Loading...
HomeMy WebLinkAboutCouncil Resolutions 1829 Docusign Envelope ID:9DB2B323-3F5B-4F14-A774-D87A13A9OEBB RESOLUTION NO. GZQI A RESOLUTION APPROVING A PROFESSIONAL SERVICES AGREEMENT FOR THE NORTH 10TH STREET IMPROVEMENTS PROJECT AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT WITH RH2 ENGINEERING,INC. RECITALS: A. WHEREAS,the City of Central Point intends to improve the section of North 10th Street between Hazel Street and Lathrop Drive to enhance pedestrian safety, ADA compliance, stormwater management, and overall connectivity; B. WHEREAS,the City conducted a Qualifications-Based Selection(QBS)process in accordance with public procurement requirements and received proposals from RH2 Engineering, Inc. and ZCS Engineering&Architecture; C. WHEREAS, RH2 Engineering, Inc. received the highest score in the QBS evaluation and was selected as the most qualified firm to perform the design services; D. WHEREAS,the City and RH2 Engineering, Inc. have agreed to a Professional Services Agreement in an amount not to exceed $221,871 for the design, coordination, and bid preparation for the North 10th Street Improvements Project. THE CITY OF CENTRAL POINT RESOLVES AS FOLLOWS: Section 1. The City Council hereby approves the Professional Services Agreement with RH2 Engineering, Inc. for the North 10th Street Improvements Project. Section 2. The City Manager is authorized to execute the agreement and any related documents necessary to carry out the intent of this resolution. Section 3. This Resolution shall take effect immediately upon passage and approval. Passed by the Council and signed by me in authentication of its passage this ( 2_ day of , 2025. Signed by LDu u, rowtn,itA.� Gn I Cui,kw I 084 t 0... Mayor Taneea W. Browning ATSI : rigs .l. lit r~W,scLwa,A,atUe 7C33C9g5CACC435... City Recorder 1 -Resolution No. t Zc1 (Council Meeting 6/12/2025)