Loading...
HomeMy WebLinkAboutRevised Oct. 3, 2023 Planning Commission Packet PLANNING COMMISSION October 3, 2023 – 6:00:PM Email planning@centralpointoregon.gov to request a Zoom link for virtual participation I. MEETING CALLED TO ORDER II. PLEDGE OF ALLEGIANCE III. ROLL CALL IV. CORRESPONDENCE V. MINUTES Review and approval of Planning Commission meeting minutes. 1. Planning Commission - Regular Meeting - Sep 5, 2023 6:00 PM VI. PUBLIC APPEARANCES VII. BUSINESS A. Urgent Care Medical Office Site Plan and Architectural Review(Presented by Gindlesperger) VIII. DISCUSSION IX. ADMINISTRATIVE REVIEWS X. MISCELLANEOUS XI. ADJOURNMENT Individuals needing special accommodations such as sign language, foreign language interpreters or equipment for the hearing impaired must request such services at least 72 hours prior to the Planning Commission meeting. To make your request, please contact the City Recorder at 541-423-1015 (voice), or by e-mail at: Rachel.neuenschwander@centralpointoregon.gov. Si necesita traductor en español o servicios de discapacidades (ADA) para asistir a una junta publica de la ciudad por favor llame con 72 horas de anticipación al 541-664-3321 ext. 201. 5.1 Packet Pg. 2 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) 5.1 Packet Pg. 3 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) 5.1 Packet Pg. 4 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) 5.1 Packet Pg. 5 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) 5.1 Packet Pg. 6 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) 5.1 Packet Pg. 7 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) 5.1 Packet Pg. 8 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) 5.1 Packet Pg. 9 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) 5.1 Packet Pg. 10 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) 5.1 Packet Pg. 11 Mi n u t e s A c c e p t a n c e : M i n u t e s o f S e p 5 , 2 0 2 3 6 : 0 0 P M ( M I N U T E S ) Staff Report Urgent Care Medical Office Site Plan and Architectural Review 1731 October 3, 2023 Consideration of a proposed 3,200 square foot medical office building and site improvements that include constructing a new public street to provide access to the site. The 3.19 acre site is located at 4404 Biddle Road and is identified on the Jackson County Assessor’s map as 37S 2W 01C, Tax Lot 701. Applicant/Agent: 814 Services, LLC (Daniel Harris) Associated Files: PAR-23001 Staff Source Justin Gindlesperger, Community Planner III Background On September 5, 2023, the Planning Commission opened a public hearing to consider a Site Plan and Architectural Review application to construct and operate an urgent care medical facility at 4404 Biddle Road near the intersection of Biddle and Table Rock Road. At that time, public comments and testimony were received expressing concerns about traffic impacts and neighborhood livability due to construction of a new local street that would provide connectivity between Biddle Road and Orchardview Drive and Ridgeway Avenue. Fire District #3 staff spoke in favor of the application due to the need for additional emergency egress routes from the adjoining residential neighborhood. After hearing the staff report and public testimony on the application, the Planning Commission voted unanimously to continue the public hearing to the October 3, 2023 meeting as needed for staff to evaluate potential options to address neighborhood concerns in balance with emergency egress and transportation planning needs. Staff has started working through the issues in partnership with the Fire District #3, the Central Point Police and Public Works Departments. However, additional time is needed to complete the review. The Applicant has requested a 42-day extension to the 120-day timeline as needed to allow staff additional time to complete the professional review of this application. Consequently, staff is recommending the public hearing be continued to the November 7, 2023 Planning Commission meeting. There is a tentative partition plan (PAR-23001) application being reviewed concurrently to divide the property into two (2) separate parcels and construct a Local Street along the west and north property boundaries. Proposed Parcel 1 is approximately 0.6 acres on the west side of the property and is the location for the proposed development (“Project Site”). Proposed Parcel 2 is 2.59 acres and is developed with an existing residence. At this time, there are no plans to develop Parcel 2. The purpose of the Site Plan and Architectural Review application is to assure the proposed site and building design are consistent with the land use and development standards for the City in accordance with CPMC 17.72, Site Plan and Architectural Review. 7.A Packet Pg. 12 Site Design: The Site Plan (Attachment “A-1”) depicts the location of the structure along with proposed parking, service and stormwater areas. The Landscape Plan (Attachment “A-2”) depicts proposed landscape areas along street frontages, around the perimeter of the site and within the parking lot. Access: The Applicant proposes to construct a public street as part of the tentative partition that will provide primary access to the Project Site. The proposed street will connect with existing streets from the adjacent development. Street trees and landscaping will be provided within the landscape rows as shown on the Landscape Plan (Attachment “A-2”) and as conditioned. As noted in the Fire District No 3 Staff Report (Attachment “E”), the connections to the existing streets will improve emergency access to the adjacent neighborhood and improve evacuation routes in the event of an emergency. Building Design: As depicted on the Building Plans (Attachment “A-4”), the proposed building features a recessed entrance, windows, exposed exterior columns oriented westward towards the new street. Material articulation includes changes in colors and material to provide visual interest and scale. Varied rooflines, including projecting parapets and cornices, are used to break up massing and vertical orientation. Building facades and wall faces that do not provide adequate transparency provide additional design elements as required per CPMC 17.75.042(A)(4). Maximum building height is 18-feet, below the maximum of 35-feet in the C-5 zoning district. Issues There are four (4) issues relative to this application as follows: 1. Off-Street Parking. The land development code sets forth maximum parking standards for professional offices, including medical offices. The maximum allowable off-street parking ratio is 1 space per 250 square feet of Gross Floor Area which is equivalent to13 spaces. The proposed site plan includes 25 off-street parking spaces. Comment: The Planning Commission may authorize an increase to the maximum parking allowance in accordance with CPMC 17.64.040(C), which requires submittal of a Parking Demand Analysis. The Applicant’s TIA (Attachment “C”) provides a Parking Demand Analysis based on the number of medical providers and the number of scheduled clients to be seen during regular business hours. The analysis considers patient overlap during peak treatment times. Patients typically arrive early to appointments while other patients are still receiving treatment. Due to the nature of the medical use to treat pain and injury, consideration of patient overlap is deemed appropriate and reflects parking demand for the Applicant’s medical use. It is further noted that the proposed development is adjacent to residential neighborhoods and there are no opportunities for shared parking, nor is there transit service available at this time. Consequently, staff recommends the evidence submitted into the record adequately justifies the need for parking and that no other reasonable alternative exists that to allow for the proposed increase to the maximum allowable parking. 7.A Packet Pg. 13 2. Traffic Impacts. In accordance with CPMC 17.05.900(A)(2), a Traffic Impact Analysis (TIA) is required for nonresidential developments that increase traffic volume by 250 average daily trips (ADT) or more; or that result in safety or operation concerns along City, County or State roadways. As noted in the Public Works Department Staff Report (Attachment “D”), the proposed development is not expected to generate trips beyond the threshold for a TIA. However, the Project Site is located at the intersection of Biddle Road and Table Rock Road, two (2) County Major Arterial streets. Comment: The Applicant submitted a TIA that examines trip generation for the proposed development to determine the effects on adjacent streets with current and future traffic volumes (Attachment “C”). The findings of the TIA conclude that the proposed medical office will not create adverse impacts on the transportation system. Future development on the remaining acreage will require additional traffic analysis. 3. Construction Timing. In accordance with CPMC 16.12.070, the final plat for the concurrent tentative partition application must be approved by the City and recorded by the County prior to building permit issuance. In the alternative, the applicant may enter into a development agreement with the City and bond for the improvements. Comment: At this time, the Applicant’s construction timing is unknown. This issue is being identified to clarify the applicable requirements for deferred public improvements as part of the concurrent land division application relative to issuance of building permits and Public Works Final Inspection/Certificate of Occupancy for Site Plan and Architectural Review. Staff is recommending Conditions 1(a) and 2(a) to address the requirements in the event final plat is not recorded prior to building permit issuance. 4. Public Comments. The City has not received any written comments in the record; however, we have received informal concerns from residents in the adjoining residential neighborhood regarding the proposed street connectivity. Specifically we have heard that residents on Orchardview and Ridgeway Avenue are concerned about increased traffic from users of the proposed facility and others aiming to cut through the development. The Applicant’s TIA (Attachment “C”) does not show any adverse impacts resulting from the proposed development that would exceed the local street classification status. Additionally, staff met with Fire District #3 on August 23, 2023 to discuss the proposal. They recommend that the street connectivity remain as proposed to increase the points of egress for fire, life, safety concerns. These recommendations are reflected in written comments received from Fire District #3 (Attachment “E”). Findings of Fact & Conclusions of Law The Planning Commission can approve, approve with conditions or deny the application based on findings set forth in CPMC 17.75. The Site Plan and Architectural Review criteria are addressed in the Applicant’s Findings dated July 10, 2023, July 22, 2023 and August 23, 2023 (Attachments “B-1,” “B-2” and “B-3”) and the Planning Department Supplemental Findings set forth below. Where there is a conflict between the Applicant’s Findings and the Planning Department Findings, the latter shall apply. CPMC 17.75.031 Findings and Conclusions 7.A Packet Pg. 14 A. Streets and Utilities. The public street and utility standards set forth in the City of Central Point Department of Public Works Standard Specifications and Uniform Standard Details for Public Works Construction shall apply to all development within the city. Finding CPMC 17.75.031(A): The development includes construction of a proposed street that will provide access to the site from Biddle Road. The proposed street is considered a Local Access street and is required to comply with the Public Works Standard Specifications for street construction. As noted in the Public Works Department Staff Report, the street must be constructed with 25-foot paved width curb-to-curb, landscape row and 5-foot sidewalk on the east side and a landscape row on the west side. Street trees are also required on both sides of the street. Staff recommends a condition of approval requiring the applicant to construct the proposed street to City of Central Point Standard Specifications. Conclusion CPMC 17.75.031(A): Complies as conditioned. CPMC 17.75.039 Findings and Conditions G. Parking/Loading Facility Landscaping and Screening. Parking lot landscaping shall be used to reinforce pedestrian and vehicular circulation, including parking lot entries, pedestrian accessways, and parking aisles. To achieve this objective the following minimum standards shall apply; however, additional landscaping may be recommended during the site plan and architectural review process (Chapter 17.72). All parking lots shall be landscaped in accordance with the following standards: TABLE 17.75.03 PARKING/LOADING FACILITY PERIMETER AND STREET FRONTAGE LANDSCAPING STANDARDS Street Frontage Min. Planting Area Width Plants Required per 100 Lineal Ft. of Street Frontage Trees Shrubs Arterial/Collector 15 ft. 4 20 Local 10 ft. 3 15 Perimeter (Abutting) Land Use Plants Required per 100 Lineal Ft. of Abutting Property Residential 20 ft. 4 20 Commercial 10 ft. 3 15 Industrial 5 ft. 2 10 1. Perimeter and Street Frontage Landscaping Requirements. The perimeter and street frontage for all parking facilities shall be landscaped according to the standards set forth in Table 17.75.03. Finding CPMC 17.75.039(G)(1): The perimeter and street frontage landscape for all parking facilities shall be landscaped according to the standards set forth in Table 17.75.03. Biddle Road is classified as a Minor Arterial and requires a minimum planting area width of 15-feet and 2 trees. The proposed street is considered a Local street and requires a minimum planting area width of 10-feet and 4 trees. The Landscape Plan (Attachment “A-4”) depicts a frontage planting area along Biddle Road that narrows to approximately 11-feet at the western most property boundary with 2 trees and a frontage planting width along the proposed public street of 10-feet with 4 trees. Staff recommends 7.A Packet Pg. 15 a Condition of Approval requiring a revised landscape plan demonstrating compliance with Table 17.75.03, incorporating a minimum 15-foot wide frontage planting area along Biddle Road. Conclusion CPMC 17.75.039(G)(1): Complies as conditioned. 2. Terminal and Interior Islands. For parking lots in excess of ten spaces all rows of parking spaces must provide terminal a minimum of six feet in width to protect parked vehicles, provide visibility, confine traffic to aisles and driveways, and provide a minimum of five feet of space for landscaping. In addition, when ten or more vehicles would be parked side-by-side in an abutting configuration, interior landscaped islands a minimum of eight feet wide must be located within the parking row. For parking lots greater than fifty parking spaces, the location of interior landscape island shall be allowed to be consolidated for planting of large stands of trees to break up the scale of the parking lot. The number of trees required in the interior landscape area shall be dependent upon the location of the parking lot in relation to the building and public right-of-way: a. Where the parking lot is located between the building and the public right-of-way, one tree for every four spaces; b. Where the parking lot is located to the side of the building and partially abuts the public right-of-way, one tree for every six spaces; c. Where the parking lot is located behind the building and is not visible from the public right-of-way, one tree for every eight spaces. Findings CPMC 17.75.039(G)(2): The Site Plan depicts 25 parking spaces as part of the proposed development, located between the building and the public right-of-way of the proposed street. Terminal landscape islands are provided throughout the side, except in the northwest and southeast corners of the parking area. The northern parking row exceeds 10 spaces and incorporates an interior landscape island. The Landscape Plan depicts all landscaping proposed for the site, including along street frontages, parking perimeters, interior parking landscape, street trees, stormwater management areas and areas adjacent to the proposed building. As noted in Findings above, and conditioned in the Staff Report, additional landscaping is required for street trees and street frontage landscape areas, increasing the total landscape area on site. Based on conditions of approval and review of the landscape plan, staff recommends approval of the Landscape Plan as conditioned. Conclusions CPMC 17.75.039(G)(2): Complies as conditioned. 3. Bioswales. The use of bioswales within parking lots is encouraged and may be located within landscape areas subject to site plan and architectural review. The tree planting standards may be reduced in areas dedicated to bioswales subject to site plan and architectural review. Findings CPMC 17.75.039(G)(3): Bioswales are not proposed in the parking area landscape. Conclusion CPMC 17.75.039(G)(3): Not applicable. Recommended Conditions of Approval 7.A Packet Pg. 16 1. Prior to building permit issuance for the medical office building, the applicant shall satisfy the following conditions of approval: a. Provide a recorded copy of the Final Plat for PAR-23001 or enter into a development agreement and bond for the improvements in accordance with CPMC 16.12.070 and CPMC 16.12.080; b. Submit a revised landscape plan that depicts a 15-foot wide landscape area between the parking area and the property line along the Biddle Road frontage and landscape row and street trees along the west side of the proposed public street; and, c. Demonstrate compliance with the Public Works Department Staff Report (Attachment “E”), including: i. Submit and receive approval for Civil Improvement Plans demonstrating compliance with Public Works Department Standard Specifications for public works construction that includes, but is not limited to, the proposed Local Access public street, sidewalks, utilities, and the protection of public infrastructure; ii. Submit and receive approval for a stormwater management plan for the expanded parking lot demonstrating compliance with the MS4 Phase II stormwater quality standards; iii. Submit and receive approval for an erosion and sediment control permit (NPDES-1200CN); and iv. Pay all System Development Charges and permit fees. 2. Prior to Public Works Final Inspection, the applicant shall demonstrate compliance with the following: a. Complete public infrastructure and civil improvements per Civil Improvement Plans approved by the Public Works Department and a fully executed development agreement and bond, if applicable. The Engineer-of-Record shall certify that all improvements were constructed per the approved plans; b. Complete stormwater management improvements per the Stormwater Management Plan approved by the Public Works Department. The Engineer-of- Record shall certify that the construction of the drainage system was constructed per the approved plans; and, c. Record an operations and maintenance agreement for all new stormwater quality features. 3. Any modifications to the site layout, including but not limited to stormwater quality 7.A Packet Pg. 17 treatment facility type and location, shall be subject to review in accordance with CPMC 17.09, Modifications to Approved Plans and Conditions of Approval. Attachments Attachment “A-1” - Master Site Plan Attachment “A-2” - Landscape Plan Attachment “A-3” - Tentative Partition Plan Attachment “A-4” - Building Elevations Attachment “B-1” - Applicant’s Findings, dated 07/10/2023 Attachment “B-2” - Applicant’s Findings, dated 07/22/2023 Attachment “B-3” - Applicant’s Findings, dated 08/23/2023 Attachment “C” - Traffic Impact Analysis Attachment “D” - Public Works Department Staff Report, dated 08/23/2023 Attachment “E” - Fire District No. 3 Staff Report, dated 08/24/2023 Attachment “F” - Rogue Valley Sewer Services Staff Report, dated 08/17/2023 Attachment “G” - Resolution No. 913 Action Conduct the continued public hearing and receive additional testimony from anyone interested in speaking on the proposed Site Plan & Architectural Review application and 1) continue the public hearing to the November 7, 2023 meeting; 2) approve; 3) approve with revisions; or 4) deny the application. Recommendation Continue the public hearing to the November 7, 2023 Planning Commission meeting as needed to complete the review of the Site Plan & Architectural Review application for the Urgent Medical Care development plan. Recommended Motion I move to continue the public hearing for the Site Plan & Architectural Review application for the Urgent Medical Care development at 4404 Biddle Road to the November 7, 2023 Planning Commission meeting. ATTACHMENTS: 1. Attachments A - G 7.A Packet Pg. 18 ATTACHMENT “A-1” 7.A.a Packet Pg. 19 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) ATTACHMENT “A-2” 7.A.a Packet Pg. 20 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) ATTACHMENT “A-3” 7.A.a Packet Pg. 21 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) ATTACHMENT “A-4” 7.A.a Packet Pg. 22 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Attachment “A-4” 7.A.a Packet Pg. 23 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Findings of Fact Site Plan and Architectural Review OR Central Point – Biddle Urgent Care 7/10/2023 dh/DH 17.75.042 Commercial building design standards. A. Building Massing, Articulation, Transparency, and Entrances 1. The building utilizes a raised parapet for signage which breaks up the roof line 2. Façade Articulation (2) South Façade: a. The façade of the building provides articulation with the two columns and projecting parapet projecting about 3 feet spanning 23 ft b. There are multiple materials being used including, stone, Hardie siding, and glazings West Façade: a. The façade of the building provides articulation with a parapet raised 2.5 ft for 28 feet b. There are multiple materials being used including, 2 colors of Hardie siding, and glazing North Façade: a. The façade of the building provides articulation with a parapet raised 2.5 ft for 20 feet b. There are multiple colors of material being used. 3. Pedestrian Entrances (3) a. b. Projected columns and signage area create a prominent entrance along with awnings to provide additional architectural elements c. Seating can be provided outside the front doors d. Exterior wall sconce lighting is present e. f. 4. Transparency a. Total façade wall face up to 12 ft tall is 595 sqft. Window coverage of this 595 sqft wall area is 239 sqft which is 40%. b. n/a c. n/a d. n/a e. Walls without 40% Transparency (3) i. ii. iii. iv. Cornice present along roof line of all walls v. Awnings a re present on all walls vi. vii. viii. ix. Vertical articulation present 7.A.a Packet Pg. 24 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Findings of Fact Site Plan and Architectural Review OR Central Point – Biddle Urgent Care 7/10/2023 dh/DH x. Lighting fixtures present xi. xii. 5. Wall Faces a. Façade Wall Face (2) i. Columns provide changes in depth of at least 24 inches ii. Changes of material, texture, and color are present b. Building Wall Face (3) i. Varying roofline of 2.5 ft ii. iii. iv. v. Awnings are present vi. vii. 12 inch high decorative cornice is present viii. c. Other Wall Faces 6. Screenings of Service Areas and Rooftop Equipment a. Service Areas i. Wood enclosure will comply ii. Plantings have been placed around the enclosure b. Rooftop Equipment i. Parapet walls are present ii. n/a 7.A.a Packet Pg. 25 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Findings of Fact Site Plan and Architectural Review OR Central Point – Biddle Urgent Care 7/10/2023 dh/DH 17.75.042 Commercial building design standards. A. Building Massing, Articulation, Transparency, and Entrances 1. The building utilizes a raised parapet for signage which breaks up the roof line 2. Façade Articulation (2) South Façade: a. The façade of the building provides articulation with the two columns and projecting parapet projecting about 3 feet spanning 23 ft b. There are multiple materials being used including, stone, Hardie siding, and glazings West Façade: a. The façade of the building provides articulation with a parapet raised 2.5 ft for 28 feet b. There are multiple materials being used including, 2 colors of Hardie siding, and glazing North Façade: a. The façade of the building provides articulation with a parapet raised 2.5 ft for 20 feet b. There are multiple colors of material being used. 3. Pedestrian Entrances (3) a. b. Projected columns and signage area create a prominent entrance along with awnings to provide additional architectural elements c. Seating can be provided outside the front doors d. Exterior wall sconce lighting is present e. f. 4. Transparency a. Total façade wall face up to 12 ft tall is 595 sqft. Window coverage of this 595 sqft wall area is 239 sqft which is 40%. b. n/a c. n/a d. n/a e. Walls without 40% Transparency (3) i. ii. iii. iv. Cornice present along roof line of all walls v. Awnings a re present on all walls vi. vii. viii. ix. Vertical articulation present 7.A.a Packet Pg. 26 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Findings of Fact Site Plan and Architectural Review OR Central Point – Biddle Urgent Care 7/10/2023 dh/DH x. Lighting fixtures present xi. xii. 5. Wall Faces a. Façade Wall Face (2) i. Columns provide changes in depth of at least 24 inches ii. Changes of material, texture, and color are present b. Building Wall Face (3) i. Varying roofline of 2.5 ft ii. iii. iv. v. Awnings are present vi. vii. 12 inch high decorative cornice is present viii. c. Other Wall Faces 6. Screenings of Service Areas and Rooftop Equipment a. Service Areas i. Wood enclosure will comply ii. Plantings have been placed around the enclosure b. Rooftop Equipment i. Parapet walls are present ii. n/a 7.A.a Packet Pg. 27 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) 7.A.a Packet Pg. 28 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) 7.A.a Packet Pg. 29 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) 7.A.a Packet Pg. 30 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Landscape Findings of Fact Site Plan and Architectural Review OR Central Point – Biddle Urgent Care 8/23/2023 dh/DH This supplemental Findings of Fact is intended to clarify the Landscape Standards Finding of Fact. (CPMC 17.75.039 Part G.) G. Parking/Loading Facility Landscaping and Screening Response: We understand that additional landscaping can be recommended during the site plan and architectural review process 1. Perimeter and Street Frontage Landscaping: Response: Due to the angles of Biddle Rd and the proposed development, the Street Frontage landscaping has a width of about 15 ft to the east and a width of about 11 ft to the west when measured from the ROW line to the northern edge of the front site landscaping. We also intend to include additional plantings within the ROW to supplement the landscape screening. When measuring from the back of sidewalk within the ROW to the northern edge of the front site landscaping, the screening varies between 16.5 ft and 21.5 ft wide. Our frontage along Biddle Road (post ROW dedication) is about 130 ft. We are required to plant 5 trees and 26 shrubs per Table 17.75.03. We are proposing 5 trees and 26 shrubs. We also front the proposed local road to the west and to the North. We have allocated a 10 ft wide planting width along the perimeter of the road in accordance with Table 17.75.03. Our frontage along the proposed local road (post ROW dedication) is about 310 ft. We are required to plant 9 trees and 47 shrubs per Table 17.75.03. We are proposing 9 trees and 49 shrubs. To the west, we abut vacant commercially zoned land. We have allocated a 10 ft wide planting area in accordance with Table 17.75.03. The only exception to the 10 ft wide planting area is where we have stubbed our parking lot for connection to future developments. 2. Terminal and Interior Islands Response: We are providing a total of 25 parking spaces. There is a terminal for each row of parking. The northern row of parking is utilizing the westerly adjacent landscaping as its terminal. The parking banks directly abutting the building does not contain greater than 10 vehicles side by side. The parking bank to the north contains 6 compact stalls and 5 standard stalls for a total of 11 stalls. We have provided an 8 ft wide interior landscape island within the parking row. 7.A.a Packet Pg. 31 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) TRAFFIC IMPACT STUDY FOR CENTRAL POINT URGENT CARE CLINIC PREPARED BY INNOVATIVE TRAFFIC CONSULTING, PLLC May 2023 7.A.a Packet Pg. 32 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 1 INNOVATIVE TRAFFIC CONSULTING, PLLC Table of Contents Introduction and project description…………………………………………..…………………………………………….3 Executive Summary…………………………………………………………………………………………………………….……..3 Scope of traffic study…………………………………………………………………………………………….……………..……4 Existing conditions…………………………………………………………………………………………….……………………….6 Existing peak hour traffic operation …………………………………………………………………………………………..5 Traffic safety ……………………………………………………………………………………………………………………….……..6 Site trip generation……………………………………………………………………….………………………..………..….…….7 Site trip distribution…………………………………………………………………………………………………….……………..7 Development access and on-site circulation……………………………………………………………………….………8 Turn lane evaluation at the site access…..………………………………………………………….………………..……..8 Site access LOS and traffic operations………………………………………………………………………………..….…...9 Trip generation for vacant land………………………………………………………………………………………….……….9 Site access traffic operation at ultimate condition………………………………………………...……………...…10 Parking assessment…..…………………………………………………………………………………………..…….……….…. 11 Conclusion ……………………………….…………………………………………….……………………..……….…….………….12 Appendices Appendix A  Vicinity map  Site plan  Urgent care floor plan Appendix B  Trip movement existing condition AM peak  Trip movement existing condition PM peak  Trip distribution for urgent care clinic  Trip impact due to urgent care clinic  Turning movement with site trips AM peak  Turning movement with site trips PM peak  Trip distribution for future land use  Trip impact due to future land use  Trip impact at site access at ultimate future conditions  Biddle road 2023 ADT along site frontage  Biddle road 2043 projected ADT along site frontage  Traffic load at site access at ultimate future conditions. 7.A.a Packet Pg. 33 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 2 INNOVATIVE TRAFFIC CONSULTING, PLLC Appendix C  Crash data and traffic safety analysis  Study intersections operational analysis- Existing conditions  Study intersections operational analysis with site traffic conditions  Site access operational analysis with development trips  Site access operational analysis at ultimate buildout.  Simulation for queue analysis at study intersections  Right turn lane evaluation at site access.  Turning movement data for study intersections  ADT data for Biddle Road  Gap Analysis for eastbound left-in at the development access. 7.A.a Packet Pg. 34 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 3 INNOVATIVE TRAFFIC CONSULTING, PLLC INTRODUCTION AND PROJECT DESCRIPTION This memorandum summarizes the traffic impact analysis associated with the proposed land use of an “Urgent Care Clinic” located at 4404 Biddle Road, Central Point, Oregon. The 6.5 acres lot is located at the northwest quadrant of Table Rock Road and Biddle Road. The site is currently vacant and will be sub-divided for realization of full land use potential at a future date. Figure 1 illustrates the vicinity map of the subject developments. The proposed development will utilize only 0.75 acres of the total lot and is planned to have a 3,198 square feet urgent care clinic with 25 parking stalls. The remaining parcel will be developed at an unknown point in time and will have shared public road access with the urgent care development’s access. The public road access is proposed to be located approximately 500 feet west of the signalized intersection of Biddle Road and Table Rock Road. It would be lined up with the other public road intersection to the south serving other developments and land uses in the area. The intersection to the south is channelized with raised median that would limit its access control to right-in, right-out and left-in. This channelized arrangement would automatically limit the access control of the proposed public road intersection access for the proposed development to right-in, right-out and left-in. Figure 2 illustrates the site plan for business. EXECUTIVE SUMMARY The traffic report has evaluated the impact of the proposed urgent care clinic at the intersections of Biddle Road and Table Rock Road & Biddle Road and Meadow Brook Drive. It has also evaluated the development’s public road access location at Biddle Road, for safety and operations, at buildout of the clinic and the development’s shared public road access with other land uses on the parcel for a 20-year traffic horizon. The urgent care is estimated to generate a total of 120 trips per day. The development is also estimated to generate 9 AM trips and 12 PM trips during the peak hour of adjacent street traffic. Based on the assumption of most intense permitted land use for the remaining pieces of 5.75 acres parcel, the potential land uses are projected to generate a total of 85 AM trips and 165 PM trips during the peak hour of adjacent street traffic. The development’s access at Biddle Road, with the combined trips of urgent care clinic and most intense assumed land use in the remaining vacant piece of land is projected to be operate satisfactorily at 20-year traffic horizon. Both the intersections of Biddle Road and Table Rock Road & Biddle Road and Meadow Brook Drive would be operating within the limits of Jackson County mobility standard at buildout of the urgent care development. 7.A.a Packet Pg. 35 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 4 INNOVATIVE TRAFFIC CONSULTING, PLLC The crash performance for the intersections of Biddle Road and Table Rock Road & Biddle Road and Meadow Brook Drive is within acceptable threshold and no red flags were raised during the review of the crash history. The Biddle Road corridor between the intersections of Table Rock Road and Meadow Brook Drive also demonstrated a safe traffic safety record based on the reported crash history for the last 5 years. SCOPE OF THE TRAFFIC REPORT AND ANALYSIS METHODOLOGY This analysis determined the traffic impact of the proposed development on the surrounding roadway network and was prepared in accordance with the City of Central Point’s requirements for traffic impact analysis. The study intersections and the scope of this traffic study is based on communication and direction of city and county staff. This report includes operational analysis and traffic safety review for the following intersections. 1. Biddle Road and Table Rock Road 2. Biddle Road and Meadow Brook Drive 3. Development site’s public road intersection at Biddle Road The study has analyzed and documented the following scenarios due to trips from the “Urgent Care Clinic” and trips from the future land-uses on the vacant parcel.  Year 2023 existing conditions analysis for the intersections of Table Rock Road & Meadow Brook Drive at Biddle Road, including Highway Capacity Manual (HCM), volume-to- capacity ratio, control delay, and 95th-percentile queuing analysis during the weekday AM and PM peak hours.  Build-out conditions for the study intersections of Table Rock Road & Meadow Brook Drive at Biddle Road, with impact from the urgent care development trips, including HCM v/c ratio, control delay, and 95th percentile queuing analysis at the weekday AM and PM peak hours.  Development access site at Biddle Road, at the buildout of the urgent care clinic, including level-of-service and volume-to-capacity ratio, control delay, and 95th-percentile queuing analysis during the weekday AM and PM peak hours.  Development site access at Biddle Road, at total buildout of the property at the northwest quadrant of Biddle Road and Table Rock Road with 20-year Biddle Road projected traffic volume, including level-of-service and volume-to-capacity ratio, control delay, and 95th- percentile queuing analysis during the weekday AM and PM peak hours. 7.A.a Packet Pg. 36 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 5 INNOVATIVE TRAFFIC CONSULTING, PLLC  A review of reported crash data from ODOT at the study intersections and Biddle Road corridor along the site frontage for the most recent five-year period available. Analysis Methodology and Applicable Standards All Level of Service analyses described in this report were performed in accordance with the procedures stated in the HCM. The operations and queuing analyses presented in this report were completed using Synchro 11 and Sim-Traffic 11 software. EXISTING CONDITIONS The proposed development is situated in the northwest quadrant of Table Rock Road and Biddle Road. The 3.2-acre site is currently vacant and will be sub-divided for realization of full land use potential at an unknown future date. The proposed development will utilize only 0.75 acres of the total lot and is planned to have its access at the western boundary of the property located approximately 500 feet west of Rock Table Road intersection and approximately 500 feet east of Meadow Brook Drive intersection. The development access roughly lines up with the intersection to the south serving a number of businesses. The intersection to the south has managed access allowing right-in, right-out and left-in. The movement is restricted via the median curb. The median access is set to automatically restrict the proposed development access, at the proposed access location, to right-in right-out and left-in. The land-use to the south of Biddle Road and west of Table Rock Road is primarily retail and commercial, including COSTCO. The land-use to the north of Biddle Road and west of Table Rock Road is primarily residential. The subject property abuts residential subdivision and would connect to subdivision streets of Orchard View Avenue and Ridgeway Avenue. Biddle Road in the vicinity of the proposed development is mostly fully developed. Biddle Road is an east-west oriented, five-lane county road with bike lanes and a posted speed of 45 MPH. It has sidewalk all along except for a small portion fronting the proposed development. It is currently classified as an urban minor arterial and under review by Transportation System Plan to be reclassified as a urban major arterial. Table Rock Road east of the proposed development is a fully improved five-lane urban major arterial with bike lanes and sidewalk. It has a posted speed of 45 MPH and currently carries approximately 15,000 vehicles per day. The intersection of Biddle Road and Table Rock Road is signalized. The next signalized intersection on Biddle Road is on Hamrick Road located approximately 2,000 feet west Table Rock Road. 7.A.a Packet Pg. 37 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 6 INNOVATIVE TRAFFIC CONSULTING, PLLC TRAFFIC VOLUME AND PEAK HOUR OPERATIONS Turning movement data for the intersection of Biddle Road and Meadow Brook Drive and “Average Daily Traffic” volume along Biddle Road were collected in April 2023. For the purpose of this traffic study, the AM and PM peak hour turning movement data for intersection of Biddle Road and Table Rock Road were utilized using the available April 2022 traffic data. Appendix “C” contains traffic count worksheet used in this analysis. Synchro software (HCM) was utilized to evaluate the intersection volume to capacity ratios, delays and intersection level-of- service. Queuing The SimTraffic queuing analysis (provided in later section of this report) Level of Service Analysis Tables 1a and 1b display the existing levels of service at each of the study intersections during weekday AM and PM peak hours. The county has adopted a Level-of-service D and v/c ratio of 0.90 as its mobility standard for signalized intersection and LOS E for two-way stop-controlled intersection in the county. As shown in the table below, each of the study intersections currently meets the county mobility standards. TABLE 1 a AM Peak Hour- Existing conditions Intersection name Control Type Worst Mvmt V/C Delay (Sec/Veh.) LOS 1 Biddle Rd & Table Rock Rd Signal EBL 0.75 42.6 D 2 Biddle Rd & Meadow Brook Dr TWSC SBL 0.42 34 C TABLE 1 b PM Peak Hour- Existing conditions Intersection name Control Type Worst Mvmt V/C Delay (Sec/Veh.) LOS 1 Biddle Rd & Table Rock Rd Signal EBL 0.75 42.6 D 2 Biddle Rd & Meadow Brook Dr TWSC SBT 0.51 44.9 E TRAFFIC SAFETY ODOT reported crash data was reviewed for the most recent five-year period, from January 1, 2018, to December 31, 2022 Table 2 summarizes the reported crash data at the study 7.A.a Packet Pg. 38 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 7 INNOVATIVE TRAFFIC CONSULTING, PLLC intersections. The raw crash data for the study intersections and corridor crash history and the crash analysis is included in appendix “C”. Table 2: ODOT-Reported Crash Data (January 1, 2018 to December 31, 2022) Intersection Crash Severity Crash Type Fatal Injury PDO1 Rear End Turning Sideswipe Angle Other Total Crash Rate2 Biddle Rd & Table Rock Rd 0 27 12 10 18 1 8 2 39 0.84 Biddle Rd & Meadow Brook Dr 0 1 2 0 2 0 0 1 3 0.77 Biddle Road Frontage 0 1 1 0 0 2 0 0 2 0.37 SITE TRIP GENERATION ITE trip generation manual does not have a category for Urgent care facility. It only has Hospital, Nursing care, Clinic and free-standing emergency room. By definition an urgent care center is a convenient option when someone's regular physician is on vacation or unable to offer a timely appointment or when illness strikes outside of regular office hours. According to Wikipedia “Urgent care is a category of walk-in clinic focused on the delivery of ambulatory care in a dedicated medical facility outside of a traditional emergency department". Based on the functionality of Urgent Care Center, the land use closely resembles Clinic. According to ITE trip generation manual land use code 630 “A clinic is a facility that provides limited diagnostic and outpatient care but is unable to provide prolonged in-house medical care. It would therefore be appropriate to estimate the trip generation of an “Urgent Care Center” based on ITE trip generation manual land use code 630 “Clinic”. Table 3 Trip generation estimate for the urgent care clinic. ITE LUC 630 GFA (Sq. ft) Trip Generation Rate Weekday 3,200 Daily AM PM ADT AM Peak Hour PM Peak Hour 37.60 2.75 3.69 Total Total Enter Exit Total Enter Exit Site Trips 120 9 7 2 12 4 8 TRIP DISTRIBUTION Trip distribution assumption for the urgent care clinic is based on area wide network, population density and in consultation with county staff. It was assumed that 60% of the trips would be from the west and 40% from the east. For the purpose of this analysis, it is assumed 7.A.a Packet Pg. 39 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 8 INNOVATIVE TRAFFIC CONSULTING, PLLC that a left-in but no left-out would be permitted from the development’s access along Biddle Road. All trips to the clinic are assumed as primary trips. For cross-circulation purposes, it is assumed that Orchard View Avenue and Ridgeway Avenue would connect to the development property. Figures 3 thru 9 illustrate the trip distribution, traffic assignments and trip impact from the development to the roadway network and are included in appendix B of this report. DEVELOPMENT ACCESS AND ON-SITE CIRCULATION The development has access at its western boundary line of the property. That access approximately lines up with the intersection to the north. The existing intersection to the north has left-out restricted via median curb. The geometric layout of the median curb automatically restricts the access movement of the proposed development to right-in, right-out and left-in. The proposed access connection would also be utilized by the future land-use in the remaining vacant land. To provide cross-circulation, the development internal road will connect to the subdivision streets to the south and west. TURN LANE EVAULATION AT THE SITE ACCESS The 2023 average daily traffic volume along westbound Biddle Road is 9056. Biddle Road already has a center turn lane. As indicated in graphical representation in appendix C, a right turn lane at the access point will not be warranted at the buildout of the urgent care clinic or at the 20-year forecasted traffic volume including trips from the vacant land. The existing eastbound left turn lane will very easily accommodate the eastbound left turning trips into the development including trips from best and highest future land use. The highway capacity manual states that traffic signal within 1000 feet of a left turn access provides additional gaps in traffic stream to facilitate left turn from the main street. Additional traffic stream gap data was collected along westbound Biddle Road at approximately the development’s access location. The gap data was collected in bins of 4-6 seconds, 7-9 seconds, 10-12 seconds and greater than 13 seconds. Data indicated that there were 143 gaps in traffic stream during the AM peak hour including 93 gaps greater than 13 seconds. There were a total of 169 gaps, 4 seconds or greater during the PM peak hour including 88 gaps greater than 13 seconds. On average, left turning traffic from the main street accepts a gap of 4 seconds in the traffic stream to turn left and follow-up vehicles accept gaps of 2.1 seconds. Based on the review of gap data it can be surmised that the actual level-of-service at the development access location would be much better and the left turn queues would be very short or non-existent as compared to predicted queue by Sim-traffic software that assumes uniform and evenly arrival of vehicles. The gaps study is included in appendix C. 7.A.a Packet Pg. 40 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 9 INNOVATIVE TRAFFIC CONSULTING, PLLC SITE ACCESS LEVEL-OF-SERVICE AND TRAFFIC OPERATIONS. Tables 4a and 4b display the level-of-service (with urgent care trips only) at each of the study intersections and the access point during weekday AM and PM peak hours. As shown in the table below, each of the study intersections currently meets the county mobility standards. Synchro analysis indicates that the unsignalized development access point, including the left-turn from the main-line will perform satisfactorily at build-out of the urgent care development. The queuing analysis for the turn lanes is addressed separately in this report. The table below shows the operational level-of-service at the driveway. The Synchro traffic analysis is included in the appendix B of this report. TABLE 4 a AM Peak Hour- with site trips Intersection name Control Type Worst Movt. /Approach V/C Delay (Sec/Veh.) LOS 1 Biddle Rd & Table Rock Rd Signal WB 0.55 29.6 C 2 Biddle Rd & Meadow Brook Dr TWSC SB 0.43 24.5 C 3 Development access TWSC SBR .001 9.3 A TABLE 4 b PM Peak Hour- with site trips Intersection name Control Type Worst Mvmt V/C Delay (Sec/Veh.) LOS 1 Biddle Rd & Table Rock Rd Signal EBL 0.75 42.6 D 2 Biddle Rd & Meadow Brook Dr TWSC SBT 1.0 36.8 E 3 Development access TWSC EBL .003 9.3 A TRIP GENERATION FOR BEST AND HIGHEST LAND USE IN THE REMAINING VACANT PARCEL. The entire piece of property located at the northwest quadrant of Table Rock Road Biddle Road is 3.2-acre. Of that 0.75 acres will be utilized by the proposed urgent care clinic. The remaining 2.45 acres will be utilized by other developments at an unknown time in the future. Based on direction from the city, this study will assume 30% of the 2.45 acres will be utilized as Gross Floor Area, which will be used in estimating the future trip generation. The city has directed the traffic study to make the following assumption for future land use. Per the direction of city of Central Point the following highest and best land-use were assumed.  5,500 SF High Turnover Restaurant (LUC 932)  12,000 SF General Office building (LUC 710) 7.A.a Packet Pg. 41 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 10 INNOVATIVE TRAFFIC CONSULTING, PLLC  5,000 SF Walk-in Bank (LUC 911)  5,000 SF Copy, Print & Express ship store (LUC) 920 Table 5 Trip generation estimate for the land use on remaining vacant land. Land use ITE LUC Gross Floor Area Square Ft. Weekday Trip Gen rate Peak Hour Trip Generation AM PM AM Peak PM Peak Total Enter Exit Total Enter Exit High Turnover Restaurant 932 5,500 9.57 9.05 53 29 24 50 31 19 General office Building 710 12,000 1.52 1.44 18 16 2 17 3 14 Walk-in Bank 911 5,000 - 12.13 - - - 61 27 34 Copy & Print store 920 5,000 2.78 7.42 14 11 3 37 16 21 Net Trips 85 56 29 165 77 88 The trip distribution for the remaining vacant land was assumed roughly the same as urgent care land use with 55% trips from the west, 40% trips from the east and 5% from Meadowbrook Drive and internal subdivision to the north. No reduction for pass-by or internal trips was assumed. The trip distribution and trip assignment for future land-use are illustrated in figures 9 thru 11 and included in appendix B. BIDDLE ROAD SITE ACCESS TRAFFIC OPERATIONS For the purpose of this traffic study, only the intersection of Biddle Road and the site access public road was studied based on 20-year projected traffic volume and the combined trip impact of urgent care plus trips from the future land-use on vacant land. It was specifically evaluated for safety and operations of the eastbound left-in movement. The most difficult movement from a driveway to an arterial i.e., left-out would be restricted. Figures 10 & 11 (appendix C) illustrate the 20- year projected traffic at Biddle Road and the movement at Biddle Road and site access. The SYNCHRO and Sim-traffic analysis for the site access and other study intersections is included in appendix C of this report. TABLE 6 Peak Hours- 20 year built-out condition. Intersection name Control Type Worst Mvmt V/C Delay Sec/Veh. LOS 95th % *** Queue (EBL) Biddle Road at Development access AM Peak TWSC SBR 0.02 9.9 A 50 feet PM Peak TWSC SBR 0.12 13.2 B 50 feet *V/C, delay, LOS and 95th percentile queue reported for the worst movement **Queue length rounded off to the next 25 feet. *** Please see “Turn lane evaluation at the site access” for realistic evaluation of EBL 7.A.a Packet Pg. 42 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Central Point Urgent Care Clinic 11 INNOVATIVE TRAFFIC CONSULTING, PLLC queue length based on field data westbound gap analysis of the traffic stream. PARKING ASSESSMENT The applicant has estimated the required number of parking spots for urgent care clinic as 25. The city has estimated the number of parking spots adequate for the land-use as 13. The applicant believes 13 parking spots would be highly inadequate to serve the clientele. As explained in the trip generation section earlier, by definition an urgent care center is a convenient option when someone's regular physician is on vacation or unable to offer a timely appointment. Therefore besides functioning as a supplemental wing of a regular clinic, it can also be classified as hybrid between a regular clinic and a traditional “emergency department". Specifically, during cold and flu seasons, other seasonal outbreaks and unforeseen demand for medical attention by the general population, urgent care routinely experience a cyclical patient load throughout the year. As can be seen from the urgent care floor plan (appendix A), the urgent care is set up to be staffed by up to 15 employees (including doctors, aids, nurses, lab and X-Ray technicians, reception, front desk etc.) during peak demand season. The average staff for this urgent care during the peak demand season is expected to be 10. The average time a patient spends in an urgent care is about an hour. There could be five to six patients being attended to in the exam room, procedure room, X-ray and lab etc. At the same time just as many patients are typically waiting to be seen or in need of medical attention. Parking need data # of exam room 4 Procedure Room 1 X-Ray Room & diagnostics 1 staff positions Laboratory 1 staff positions Nursing Station 4 staff positions Reception 2 staff positions Two office rooms 2 staff positions Average # of patients during peak cyclical demand 11 patients Ave. patient turnover time 60 minutes Ave. delivery/maintenance vehicles, Patients pick-up drop-off reports, Other etc 1 # of handicap parking stalls 1 (Not always 100% utilized) The average peak cyclical parking demand is estimated as follows. 7.A.a Packet Pg. 43 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) 7.A.a Packet Pg. 44 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Appendix A • Vicinity map • Site plan • Urgent care floor plan 7.A.a Packet Pg. 45 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) 140 South 3rd Street  Central Point, OR 97502  541.664.3321  Fax 541.664.6384 PUBLIC WORKS STAFF REPORT August 23, 2023 AGENDA ITEM: A two-lot partition (PAR – 23001) and Site Plan and Architectural Review (SPAR-23002) application to construct a 3,200-square-foot medical clinic and to divide the property into two parcels - 37S 02W 01C, Tax Lot 701. Agent: Daniel Harris Traffic: The proposed development will generate less than 25 peak-hour trips, the threshold for a Traffic Impact Analysis (TIA). However, the project site takes access from two Major County Arterial Streets, Biddle and Table Rock Roads. Given proximity of the site to the intersection of these roads, a TIA was required to assess the safety and operational and functional needs for the proposed site access. The City uses the International Transportation Engineers Manual 10th generation, and based on the studies, this development will generate 11.42 peak-hour trips. For the partition, an existing county public access road currently exists. The applicant shall widen that access road to a new public street. New access is provided via standard city streets and a new right-in/right-out access on Biddle Road. Existing Infrastructure: Water: There are 8-inch water lines in Ridgeway and Orchardview Drive and a 12-inch line on Biddle Road. Streets: The development is served by a Jackson County Arterial on Biddle Road and two city streets, Ridgeway and Orchardview. Stormwater: There are county storm facilities in Biddle Road, a 15-inch line in Orchardview, and a 30-inch line on Ridgeway. Background: This application is for a two (2) parcel partition and medical office adjacent to existing public infrastructure. Issues: The applicant is required to extend public infrastructure to service both parcels, including water and stormwater. This development has an existing county public access road on the west and north sides. The applicant is widening this access to street standards. The proposal includes connecting the new public street to existing streets: Orchardview and Ridgeway Avenue. The existing streets were planned for future extension but have been dead-end streets for approximately twenty years. After conferring with public safety, public works believe the connection of the streets is needed for fire, life, and safety reasons. Conditions of Approval: Prior to the final plat approval, the following conditions shall be satisfied: 1. Public Street– Applicant shall dedicate land to widen the existing public access to City street standards (ST-05), which is 25’ curb to curb with no parking on either side, with landscape row and sidewalk on the east side. A landscape row is required for the west side. Public Works Department Matt Samitore, Director 7.A.a Packet Pg. 46 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) 2. Public Street Connectivity - Applicant shall also construct the proposed Urgent Care Avenue to City Street Standards with the proposed connection to Orchardview and Ridgeway Avenue. Construction shall demonstrate compliance with the Public Works Standard Specifications and Uniform Details for Construction. 3. Public Utility Easement – Applicant shall provide a 10-foot Public Utility Easement (PUE) on the east side of the proposed Urgent Care Avenue. 4. Street Trees Plan - Applicant shall design and implement a planting plan for both the west and east sides of the proposed new street. Prior to the building permit issuance and start of construction, the following conditions shall be satisfied: 1. Stormwater Management. a. NPDES Stormwater Management Plan - The applicant shall submit to Public Works for review and approval a stormwater management plan in accordance with the Rogue Valley Stormwater Quality Design Manual, which requires stormwater quantity and quality treatment of all proposed impervious surfaces proposed as part of the partition and site plan. b. Civil Improvement Plan Review – The applicant shall submit civil improvement plans for stormwater infrastructure construction demonstrating compliance with the approved NPDES Stormwater Management Plan approved in accordance with Condition No. 1(a). c. Erosion and Sediment Control – Construction of required improvements will disturb more than one acre. The applicant shall obtain an erosion and sediment control permit (NPDES 1200-CN) from the Public Works Department. Prior to the Public Works Final Inspection and Certificate of Occupancy, the applicant shall comply with the following conditions of approval: 1. PW Standards and Specifications – Applicant shall demonstrate that all Public Works infrastructure construction is in compliance with the Standards Specifications and Uniform Details for Construction. 2. Stormwater Quality Operations & Maintenance– The Applicant shall record and submit to the Public Works Department an Operations and Maintenance Manual and Declaration of Covenants for Operation and Maintenance of the Stormwater Quality Features as required by the Rogue Valley Stormwater Quality Manual. 3. Public Utility Easements – The proposed partition plat shall include public utility easements paralleling the proposed Urgent Care Avenue. 7.A.a Packet Pg. 47 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) 7.A.a Packet Pg. 48 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w )   August 17, 2023    City of Central Point Planning Department  155 South Second Street  Central Point, Oregon   97502    Re: PAR‐23001 & SPAR‐23002, Urgent Care, Tax Lots 701, Map 37S 2W 01C    There are existing 8 inch sewer mains to the west along Orchardview Avenue and to the north along  Ridgeway Avenue.  Sewer service for the proposed Urgent Care will require a short sewer main  extension into the right‐of‐way from either 8 inch main. Sewer construction and service extension will  not be a condition of approval for the proposed partition.    Rogue Valley Sewer Services requests that approval of this development be subject to the following  conditions:    1. The applicant must submit sewer construction drawings to RVSS for review and approval.   2. Sewer connection permits will not be issued until any proposed main is constructed and accepted by  RVSS.  3. The applicant must submit architectural plumbing plans to RVSS for the calculation of SDC fees  associated with sewer connection permits.  4. The applicant must obtain sewer connection permits from RVSS and pay all related fees.    Feel free to call me if you have any questions.      Sincerely,        Nicholas R Bakke, PE  District Engineer      7.A.a Packet Pg. 49 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w ) Planning Commission Resolution No. 913 (09/05/2023) PLANNING COMMISSION RESOLUTION NO. 913 A RESOLUTION OF THE PLANNING COMMISSION APPROVING A SITE PLAN AND ARCHITECTURAL REVIEW FOR A MEDICAL OFFICE BUILDING ON LANDS WITHIN THE THOROUGHFARE COMMERCIAL (C-5) ZONING DISTRICT. (File No: SPAR-23002) WHEREAS, the applicant has submitted a site plan and architectural review application that includes constructing site access, building, and circulation, parking lot and landscpe improvements on a 3.19 acre site within the Thoroughfare Commercial (C-5) zoning district, identified on the Jackson County Assessor’s map as 37S 2W 1C, Tax Lots 701, Central Point, Oregon; and WHEREAS, the Planning Commission’s consideration of the application is based on the standards and criteria applicable to Site Plan and Architectural Review in accordance with Section 17.72 and Design and Development Standards in accordance with Section 17.75; and WHEREAS, on September 5, 2023, at a duly noticed public hearing, the City of Central Point Planning Commission considered the Applicant’s request for Site Plan and Architectural Review approval, at which time it reviewed the Staff Report and heard testimony and comments on the application; and NOW, THEREFORE, BE IT RESOLVED that the City of Central Point Planning Commission by Resolution No. 913 does hereby approve the Site Plan and Architectural Review application for a medical office building, based on the findings and conditions of approval as set forth in Exhibit “A,” the Planning Department Staff Report dated September 5, 2023, including attachments incorporated by reference. PASSED by the Planning Commission and signed by me in authentication of its passage this 5th day of September, 2023. __________________________________ Planning Commission Chair ATTEST: _______________________________ City Representative 7.A.a Packet Pg. 50 At t a c h m e n t : A t t a c h m e n t s A - G ( 1 7 3 1 : U r g e n t C a r e M e d i c a l O f f i c e S i t e P l a n a n d A r c h i t e c t u r a l R e v i e w )