City of Central Point
Development Commission
Agenda
Thursday, August 25, 2011
6:00 P.M.
Central Point
Council Chambers
140 S. 3rd Street
Central Point, Oregon
Meeting time, date, or location mad be subject to change. Please contact the Cite Recorder at
541-423-1026 for additional information.
I. MEETING CALLED TO ORDER- 6:00 p.m.
II. ROLL CALL
III. APPROVAL OF MINUTES
A. July 28, 2011 Minutes
IV. BUSINESS
A. No Business.
V. DISCUSSION ITEMS
A. Final Draft Boundaries
B. Maximum Indebtedness and Financial Feasibility Overview (Sections 1100 - 1200)
C. Public Meeting and Study Session Scheduling to Discuss Urban Renewal Draft Plans
VI. ADJOURNEMENT
CITY OF CENTRAL POINT
Development Commission Minutes
July 28, 2011
I. REGULAR MEETING CALLED TO ORDER
Chair, Mayor Hank Williams called the meeting to order at 6:00 p.m.
II. ROLL CALL: Chair: Mayor Hank Williams
Commission Members: Allen Broderick, Bruce Dingler,
Carol Fischer, Kay Harrison, and Matthew Stephenson
were present. Kelly Geiger was excused.
City Manager Phil Messina; Community Development
Director Tom Humphrey; Parks and Public Works Director
Matt Samitore; Assistant City Manager Chris Clayton;
Planning Manager Don Burt; and City Recorder Deanna
Casey were also present.
III. APPROVAL OF MINUTES
A. Approval of Development Commission Minutes from June 23, 2011.
Kay Harrison made a motion to approve the minutes as presented. Carol
Fischer seconded. Roll call: Allen Broderick, yes, Bruce Dingler, yes; Carol
Fischer, yes; Kay Harrison, yes; Hank Williams, yes; and Ellie George, yes.
Motion approved.
IV. BUSINESS -None
V. DISCUSSION ITEMS
A. June 23, 2011 Meeting Questions
Planning Manager Don Burt explained that there were concerns from the
Commission regarding the phrase "small town feel". They will be replacing that
phrase with "maintaining a highly livable community,". The Commission was
more comfortable with the new wording.
B. Draft Urban Renewal District Boundaries
Mr. Burt presented the proposed boundaries for the plan. There was discussion
regarding the boundary line. Would it include property on both sides of a street or
just one side. If the line goes down Oak Street, the property within the boundary
would be included to the middle of the right of way. If the property on the
opposite side also needs improvement then the line would follow the property line
instead of a street line. These are draft maps and can be changed until the plan
is adopted. By law the boundary maps cannot be more than 25% of the total area
within the City limits. The proposed maps give the city options to create another
district in the future.
City of Central Point
City Council Minutes
July 28, 2011
Page 2
C. Section 800, Projects and Activities
Mr. Burt explained the proposed projects and activities that the City should
concentrate on. When thinking about projects to be included we should always
keep in mind the elimination of blight and items to stabilize the community. The
projects should be structured with a return on investment in mind. We need to
consider what the city will receive when a project is complete, does it fit into the
goals and objectives of the district.
We should consider who the partners are for each project and what the benefit is
to them. If the partners will see a profit from the project what will their contribution
be? At this time the Commission can add projects to the plan, and/or direct staff
to do more research on specified projects. If they are not happy with one of the
proposed projects, it can be removed later (prior to adoption of the plan). We
want to make sure that the wording for each project does not limit the
commission on adding or subtracting the scope of the project in the future.
a. Parks: Projects to be included in this area would be the construction
of a community center including a gym and senior center. Park
enhancements for Pfaff Park would include new restrooms, new
playground equipment, landscaping and the improvement of the utilities at
the park.
b. Transportation: Transportation projects would include new
signalization on Pine Street in the downtown area, bicycle lane and
sidewalk improvements in the older parts of town. Additional projects
would be the Hwy 99 RR-Xing, and parking for the downtown core area.
The transportation element would change some streets to collectors in
order to handle increased traffic.
c. Beautification: Beautification projects are being planned in phases for
Hwy 99, Pine Street, gateways and underground utilities for the
downtown core area.
d. Infrastructure: Infrastructure projects being considered are fire flow
improvements for several portions of the city, extending storm drains and
replacing inlets and laterals in the core area of the city that are
deteriorating.
e. Economic: the Commission may establish incentive programs to
encourage commercial and residential development within the urban
renewal area.
All of these projects and activities will promote a pleasant and safe downtown
environment that is pedestrian friendly.
City of Central Point
City Council Minutes
July 28, 2011
Page 3
There was discussion regarding the time line for completion. The August meeting
will be to talk about financing projections and expenditures. At the August
meeting discussion will include the date and time for a meeting to allow public
input on the urban renewals, goals, policies, projects and project costs, and
boundary as currently proposed. The Commission would like to have another
meeting prior to the public hearing to be as informed as they can be.
VI. ADJOURNMENT
Kay Harrison moved to adjourn, Ellie George seconded, all said "aye" and the
Meeting was adjourned at 6:56 p.m.
Dated:
Chair Mayor Hank Williams
ATTEST:
City Recorder
Ket urn I o Hgenda
City of Central Paint, t~r~c~n
14o So.Third 5t., Central Point,t7r 975Q2
541.664.3321 Fax 541.664.6384
www.ci.central-point.or.us
MEMORANDUM
DISCUSSION ITEMS
August 18, 2011 Agenda
` ~}
To: Central Point Deg elopment Commission
Chris Clay-ton, Assistant City- Administrator
From: Don Burt, Punning Mlnlger
Subject: Cite of Central Point Urban Renee a1 Plan
Date: August 25, 2011
Planning apartment
Tim i-~Um~nrey, aic~
Community Deveiopmen )hector/
nistrator
DISCUSSION ITEM 1-URBAN RENEWAL BOUNDARY. Since our last discussion, Ind.
based on the financial feasibilit<- calculations, the boundary, has mo~-ed ~~-esterl~, to includepart of
the T~~-in Creeks commercial area near the proposed T~~-in Creeks RR-Xing, and has eliminated the
High School property .The inclusion of the T~~ in Creeps area (cross-hitched area on map) ~~ as
based on those properties benefiting from the urban rene~~-a1 rr-wing project. If the rr-wing is not
impro~ ed the propel-ties ~~ i11 hay e limited, if and , deg elopment potential due to traffic limitations.
The High School propel-t~ ~~ 1s remo~ ed to reduce/off-set the urban rene~~ 11 district's lcrelge
percentage. Attached is a map of the modified boundary, .The percentage distributions (acreage and
Assessed. Value) Ire 18.2% Ind 13.1% respecti~ eh . A maximum of 25% is allo~~ ed b~ la~~ .
As part of the boundary, consideration it should be noted that not all of the H~~~-. 99 and railroad
right-of-~~ a~ are ~~ ithin the Cite limits. To a~ old confusion in the future it is recommended. that the
Cit<- initiate annexation of the appropriate rights-of-~~-a~-.
Before leap ing this discussion item it is appropriate that there be a general consensus to more
fore-ard using the latest boundaries.
DISCUSSION ITEM 2 -MAXIMUM INDEBTEDNESS AND FINANCIAL FEASIBILITY.
As ~~-e discussed at the last meeting the estimated total project cost for the urban rene~~-a1 program,
measured in today-'s dollars, is appro~imatel~, $56,000,000'. Urban Renewal's share is
approsimateh $45,000,000, ~~ ith other organizations responsible for the balance, i.e. SDC fees,
grant s de~-eloper participation, etc. These amounts are based on 2011 dollars. It is estimated that b~-
At the July meeting the Economic hlcentiye Project was unfunaea ana has now been funaea to the extent of
$6,000,000 per Table 1.
Page 1 of 5
the end of the program the cost to complete the projects ~~-i11 be $60,000,000 ~-s. the original
$45,000,000. The $60,000,000 is ~~-hat ~~-i11 be used as the maximum indebtedness.
Based on past construction acti~-it<- and assessed ~-alue increases a projection ~~-as prepared for to
FY2037-38 of the urban rene~~ a1 programs incremental assessed. ~ aloe. An o~ ei~ ie~~ of the
methodology used. for the assessed. ~ aloe projections ~~i11 be presented at the meeting. Based. on the
assessed ~-alue projections it appears that the urban rene~~-a1 program ~~-i11 generate an estimated
$68,000,000 measured in fiittire ~-aloe. Gig-en a mazinnun indebtedness of $60,000,000
(expenditures) and $68,000,000 (rep enue) the urban rene~~ a1 program's appeals to be financialh
feasible (re~-enue exceeds expenditures).
Attached. to this memo are draft Sections 1100 and 1200 addressing the financial limitations of the
urban rene~~-a1 plan.
Table 1
SECTION 800 PROJECTS AND ESTIMATED COSTS
CENTRAL POINT URBAN RENEWAL AGENCY
1 Downtown Core Area Streetscape Improvements $ 7,197,511 $ 719,751 $ 6,477,760
2 Pine Stree Improvements, east of 10th St. $ 5,564,984 $ 2,225,994 $ 3,338,991
3 Neighborhood Sidewalk, Street Lighting, and Alleys $ 2,121,071 $ 848,428 $ 1,272,643
4 Hwy. 99 Corridorlmprovements $ 1,939,104 $ 775,642 $ 1,163,462
5 Intersection Signalization $ 5,104,818 $ 2,552,409 $ 2,552,409
6 Off-Street Parking Facilities $ 555,617 $ 222,247 $ 333,370
7 Underground Existing Pole Mounted Utility Systems $ 4,000,000 $ - $ 4,000,000
8 Gebard Rd. Extension $ 2,500,000 $ 500,000 $ 2,000,000
9 Pfaff Park Renovation $ 206,464 $ 103,232 $ 103,232
10 Freeman Road Upgrade to Collector Street Standards $ 1,474,271 $ 442,281 $ 1,031,990
11 Penninger Road Southern Extension $ 11,741,423 $ 2,348,285 $ 9,393,138
12 Miscellaneous Public Works $ 2,234,648 $ 670,394 $ 1,564,253
13 Community Center $ 4,305,303 $ 3,228,978 $ 1,076,326
14 South Hamrick Road Extension $ 1,333,481 $ 400,044 $ 933,437
15 Economic Development Incentives Programs $ 6,000,000 $ 600,000 $ 5,400,000
Administration (10%) $ 4,064,101
DISCUSSION ITEM 3 -STUDY SESSION AND PUBLIC MEETING SCHEDULING. At
the last meeting the Commission indicated an interest in ha~-ing a stud- session ~~%ith the Planning
Commission to discussion the projects, maximum indebtedness, and financial feasibilit<-. If it is the
Commission's intent to hay e such a study session, it should. be scheduled. for t~~ o hours minimum.
With regard. to a general public meeting (not a hearing) it is probabh best to schedule such a
meeting late September (after school starts) or later in October. The purpose of the public meeting
is to open discussion to the public, introduce urban rene~~-al's purpose, and gather support,
concerns, objections.
Page 2 of 5
Ket urn t o 5t at t Kepor t
Central Paint
Urban Renewal Boundary
tcpnkiVeparrnelnPLnNNINGGG uap PFbI~~tUroar RereUanaorrrJartfWYnf89UtlM6r1Hg16Gt661A61rfJahf'nrg anrr
Ket urn t o Hgenda
P1ge 3 of
In accordance ~~%ith ORS 457.190(3)(a) the maximum amount of indebtedness that mad- be incurred
throughout the remaining duration of this Plan, commencing ~~%ith fiscal ~, ear 2012-13 through fiscal
~ e1r 2037-2038, sh111 not exceed $60,000,000. The Bo1rd of the Urban Renee 11 Agency m1~
borro~~- money- and accept ad~-ances, grants and and- other legal form of financial assistance from the
federal go~-ernment, State, Cit<-, County-, or other public body-, or from and- legal source, public or
prig 1te, for purposes of undertlking Ind. c1n~ ing out this P11n, or m1~ othei7~ ise obtlin financing
as authorized b~- ORS Chapter 457.
1101. SELF LIQUIDATION OF COSTS OF URBAN RENEWAL
INDEBTEDNESS (TAY INCREMENT FINANCING)."
The projects mad- be financed, in ~~-hole or in part, b~- self-liquidation of the costs of urban
rene~~ 11 1cti~ ities 1s prop ided in ORS 457.420 through 457.460. The 1d ~ 1lorem uses,
le~-ied b~- a taring body- upon the taxable real and personal property- situated in the Urban
Renee-al Area, shall be di~-ided as pro~-ided in ORS 457.440. That portion of the tales
representing the lei ~ 1glinst the increlse, in the lssessed ~ 11ue of propei~t~ loclted in the
urban rene~~-a1 areas, or part thereof, o~-er the assessed ~-alue specified in the certificate filed
under ORS 457.430, shall, after collection b~- the tax collector, be paid into a special fund
of the Commission of Directors of the Urban Renee 11 Agency Ind. sh111 be used. to p1~ the
principal and interest on and- indebtedness incurred b~- the Commission to finance or
refinance this Plan and and- projects or acti~-ities authorized and undertaken pursuant to the
prop isions of this P11n.
The tax increment financing process, pursuant to ORS 457.420 through 457.460, shall be
terminated no later than Fiscal Year 2037-38. Ho~~~e~-er, the tax increment collection
process m1~ be terminated prior to Fisc11 Ye1r 2037-38 should. debts of the Agency be
retired earlier.
B1sed on the most lccurlte estimltes of Commission costs Ind. income ~~hich Ire possible
to make during the preparation of this Plan, the tax increment process commencing in
Fiscal Year 2012-13 mad- be terminated in Fiscal Year 2037-38, follo~~~ing h~~ent~--fire (25)
~ elrs of t1s increment collection of $60,000,000 ~~hich represents the misimum lmount of
indebtedness of this Plan as appro~-ed b~- the Cit<- Council in Ordinance No. sss on ssss
ss,ssss.
Should the terminal sear of tax increment proceeds collection be greater than the amount of
debt to be retired, the surplus amount of such tax increment proceeds shall be prorated
back to the affected taxing bodies as required by ORS 457.450(3 ).
1102. PRIOR INDEBTEDNESS
And- indebtedness permitted b~- la~~- and incurred b~- the Commission, or the Cit<- of Central
Point in connection ~~ ith prepllnning for this Urban Renee 11 P11n m1~ be replid from
Commission finds ~~hen Ind. if such funds Ire 1~ 1i11b1e.
P1ge 4 of 5
1103. ANNUAL BUDGET
The Agency- shall adopt and use a fiscal sear ending June 30 accounting period. Each sear,
b~ July 1, the Commission sh111 ldopt 1 budget in conformince ~~ ith the prop isions of ORS
294 and ORS 457.460 ~~-hich shall describe its source of re~-enue, proposed expenditures
Ind 1cti~ ities.
The Agency- shall submit its proposed budget to the Urban Renee-al Agency-'s Budget
Committee for its rep ie~~ Ind lppro~ 11 Ind. the Commission sh111 not undertlke 1n~
1cti~ ities nor expend. 1n~ funds except 1s prop ided in the lppro~ ed budget.
~.
1201. REQUIRED FINANCIAL STATEMENT
ORS Section 457.460 required. thlt the Commission, b~ J1nu1i-~ 31 of etch ~ e1r, prepare 1
statement containing:
1. The lmount of money 1ctu11h recei~ ed during the preceding fiscal ~ e1r under
subsection (4) of ORS 457.420 to 457.460 and from indebtedness incurred under
ORS 457.420 to 457.460;
b. The purpose Ind lmounts for ~~hich 1n~ money recei~ ed under 457.420 to 457.460
and from indebtedness incurred under ORS 457.420 to 457.460 ~~-ere expanded
during the preceding fiscal sear;
c. An estimate of monies to be recei~-ed during the current fiscal sear under ORS
457.420 to 457.460 Ind. from indebtedness incurred under ORS 457.420 to
457.460;
d. A budget setting forth the purposes and estimated amounts for ~~-hich the monies
~~hich h1~e been or ~~i11 be recei~ ed under ORS 457.420 to 457.460 Ind. from
indebtedness incurred under ORS 457.420 to 457.460 Ire to be expended. during
the current fiscal ~, ear; and
e. An anal~,sis of the impact, if and-, of carry-ing out the urban rene~~-a1 plan on the tax
collections for the preceding ~ e1r for 111 tlxing bodies included under ORS
457.430.
£ If the August 1 deadline to meet the pro~-isions of ORS Section 457.460 is changed
b~- the legislature, the Agency- ~~-i11 conform to the ne~~- date to prepare the required
statement.
Ket urn t o 5~ at t Kepor t
Ket urn t o Hgenda
P1ge 5 of 5