Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ordinances 398
-IMPROVEMENT ORDINANCE'm ASSESSMENTS Nature of Improvement: concrete sidewalks Location: resterly side of North Third Street From: anzan i to Street To: Hazel Street ORDINANCE NO. 3 7S AN OR INANCE declaring the assessent on property benefited for the cost of constructing concrete sidewalks on the `esterly side of North Third Street from Manzanita Street to Hazel Street in the City of Central J?oint, Oregon; and directing the Recorder to enter a statement thereof in the locket of City Liens and publish a notice thereof. THE PEOPLE OF THE CITY OF CENTRAL POINT IA CHAIN AS FOLLOWS: Section 1. WHEREAS, the City Council did heretofore by Ordinance declare its intention to construct concrete sidewalks on the `. esterlyT siue of North Third Street from Manzanita Street to Hazel Street in the City of Central Point, Oregon; and to Pasess the cost thereof upon each lot or part thereof adjacent to and benefited by such improvement its proporti :nate share of the cost of said concrete sidewalks, and did fix the time and place for hearing protests against the construction of said concrete sidewalks, and the assessment of the cost thereof, as aforesaid, and WHEREAS, said. Ordinance was duly posted and published as required by the Charter of the City, and WHEREAS, a meeting of the Council was held at the time and place fixed in said Ordinance for the purpose of considering any such protests, but no protests were at such time, or at any time, made to, or received by the Council to the construction of said con- crete sidewalks, or the assessing of the cost thereof, as aforesaid, and said Council has considered the matter and deeming that said construction of said concrete sidewalks was and is of material benefit to said City, and that all the property to be assessed therefor will be benefited thereby to the extent of the probable amount of the respective assessments to be levied against saiu property, ail order the construction of said concrete sidewalks, and WHEREAS, the cost of said concrete sidewalks hes been and hereby is determined to be the sum of C2,5©2.55, NO , THaa l FORE, it is hereby determined that the proportion- ate share of the cost of construction of s ..:a concrete sidewalks, on each parcel of property adjacent to said improvement and benefited thereby is the amount set opposite the description of each piece or parcel of land below, and that each piece or parcel of land is benefited by the construction of said concrete sidewalks, to the full extent of the amount so set opposite such piece or parcel and that the respective amount represent the proportional benefits of said concrete sidewalks to said respective parcels of property, end the Council does -t- hereby aeclare each of the p .reels of property described below, and each of the same is hereby assessed the amount set opposite each respective description, for the cost of the construction of concrete sidewalks. That the following is a szmmary of assessment for con- struction of concrete s_ ewals on the vresterly side of North Third Street from Manzariits_ Street to Hazel Street, In the City of Central Point, Oregon: Contractor - 1,925.75 Survey, engineering and legal - 384.73 Advertising an,.i printing - 121.39 Intere t on Warrants - 25.68 Less City of Central Point share - 252.35 Base Material - i5.00 Total Assessments 2,250.20 Assessment for the construction of concrete sidewalks on the esterly slue of North Third Street from Manzanita Street to Hazel Street on the following described parcels of real property in the City of Central Point, Jackson County, Oregon, to-wit: Assessment No. 1 Cnarles R, Cummins and Jennie Irene Cummins North Half of Block 74, Original Town site of Central Point, Jackson County, Oregon, fronting 140' : Amount of Assessment 275.10 Assessment No. 2 H. Dressler easterly 55 feet of the South Half of Block 74, Original Town Site of Central Point, Jackson County, 0re ;on, to-wit: Amount of Assessment ti'. 275.10 Assessment No. 3 Ruby Colgan Lot 1, Block 63, Original Town site of Central Point, Jackson County, Oregon: Amount of assessment ti 275.10 Assessment No. 4 Wallace A. Mc-o °aell and Alva S. Mc .ow ell Lot 8, blocs-; 63, Original Town site of Central Point, Jackson County, Oregon: Amount of Assessment 309.60 Assessment No. 5 Arthur C. Hunter and chyloe B. Hunter Lot 1, block 59, Original Town site, of Central roint, Jackson County, Oregon: Amount of Assessment 275.10 -3- Assessment No. 6 Minnie A. Colman Lot 8, Block 59, 0ririnal Town site of Central Point, Jackson County, Oregon: �� Amount of Agsessr 21,ment 5.10 Assessment No. 7 Mildred Frank North Half, Lot 1, Block 5, Original '_'own site of Central Point, Jackson Count,", Oregon: Amount of Assessment 137.55 Assessment No. 8 _Loyd C. Everenden South Half, Lot 1, Block 5, Original To site of Central Point, Jackson County, Oregon: Amount of Assessment 152.45 Assessment No. 9 iiaymonu E. Britton any Nora A. Britton Lot id, Block 5, Original Town site of Central Point, Jackson County, Oregon: Amount of Assessment 275.10 Section 2: The riecoruer of the City of Central Point is hereby directed to enter a statement of said several assessments in the Docket of City Liens of said City, said assessments are hereby declared due and payable, and the owners of property herein assessed a re required to pay said assessments to the -ecorder within ten (10) days after notice of such assessments is published. Section 3 : The tecorder is hereby directed to serve notice of the foregoing assessments by publishing this Ordinance once in the Central Point American on the 13th day of January, 1955. Passed by the City Council and signed by me in open session in authentication of its passage this 3rd day of January, 1955. Mayor ATTLST: Recorder Approved by me this 3rd ,,ay of January, 1955. Mayor