Please accept this letter as a formal Task Release Request to authorize Northwest Hydraulic Consultants,
Inc. (NHC) to begin work on the Twin Creeks CLOMR Review for the City of Central Point, Oregon. Work will
be performed under the existing General Services Agreement established in February 2007, between NHC
and the City. Project tasks and budget are summarized in the attached scope of work and cost estimate,
respectively. In addition we are providing the City with a copy of our current certificate of commercial general
liability insurance, and updated billing rates.
Two signed copies of this Task Release Request are being provided. Once signed by the City, we ask that
you please return a copy for our records. Thank you for the opportunity to work for you again.
Rega rd7~
Peter Brooks, P.E.
Staff Engineer
City of Central Point
By:
~~~ ~~~~
Authorized Signatory
Printed Name:
11'b.-H- ~~nm~~"oYP.
Title:
~a~r ~.~itbliCWoYk51~YeC~c~'
Date:
~a/~q ICI 1
Northwest Hydraulic Consultants, Inc.
By:
,~ ~~~
Authorized Signatory
Printed Name:
Title:
~~r-~c.~,p Pri.
Date:
67~ `lr to ~ 11
l
City of Central Point, Oregon
Twin Creeks CLOMR Review
Scope of Work
Northwest Hydraulic Consultants, Inc. (NHC) has been asked by the City of Central Point
(City) to provide the following scope of work and cost estimate to conduct an independent
technical review of a Conditional Letter of Map Revision (CLOMR) submittal package. The
CLOMR submittal package was prepared by Public Works Management, Inc. (PWM) to
document proposed changes to the effective FEMA 100-year floodplain and regulatory
floodway within the Twin Creeks Development. Future development of the site requires that
a CLOMR submittal be accepted by FEMA.
NHC will complete the following tasks as part of the independent technical review.
Technical Review
NHC will perform a cursory review of the hydraulic modeling analysis, revised floodplain
mapping, and documentation from the PWM CLOMR submittal package, as provided by the
City. Review of the hydraulic model will include evaluation of specified boundary conditions,
backwater profile computations, and encroachment analysis. Mapping will be reviewed to
assess consistency with hydraulic modeling, as well as merging with effective FEMA
mappirig.
Memorandum
NHC will prepare a brief memorandum that summarizes the findings of the technical review,
identify any existing inadequacies found in the existing CLOMR submittal package, and if
needed, provide suggestions for improving the data submittal.
Schedule
To be mutually agreed upon by the City and NHC.
nhc -- Northwest Hydraulic Consultants Inc.
16300 Christensen Road, Suite 350
Seattle, WA 98188-3418
Tel. (206)241-6000
Fax (206)439-2420
Fee Schedule
Prepared for: City of Central Point, Oregon
Project: Twin Creek CLOMR Review
Date: 12/13/11
Project #: -
Prepared By: Peter Brooks .
TASK DESCRIPTION
Princ.
Sr Eng. to ours
Eng.
Jr. Eng.
Tech. Adm. /Clerical
Totals
Technical Review 1 16 $fi69
Memorandum 1 8 $369
General Protect Mana ement 1 1 $65
Total hlours antl Direct Labor Cost (DL) ~~ ~ ,....._._. ~~~~-~-...~......
Direcl Labor Rate ($Rrr)
Overhead (OH) 199.0%
Fixed Fee = 28 % (DL)
TOTAL LABOR COST 20
68.57 0.0
51.92 25.0
37.50 0.0
3173 0.0 1.0
25.00 27.64 $1,102
$1,102
$2,19a
5309
$3,604
Direct Expense Detail
Cost Summary
Total Labor $3,604
Total Direct Expenses $0
TOTAL COST $3,604