HomeMy WebLinkAboutVilas Reservoir Irrigation Relocation Visar ConstructionCONTRACT FOR CONSTRUCTION This contract, made and entered into this 1st day of July 2011, by and between the CITY OF CENTRAL POINT, OREGON, hereinafter called the "OWNER", and Stan Sesar of Visar Construction ,hereinafter called the "CONTRACTOR". WITNESSETIi; Said Contractor, in consideration of the sum. and/or unit prices to be paid to himlher by the Owner, and of the covenants and agreements herein contained, hereby agrees, at his own proper cost and expense, to do all work and furnish all materials, supplies, supervision, labor, tools, equipment, transportation and incidentals, and shall pay all applicable taxes and fees necessary for the completion of the construction of the Vilas Reservoir Irrigation Relocation, in the City of Central Point, Oregon, for said Owner, to the extent of the Proposal, with unit prices filled in made and submitted by the Contractor on the 1st day of J~ 2011, all in full compliance with CONTRACT DOCUMENTS, which includes: The Advertisement for Bids, the Information and Instructions for Bidders, the Bidders Proposal and the Bid Bond, the Performance and Payment Bond, the General Conditions, the Special Provisions, Special Specifications and the applicable portions of the City's Public Works Standard Specifications and Details, included herewith, and in accordance with the Plans prepared by Public Works Management for the City of Central Point, Public Works Department, dated May 11,2011, entitled: Vilas Reservoir Irri ag tion Relocation which Plans and aforementioned Contract Documents are hereby referred to, and by reference made a part of this CONTRACT FOR CONSTRUCTION as fully and completely as if the same were fully set forth herein, and axe mutually cooperative herewith. In consideration of the faithful performance of the work herein set forth, and in accordance with the directions of the Engineer, and to his satisfaction as provided herein, the Owner agrees to pay to the Contractor the amounts bid in the Proposal, adjusted in accordance with the General Conditions, and to make such payments in the manner and at the times provided for in the General Conditions. Before starting work, the Contractor and subcontractors shall each file with the Construction Contractors Board, and maintain in full force and effect, a separate public works bond, in the amount of $72,791.50 unless otherwise exempt, as required by ORS 279C.836 and OAR 839-025-0015. The Contractor shall verify subcontractors have filed a Public Works Bond before the subcontractor begins work. The Contractor agrees to complete the work within the time limits as specified herein and to accept as full payment the amounts set forth in the Proposal and computed in accordance with the Contract Documents. It is agreed that the Contractor shall complete the work in all respects by the following schedule: Complete all work by October 31, 2011. In the event the Contractor shall fail to complete the work within the time limits or the extended time limits agreed upon, liquidated damages shall be paid to the Owner in the amount of $400.00 ~~ ;.:per day until the work is completed as set forth in the Contract Documents and to the satisfaction of the Engineer. Sundays and legal holidays will be excluded when determining days in default. The Contractor agrees to hold harmless the City from, and to repair and replace (as directed by the City's Public Works Director) any and all defects and deficiencies which develop in workmanship and/or materials for a period of two (2) years or as stated in the special specifications after the date of the written notice from the Engineer of the final acceptance of the project by the City. IN WITNESS THEREOF, we, the parties hereto, each subscribes the same this ~, ~~-,_ day of ~ ~ ~'~' 2011. CITY OF:.CENTRAL POINT: B (City Administrator) ~ ~ ~/ CONTRACTOR: ~~ (Co pany Name) 4 ~ ~ ~... Title: ~~ ~~~.C ,~.;..: