HomeMy WebLinkAboutIGA Amendment OR99: I-5 to Scenic Ave Misc. Contracts and Agreements
No. 33335
I A136-G0092418
AMENDMENT NUMBER 03
INTERGOVERNMENTAL AGREEMENT
OR99: 1-5 to Scenic Ave.
This is Amendment No. 03 to the Agreement between the State of Oregon, acting by
and through its Department of Transportation, hereinafter referred to as "State," or
"ODOT," the City of Central Point, acting by and through its elected officials,
hereinafter referred to as "City," and Jackson County, acting by and through its Board
of Commissioners, hereinafter referred to as "County," entered into on September 3,
2019, Amendment Number 01 on March 15, 2021 and Amendment Number 02 on
October 14, 2021.
It has now been determined by State, City and County that the Agreement referenced
above shall be amended to a change in obligations.
1. Effective Date. This Amendment shall become effective on the date it is fully
executed and approved as required by applicable law.
2. Amendment to Agreement.
Revised Exhibit A shall be deleted in its entirety and replaced with the
attached Revised Exhibit A-1. All references to "Revised Exhibit A" shall
hereinafter be referred to as "Revised Exhibit A-1."
a. TERMS OF AGREEMENT, Paragraph 1, Page 2, which reads:
1. Under such authority, State, City and County agree that State shall design and
construct the OR 99: 1-5 to Scenic Ave. project, hereinafter referred to as
"Project". The Project includes converting the current four (4) lane roadway to a
three (3) lane roadway with a continuous two (2) way left turn lane on OR 99
from MP 0.35 to MP 1.95, install a traffic signal at OR 99/Scenic Avenue
intersection, reconstruct a pedestrian ramp, and upgrade the railroad crossing on
Scenic Avenue. The location of the Project is approximately as shown on the
sketch map attached hereto, marked Exhibit A, and by this reference made a part
hereof. Also acting under such authority, State and City agree to jointly fund the
Project as described herein.
Shall be deleted in its entirety and replaced with the following:
1. Under such authority, State, City and County agree that State shall design and
construct the OR 99: 1-5 to Scenic Ave. project, hereinafter referred to as
"Project". The Project includes converting the current four (4) lane roadway to a
three (3) lane roadway with a continuous two (2) way left turn lane on OR 99
from MP 0.35 to MP 1.95, install a traffic signal at OR 99/Scenic Avenue
intersection, reconfigure the southeast pedestrian ramp at OR99/Scenic Avenue
to include two pedestrian ramps, install new pedestrian ramps in the remaining
State/City/County
Agreement No. 33335
three quadrants at OR99/ Scenic Avenue, upgrade the railroad crossing on
Scenic Avenue and relocate inlet, existing storm sewer pipe and install storm
sewer manhole within City right of way. The location of the Project is
approximately as shown on the sketch maps attached hereto, marked Revised
Exhibit A-1, and by this reference made a part hereof. Also acting under such
authority, State and City agree to jointly fund the Project as described herein.
b. Insert new CITY OBLIGATIONS, Paragraphs 2 and 3, to read as follows:
2. City agrees to the relocation of inlet, relocation of existing storm sewer pipe and
installation of storm sewer manhole behind sidewalk within the City right of way.
3. City shall retain jurisdication and contol of the southeast corner sidewalks, curbs
and drainage and at its own expense shall maintain and operate these sidewalks,
curbs and drainage. Upon completion of the Project, City shall be responsible for
all mainteance including, but not limited to sidewalks, curbs and drainage for the
SE corner of OR99/Scenic Avenue intersection.
CITY OBLIGATIONS, Paragraphs 2 through 8, shall be hereinafter re-numbered as
Paragraphs 4 through 10.
c. Insert new STATE OBLIGATIONS, Paragraph 3, to read as follows:
3. State shall remove existing type CG-3 inlet on OR99, construct type G-3 inlet,
remove or abandon existing storm sewer pipe, install storm sewer pipe, install a
storm sewer manhole behind the sidewalk within City right of way, reconstruct
the southeast pedestrian ramp on OR99/Scenic Avenue and construct new
pedestrian ramps in the remaining three quadrants of the OR99/Scenic Avenue
intersection.
STATE OBLIGATIONS, Paragraphs 3 through 11, shall be hereinafter re-numbered
as Paragraphs 4 through 12.
3. Counterparts. This Amendment may be executed in two or more counterparts (by
facsimile or otherwise) each of which is an original and all of which when taken
together are deemed one agreement binding on all Parties, notwithstanding that all
Parties are not signatories to the same counterpart.
4. Original Agreement. Except as expressly amended above, all other terms and
conditions of the original Agreement are still in full force and effect. Agency certifies
that the representations, warranties and certifications in the original Agreement are
true and correct as of the effective date of this Amendment and with the same effect
as though made at the time of this Amendment.
2
State/City/County
Agreement No. 33335
THE PARTIES, by execution of this Agreement, hereby acknowledge that their signing
representatives have read this Agreement, understand it, and agree to be bound by its
terms and conditions.
This Project is in the 2021-2024 Statewide Transportation Improvement Program
(STIP), (Key #20185) that was adopted by the Oregon Transportation Commission on
July 15, 2020 (or subsequently by amendment to the STIP).
CITY OF CENTRAL POINT, by and STATE OF OREGON, by and through
through its elected officials� its Department of T ansportation
By (h. O, A'[Al By M G
G &imiggs Nka i6Cats4on Delivery&OteratOs Division
Date Administrator
Date 07/11/2022
By
Date APPROVAL RECOMMENDED
LEGAL REVIEW APPROVAL(If By 1) — L °`°I'n
required in City's process) Region 3 Manager
Date 07/11/2022
By O'y Jered Carpenter „k: gWabJred:@GCity Cee612.9 By
Region 3 Traffic Manager
Date It 2.3.2102 _ Date
JACKSON COUNTY, by and through its APPROVED AS TO LEGAL
Board of Directors SUFFICIENCY
-.DANNY JORDAN
By ; 1 '"` 5') Copy Adrninisthat Janet C.Borth Via-email
Assistant Attorney General
Date L 1? _.___
Date: 08/22/22
LEGAL REVIEW APPROV L
requir in County's '
•` es
.
aidi
Counsel'
Date 6 /12- C°
1'Z
i
3
State/City/County
Agreement No. 33335
City Contact:
Matt Samitore
Parks and Public Works Director
140 South Third Street
Central Point, OR 97502
541-664-3321 ext. 205
Mattt.samitore@centralpointoregon.gov
County Contact:
Mike Kuntz
County Engineer
200 Antelope Road
White City, OR 97503
541-774-6228
kuntzmiacksoncountv.orq
State Contact:
Elijah Oberlander
Transportation Project Manager
100 Antelope Road
White City, OR 97503
541-864-8828
Eliiah.oberlander(cr�odot.oregon.gov
4
State/City/County
Agreement No. 33335
REVISED EXHIBIT A-1
Project Location Maps
4.}
s .
a pea
1
o
4
111111111410.\\.- \
Project
Limits
MP 0.36
o
c
G
sP
4...
C
A-
4.
4.
< SCENIC AVE
$
G
0
0,4
-7i
tom.
Project Limits
MP 1.95
5
State/City/County
Agreement No. 33335
1\4\
. -
q," t w .w ILL
%, , ` New Storm Sewer - 711144
_.
k.�0 Manhole within City
ROW (southeast corner el.
...ate► (' i`
of OR99/Scenic Ave.) Y `
x ,� = ., .,
# 'F
r
N
1
,. jV' . .
. r
4 "'x•"'
t y
4414. ,
c ,g
,., t ` .t •
�
6