HomeMy WebLinkAboutDCP081122 City of Central Point Development Commission Agenda August 11, 2022 6:15 p.m. Central Point Central Point City Hall 140 South 3rd Street Central Point, Oregon Members: Hank Williams Taneea Browning Neil Olsen Kelley Johnson Melody Thueson Michael Parsons Rob Hernandez Staff Liaison: Chris Clayton Meeting time, date, or location may be subject to change. Please contact the City Recorder at 541-423-1026 for additional information. I. MEETING CALLED TO ORDER II. ROLL CALL III. APPROVAL OF MINUTES A. Community Development Commission - Regular Meeting - Jun 23, 2022 6:00 PM IV. DISCUSSION ITEMS A. Open House Downtown & East Pine Street Corridor Revitalization Plan Amendment(Presented by Clayton) V. ADJOURNMENT Individuals needing special accommodations such as sign language, foreign language interpreters or equipment for the hearing impaired must request such services at least 72 hours prior to the City Council meeting. To make your request, please contact the City Recorder at 541-423-1026 (voice), or by e-mail to Deanna.casey@centralpointoregon.gov. Si necesita traductor en español o servicios de discapacidades (ADA) para asistir a una junta publica de la ciudad por favor llame con 72 horas de anticipación al 541-664-3321 ext. 201 CITY OF CENTRAL POINT Oregon Community Development Commission Regular Meeting Minutes Thursday, June 23, 2022 I. MEETING CALLED TO ORDER II. ROLL CALL Attendee Name Title Status Arrived Hank Williams Mayor Present Taneea Browning Ward IV Remote 6:25 AM Neil Olsen Ward I Present Kelley Johnson Ward II Present Melody Thueson Ward III Present Michael Parsons At Large Present Rob Hernandez At Large Present Also present were City Manager Chris Clayton, City Recorder Deanna Casey, and Finance Director Steven Weber. III. APPROVAL OF MINUTES A. Community Development Commission - Regular Meeting - Mar 10, 2022 6:30 PM RESULT: ACCEPTED [UNANIMOUS] MOVER: Michael Parsons, At Large SECONDER: Rob Hernandez, At Large AYES: Williams, Browning, Olsen, Johnson, Thueson, Parsons, Hernandez IV. DISCUSSION ITEMS A. Resolution No. 2022-02 Adopting the Budget, Making Appropriations, and Declaring Tax Increment(Presented by Weber) Finance Director Steven Weber stated that on May 16, 2022 the Central Point Development Commission Budget Committee met to review the proposed budget for the 2022-23 fiscal year. The $2,165,865 budget was approved to move forward to the Board of Directors for formal adoption. Staff recommends approval of the proposed resolution. Kelley Johnson moved to approve Resolution No. 2022, A Resolution 3.A Packet Pg. 2 Minutes Acceptance: Minutes of Jun 23, 2022 6:00 PM (APPROVAL OF MINUTES) City of Central Point Development Commission June 23, 2022 Page 2 adopting the Budget, Making Appropriations and Declaring Tax Increment for Fiscal Year 2022-23. RESULT: APPROVED [UNANIMOUS] MOVER: Kelley Johnson, Ward II SECONDER: Melody Thueson, Ward III AYES: Williams, Browning, Olsen, Johnson, Thueson, Parsons, Hernandez B. Financial Projections Review(Presented by Clayton) City Manager Chris Clayton explained the process for adopting a new Urban Renewal Plan Amendment. He presented the proposed boundary changes, which include the Greenway within the City limits and the Jackson County Expo property where the Community Center is being proposed. One of the big components is the financial analysis that goes along with the expansion. Development Assumptions - He explained the assumed rate of growth for this area. We kept a conservative estimate for future growth over the next 5 years. He explained the Tax Increment Finance (TIF) Revenue projections with the taxing districts under the UR plan and the windfall they receive at the end of the plan in 2040 when it expires. The project list will be amended to include the Community Center, development of the Greenway, and the Beebe Bridge. We will be able to do smaller projects like sidewalk improvements or beautification projects throughout the 10-year plan. As we get close to the end of the district in 2036, we will stop doing projects and settle all the bills by 2040 if not sooner. Our goal is to end the district sooner than 2040, but the people in charge at that time may have other opinions and extent the district. They discussed funding options the possibility of a recession and what that could do to the projects. RESULT: FOR DISCUSSION ONLY V. ADJOURNMENT Rob Hernandez moved to adjourn the meeting at 6:28 p.m. The foregoing minutes of the June 23, 2022, Development Commission meeting were approved by the Development Commission at its meeting of _________________________. Dated: _________________________ Chair Hank Williams ATTEST: __________________________ City Recorder 3.A Packet Pg. 3 Minutes Acceptance: Minutes of Jun 23, 2022 6:00 PM (APPROVAL OF MINUTES) City of Central Point Staff Report ISSUE SUMMARY TO: Community Development Commission DEPARTMENT: City Manager FROM: Chris Clayton, City Manager MEETING DATE: August 11, 2022 SUBJECT: Open House Downtown & East Pine Street Corridor Revitalization Plan Amendment ACTION REQUIRED: Motion RECOMMENDATION: Approval PURPOSE The Central Point Development Commission (Development Commission) is being asked to review the proposed Downtown & East Pine Street Corridor Revitalization Plan Amendment (Amendment) and to decide whether to recommend the Amendment be forwarded through the public review process of urban renewal amendments including presentation to the Planning Commission for their review of conformance with the Central Point Comprehensive Plan, to the Jackson County Commission for their approval by adopting a resoltuoin as there is property within the proposed amendment area that is in unincorporated Central Point, and to the Central Point City Council for consideration of a non-emergency ordinance to adopt the Amendment. BACKGROUND The purpose of the amendment is to remove property and to add property and projects to the Downtown & East Pine Street Corridor Revitalization Plan. The removed properties are not taxable and projects are not contemplated on them. The added properties will enable the Development Commission to allocate funding to the Bear Creek Greenway design and implementation, to add the Beebe Road Bridge Extension and to place the future community center within the urban renewal area boundary to allow funding to be allocated to the project. This amendment is a substantial amendment to the Downtown & East Pine Street Corridor Revitalization Plan as the additon of acreage is in excess of a cumulative 1% of the acreage of the urban renewal area (ORS 457.085(i)(A)). The project for a community center is already a part of the Plan, however, the location has changed to be a joint center with Jackson County expected to be located at the Jackson County Expo site. A community center is not specifically identified as a public building project in ORS 457.010 (12). In addition, the community center project was already a part of the Plan prior to the inclusion of a definition of public building project in ORS Chapter 457. If for some reason the community center project with Jackson County is not able to proceed, the Development Commission still has the authority to expend funds on the project elsewhere within the Plan 4.A Packet Pg. 4 boundary. The existing maximum indebtedness of $43,177,530 is not proposed to be increased, and therefore, there are no increased impacts to the taxing jurisdictions beyond those calculated when the original Downtown & East Pine Street Corridor Revitalization Plan was adopted. (Show map of added and removed properties) After the Amendment, the Downtown & East Pine Street Corridor Revitalization Plan Area (Area) will consist of approximately 514 acres of land including rights of way, still within the 25% limitation of urban renewal acreage in a city. The Plan is projected to continue tax increment revenue collection through FYE 2039. At that time, the urban renewal area is anticipated to be terminated and the properties would go back on the regular roll. PROCESS 1. The process for approval will include the following steps, in accordance with ORS 457. 2. Preparation of an Amendment including opportunity for citizen involvement. 3. Development Commission review of the proposed Amendment and accompanying Report on August 11, 2022. 4. Review and recommendation by the Central Point Planning Commission on September 6, 2022. 5. Presentation of the Amendment to the Jackson County Commission for their approval on September 12, 2022. 6. Notice to citizens of consideration of an ordinance via utility bills. 7. Forwarding a copy of the proposed Amendment and the Report to the governing body of each taxing district. The formal taxing districts letters will be sent out on August 12, 2022. 8. Hearing by Central Point City Council and adoption of the proposed Amendment and accompanying Report by a non-emergency ordinance. The hearing and first reading of the Ordinance will be held on September 22, 2022 and the second reading and vote by City Council will occur on October 13, 2022. The ordinance must be a non-emergency ordinance, which means that the ordinance does not take effect until 30 days after its approval and during that period of time may be referred to Central Point voters if a sufficient number of signatures are obtained on a referral petition. STAFF RECOMMENDATION Staff recommends that the Central Point Development Commission pass the following motion. Draft motion: The Central Point Development Commission forwards the Downtown & East Pine Street Corridor Revitalization Plan Amendment to the Central Point Planning Commission for their review of the Amendment’s conformance to the Central Point Comprehensive Plan, to the Jackson County Commission for their adoption by resolution and then to the Central Point City Council for their review, to hold a public hearing and vote on adoption of a non-emergency ordinance. Attachments: 1. Downtown & East Pine Street Corridor Revitalization Plan Amendment. 2. Report Accompanying the Downtown & East Pine Street Corridor Revitalization Plan Amendment. 4.A Packet Pg. 5 3. Plan Amendment FAQ. ATTACHMENTS: 1. 1_Plan Amendment CP 07 26 2022 cc_eh 2. 2_ Report on Plan Amendment 08 01 2022 3. FAQ v2 4.A Packet Pg. 6 Proposed new text is shown in double-underline. Deleted text is shown in strikethrough. Explanatory language shown in italics. DOWNTOWN & EAST PINE STREET CORRIDOR REVITALIZATON PLAN SUBSTANTIAL AMENDMENT 2022 Only the proposed changes are shown in this amendment, the current plan can be viewed at: https://www.centralpointoregon.gov/urbanrenewal Section 1.1 INTRODUCTION The first substantial amendment was developed in 2022 to remove property, add property and projects to the urban renewal area. The removed properties are not taxable and projects are not contemplated on them. The added properties will enable the Agency to allocate funding to the Bear Creek Greenway design and implementation, to add the Beebe Road Bridge Extension and to place the future community center within the urban renewal area boundary to allow funding to be allocated to the project. Section 1.2 CITY AND AGENCY RELATIONSHIP No changes to this section Section 1.3 DEFINITIONS No changes to this section Section 1.4 LEGAL BOUNDARY The Urban Renewal Area contains 446.3 514 acres accounting for 15.5% 17.7% of the City’s total acreage. The legal description and illustration of the boundary of the Urban Renewal Area are described as follows: ( the Legal Description (Exhibit 1) Boundary Map, Exhibit B 2 and Urban Renewal Area Tax lot Inventory, Exhibit 3C. were updated in the 2022 Amendment) Section 1.5.4 CONSISTENCY WITH THE COMPREHENSIVE PLAN This Plan has been prepared in conformity with the City’s adopted Comprehensive Plan including its goals, policies, procedures and implementing provisions, as exist on the effective date of this Urban Renewal Plan, or as may be amended from time to time, which is hereby incorporated by reference as if it were included in full. See Appendix, Exhibit 4. Relationship to Comprehensive Plan. SECTION 1.6 1 To achieve the goals and objectives of this Plan the following activities may be undertaken by the Central Point Development Commission, or caused to be undertaken by others, in accordance with applicable Federal, State, County and City laws, policies and procedures and in compliance with the provisions of this Plan. The Central Point Development Commission’s responsibility for all activities identified in the Plan is subject to the availability of appropriate funding. 1.6.1 URBAN RENEWAL PROJECTS AND ACITIVITIES 2. EAST PINE STREET IMPROVEMENTS. Improve the streetscape along that section of East Pine Street between the Downtown Core Area and Hamrick Road. Streetscape improvements may include curb and gutter, sidewalks, crosswalks, street trees, tree grates, street lights, plazas, gateways, portal signage on I-5, and street furniture. All streetscape improvements shall be constructed in accordance with an approved streetscape master plan East Pine Street. 2022 Note – A portion of this project has been completed (1st to 6th Street on Pine Street). 5. INTERSECTION SIGNALIZATION. Install/upgrade/modify traffic signals at the following intersection: 4.A.a Packet Pg. 7 Attachment: 1_Plan Amendment CP 07 26 2022 cc_eh [Revision 1] (1569 : Open House Downtown & East Pine Street Corridor Revitalization a. Twin Creeks RR-Xing. Install new signalized intersection at Hwy. 99 and Twin Creeks Dr. including a new railroad crossing at Twin Creeks Dr. Improvements shall include, but not be limited to easement acquisition, curb and gutter, street surface improvement, railroad crossing signalization, Hwy. 99 signalization, sidewalks, street lights, and landscaping; 2022 update: project completed. 6. OFF-STREET PARKING FACILITIES. All public parking constructed under the provisions of this Section shall comply with the objectives and policies of the City of Central Point Comprehensive Plan and the City of Central Point Transportation System Plan as applies to the Downtown, and with the applicable standards set forth in the Land Development Code. a. Oak Street Parking Facility. Design and construct a parking facility on the northwest corner of Oak Street and Third Street. b. Manzanita Street Parking Facility. Design and construct a parking facility on the southeast corner of Manzanita Street and First St. 2022 update: project completed. 9.PFAFF PARK RENOVATION. Renovate Pfaff Park including new landscaping, restroom facilities, playground equipment, and lighting. 2022 update: partially complete (restroom facilities). 10.FREEMAN ROAD UPGRADE TO COLLECTOR STREET STANDARDS. Between Oak St. and Hopkins Road rebuild Freeman Road to collector street standards, including curb, gutter, sidewalks, street lights, traffic control devices, and street trees. 2022 update: project completed. 11. BEEBE ROAD EXTENSION AND BRIDGE EXTENSION PENINGER ROAD SOUTHERLY EXTENSION Extend Beebe Road from its current intersection with Gebhard Road to the west through Jackson County Expo to connect with Penninger Road. Includes intersection improvements at Penninger & Beebe Roads and Beebe & Gebhard Roads. Extend Peninger Road south across Bear Creek to collector street standards to intersect with Hamrick; including intersection signal modifications at East Pine Street and Peninger, southerly bridge crossing and bike lanes. The specifics and timing of this project shall be based on a transportation analysis prior to commencement of construction. 13.CITY OF CENTRAL POINT COMMUNITY CENTER. Assist with the feasibility analysis, site and architectural design, land acquisition, and construction of a community center within the Area. The Agency’s participation in the development of a community center shall be limited to the percentage of the total design and development costs, including land acquisition that can be reasonably attributed to serving the Area. 2022 update: The proposed Community Center now includes a possible location on Jackson County controlled land outside of Central Point city limits (Expo Property/Site). This property is being included into the urban renewal area in the 2022 amendment. 15. BEAR CREEK GREENWAY DESIGN AND IMPROVEMENTS. Improve the publicly owned lands adjacent to the Bear Creek Greenway from E. Pine Street to the Table Rock Overpass. The newly created park system will balance passive and active areas, including walking paths, benches, tables, pavilions/gazebos, playgrounds, restrooms, bicycle improvements, and various recreational areas/opportunities. The Bear Creek Greenway Project was added as a result of the blight created by the 2020 wildfires with the intention of preventing a similar catastrophe in the future. SECTION 1.7 MAXIMUM INDEBTEDNESS AND FINANCING MAXIMUM INDEBTEDNESS No changes to this section SECTION 1.8 ANNUAL FINANCIAL STATEMENT REQUIRED No changes to this section SECTION 1.9 CITIZEN PARTICIPATION No changes to this section 4.A.a Packet Pg. 8 Attachment: 1_Plan Amendment CP 07 26 2022 cc_eh [Revision 1] (1569 : Open House Downtown & East Pine Street Corridor Revitalization SECTION 1.10 NON-DISCRIMINATION No changes to this section SECTION 1.11 RECORDING OF PLAN No changes to this section SECTION 1.12 PROCEDURES FOR AMENDMENTS TO THE URBAN RENEWAL PLAN No changes to this section SECTION 13 DURATION AND VALIDITY OF APPROVED URBAN RENEWAL PLAN No changes to this section Exhibit 1 is updated to include the boundary changes of the 2022 Amendment. Note: The legal description narrative will be provided at the August 11th Central Point Development Commission meeting. Exhibit 2 is updated to include the boundary changes of the 2022 Amendment. Exhibit 2- Graphic Description of Urban Renewal Area with the 2022 Amendment Exhibit 3 is updated to include the boundary changes of the 2022 Amendment. 4.A.a Packet Pg. 9 Attachment: 1_Plan Amendment CP 07 26 2022 cc_eh [Revision 1] (1569 : Open House Downtown & East Pine Street Corridor Revitalization Exhibit -3 Urban Renewal Area Tax Lot Inventory Changes Properties Added Map Number Account Number Acreage 372W02D300 10195939 9.02 372W02D400 10998025 7.17 372W02D400 10195970 13.89 372W02D500 10195988 12.19 372W02D501 10992858 1.47 372W02D600 10195996 4.95 372W11A102 10799146 3.52 372W11A28100 10799152 1.38 372W12B501 10202983 2.55 372W12B502 10730828 13.21 372W12B505 10993098 4.25 372W12B600 10462312 13.91 372W02D700 10196009 1.88 TOTAL 89.39 Properties Removed Map Number Account Number Acreage 372W11BC5300 10179641 1.76 372W11BC5302 10714077 0.10 372W11BC5303 10714085 0.10 372W11BC5000 10179674 0.46 372W11BC5301 10705457 0.66 372W11BC5200 10179658 3.60 TOTAL 6.68 4.A.a Packet Pg. 10 Attachment: 1_Plan Amendment CP 07 26 2022 cc_eh [Revision 1] (1569 : Open House Downtown & East Pine Street Corridor Revitalization Appendix, Exhibit 4. This entire section is new. Central Point Comprehensive Plan 1.1. Community Engagement Community engagement and feedback played an important role in establishing a clear planning framework that reflects current community priorities. Throughout this planning process, the public provided information and expressed opinions about the needs and priorities for parks, trails and recreation facilities, including recreational programs in Central Point. A variety of public outreach methods were used; including community surveys, community meetings, stakeholder discussions, online engagement and emails, and Parks and Recreation Commission sessions. Feedback from the community outreach efforts played a crucial role in updating policies and prioritizing capital investments. The City’s residents are generally satisfied with the parks, trails and recreation opportunities in the City. Most residents care deeply about the future of the City’s parks, recreation and trail system and appreciate the opportunity to offer feedback in the development of the Parks Element, including a strong interest in additional or expanded services and facilities. Specific recommendations are included in the Needs Assessment chapter and the results from surveys, meeting notes and major findings are included in the Parks and Recreation Master Plan, a ten year parks and recreation development program. 1.2. Strategic Objectives Preparation of the Parks Element is based on six strategic objectives intended to guide City decision- making necessary to ensure that the City’s parks and recreation system meets the long-term needs of the community. These strategic objectives are: 1. Community Engagement and Communication: Encourage meaningful public involvement in park and recreation; 2. Recreation Programming: Establish and maintain a varied and inclusive suite of recreation programs that accommodate a spectrum of ages, interests and abilities and promote the health and wellness of the community; 3. Parks & Open Space: Acquire and develop a high-quality, diversified system of parks, recreation amenities and open spaces that provide equitable access to all residents; 4. Trails & Pathways: Develop a high-quality system of multi-use trails and bicycle and pedestrian corridors that connects to regional trails and provides access to public facilities, neighborhoods and businesses; 5. Design, Development & Management: Plan for a parks system that is efficient to maintain and operate, while protecting capital investment; and 6. Facilities Development Plan: Maintain and implement the Parks and Recreation Master Plan, a ten year parks and recreation development program. FINDING: There was significant public engagement in the development of the City of Central Point Parks Master Plan. A variety of public outreach methods were used, including:  A mail and online community survey  Two community meetings  Six stakeholder discussions  Website content & email blasts  mySidewalk online engagement platform 4.A.a Packet Pg. 11 Attachment: 1_Plan Amendment CP 07 26 2022 cc_eh [Revision 1] (1569 : Open House Downtown & East Pine Street Corridor Revitalization  Parks and Recreation Commission sessions (p11) 2.1.1.City Mission Statement The City’s mission statement reads as follows: It is the mission of the City of Central Point to build and maintain a highly livable community by working in harmony and being a catalyst for partnership with all the members of the community, public and private. 2.1.2.City Statement of Values The Strategic Plan contains a set of five values as follows: • Growth: We value planned growth that will retain our small town atmosphere. • Public Safety: We value a professional service oriented public safety policy that promotes a sense of safety and security in our city. • Transportation: We value a system of transportation and infrastructure that is modern, efficient and sensitive to the environment. • Community: We value a clean and attractive city with parks, open space and recreational opportunities. • Service: Provide highest level of service possible in the most efficient and responsible manner. FINDING: The Bear Creek Greenway project implements the Public Safety, Transportation and Community values by providing improvements to the greenway to improve resiliency in the face of fire, providing more park amenities for the community and an added alternative means of transportation for the community. The Beebe Road Extension project implements the Public Safety, Transportation and Community values by improving the transportation system. The Amendment conforms with the City Vision Statement of the Comprehensive Plan. 2.2.3.Central Point Parks and Recreation Master Plan The Central Point Parks and Recreation Master Plan10 (Parks Master Plan) is an adjunct document to the Parks Element, the purpose of which is to outline the goals, community needs, and implementation strategies to be achieved within a ten year program period. The Parks Master Plan outlines capital improvement, and lists and prioritizes projects across the city. Major recommendations include the acquisition of additional parkland, development of a swimming pool, development of a community center and the development of additional walking and bicycle paths throughout the city. 5.1.3.Parks & Open Space Goal 3: Acquire and develop a high-quality, diversified system of parks, recreation amenities and open spaces that provide equitable access to all residents. Policies 3.3 Prioritize park acquisition and development in underserved areas where households are more than ½- mile from a developed park. 3.4 Explore partnership with local utilities, public agencies and private landowners for easements for parkland, trail corridors and recreation facilities. 3.5 Pursue low-cost and/or non-purchase options to preserve open space, including the use of conservation easements and development agreements. 4.A.a Packet Pg. 12 Attachment: 1_Plan Amendment CP 07 26 2022 cc_eh [Revision 1] (1569 : Open House Downtown & East Pine Street Corridor Revitalization 3.8 Coordinate with public agencies and private landowners for the protection of valuable natural areas and sensitive lands through the purchase of development rights, easements or title and make these lands available for passive recreation as appropriate. 3.10 Manage vegetation in natural areas to support or maintain native plant species, habitat function and other ecological values; remove and control non-native or invasive plants as appropriate. 5.1.4.Trails & Pathways Goal 4: Develop a high-quality system of multi-use trails and bicycle and pedestrian corridors that connects to regional trails and provides access to public facilities, neighborhoods and businesses to promote exercise, walking and biking. Policies 4.1 Coordinate recreational path and trail system planning and development with the City’s and Jackson County’s Transportation System Plan to provide a comprehensive pedestrian and bicycle network. Coordinate with Medford’s pathway plans for improved connectivity. Create an updated Pedestrian and Bike Trails Plan. 4.2 Facilitate and provide improved pedestrian and bicycle connectivity from major shared-use paths, such as the Bear Creek Greenway, to parks and other destinations. 4.4 Expand the system of off-street trails by utilizing greenways, parks, utility corridors and critical areas as appropriate; purchase rights-of-way or easements as necessary. 4.5 Partner with local utilities, public agencies and private landowners to secure easements and access to open space for path and trail connections. 4.6 Implement trail, route and wayfinding signage for trails and associated facilities, informational maps and materials identifying existing and planned trail facilities. 4.7 Provide trailhead accommodations, as appropriate, to include parking, signage, restrooms and other amenities. 4.8 Promote the planning, design and implementation of safe pedestrian and bicycle routes during development review to encourage connectivity to parks, trails, schools and local goods and services. Safe connections should be required for new construction and retrofitted into older neighborhoods to promote community health and safe routes to destinations. FINDING: The implementation of the Bear Creek Greenway project will balance passive and active areas, including walking paths, benches, tables, pavilions/gazebos, playgrounds, restrooms, bicycle improvements, and various recreational areas/opportunities. The Amendment conforms with the Parks Element of the Comprehensive Plan. 5.1.5.Design, Development & Management Goal 5: Plan for a parks system that is efficient to maintain and operate, while protecting capital investment. 5.4 Formulate illustrative master plans for the development or redevelopment of each City park, as appropriate, to take advantage of grant or other funding opportunities. 5.5 Design parks and facilities to offer universal accessibility for residents of all physical capabilities, skill levels and age, as appropriate. 5.6 Incorporate sustainable development and low impact design practices into the design, planning and rehabilitation of new and existing facilities. 4.A.a Packet Pg. 13 Attachment: 1_Plan Amendment CP 07 26 2022 cc_eh [Revision 1] (1569 : Open House Downtown & East Pine Street Corridor Revitalization FINDING: The implementation of the Bear Creek Greenway project will be done within the guidelines of the Design, Development & Management goal of Comprehensive Plan. The Amendment conforms with the Parks Element of the Comprehensive Plan. Transportation Element The City of Central Point Transportation Systems Plan (TSP) was approved by the Central Point City Council on December 18, 2008 and is implemented by Ordinance #1922. The TSP is undergoing an amendment in 2022 which would add the Beebe Road Bridge project to cross Bear Creek and connect with Penninger Road. This amendment is expected to be finalized by 12/31/2022. By adding this to the TSP, the city is able to also able to allocate System Development Charges to the construction of the bridge that can be leveraged with urban renewal funding to undertake this project. FINDING: The Amendment and the added Bear Creek Greenway project and the Beebe Road extension and bridge project are in conformance with the City of Central Point Transportation Systems Plan. City of Central Point Parks Master Plan The City of Central Point Parks Master Plan states that a public survey found 72.5% of the respondents were from somewhat supportive to very supportive of upgrading the Bear Creek Greenway project. (p. 46) The Parks Master Plan also states “The City should consider adding the following recreation features in the development of new community parks to expand recreational opportunities:  Walking trails  Picnic shelters that allow larger family and community events.  Restrooms, bicycle parking, drinking fountains and other site furnishings that support residents’ use of parks.” (p. 62) “TRAILS (p 67 excerpt) Walking, walking a dog, running, and biking are among the most popular forms of recreation in the Central Point vicinity and statewide. Trails can serve as a safe location for all of these recreational activities, while providing active transportation connections and creating opportunities for users to enjoy nature. In the future, a Central Point trail system could build on the outstanding amenity of the Bear Creek Greenway to offer connections throughout the community. Upgrading existing trails and developing new trails were the top two resident priorities expressed in the community survey. Bear Creek Greenway Central Point is located along the northern portion of the Bear Creek Greenway, a multi-use trail that stretches 20 miles from Ashland to Central Point. The trail, which runs along Bear Creek and parallel to both I-5 and Highway 99, offers area residents a car-free route to walk and bike. With its proximity to the creek and adjacent riparian 4.A.a Packet Pg. 14 Attachment: 1_Plan Amendment CP 07 26 2022 cc_eh [Revision 1] (1569 : Open House Downtown & East Pine Street Corridor Revitalization areas, the Greenway provides unique bird watching, wildlife viewing and interpretive education opportunities. The Greenway is one of the most popular recreational amenities in the City. However, while two thirds of residents are happy with the condition of the Bear Creek Greenway, one third rated the condition as fair or poor – the highest negative rating of all City parks and facilities. In addition, 73% of residents were supportive of improving the Greenway. The City has set aside funding for trail maintenance (i.e. pavement repair and consistent signage), but the City should continue to partner with adjacent communities to improve the quality of experience along the trail.” FINDING: The Amendment and the added Bear Creek Greenway project are in conformance with the City of Central Point Parks Master Plan. 4.A.a Packet Pg. 15 Attachment: 1_Plan Amendment CP 07 26 2022 cc_eh [Revision 1] (1569 : Open House Downtown & East Pine Street Corridor Revitalization Report Accompanying the Downtown & East Pine Street Corridor Revitalizaton Plan This document remains draft until the City Council adoption of the Central Point Urban Renewal Plan. Downtown & East Pine Street Corridor Revitalizaton Plan Amendment adopted by the City of Central Point by Ordinance No. 1955 March 8, 2012 Subatantial Amendment adopted by the Cityof Central Point by Ordinance No. ____ on ____. 4.A.b Packet Pg. 16 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan LIST OF PARTICIPANTS City Council Henry (Hank) Williams, Mayor Dr. Neil Olsen, Ward I Kelley Johnson, Ward II Melody Thueson, Ward III Taneea Browning, Ward IV Michael Parsons, Member at Large 1 Rob Hernandez, Member at Large 2 Central Point Development Commission Henry (Hank) Williams Dr. Neil Olsen Kelley Johnson Melody Thueson Taneea Browning Michael Parsons Rob Hernandez Chris Clayton, Executive Director Steve Weber, Finance Director Planning Commission Thomas Van Voorhees (Chairperson) Jim Mock Kay Harrison Amy Moore Pat Smith Chris Richey Brad Cozza City of Central Point Staff Chris Clayton, City Manager Steve Weber, Finance Director Matt Samitore, Parks and Public Works Director Stephanie Holtey, CFM Planning Director Consulting Team Elaine Howard Consulting, LLC Elaine Howard Scott Vanden Bos Tiberius Solutions LLC Nick Popenuk Ali Danko Rob Wyman 4.A.b Packet Pg. 17 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan TABLE OF CONTENTS I. INTRODUCTION ............................................................................................................... 1 II. THE PROJECTS IN THE AREA AND THE RELATIONSHIP BETWEEN URBAN RENEWAL PROJECTS AND THE EXISTING CONDITIONS IN THE URBAN RENEWAL AREA ...................................................................................................... 4 III. THE ESTIMATED TOTAL COST OF EACH PROJECT AND THE SOURCES OF MONEYS TO PAY SUCH COSTS ............................................................................. 6 IV. FINANCIAL ANALYSIS OF THE PLAN ........................................................................... 7 V. THE ESTIMATED AMOUNT OF TAX INCREMENT REVENUES REQUIRED AND THE ANTICIPATED YEAR IN WHICH INDEBTEDNESS WILL BE RETIRED ................. 10 VI. THE ANTICIPATED COMPLETION DATE FOR EACH PROJECT ............................... 15 VII. REVENUE SHARING ................................................................................................... 19 VIII. IMPACT OF THE TAX INCREMENT FINANCING ....................................................... 19 IX. COMPLIANCE WITH STATUTORY LIMITS ON ASSESSED VALUE AND SIZE OF URBAN RENEWAL AREA ....................................................................................... 23 X. EXISTING PHYSICAL, SOCIAL, AND ECONOMIC CONDITIONS AND IMPACTS ON MUNICIPAL SERVICES .......................................................................................... 24 XI. REASONS FOR SELECTION OF EACH URBAN RENEWAL AREA IN THE PLAN ...... 36 XII. RELOCATION REPORT ............................................................................................... 36 4.A.b Packet Pg. 18 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Definitions “Agency” means the Central Point Development Commission “Area” means the properties and rights-of-way located with the Downtown and East Pine Street Corridor Revitalization Plan Area. “Blight” is defined in ORS 457.010(1)(A-E) and identified in the ordinance adopting the urban renewal plan. “Board of Commissioners” means the Jackson County Board of Commissioners. “City” means the City of Central Point, Oregon. “City Council” or “Council” means the Central Point City Council. “Comprehensive Plan” means the City of Central Point comprehensive land use plan and its implementing ordinances, policies, and standards. “County” means Jackson County, Oregon. “Fiscal year” means the year commencing on July 1 and closing on June 30. “Frozen base” means the total assessed value including all real, personal, manufactured, and utility values within an urban renewal area at the time of adoption. The county assessor certifies the assessed value after the adoption of an urban renewal plan. “Increment” means that part of the assessed value of a taxing district attributable to any increase in the assessed value of the property located in an urban renewal area, or portion thereof, over the assessed value specified in the certified statement. “Maximum indebtedness” means the amount of the principal of indebtedness included in a plan pursuant to ORS 457.190 and does not include indebtedness incurred to refund or refinance existing indebtedness. “ORS” means the Oregon revised statutes and specifically Chapter 457, which relates to urban renewal. “Planning Commission” means the Central Point Planning Commission. “Revenue sharing” means sharing tax increment proceeds as defined in ORS 457.470. “Tax increment financing (TIF)” means the funds that are associated with the division of taxes accomplished through the adoption of an urban renewal plan. “Tax increment revenues” means the funds allocated by the assessor to an urban renewal area due to increases in assessed value over the frozen base within the area. “UGB” means urban growth boundary. “Urban renewal area” means a blighted area included in an urban renewal plan or an area included in an urban renewal plan under ORS 457.160. “Urban renewal plan” or “Plan” means a plan, as it exists or is changed or modified from time to time, for one or more urban renewal areas, as provided in ORS 457.085, 457.095, 457.105, 457.115, 457.120, 457.125, 457.135 and 457.220. 4.A.b Packet Pg. 19 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan “Urban renewal project” or “Project” means any work or undertaking carried out under ORS 457.170 in an urban renewal area. “Urban renewal report” or “Report” means the official report that accompanies the urban renewal plan pursuant to ORS 457.085(3). 4.A.b Packet Pg. 20 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 1 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment I. INTRODUCTION The Report Accompanying the Downtown & East Pine Street Corridor Revitalizaton Plan Amendment (Report) contains background information and project details that pertain to the Downtown & East Pine Street Corridor Revitalizaton Plan Amendment (Plan Amendment). The Report is not a legal part of the Plan Amendment, but is intended to provide public information and support the findings made by the Central Point City Council as part of the approval of the Plan Amendment. The Report provides the analysis and contains the information required to meet the standards of ORS 457.087, including financial feasibility. These requirements include:  A description of the physical, social, and economic conditions in the area and expected impact of the plan, including fiscal impact in light of increased services; (ORS 457.087(1))  Reasons for selection of the plan Area; (ORS 457.087(2))  The relationship between each project to be undertaken and the existing conditions; (ORS 457.087(3))  The estimated total cost of each project and the source of funds to pay such costs; (ORS 457.087(4))  The estimated completion date of each project; (ORS 457.087(5))  The estimated amount of funds required in the Area and the anticipated year in which the debt will be retired; (ORS 457.087(6))  A financial analysis of the plan; (ORS 457.087(7))  A fiscal impact statement that estimates the impact of tax increment financing (TIF) upon all entities levying taxes upon property in the urban renewal area; (ORS 457.0857(8)) and  A relocation report (ORS 457.087(9)). The relationship of the sections of the Report and the ORS 457.087 requirements is shown in Table 1. The specific reference shown is the section of this Report that most addresses the statutory reference. There may be other sections of the Report that also address the statute. 4.A.b Packet Pg. 21 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 2 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 1 - Statutory References Statutory Requirement Report Section ORS 457.087 (1) X ORS 457.087 (2) XI ORS 457.087 (3) II ORS 457.087 (4) III ORS 457.087 (5) VI ORS 457.087 (6) IV,V ORS 457.087 (7) IV,V ORS 457.087 (8) VIII ORS 457.087 (9) XII The Report provides guidance on how the Plan might be implemented. As the Central Point Development Commission (CPDC) reviews revenues and potential projects each year, it has the authority to adjust the implementation assumptions in this Report. The CPDC may allocate budgets differently, adjust the timing of the projects, decide to incur debt at different times than assumed in this Report, and make other adjustments to the financials as determined by the CPDC. The CPDC may also make changes as allowed in the Amendments section of the Plan. 4.A.b Packet Pg. 22 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 3 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Figure 1 - Downtown & East Pine Street Corridor Revitalizaton Plan Boundary Source: Tiberius Solutions 4.A.b Packet Pg. 23 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 4 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment II. THE PROJECTS IN THE AREA AND THE RELATIONSHIP BETWEEN URBAN RENEWAL PROJECTS AND THE EXISTING CONDITIONS IN THE URBAN RENEWAL AREA This section details the new projects added to the Plan by the Amendment. Information on projects already within the Plan is not required in this section. The new projects identified for the Amendment are described below, including how they relate to the existing conditions in the Area. A. Bear Creek Greenway Project. Improve the publicly owned lands adjacent to the Bear Creek Greenway from E. Pine Street to the Table Rock Overpass. The newly created park system will balance passive and active areas, including walking paths, benches, tables, pavilions/gazebos, playgrounds, restrooms, bicycle improvements, and various recreational areas/opportunities. The Bear Creek Greenway Project was added as a result of the blight created by the 2020 wildfires, with the intention of preventing a similar catastrophe in the future. Existing Conditions: The 2020 Alameda Fire burned through the Bear Creek Greenway. The area has not been fully restored and needs additional improvements to help prevent future fire damage. catastrophes. Additionally, the Bear Creek Master Plan identifies a need for additional park facilities in Central Point. B. Beebe Road Bridge Extension. Extend Beebe Road from its current intersection with Gebhard Road to the west, through Jackson County Expo, to connect with Penninger Road. This project includes intersection improvements at Penninger & Beebe Roads and Beebe & Gebhard Roads. Existing Conditions: Beebe Road currently ends at its intersection with Gebhard Road. There is no connection from Beebe Road to Penninger Road. The intersection at Beebe and Gebhard Road is a two way connection. The road does not extend over Bear Creek. 4.A.b Packet Pg. 24 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 5 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Figure 2 - Bear Creek Greenway Site Plan 4.A.b Packet Pg. 25 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Page 6 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment III. THE ESTIMATED TOTAL COST OF EACH PROJECT AND THE SOURCES OF MONEYS TO PAY SUCH COSTS Table 2 shows the costs of the projects in FYE 2022 constant dollars and the estimated year of expenditure dollars. These costs are also shown in “year of expenditure” costs, which assumes inflation of 3.0% annually. City Staff provides cost estimates and are reviewed by City Council. These estimates are ballpark estimates and will be refined in the annual budgeting process with the acknowledgement of the limiting total cost factor of the maximum indebtedness. Different allocations may be made to different line items within the Plan. The Plan assumes that the CPDC/City will use other funds to assist in the completion of the projects within the Area. The CPDC/City may pursue regional, county, state, and federal funding, private developer contributions, and any other sources of funding that may assist in the implementation of the programs. Table 2 – Estimated Project Costs Expenditures (Constant FYE 2022) Constant 2022$ Year of Expenditure $ Materials and Services (144,136) (146,000) Façade Improvement (68,981) (70,000) Economic Incentive - - Pine Street/Downtown - - Pfaff Restrooms (200,000) (200,000) Hamrick & Pine (857,524) (875,000) Community Center (4,500,000) 5,272,470 Bear Creek Greenway (3,500,000) (3,939,250) Crater Ped Crossing (100,000) (100,000) Capital Project Design Cost (631,068) (650,000) TPR Planning (48,544) (50,000) Bridge (5,500,000) (6,567,550) Miscellaneous Public Works Projects (9,123,870) (13,389,432) Fire District 3 Equipment/Fire Safety (1,500,000) (2,407,050) Economic Development Incentive (3,500,000) (5,082,700) Other Projects - - Financing Fees (204,291) (232,000) Administration - - Total Expenditures (29,878,413) (38,981,452) Source: Tiberius Solutions with input from the City of Central Point staff 4.A.b Packet Pg. 26 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 7 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment IV. FINANCIAL ANALYSIS OF THE PLAN The estimated tax increment revenues through Fiscal Year Ending (FYE) 2040 are calculated based on projections of the assessed value within the Area and the consolidated tax rate that will apply in the Area. The long-term projections for FYE 2022 and beyond assume an annual growth rate for assessed value in the Area of 3.5% for through FYE 2029 and 4.0% for the remainder of the life of the Plan. These projections of growth are the basis for the projections in Table 6, through Table 8. Assessed value in FYE 2024 is anticipated to grow by an additional 0.1%, due to the addition of properties to the Area boundary. If actual assessed value growth is less than forecast, then it would reduce the financial capacity of the Area to fund projects listed in the Plan over the anticipated duration of the Plan. Table 3 shows the incremental assessed value, tax rates, and tax increment revenues each year, adjusted for discounts, delinquencies, and truncation loss. The first year of tax increment collections is anticipated to be FYE 2022. Gross tax increment financing revenue (TIF) is calculated by multiplying the tax rate times the assessed value used. The tax rate is per thousand dollars of assessed value, so the calculation is “tax rate times assessed value used divided by one thousand.” The consolidated tax rate includes only permanent tax rates. General obligation bonds and local option levies are excluded, and will not be impacted by this Plan. Figure 3 shows expected TIF revenues over time and the projected tax revenues after termination of the Area. 4.A.b Packet Pg. 27 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 8 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 3 - Projected Incremental Assessed Value, Tax Rates, and Tax Increment Revenues FYE Total AV Frozen Base AV Increment Applied Increment Shared Tax Rate Gross TIF Adjustmen ts Current Year Net Prior Year Net Total TIF 2022 195,158,782 139,787,170 55,371,612 - 15.7106 869,921 (43,496) 826,425 13,049 839,474 2023 201,938,363 139,787,170 62,151,193 - 15.7106 976,433 (48,822) 927,611 12,396 940,007 2024 209,083,470 139,909,490 69,173,980 - 15.7106 1,086,765 (54,338) 1,032,426 13,914 1,046,341 2025 216,347,310 139,909,490 76,437,820 - 15.7106 1,200,884 (60,044) 1,140,840 15,486 1,156,326 2026 223,863,763 139,909,490 83,954,273 - 15.7106 1,318,972 (65,949) 1,253,023 17,113 1,270,136 2027 238,088,140 139,909,490 98,178,650 - 15.7106 1,542,446 (77,122) 1,465,323 18,795 1,484,119 2028 271,844,661 139,909,490 131,935,171 - 15.7106 2,072,781 (103,639) 1,969,142 21,980 1,991,122 2029 287,976,687 139,909,490 148,067,197 - 15.7106 2,326,225 (116,311) 2,209,913 29,537 2,239,450 2030 298,970,782 139,909,490 159,061,292 - 15.7106 2,498,948 (124,947) 2,374,001 33,149 2,407,150 2031 310,388,891 139,909,490 170,479,401 - 15.7106 2,678,334 (133,917) 2,544,417 35,610 2,580,027 2032 322,247,502 139,909,490 182,338,012 - 15.7106 2,864,640 (143,232) 2,721,408 38,166 2,759,574 2033 334,563,750 139,909,490 194,654,260 - 15.7106 3,058,135 (152,907) 2,905,228 40,821 2,946,050 2034 347,355,437 139,909,490 207,445,947 - 15.7106 3,259,100 (162,955) 3,096,145 43,578 3,139,724 2035 360,641,066 139,909,490 220,731,576 - 15.7106 3,467,826 (173,391) 3,294,434 46,442 3,340,876 2036 374,439,863 139,909,490 234,530,373 - 15.7106 3,684,613 (184,231) 3,500,382 49,417 3,549,799 2037 388,771,806 139,909,490 248,862,316 - 15.7106 3,909,776 (195,489) 3,714,287 52,506 3,766,793 2038 403,657,657 139,909,490 263,748,167 - 15.7106 4,143,642 (207,182) 3,936,460 55,714 3,992,174 2039 419,118,991 139,909,490 279,209,501 - 15.7106 4,386,549 (219,327) 4,167,221 59,047 4,226,268 2040 435,178,229 139,909,490 206,697,513 88,571,226 15.7106 3,247,342 (162,367) 3,084,975 62,508 3,147,483 TOTAL: 48,593,332 (2,429,666) 46,163,661 659,228 46,822,893 Source: Tiberius Solutions 4.A.b Packet Pg. 28 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Page 9 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Figure 3 - TIF Projections Over Time Source: Tiberius Solutions Figure 4 – Resources Including Future Bonds Over Time Source: Tiberius Solutions $- $1 $2 $3 $4 $5 $6 $7 $8 $9 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044Gross Tax Revenue (Millions)FYE To Taxing Districts from Frozen Base URA EXpiresTo URA from Increment Shared $- $1 $2 $3 $4 $5 $6 2022202320242025202620272028202920302031203220332034203520362037203820392040MillionsFYE Gross TIF (YOE$)Capacity (2022$) 4.A.b Packet Pg. 29 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 10 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment V. THE ESTIMATED AMOUNT OF TAX INCREMENT REVENUES REQUIRED AND THE ANTICIPATED YEAR IN WHICH INDEBTEDNESS WILL BE RETIRED Table 4 shows a summary of the financial capacity of the Area, including how total TIF revenue translates to the ability to fund projects in constant 2022 dollars, in five-year increments. Table 6 through Table 8 show more detailed tables on the allocation of tax revenues to debt service. Table 9 through Table 11 show potential allocations to projects, programs, and administration over time. The Area is anticipated to complete all projects and have sufficient tax increment finance revenue to terminate the urban renewal area in FYE 2040. If growth in assessed value is slower than projected, the Agency may not be able to complete all projects in the Plan. If growth in assessed value is more robust than the projections, it may take a shorter time period. These assumptions show one scenario for financing and that this scenario is financially feasible. The maximum indebtedness is $43,177,530 (Forty-Three Million One Hundred Seventy-Seven Thousand Five Hundred Thirty). The estimated total amount of TIF revenues required to service the remaining maximum indebtedness as of June 30, 2021, $38,891,711, is $46,822,892 and is from permanent rate tax levies. The additional TIF revenue required is greater than the maximum indebtedness remaining due to the projected cost of the interest on borrowings (loans). Table 4 - TIF Capacity of the Area in FYE 2022 Constant Rounded Numbers Net TIF $ 46,800,000 Maximum Indebtedness $ 43,177,530 Remaining MI as of June 30, 2021 $ 38,891,711 Capacity (2022$) of remaining MI $ 29,900,000 Years 1-5 $ 9,200,000 Years 6-10 $ 6,300,000 Years 11-15 $ 9,700,000 Years 16-19 $ 4,800,000 Source: Tiberius Solutions This financial analysis shows projected borrowings as identified in Table 5. This is only one scenario for how the Agency may decide to implement this Plan, and this scenario is financially feasible. The Agency may decide to do borrowings at different times or for different amounts, depending on their analysis at the time. The timeframes on these borrowings are designed to have all borrowings repaid at the termination of the District in FYE 2040. The amounts shown are the principal amounts of the borrowings. The total amounts, including interest, are shown in the second column of Table 6. 4.A.b Packet Pg. 30 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 11 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 5 - Estimated Borrowings and Amounts Loan A Loan B Loan C Principal Amount 3,300,000 3,000,000 5,300,000 Interest Rate 3.00% 5.00% 5.00% Loan Term 20 20 20 Loan Year 2024 2026 2028 Interest Payment Start 2024 2026 2028 Principal Payment Start 2024 2026 2028 Annual Payment ($221,811.84) ($240,727.76) ($425,285.71) Source: Tiberius Solution 4.A.b Packet Pg. 31 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 12 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 6 - Tax Increment Revenues and Allocations to Debt Service, Page 1 Total FYE 2022 FYE 2023 FYE 2024 FYE 2025 FYE 2026 FYE 2027 Resources - - - - - - - Beginning Balance 956,840 - - - - - Interest Earnings 12,625 12,625 - - - - - TIF: Current Year 46,163,663 826,425 927,611 1,032,426 1,140,840 1,253,023 1,465,323 TIF: Prior Years 659,229 13,049 12,396 13,914 15,486 17,113 18,795 Total Resources 47,792,357 1,808,939 940,007 1,046,341 1,156,326 1,270,136 1,484,119 Expenditures - - - - - - - Debt Service - - - - - - - Scheduled Payments - - - - - - - Loan A (3,548,989) - - (221,812) (221,812) (221,812) (221,812) Loan B (3,610,916) - - - - (240,728) (240,728) Loan C (5,528,714) - - - - - - FY 2017-18 Bond (3,533,091) (288,857) (312,917) (341,119) (363,463) (383,041) (395,960) Early Principal Payment Loan A (824,496) - - - - - - Loan B (993,577) - - - - - - Loan C (2,460,862) - - - - - - Total Debt Service, Scheduled Only (16,221,711) (288,857) (312,917) (562,931) (585,275) (845,581) (858,499) Total Debt Service (20,500,646) (288,857) (312,917) (562,931) (585,275) (845,581) (858,499) Debt Service Coverage Ratio 2.91 3.00 1.86 1.98 1.50 1.73 Transfer to URA Projects Fund (27,291,711) (1,520,082) (627,090) (483,410) (571,052) (424,555) (625,619) Total Expenditures (47,792,357) (1,808,939) (940,007) (1,046,341) (1,156,326) (1,270,136) (1,484,119) Ending Balance - - - - - - - Source: Tiberius Solutions 4.A.b Packet Pg. 32 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Page 13 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 7 - Tax Increment Revenues and Allocations to Debt Service, Page 2 FYE 2028 FYE 2029 FYE 2030 FYE 2031 FYE 2032 FYE 2033 FYE 2034 Resources - - - - - - Beginning Balance - - - - - - Interest Earnings - - - - - - TIF: Current Year 1,969,142 2,209,913 2,374,001 2,544,417 2,721,408 2,905,228 3,096,145 TIF: Prior Years 21,980 29,537 33,149 35,610 38,166 40,821 43,578 Total Resources 1,991,122 2,239,450 2,407,150 2,580,027 2,759,574 2,946,050 3,139,724 Expenditures Debt Service Scheduled Payments Loan A (221,812) (221,812) (221,812) (221,812) (221,812) (221,812) (221,812) Loan B (240,728) (240,728) (240,728) (240,728) (240,728) (240,728) (240,728) Loan C (425,286) (425,286) (425,286) (425,286) (425,286) (425,286) (425,286) FY 2017-18 Bond (361,918) (362,087) (362,018) (361,712) Total Debt Service (1,249,743) (1,249,912) (1,249,844) (1,249,538) (887,825) (887,825) (887,825) Debt Service Coverage Ratio 1.59 1.79 1.93 2.06 3.11 3.32 3.54 Transfer to URA Projects Fund (741,379) (989,538) (1,157,306) (1,330,489) (1,871,749) (2,058,224) (2,251,898) Total Expenditures (1,991,122) (2,239,450) (2,407,150) (2,580,027) (2,759,574) (2,946,050) (3,139,724) Ending Balance - - - - - - Source: Tiberius Solutions 4.A.b Packet Pg. 33 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Page 14 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 8 - Tax Increment Revenues and Allocations to Debt Service, Page 3 FYE 2035 FYE 2036 FYE 2037 FYE 2038 FYE 2039 FYE 2040 Resources - - - - - - Beginning Balance - - - - - - Interest Earnings - - - - - - TIF: Current Year 3,294,434 3,500,382 3,714,287 3,936,460 4,167,221 3,084,975 TIF: Prior Years 46,442 49,417 52,506 55,714 59,047 62,508 Total Resources 3,340,876 3,549,799 3,766,793 3,992,174 4,226,268 3,147,483 Expenditures Debt Service Scheduled Payments Loan A (221,812) (221,812) (221,812) (221,812) (221,812) - Loan B (240,728) (240,728) (240,728) (240,728) (240,728) (240,728) Loan C (425,286) (425,286) (425,286) (425,286) (425,286) (425,286) FY 2017-18 Bond Early Principal Payment - - - - Loan A - - - (824,496) - Loan B - - - (972,969) (20,608) Loan C - - - - (2,460,862) Total Debt Service, Scheduled Only (887,825) (887,825) (887,825) (887,825) (887,825) (666,013) Total Debt Service (887,825) (887,825) (887,825) (887,825) (2,685,291) (3,147,483) Debt Service Coverage Ratio 3.76 4.00 4.24 4.50 4.76 4.73 Transfer to URA Projects Fund (2,453,051) (2,661,973) (2,878,968) (3,104,349) (1,540,978) - Total Expenditures (3,340,876) (3,549,799) (3,766,793) (3,992,174) (4,226,268) (3,147,483) Ending Balance - - - - - Source: Tiberius Solutions 4.A.b Packet Pg. 34 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Page 15 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment VI. THE ANTICIPATED COMPLETION DATE FOR EACH PROJECT The schedule for construction of projects will be based on the availability of funding. The projects will be ongoing and will be completed as directed by the CPDC. Annual expenditures for program administration are also included. The amount of money available for projects in 2022 constant dollars for the Area is $29,878,413. See Table 2 for the individual project analysis. This $29,878,413 is calculated by reflecting the maximum indebtedness of $43,177,530 in constant 2022 dollars. The CPDC’s cost estimates are typically shown in constant dollars, so understanding how these cost estimates relate to the overall maximum indebtedness over the ensuing years is important to help the CPDC to make projections on the allocation of funds throughout the life of the Area. Table 9 through Table 11 show the $29,878,413 of 2022 project dollars inflated over the life of the Area, including administrative expenses. All costs shown in Table 9 through Table 11 are in year-of- expenditure dollars, which are adjusted by 3.0% annually to account for inflation. The year of expenditure total cost is $38,981,452. The 3.0% inflation rate is the rate to use in the future if any amendment to increase maximum indebtedness is pursued in accordance with ORS 457.470.The CPDC may change the completion dates in their annual budgeting process or as project decisions are made in administering the Plan. The following tables are prepared to show that the Area is financially feasible as required by ORS 457. It assumes completion of projects as funding becomes available. 4.A.b Packet Pg. 35 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 16 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 9 - Programs and Costs in Year of Expenditure Dollars, Page 1 TOTAL FYE 2022 FYE 2023 FYE 2024 FYE 2025 FYE 2026 FYE 2027 FYE 2028 Resources Beginning Balance - 828,082 60,313 64,875 636,250 64,736 690,680 Interest Earnings 89,741 - 4,140 302 324 3,181 324 3,453 Transfer from TIF Fund 27,291,711 1,520,082 627,090 483,410 571,052 424,555 625,619 741,379 Bond/Loan Proceeds 11,600,000 - - 3,300,000 - 3,000,000 - 5,300,000 Total Resources 38,981,452 1,520,082 1,459,313 3,844,025 636,250 4,063,986 690,680 6,735,511 Expenditures (YOE $) Materials and Services (146,000) (82,000) (64,000) Façade Improvement (70,000) (35,000) (35,000) Economic Incentive 0 Pine Street/Downtown 0 Pfaff Restrooms (200,000) (200,000) Hamrick & Pine (875,000) (275,000) (600,000) Community Center 5,272,470 (3,713,150) Bear Creek Greenway (3,939,250) (3,939,250) Crater Ped Crossing (100,000) (100,000) Capital Project Design Cost (650,000) (650,000) TPR Planning (50,000) (50,000) Bridge (6,567,550) (6,567,550) Miscellaneous Public Works Projects (13,389,432) Fire District 3 Equipment/Fire Safety (2,407,050) Economic Development Incentive (5,082,700) Financing Fees (232,000) (60,000) (106,000) Administration Total Expenditures (38,981,452) (3,999,250) (6,673,550) Ending Balance 828,082 60,313 64,875 636,250 64,736 690,680 61,961 Source: Tiberius Solutions Table 10 - Programs and Costs in Year of Expenditure Dollars, Page 2 4.A.b Packet Pg. 36 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Page 17 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment FYE 2029 FYE 2030 FYE 2031 FYE 2032 FYE 2033 FYE 2034 FYE 2035 FYE 2036 Resources Beginning Balance 61,961 1,051,810 1,770,995 2,653,659 708,560 2,285,858 485,940 2,133,746 Interest Earnings 310 5,259 8,855 13,268 3,543 11,429 2,430 10,669 Transfer from TIF Fund 989,538 1,157,306 1,330,489 1,871,749 2,058,224 2,251,898 2,453,051 2,661,973 Bond/Loan Proceeds 0 0 0 0 0 0 0 0 Total Resources 1,051,810 2,214,375 3,110,339 4,538,675 2,770,328 4,549,185 2,941,421 4,806,389 Expenditures (YOE $) Materials and Services Façade Improvement Economic Incentive Pine Street/Downtown Pfaff Restrooms Hamrick & Pine Community Center (293,700) (302,520) Bear Creek Greenway Crater Ped Crossing Capital Project Design Cost TPR Planning Bridge Miscellaneous Public Works Projects (3,359,750) (3,564,250) (3,781,500) Fire District 3 Equipment/Fire Safety Economic Development Incentive (443,380) (456,680) (470,365) (484,470) (498,995) (513,975) (529,410) Financing Fees Administration Total Expenditures 0 (443,380) (456,680) (3,830,115) (484,470) (4,063,245) (807,675) (4,613,430) Ending Balance 1,051,810 1,770,995 2,653,659 708,560 2,285,858 485,940 2,133,746 192,959 Source: Tiberius Solutions 4.A.b Packet Pg. 37 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Page 18 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 11 - Programs and Costs in Year of Expenditure Dollars, Page 3 FYE 2037 FYE 2038 FYE 2039 Resources Beginning Balance Interest Earnings 965 11,080 10,209 Transfer from TIF Fund 2,878,968 3,104,349 1,540,978 Bond/Loan Proceeds 0 0 0 Total Resources 3,072,892 5,331,420 3,592,972 Expenditures (YOE $) Materials and Services Façade Improvement Economic Incentive Pine Street/Downtown Pfaff Restrooms Hamrick & Pine Community Center (311,600) (320,940) (330,560) Bear Creek Greenway Crater Ped Crossing Capital Project Design Cost TPR Planning Bridge Miscellaneous Public Works Projects (2,683,932) Fire District 3 Equipment/Fire Safety (2,407,050) Economic Development Incentive (545,300) (561,645) (578,480) Financing Fees Administration Total Expenditures (856,900) (3,289,635) (3,592,972) Ending Balance 2,215,992 2,041,785 0 Source: Tiberius Solutions 4.A.b Packet Pg. 38 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Page 19 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment VII. REVENUE SHARING Revenue sharing targets are projected to be reached in FYE 2040, as the threshold set in ORS 457 (annual tax increment revenues in excess of 10 percent of the maximum indebtedness) is met the previous year, FYE 2039. In addition, the MI is expected to be reached in FYE 2040, meaning the CPDC is not projected to take the full division of taxes that year, but to underlevy for both the mandatory revenue sharing and the amount that exceeds the MI. Revenue sharing means that, at thresholds defined in ORS 457.470, the impacted taxing jurisdictions will receive a share of the incremental growth in the Area. The first threshold is when annual tax increment finance revenues exceed 10% of the original maximum indebtedness of the Plan ($43,177,530 x.10% is $4,317,753). At the 10% threshold, the Agency will receive the full 10% of the initial maximum indebtedness plus 25% of the increment above the 10% threshold, and the taxing jurisdictions will receive 75% of the increment above the 10% threshold. The second threshold is set at 12.5% of the maximum indebtedness is $5,397,191 ($43,177,530 x.12.5%). If this threshold is met, revenue for the Area would be capped at 12.5% of the maximum indebtedness, with all additional tax revenue being shared with affected taxing districts. If assessed value in the Area grows more quickly than projected, the revenue sharing thresholds could be reached earlier. VIII. IMPACT OF THE TAX INCREMENT FINANCING This section describes the impact of tax increment financing of the maximum indebtedness, both until and after the indebtedness is repaid, upon all entities levying taxes upon property in the Area. The impact of tax increment financing on overlapping taxing districts consists primarily of the property tax revenues foregone on permanent rate levies as applied to the growth in assessed value in the Area. These projections are for impacts estimated through FYE 2040 and are shown in Table 12 for the general government taxing districts and Table 13 for the education taxing districts. The Central Point School District 6 and the Southern Oregon Education Service District are not directly affected by the tax increment financing, but the amounts of their taxes divided for the Plan are shown in the following tables. Under current school funding law, property tax revenues are combined with State School Fund revenues to achieve per-student funding targets. Under this system, property taxes foregone, due to the use of tax increment financing, are substantially replaced with State School Fund revenues, as determined by a funding formula at the state level. 4.A.b Packet Pg. 39 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 20 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 12 - Projected Impact on Taxing District Permanent Rate Levies - General Government FYE Jackson County 4-H Extension Service District Vector Control RVTD Jackson Soil & Water Cons Jackson County Library Dist City of Central Point Jackson County RFPD #3 Subtotal 2022 (107,396) (2,276) (2,292) (9,468) (2,672) (27,785) (238,848) (166,681) (557,419) 2023 (120,258) (2,549) (2,567) (10,602) (2,992) (31,113) (267,452) (186,642) (624,174) 2024 (133,861) (2,837) (2,857) (11,802) (3,330) (34,632) (297,706) (207,755) (694,781) 2025 (147,932) (3,135) (3,158) (13,042) (3,680) (38,273) (328,999) (229,593) (767,812) 2026 (162,492) (3,444) (3,468) (14,326) (4,042) (42,040) (361,381) (252,190) (843,383) 2027 (189,867) (4,024) (4,053) (16,739) (4,723) (49,122) (422,263) (294,677) (985,470) 2028 (254,730) (5,399) (5,437) (22,458) (6,337) (65,903) (566,516) (395,345) (1,322,125) 2029 (286,499) (6,072) (6,115) (25,259) (7,127) (74,123) (637,171) (444,651) (1,487,018) 2030 (307,953) (6,527) (6,573) (27,150) (7,661) (79,673) (684,885) (477,949) (1,598,372) 2031 (330,070) (6,996) (7,045) (29,100) (8,211) (85,395) (734,073) (512,274) (1,713,164) 2032 (353,040) (7,483) (7,535) (31,125) (8,783) (91,338) (785,157) (547,924) (1,832,385) 2033 (376,896) (7,988) (8,045) (33,229) (9,376) (97,510) (838,214) (584,949) (1,956,207) 2034 (401,673) (8,514) (8,573) (35,413) (9,992) (103,921) (893,318) (623,404) (2,084,809) 2035 (427,407) (9,059) (9,123) (37,682) (10,633) (110,579) (950,550) (663,344) (2,218,376) 2036 (454,135) (9,625) (9,693) (40,038) (11,297) (117,494) (1,009,993) (704,826) (2,357,103) 2037 (481,896) (10,214) (10,286) (42,486) (11,988) (124,676) (1,071,733) (747,911) (2,501,189) 2038 (510,730) (10,825) (10,901) (45,028) (12,705) (132,136) (1,135,859) (792,662) (2,650,845) 2039 (540,678) (11,460) (11,540) (47,668) (13,450) (139,884) (1,202,463) (839,142) (2,806,286) 2040 (402,666) (8,535) (8,595) (35,500) (10,017) (104,178) (895,526) (624,945) (2,089,961) TOTAL: (5,990,181) (126,962) (127,856) (528,116) (149,017) (1,549,776) (13,322,109) (9,296,865) (31,090,882) Source: Tiberius Solutions 4.A.b Packet Pg. 40 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Page 21 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 13 - Projected Impact on Taxing District Permanent Rate Levies - Education FYE Education Service District RCC Central Pt SD 6 Subtotal Total 2022 (18,830) (27,401) (235,824) (282,055) (839,474) 2023 (21,085) (30,682) (264,066) (315,833) (940,007) 2024 (23,470) (34,153) (293,937) (351,560) (1,046,341) 2025 (25,937) (37,743) (324,834) (388,514) (1,156,326) 2026 (28,490) (41,458) (356,805) (426,753) (1,270,136) 2027 (33,290) (48,442) (416,917) (498,649) (1,484,119) 2028 (44,662) (64,991) (559,343) (668,996) (1,991,122) 2029 (50,232) (73,097) (629,103) (752,432) (2,239,450) 2030 (53,994) (78,570) (676,213) (808,778) (2,407,150) 2031 (57,872) (84,213) (724,778) (866,863) (2,580,027) 2032 (61,899) (90,074) (775,216) (927,188) (2,759,574) 2033 (66,082) (96,160) (827,600) (989,842) (2,946,050) 2034 (70,426) (102,482) (882,007) (1,054,915) (3,139,724) 2035 (74,938) (109,047) (938,514) (1,122,500) (3,340,876) 2036 (79,625) (115,867) (997,205) (1,192,696) (3,549,799) 2037 (84,492) (122,950) (1,058,162) (1,265,604) (3,766,793) 2038 (89,547) (130,306) (1,121,476) (1,341,329) (3,992,174) 2039 (94,798) (137,947) (1,187,237) (1,419,983) (4,226,268) 2040 (70,600) (102,735) (884,187) (1,057,522) (3,147,483) TOTAL: (1,050,271) (1,528,317) (13,153,422) (15,732,010) (46,822,892) Source: Tiberius Solutions Table 14 shows the projected increased revenue to the taxing jurisdictions after tax increment proceeds are projected to be terminated. These projections are for FYE 2041. The Frozen Base is the assessed value of the Area established by the county assessor at the time the Area is established. Excess Value is the increased assessed value in the Area above the Frozen Base. 4.A.b Packet Pg. 41 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 22 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Table 14 - Additional Revenues Obtained after Termination of Tax Increment Financing – FYE 2041 Taxing District Tax Rate From Frozen Base From Excess Value TOTAL General Government Jackson County 2.0099 $281,204 $626,987 $908,191 4-H Extension Service District 0.0426 $5,960 $13,289 $19,249 Vector Control 0.0429 $6,002 $13,383 $19,385 Rogue Valley Transit D 0.1772 $24,792 $55,277 $80,069 Jackson Soil & Water Conservation 0.0500 $6,995 $15,597 $22,592 Jackson County Library District 0.5200 $72,753 $162,214 $234,967 City of Central Point 4.4700 $625,395 $1,394,413 $2,019,808 Jackson County RFPD #3 3.1194 $436,434 $973,094 $1,409,528 Subtotal General Government 10.4320 $1,459,535 $3,254,254 $4,713,789 Education Education Service District 0.3524 $49,304 $109,931 $159,235 Rogue Community College 0.5128 $71,746 $159,968 $231,714 Central Point SD 6 4.4134 $617,477 $1,376,757 $1,994,234 Subtotal Education 5.2786 $738,527 $1,646,656 $2,385,183 TOTAL: 15.7106 $2,198,062 $4,900,910 $7,098,972 Source: Tiberius Solutions 4.A.b Packet Pg. 42 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 23 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment IX. COMPLIANCE WITH STATUTORY LIMITS ON ASSESSED VALUE AND SIZE OF URBAN RENEWAL AREA State law limits the percentage of both a municipality’s total assessed value and the total land area that can be contained in an urban renewal area at the time of its establishment to 25% for municipalities under 50,000 in population. As noted below, the frozen base (assumed to be FYE 2022 values), including all real, personal, personal, manufactured, and utility properties in the Area, for the Area after the Amendment is projected to be $139,909,490. The Jackson County Assessor will certify the new frozen base of the new properties once the urban renewal plan amendment is adopted. This will be added to the existing frozen base. The total assessed value of the City of Central Point in FYE 2022 is $1,450,597,2071. The percentage of total City assessed value in the urban renewal area is 10.03%, below the 25% threshold. ORS 457.160 (2)(b) states “For municipalities having a population of less than 50,000, according to the latest state census: A. The assessed value for the urban renewal areas of the plan, when added to the total assessed value previously certified by the assessor for other urban renewal plans of the municipality for which a division of ad valorem taxes is provided, exceeds a figure equal to 25 percent of the total assessed value of that municipality, exclusive of any increased assessed value for other urban renewal areas and without regard to adjustments made pursuant to ORS 457.435.” The Area contains 514 acres, including public rights-of-way. The City of Central Point contains 2,904.1 acres. This puts 17.7% of the City’s acreage in an urban renewal area, which is below the 25% threshold. Table 15 - Urban Renewal Area Conformance with Assessed Value and Acreage Limits Acreage Frozen Value after amendment Excess Value Downtown and East Pine Revitalization Area 514 $139,909,490 $55,371,612 City of Central Point 2,904.1 $1,450,597,207 % of City 17.7% 10.03% Source: Compiled by Elaine Howard Consulting, LLC with data from Tiberius Solutions LLC, City of Central Point, and Jackson County Department of Assessment and Taxation (FYE 2022) *Estimated value, exact value will be set by the Jackson County Assessor upon adoption of the Plan. 1 Jackson County Assessor FY 2021/2022 SAL 4a Report. 4.A.b Packet Pg. 43 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 24 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment X. EXISTING PHYSICAL, SOCIAL, AND ECONOMIC CONDITIONS AND IMPACTS ON MUNICIPAL SERVICES A. Physical Conditions 1. Properties Added and Removed The properties to be added and removed are shown in Table 16. Table 16 – Properties to be Added and removed in 2022 Amendment Properties Added Properties Removed Map Number Account Number Acreage Map Number Account Number Acreage 372W02D300 10195939 9.02 372W11BC5300 10179641 1.76 372W02D400 10998025 7.17 372W11BC5302 10714077 0.10 372W02D400 10195970 13.89 372W11BC5303 10714085 0.10 372W02D500 10195988 12.19 372W11BC5000 10179674 0.46 372W02D501 10992858 1.47 372W11BC5301 10705457 0.66 372W02D600 10195996 4.95 372W11BC5200 10179658 3.60 372W11A102 10799146 3.52 TOTAL 6.68 372W11A28100 10799152 1.38 372W12B501 10202983 2.55 372W12B502 10730828 13.21 372W12B505 10993098 4.25 372W12B600 10462312 13.91 372W02D700 10196009 1.88 TOTAL 89.39 Source: City of Central Point 4.A.b Packet Pg. 44 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 25 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment 2. Land Use The Area measures 514 total acres in size, which is composed of 948 individual parcels encompassing 375.15 acres, and an additional 138.85 acres in public rights-of-way. An analysis of FYE 2022 property classification data from the Jackson County Department of Assessment and Taxation database was used to determine the land use designation of parcels in the Area. By acreage, Commercial (32.13%) accounts for the most prevalent land use within the area. This was followed by Residential (29.30%). Detailed land use designations in the area can be seen in Table 17. Table 17 - Land Use in the Area Land Use Parcels Acres Percent of Acres Commercial 197 120.55 32.13% Residential 635 109.93 29.30% Exempt 64 85.79 22.87% Industrial 18 22.38 5.97% Tract 2 16.92 4.51% Multi-Family 25 12.68 3.38% Miscellaneous 6 6.68 1.78% Farm 1 0.21 0.06% TOTAL: 948 375.15 100.00% Source: Compiled by Tiberius Solutions LLC with data from the City of Central Point 4.A.b Packet Pg. 45 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 26 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment 3. Comprehensive Plan Designations The most prevalent comprehensive plan designation by acreage in the Area is Commercial (39.73%). The second most prevalent comprehensive plan designation in the Area is Residential (36.33%). Detailed comprehensive plan designations in the Area can be seen in Table 18. Table 18 – Comprehensive Plan Designations in the Area Comprehensive Plan Designation Parcels Acres Percent of Acres Commercial 234 149.05 39.73% Residential 680 136.28 36.33% Parks OS 14 53.92 14.37% Industrial 4 19.46 5.19% Civic 16 16.43 4.38% TOTAL: 948 375.15 100.00% Source: Compiled by Tiberius Solutions LLC with data from the City of Central Point Figure 5 – Comprehensive Plan Designations Source: Tiberius Solutions 4.A.b Packet Pg. 46 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 27 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment 4. Zoning Designations The most prevalent zoning designation by acreage in the Area is C-4: Tourist and Office (18.01%). The second most prevalent zoning designation in the Area is GC: General Commercial (15.58%). Detailed zoning designations in the Area can be seen in Table 19. Table 19 - Zoning Designations in the Area Zoning Designations Parcels Acres Percent of Acres C-4: Tourist and Office 68 67.53 18.01% GC: General Commercial 91 58.46 15.58% BCG: Bear Creek Greenway 10 46.54 12.41% R-1-6: SF Residential – 6,000 183 35.72 9.52% R-3: Multiple Family Residential 184 34.82 9.28% R-2: Two-Family Residential 199 32.01 8.53% HMR: High Mix Res / Com 82 22.92 6.11% EC: Employment Commercial 64 20.53 5.47% M-2: Industrial General 4 19.46 5.19% Civic 17 17.07 4.55% MMR: Medium Mix Residential 41 12.08 3.22% OS: Open Space 5 7.99 2.13% TOTAL: 948 375.15 100.00% Source: Compiled by Tiberius Solutions LLC with data from the City of Central Point Figure 6 - Zoning in the Area Source: Tiberius Solutions 4.A.b Packet Pg. 47 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 28 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment B. Infrastructure This section identifies the existing conditions in the Area to assist in establishing blight in the ordinance adopting the urban renewal plan. There are projects identified by the City of Central Point in itemizing blighting conditions in the Area. This does not mean that all of these projects are included in the urban renewal plan. The specific projects that are included in the Plan are listed in Sections II and III of this Report and in the original Plan. 1. Transportation Systems Plan - Interstate Access Management Plan 33 In 2015 the City amended the Transportation Systems Plan (TSP) twice to (1) incorporate the Interstate Access Management Plan (IAMP) 33 into the TSP and (2) add the Gebhard Road extension project to the TSP. All of the projects in IAMP 33 are within the Area and projects that have been completed or are funded for completion in the near future have been excluded. The Gebhard Road extension is partly within the current Urban Renewal Area (i.e. Walmart property on East Pine Street).2 1-5 Southbound Ramp Terminal/East Pine Street TSM - Signal Timing Modifications: Maintain traffic signal timing to safely manage queues on the SB off-ramp Northbound Ramp Terminal/East Pine Street TSM - Signal Timing Modifications: Maintain traffic signal timing to safely manage queues on the NB off-ramp 10th Street/Freeman Road/East Pine Street TSM - Signal Timing Modifications and Queue Storage: Maintain signal progression, change signal phasing, extend westbound left-turn lane striping on East Pine Street to provide more queue storage, consider access restrictions to improve safety Peninger Road/East Pine Street TSM - Signal Timing Modifications: Maintain signal progression to ovoid queuing conflict that affects /-5 NB Ramp Terminal, and change signal phasing East Pine Street TSM Signal Timing Modifications: Maintain signal progression, particularly in the eastbound direction, to avoid queuing that affects 1-5 NB ramp terminal South Sidewalk between Ramp Terminals: Add a sidewalk on the south side of East Pine Street between the northbound and southbound ramp terminals Bike Lane Improvements: Restripe eastbound trove/ lanes between 9th Street and the 1-5 southbound ramp to improve bike lane transitions 1-S Southbound On-Ramp- Dual Westbound Left-Turn Lanes: Add a second westbound left- turn lane on East Pine Street onto the /-5 southbound on-ramp and a second southbound receiving lone on the 1-5 southbound on-ramp 2 City of Central Point Transportation Systems Plan - Interstate Access Management Plan 33 Capital Improvement Project list 4.A.b Packet Pg. 48 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 29 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment Peninger Road/East Pine Street Intersection Improvements: Implement Central Point TSP Tier 2 Project #236 as revised - Widen East Pine Street to accommodate a third westbound through travel Jane, maintain bike lanes, and odd sidewalks where necessary Figure 7 – IAMP Projects in Area Source: TSP IAMP 33 Projects 2. Transportation Systems Plan The City is in the process of updating the TSP to add needed projects within the recently expanded Urban Growth Boundary (UGB), including the properties being added to the Area. Most notable here will be extension of Beebe Road west across Bear Creek and connecting with Peninger Road. It is a significant project and one that is a priority for funding in part by Urban Renewal. The following projects are listed in the TSP and are in the Area.3 204 S. Haskell Street, Pine Street to Ash Street – widen to three lanes with curb, gutter, bike lanes and sidewalks 208 Oak Street: Second-Third & First Street: Manzanita – Laurel Improve alleyways and parking facility 211 Beebe Road & Hamrick Road Intersection – Add traffic signal for pedestrian crossing safety 212 Highway 99, Project No. 4 Cupp Street Greenway 216 E. Pine Street & Hamrick Road Intersection – Widen west and south approaches to add a second eastbound left turn lane and second receiving lane. Restripe northbound approach to include dual left turns and a single through-shared right turn. Restripe southbound approach to include a left turn, through and exclusive right turn lanes. 3 City of Central Point Transportation Systems Plan, Table 12.3 Short Term Projects and table 12.5 Tier 1 – Long Term Projects, Table 12.6 Tier 2 Projects 4.A.b Packet Pg. 49 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 30 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment 222 3rd Street: E. Pine Street to Hazel Street – Add bike lanes and sidewalks 223 Hazel Street: Third to 10th Street – Pave and improve adding sidewalks 228 E. Pine Street traffic calming – miscellaneous enhancements such as bulb-outs, cross-walks, signals, that improve the pedestrian environment along Pine Street 233 E. Pine Street: Hamrick Road to Bear Creek Bridge – widen for decel/accel lanes, add bike lanes and sidewalks 234 E- W Hamrick Road extension (south of E Pine Street) – Extend Hamrick Road westerly to intersect with Peninger Road (collector standards) 236 E. Pine Street: Bear Creek Ridge to Peninger Road – widen for turn lanes, bike lanes, add sidewalks and third lane 238 10th Street: E. Pine Street to Hazel Street – widen to add continuous turn lane, bike lanes and sidewalks 240 Peninger Road Extension, south – extend Peninger Road from E. Pine Street south across Bear Creek to Hamrick Road and construct new bridge across Bear Creek 241 3rd Street:” Hazel Street to Scenic Avenue – widen to 3 lanes, bike lanes, sidewalks, urban upgrade (collector standards) 245 Peninger Road Project – Extend Peninger road from E. Pine Street north across Bear Creek to Beebe Road and remove signal at Peninger/Pine Street. Construct bridge across Bear Creek. Extend Peninger Road south across Bear Creek to intersect with S. Harmick Road. 246 Freeman Road & Hopkins Road Intersection – Install new signal 247 3rd Street: E. Pine Street to Ash Street – Install new signal 248 Maple Street: Highway 99 to 10th Street – construct sidewalks, repair curb and gutter 249 4th Street: Ash Street to Cedar Street – construct sidewalks, repair curb and gutter 250 Ash Street: Highway 99 to Freeman Road – construct sidewalks, repair curb and gutter 251 Oak Street: Highway 99 to Freeman Road – construct sidewalks, repair curb and gutter 255 E. Pine Street: I-5 to Table Rock Road – widen E. Pine Street to add third westbound through lane from east side of Table Rock Road to I5 SB off ramp 4.A.b Packet Pg. 50 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 31 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment 3. Stormwater Capital Improvement Plan The Stormwater Master Plan is nearing the end of its planning horizon and is planned to be updated in the next budget cycle. The following projects are listed in the Stormwater CIP for Flood Control CIP prioritization and ranking4: 8.2 Oak Street Overflow 8.3 Ash Street Pipe Replacement 8.4 2nd Street Pipe Replacement 8.5 Cedar Street Bypass 8.6 Rostell Street Channel 11 Freeman Road at Ash The following projects are listed in the Stormwater CIP for Water Quality COP prioritization: 7.1 Green Street: Cherry St from N. 2nd to N. 4th Street 7.2 Green Street: Maple Street from N. 1st to N. 6th Street 7.3 Green Street: Laurel Street from N. 2nd to N. 6th Street 7.4 Green Street: Alder from S. 1st to N. 6th Street 8.1 Jewett Elementary School Channel 9 City Hall Rain Garden Demonstration 10 Ray's Food Place Planter 4. Water Master Plan The following projects are included in the Water Master Plan and are in the Area. 5 14 Fire flow improvements near Front Street and Bush 15 Fire flow improvements on Maple 16 Fire flow improvements on Bigham north of Oak Street 17 Fire flow improvements on S. 9th Street 4 City of Central Point Stormwater Capital Improvement Plan, Section 7 Table 7-1 Flood Control CIP Prioritization and Ranking 5 City of Central Point Water Master Plan, Section 8 table 8-1 Capital Improvements Project Summary List 4.A.b Packet Pg. 51 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 32 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment 18 Fire flow improvements on Oak Street 19 Fire flow improvements on Bigham 20 Fire flow improvements on Chestnut 21 Fire flow improvements on Ash Street 22 Fire flow improvements on Rostel Street 23 Fire flow improvements on Hazel and 9th 24 Fire flow improvements on Laurel Street 25 Fire flow improvements on Manzanita 27 Fire flow improvements on Bush Street 28 Fire flow improvements on Grand Avenue Figure 8 – Fire Flow Improvements in the Area Source: City of Central Point Water Master Plan 4.A.b Packet Pg. 52 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 33 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment C. Social Conditions According to the US Census Bureau, American Community Survey 2016-2020 Five Year Estimates, the block groups have 3,188 residents, 9.28% of whom identify as Hispanic or Latino. Table 20 - Race in the Area Race Number Percent White alone 2,821 88.49% Black or African American alone 0 0.00% American Indian and Alaska Native alone 166 5.21% Asian alone 29 0.91% Native Hawaiian and Other Pacific Islander alone 105 3.29% Some other race alone 15 0.47% Two or more races 52 1.63% TOTAL: 3,188 1% Source: American Community Survey 2016-2020 Five Year Estimates The largest percentage of residents are between 45 to 54 years of age (19.23%). Table 21 - Age in the Area Age Number Percent Under 5 years 155 4.86% 5 to 9 years 253 7.94% 10 to 14 years 207 6.49% 15 to 17 years 114 3.58% 18 to 24 years 262 8.22% 25 to 34 years 397 12.45% 35 to 44 years 418 13.11% 45 to 54 years 613 19.23% 55 to 64 years 359 11.26% 65 to 74 years 248 7.78% 75 to 84 years 96 3.01% 85 years and over 66 2.07% TOTAL: 3188 1% Source: American Community Survey 2016-2020 Five Year Estimates In the block groups, 20.98% of adult residents have earned a bachelor’s degree or higher. Another 32.04% have some college education without a degree, and another 26.40% have graduated from high school but have not attended college. Table 22 - Educational Attainment in the Area Education Number Percent Less than high school 205 9.33% High school graduate (includes equivalency) 580 26.40% Some college 704 32.04% Associate's degree 247 11.24% Bachelor's degree 371 16.89% Master's degree 75 3.41% Professional school degree 15 0.68% Doctorate degree 0 0.00% TOTAL: 2197 0.9999% Source: American Community Survey 2016-2020 Five Year Estimates 4.A.b Packet Pg. 53 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 34 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment The most common travel time to work class was 10 to 19 minutes, with 53.68% of commutes being in this class. This was followed by the less than 10 minutes travel time class, which represented 31.75% of commutes. Table 23 - Travel Time to Work in the Area Travel Time Number Percent Less than 10 minutes 462 31.75% 10 to 19 minutes 781 53.68% 20 to 29 minutes 93 6.39% 30 to 39 minutes 66 4.54% 40 to 59 minutes 35 2.41% 60 to 89 minutes 18 1.24% 90 or more minutes 0 0.00% TOTAL: 1455 1.0001% Source: American Community Survey 2016-2020 Five Year Estimates Of commuting to work, the majority, 82.11%, drove alone, and another 10.80% carpooled. Table 24 - Means of Transportation to Work in the Area Means of Transportation Number Percent Drove alone 1,239 82.11% Carpooled 163 10.80% Public transportation (includes taxicab) 18 1.19% Motorcycle 6 0.40% Bicycle 0 0.00% Walked 29 1.92% Other means 0 0.00% Worked at home 54 3.58% TOTAL: 1,509 1% Source: American Community Survey 2016-2020 Five Year Estimates 4.A.b Packet Pg. 54 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 35 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment D. Economic Conditions 1. Taxable Value of Property within the Area The frozen base of the Area in FYE 2022 is $139,787,1706. Once the Amendment is adopted, the frozen base is estimated to be $139,909,490.The increment in FYE 2022 is $55,371,612.7 2. Building to Land Value Ratio An analysis of property values can be used to evaluate the economic condition of real estate investments in a given area. The relationship of a property’s improvement value (the value of buildings and other improvements to the property) to its land value is generally an accurate indicator of the condition of real estate investments. This relationship is referred to as the “Improvement to Land Value Ratio," or “I:L.” The values used are real market values. In urban renewal areas, the I:L is often used to measure the intensity of development or the extent to which an area has achieved its short- and long-term development objectives. Table 25 shows the improvement to land ratios (I:L) for properties within the Area. In the Area, 254 parcels representing 36.90% of the acreage have I:L ratios less than 1.0. In other words, the improvements on these properties are worth less than the land they sit on. A reasonable I:L ratio for properties in the Area is 2.0. Only 242 of the 948 parcels in the Area, totaling 16.47% of the acreage have I:L ratios of 2.0 or more in FYE 2022. In summary, the area is underdeveloped and not contributing significantly to the tax base in Central Point. Table 25 - Improvement to Land Ratios in the Area Improvement to Land Ratio Parcels Acres Percent of Acres Exempt 64 85.79 22.87% No Improvement Value 78 88.83 23.68% 0.01-0.50 52 23.37 6.23% 0.51-1.00 124 26.23 6.99% 1.01-1.50 229 53.34 14.22% 1.51-2.00 159 35.80 9.54% 2.01-2.50 84 21.16 5.64% 2.51-3.00 63 16.05 4.28% 3.01-4.00 51 14.89 3.97% > 4.00 44 9.68 2.58% TOTAL: 948 375.15 100.00% Source: Compiled by Tiberius Solutions LLC with data from the Jackson County Department of Assessment and Taxation (FYE 2022) 6 Jackson County Assessor Sal 4 e FY 2021-2022 7 Ibid. 4.A.b Packet Pg. 55 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Page 36 | Report Accompanying the Downtown and East Pine Revitilazation Plan Amendment E. Impact on Municipal Services The fiscal impact of tax increment financing on taxing districts that levy taxes within the Area (affected taxing districts) is described in Section VIII of this Report. This subsection discusses the fiscal impacts resulting from potential increases in demand for municipal services. The projects being considered in the Amendment for future use of urban renewal funding are for facilitating transportation improvements to allow for better connections and for recreation improvements. The use of tax increment allows the City to add an additional funding source to the City of Central Point’s other funding sources to allow these projects to be completed. The financial impacts from tax increment collections will be countered by future economic development, and, in the future, adding increases in assessed value to the tax base for all taxing jurisdictions, including the City. XI. REASONS FOR SELECTION OF EACH URBAN RENEWAL AREA IN THE PLAN The reason for selecting the Area is to provide the ability to fund projects and programs necessary to cure blight within the Area. The outcome of implementing these projects is anticipated to be an increase to the economic growth in Central Point by providing infrastructure improvements inside the Area to assist with economic development. XII. RELOCATION REPORT When the CPDC acquires occupied property under the Plan, residential or commercial occupants of such property shall be offered relocation assistance, as required under applicable state law. Prior to such acquisition, the CPDC shall adopt rules and regulations, as necessary, for the administration of relocation assistance. The CPDC will comply with all applicable state law in providing these potential benefits. 4.A.b Packet Pg. 56 Attachment: 2_ Report on Plan Amendment 08 01 2022 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan What is happening now? The Central Point Development Commission is proposing to amend the Downtown and East Pine Redevelopment Plan (Plan) to add property and projects. This must be done in a specific way as directed by the Plan. Properties are proposed to be added to the urban renewal area to allow projects located on the properties to benefit from the use of urban renewal funding. The proposed projects are: The Bear Creek Greenway Design and Improvements project will improve the publicly owned lands adjacent to the Bear Creek Greenway from E. Pine Street to the Table Rock Overpass. The newly created park system will balance passive and active areas, including walking paths, benches, tables, pavilions/gazebos, playgrounds, restrooms, bicycle improvements, and various recreational areas/opportunities. It is anticipated that this project will start in fiscal year 2025/2026. The Beebe Road Extension and Bridge Extension project will extend Beebe Road from its current intersection with Gebhard Road to the west through Jackson County Expo to connect with Penninger Road. Includes intersection improvements at Penninger & Beebe Roads and Beebe & Gebhard Roads. It is anticipated that this project will start in fiscal year 2027/2028. The Central Point Community Center was already a project in the Plan, but the project has evolved over time and Jackson County is participating in this project. The project description has been updated to reflect this partnership. This project will have multiple funding sources, including urban renewal funds. It is anticipated that this project will begin in FY 2024. The proposed Amendment is not an increase in the amount of money allocated to the Central Point Development Commission. How Does Tax Increment Financing Affect Property Taxpayers? Property taxpayers will not see an increase in property taxes as a direct result of a new urban renewal area or an amendment to an urban renewal plan. The allocation of revenues received from a property taxpayer’s payment is changed as a portion of that payment would go to the new urban renewal area. This is called “division of taxes” and is the administrative way that assessors must calculate the urban renewal revenue. When an urban renewal area is adopted in a city, all property taxpayers see a line item on the property tax bills that shows a division of taxes for urban renewal. This is a result of the property tax limitations in Oregon. Again, this is not an increase in property taxes, merely a division of taxes already paid. Since urban renewal already exists in Central Point, all property owners in Central Point already see this line item on their property tax bills. Again, this does not mean that you pay additional taxes, but is a division of taxes already paid. What is Urban Renewal? Urban renewal is a program authorized under state law and implemented locally that allows for the concentrated use of property tax revenues to upgrade certain designated areas of a city. It is not a new tax or an increase in taxes. These urban renewal areas are called “blighted” by state statute and typically contain sections of a city that are underdeveloped, have infrastructure needs and are not contributing fully to the local economy. How does Tax Increment Financing Work? While urban renewal itself does not increase property tax rates, it does function on the increases in property tax revenues from year-to-year. An individual property tax- payer’s property taxes may increase for two reasons, one, the assessor can increase property values at a rate of 3% per year and does so in most cases, and, two, if a substantial renovation is completed on a property resulting in increased assessed valuation. When an urban renewal area is created, the property tax revenue from that area is diverted into two revenue streams. The first stream is what is called “the frozen base”. The frozen base is the property tax revenue from the total assessed value of the urban renewal area from the year the urban renewal area was formed. The frozen base revenue stream continues to go to the regular taxing jurisdictions, such as the city and the county. The second revenue stream is any increase over the frozen base which is called “the increment”. The increment represents the basis for tax increment financing and is any increase in property tax revenues above the frozen base. The second revenue stream goes to the urban renewal agency for use on projects, programs, and administration. 4.A.c Packet Pg. 57 Attachment: FAQ v2 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Amendment) Who Administers an Urban Renewal Program? The Central Point Development Commission administers an urban renewal program in the downtown and East Pine Street areas. This urban renewal plan (Plan) was adopted in 2012. The Central Point Development Commission board members are the Mayor and City Council. How Does Tax Increment Financing Affect Overlapping Taxing Districts? Taxing jurisdictions gain revenues through the collection of property taxes. During the use of tax increment financing, the permanent rate property taxes on the growth in assessed value in the urban renewal area are allocated to the Central Point Development Commission and not the individual taxing districts. The taxing districts are still able to collect the property tax revenues from the assessed value of the frozen base but increases in revenues are allocated to the Urban Renewal Agency for use within the urban renewal area. In many urban renewal areas, that growth from new investment would not have occurred but for the use of urban renewal which has stimulated the growth. The impact on schools and education service districts is indirect, as they are funded through a state allocation based on per pupil counts. Property taxes fund a portion of the State School Fund, but not all of it. Once an urban renewal area is terminated, there generally will be an increase in property tax revenues to all taxing jurisdictions. This increase of property tax revenue is a result of the ability to concentrate funding in a specific area, encouraging the area to develop properly. How Can You Provide Input? The Amendment schedule is: Summer 2022 Online Open House Summer 2022 Central Point Redevelopment Commission Meeting Summer 2022 Consult and Confer letters to taxing districts Fall 2022 Jackson County Briefing Fall 2022 Planning Commission Meeting Fall 2022 City Council Hearing Fall 2022 City Council Vote Fall 2022 County Commission Vote Fall 2022 Effective Date of urban renewal plan if adopted You may also provide input by contacting: City of Central Point Urban Renewal Executive Director 140 S. 3rd Street Central Point, OR 97502 Updates on the Amendment will be posted to the City of Central Point website 4.A.c Packet Pg. 58 Attachment: FAQ v2 (1569 : Open House Downtown & East Pine Street Corridor Revitalization Plan Amendment)