned retail path is proposed.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 34
CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document• November 2026
What the steps deliver
Service Recovery now At the planned fee Fee Steps
Police/public safety 8.7% 15.9% (target 15%) $9.14 three
Parks maintenance 24.1% 36.5% $5.29 three
Recreation and community center 51.1% 57.4% $4.22 two
Recovery is measured on the fees as billed: public safety is tiered (four commercial tiers), so$9.14 residential-
equivalent recovers 15.9%of base-year police cost, and each $1.00 of residential fee is worth about$112,600
a year. Because cost grows while the correction is phased, the fee recovers about 13.9%of contemporaneous
police cost when the last step lands; the annual rate report reports both figures. On the base year the fees land
above target and recede toward 15/35/55 as cost grows. The General Fund reaches six months in FY
2028-29 and ends at 5.7.
Where the street and stormwater money goes: pavement$800K-.-$900K a year against a$1.5M
backlog; stormwater master plan $250K-$300K; technology $150K from General Fund headroom;
Reserve Fund $200K a year from FY 2027-28. Each is moderated at budget review in any year its
fund runs below standard.
Three points that frame the package
• Part of the public safety correction is a restoration. The fee was established to achieve
$1.4M per biennium — 10.8% of police cost. Restoring it to that basis is target restoration; the
increment from 10.8% to 15% is a policy choice, and it is what carries the General Fund to the
standard.
• One date, one change. Consolidating onto one February date does not change the cumulative
bill — it changes when a customer sees it, once a year rather than twice. On the all-in bill that is
+18.1% in February 2027 and +16.9% in February 2028, driven by the planned water increases;
the five fixed fees stay within the 15% limit every year.
• Council adopts every year's rates, one year at a time. Each December the rate report is
filed and certified; each winter Council adopts the coming February's rates by resolution
with a hearing. The formula and the 6.0% cap set the
limit; Council sets the rate.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 35
CITY OF CENTRAL POINT, OREGON • OFFICE OF THE CITY MANAGER Adoption Document November 2026
The staffing restructure in brief
The cost side of the same plan, informational here. The Police Department change is made
administratively; the others return to Council through the FY 2027-29 budget process, two by
Council resolution. The full memorandum is Appendix C; the position map is Appendix D.
-10 +3 -7
Positions eliminated January 2026— Positions created, all of them at entry Net reduction in the size of the
June 2029 level organization
5 0 -2
Positions carried in the plan from FY Of them authorized outright—all five Where the organization stands even at
2030-31 are conditioned full restoration
How the ten positions leave
Route Positions What it means
Retirement or departure already 8 The position is not refilled. The work is absorbed,
occurred or known reorganized, or purchased under contract.
Service change 2 Police service delivery is modified to produce these
savings, as agreed by the City Manager and Police
Chief. The only staff reductions in the package.
The Council chose fewer staff reductions over more savings
Council held the Police Department reduction to the equivalent of two positions rather than three,
forgoing roughly $1.1 million of savings across the decade; the plan still reaches its reserve
standard. The City Manager and Police Chief have administrative discretion over the change.
What it saves
Fund FY 2027-28 FY 2028-29 2027-29
biennium
General Fund—police, parks, recreation, $470,361 $785,221 $1,255,582
administration
Building, Water, Stormwater, Street and Internal $92,688 $145,949 $238,637
Services
All funds $563,049 $931,170 $1,494,219
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 36
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
About $8.7 million to the General Fund over ten years
The financial plan counts these savings, and counts on them. They are what keeps the General
Fund at its standard — not what allows anything new. Without the staffing changes the General
Fund ends the decade at 1.0 months of reserve rather than near six.
General Fund, ten years
Identified actions, escalated on the schedule $8,667,528
Credited to the four other funds $1,376,280
t
What residents will notice
This is the same service from a smaller, more capable staff— and in a few places service reduces.
Area What changes
Police Department service The clearest reduction in the package. Service delivery changes are set by
delivery agreement between the City Manager and the Police Chief, who will report the
detail to Council. f
Urban forestry Tree work becomes a contracted service. Response is scheduled rather than
immediate.
Building permit support The Building program loses half a support position.
Planning and mapping Shared across two functions. Turnaround will lengthen.
support
Park planning Absorbed by existing staff who are compensated for it. Complex projects lean
more on consultants.
Safety program Moves from a dedicated manager back to Public Works and Police within
existing staff hours.
Stormwater field maintenance Increases—two dedicated maintenance positions replace fractional shares of
senior staff.
Where a function reduces, Council and residents hear it from us directly.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 37
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 202.6
Attachment B — Policy resolution
The policy resolution adopted with this plan is Resolution No. , Attachment 1 to the November
19, 2026 staff report, on file with the City Recorder. It is not reproduced here, so that the plan
record carries one text of the resolution — the one Council adopts. Exhibit A to the resolution is
this document.
The resolution adopts this plan as the City's long term financial plan of record and establishes, as
Council policy: the six-month reserve standard for the General, Water, Street and Stormwater
Funds and the eight-month ceiling threshold; the cost recovery targets; the planned rate path at
Section 9 and Appendix B, enacted one year at a time by annual resolution; the Capital Reserve
Fund and the System Development Charge Fund; the pavement, stormwater, technology and
Reserve Fund commitments; the water franchise and Banner Bank debt allocation; the downside
and growth triggers; the annual rate report and the biennial budget reconciliation; and the certifying
officer. Adoption of the plan adopts no fee, rate or staffing action; each returns to the Council
through its own process.
The rate ordinance (Attachment A — Ordinance No. , adding Chapter 3.42, Fee and Rate
Indexing, to the Municipal Code and amending Chapters 3.25, 3.26, 3.27, 11.16, 11.20 and 13.04)
carries the indexing machinery —the cost index, the 6.0 percent cap, the ceiling governor, the no-
stacking rule and the annual certification — and comes to Council for first reading the same
evening; it also directs the City Manager to present an update of the plan within three years
(Section 3.42.100). Each year's rates are set by the annual rate resolution (Attachment C) with
notice and a public hearing.
Adoption Document• November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 38
CITY OF CENTRAL POINT,OREGON • OFFICE OF THE CITY MANAGER Adoption Document • November 2026
The calendar
The calendar is built back from the first adjusted bill on February 20, 2027.
When Action Instrument
September 2026 Council study session. The plan, the staffing restructure and the —
rate package are presented together. Informational; no action is
taken.
November 19, 2026 Council adopts the plan and the financial policies; first reading Resolution;
of the rate ordinance the same evening Attachment A
December 2026 First rate report and certification filed and received Plan §10.3
December 10, 2026 Second reading and adoption; effective January 9, 2027. Attachment A
January 2027 Rate resolution adopted with notice and hearing; billing system Attachment C
configured; customer notice
January 21, 2027 Volumetric water rate applies to service from this date —
February 20, 2027 First bill carrying every adjusted rate —
Fall 2026, separately Building permit fee study commissioned—its own ORS -
455.210 notice and hearing track, not part of this package
Two instruments, each with its own job
The ordinance carries the machinery—the formula, the 6.0 percent cap, the ceiling governor, the
no-stacking rule and the annual certification — so that the guardrails are harder to remove than
the rates are to adjust; it also directs the City Manager to present an update of the plan within
three years. The policy resolution adopted tonight carries the planned rate path and the policy
settings. Each year's annual rate resolution sets the rate.
Office of the City Manager • 140 South Third Street, Central Point, Oregon 97502 • (541) 664-3321 • Figures
are planning-level and drawn from CP_LTFP_2026_2036_Model_Rev34.xlsx. Not a legal opinion; staff are not
attorneys.
Adoption Document•November 2026 • Planning-level figures • Not a legal opinion;staff are not attorneys Page 39