Loading...
HomeMy WebLinkAboutCouncil Resolutions 1701 RESOLUTION NO. n D t A RESOLUTION APPROVING THE LOWEST QUALIFIED BID FOR THE CONSTRUCTION OF DENNIS RICHARDSON AND WAR MEMORIAL PROJECTS TO KNIFE RIVER MATERIALS, INC. AND AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT. RECITALS: A. WHEREAS, the City recently published a solicitation for lowest bids for the construction of the Dennis Richardson and War Memorial Bid. B. WHEREAS, the City received two bids. C. WHEREAS, the lowest bid was submitted by Knife River Materials, Inc. for $552,374. The City of Central Point resolves as follows: Section 1. The City Council hereby accepts the lowest bid from Knife River Materials Inc. for the construction of the Dennis Richardson and War Memorial Projects. Section 2. The City Manager is hereby authorized to execute a contract and any related documents necessary to effectuate the acceptance of this award in a form substantially the same as that included in the specifications. Section 3. This Resolution shall take effect immediately from and after its passage and approval. Passed by the ouncil and signed by me in authentication of its passage this geltday of r' , 2022. Mayor Hank Williams ATT- . _ / City Recorder Knife River Materials-Medford r4 KNIFE RIVER MATERIALS AN MOU RESOURCESCONMM 22A02 COCP WAR VETERANS&DENNIS RICHARDSON ME Zeedyk,Richard BID PROPOSAL Biditem Descri tion Quantity Units Unit Price Bid Total 10 MOBILIZATION 1.000 LS 45,000.00 45,000.00 120 'TEMPORARY WORK ZONE TRAFFIC CONTROL,COMPLETE 1 1.0001 LSI 1,000 001 1,000.00 130 'EROSION AND SEDIMENT CONTROL I 1.0001 LSI 250.001 250.001 40 CONSTRUCTION SURVEY WORK 1.000 LS 2,430.00 2,430.00 150 'REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1 1.0001 LSI 26,000.001 26,000.001 60 4-INCH SEWER PIPE 200.000 LF 73.00 14,600.00 170 I CATCH BASINS,AREA DRAIN 1 1.0001 EAI 650.001 650.00 95 SEAT WALL ALT 65.000 LF 310.00 20,150.00 1 105 'RETAINING WALL ALT 1 58.0001 LFI 370.001 21,460.001 110 CONCRETE MOW STRIP 437.000 LF 35.00 15,295.00 120 'CONCRETE WALKS 1 950.0001 SF 1 19.001 18,050 00 1 135 'EXPOSED AGGREGATE CONCRETE 1 1,200.0001 SF' 20.001 24,000.00 145 LIGHTING ALT 1 000 LS 60,000.00 60,000.00 150 FOUNTAIN 1.000 EA 99,500.00 99,500.00 170 SEEDING 4,140.000 SF 1 0.40 1,656.00 180 TOPSOIL 560.000 CY 1 90 00 50,400.00 190 MULCH 63.000 CY! 95 00 5,985 00 200 TREE-1 1/4-INCH CAL 2.000 EA 1 560.00 1,120.001 210 TREE-2-INCH CAL 3.000 EA 1 670.00 2,010.001 220 TREE-3-INCH CAL 2.000 EA! 1,100.00 2,200.001 230 TREE-8 FOOT HEIGHT MINIMUM 3.000 EA 560.00 1,680.001 240 SHRUB PLANTING-1 GALLON 311.000 EA 34.00 10,574.00 250 SHRUB PLANTING-2 GALLON 204.000 EA 34.00 6,936.00 1260 SHRUB PLANTING-3 GALLON 92 000 EA 44.00 4,048.00 1270 SHRUB PLANTING-5 GALLON 211.000 EA 48.00 10,128.001 11280 ANNUALS-4-INCH POT 497.000 EA 16.00 7,952.0011 1290 BULBS 1.000 LS! 2,200.00 2,200 001 1310 BOULDERS 2.000 EAI 1,050.00 2,100.00 320 IRRIGATION SYSTEM 1.000 LS 1 95,000.00 95,000.001 I Bid Total I I I 1 S552,374.001 1