HomeMy WebLinkAboutResolution 879 - Tent. Plan for Table Rock CrossingPLANNING COMMISSION RESOLUTION NO. 879
A RESOLUTION OF THE PLANNING COMMISSION APPROVING A TENTATIVE PLAN
FOR AN 8 LOT SUBDIVISION TO BE KNOWN AS TABLE ROCK CROSSING.
(File No: SUB -20001)
WHEREAS, the applicant has submitted a tentative plan application to create an 8 lot subdivision
consisting of commercial property identified on the Jackson County Assessor's map as 37S 2W 01 C, Tax
Lot 700, Central Point, Oregon; and
WHEREAS, the project site is located in the C-4, Tourist and Office Professional zoning district; and
WHEREAS, the application has been found to be consistent with the applicable approval criteria set forth
in Title 16, Subdivisions and Title 17, Zoning, and per conditions noted in the Staff Report dated May 5,
2020; and
WHEREAS, on May 5, 2020, at a duly noticed public hearing, the City of Central Point Planning
Commission considered the Applicant's request for Tentative Plan approval for Table Rock Crossing.
NOW, THEREFORE, BE IT RESOLVED that the City of Central Point Planning Commission by
Resolution No. 879 does hereby approve the Tentative Plan application for Table Rock Crossing,
based on the findings and conditions of approval as set forth in Exhibit "A," the Planning
Department Staff Report dated May 5, 2020, including attachments incorporated by reference.
PASSED by the Planning Commission and signed by me in authentication of its passage this 5'' day of
May, 2020.
Planning Com isslon Chair
ATTE$ l:
---Ni/
City Reprbsentative
Planning Commission Resolution No. 879 (05/04/2020)
Citxof Central Point, Oregon Ak
CENTRAL
140 S 3rd Street, Central Point, OR 97502
541.664.3321 Fax 541.664.6384 �� � NT
www.centralpointoregon.gov I
0repan
STAFF REPORT
May 5, 2020
AGENDA ITEM: VII -A File No. PAR -20001
Community Development
Tom Humphrey, AICP
Community Development Director
Consideration of a Subdivision Tentative Plan for the development of an eight (8) lot commercial
subdivision in the Tourist and Office -Professional (C-4) Zoning District. The project site is located at
4245 Table Rock Road on property identified on the Jackson County Assessor's Map as 37 2W 0 1 C Tax
Lot 700. Applicant: South Salem, LLC; Agent: Rogue Planning & Development Services, LLC
STAFF SOURCE:
Justin Gindlesperger, Community Planner II
BACKGROUND:
The applicant is proposing an eight (8) lot commercial subdivision on an approximately 7.01 acre
property at the southwest corner of Biddle Road and Table Rock Road (Attachment "A-1" ). The
subdivision will provide for a variety of commercial uses with common access and circulation that will
function as a shopping center. Future developments on the individual lots will be subject to land use and
Site Plan and Architectural Review requirements.
Biddle and Table Rock Road are Jackson County Major Arterial roadways that require consolidated
access drives to serve the proposed lots. This is accomplished with a Private Retail Street that provides
east/west connectivity between Hamrick and Table Rock Road through existing development to the west.
As shown on the Tentative Plan, the Private Retail Streets have been designed to meet the City's block
length standards.
Water and sewer utilities are located just west of the subject property (Attachment "A-2"). Separate
services are required for each parcel and will require mainline extensions into the property from the
existing utility mains. Storm water facilities are located within the existing retail street to the west of the
site (Attachment "A-3").
ISSUES:
There are two (2) issues relative to this application as follows:
1. Traffic Impact Analysis (TIA). The applicant's Traffic Impact Analysis (TIA) examined trip
generation calculations for the proposed commercial subdivision and considered the effects on
adjacent streets with current and future traffic volumes. Per the TIA, the queue lengths at the
approaches following construction of the commercial subdivision will impact traffic on the
adjacent streets.
Comment: Comments from Jackson County Roads recommends limiting the turning movements
from the development to right -in, right -out, left -in (RIROLI) at the approaches to the public
streets. Staff recommends Condition No. 2(b) requiring the applicant to complete the access
improvements along Biddle Road and Table Rock Road in accordance with Jackson County
requirements.
140 South Third Street • Central Point, OR 97502 ■ 541.664.3321 ■ 541.664.6384
ITEM VII -A: CONSIDERATON OF AN 8 -LOT TENTATIVE SUBDIVISION PLAN
ON 7.01 ACRES AT THE SOUTH WEST CORNER OF TABLE ROCK AND
BIDDLE ROAD.
2. Block Perimeter. The newly created block, located north of the proposed retail street and west
of the retail street connecting to Biddle Road, is 2,153 feet in perimeter and exceeds the 2,000
foot block perimeter standard in CPMC 17.75.031(B)(1).
Comment: In accordance with CPMC 17.75.03 1 (B)(4)(d), the block perimeter standard may be
modified due to traffic safety concerns. The Private Retail Street access on Table Rock is 455 -ft
from the intersection of Table Rock and Biddle Road. Although the typical intersection spacing
distance is 300 -ft, the increased distance was deemed necessary to increase safety and traffic
movement. Staff recommends this adjustment to the block perimeter be approved as proposed to
minimize potential traffic safety concerns.
FINDINGS:
The proposed tentative plan has been reviewed against all applicable sections of 16.10, 16.24 and 17.75 of
the Central Point Municipal Code and found to comply as conditioned in the Staff Report dated May 5,
2020, the Applicant's Findings (Attachment `B") and the Planning Department Supplemental Findings
(Attachment "D").
CONDITIONS OF APPROVAL:
Prior to Final Plat approval, the applicant shall:
1. Provide documentation from the Jackson County Surveyor's Office that the name of the proposed
subdivision is unique relative to other approved land divisions in Jackson County.
2. Demonstrate compliance with all agency conditions of approval including the following:
a. Satisfy conditions of approval in the Public Works Staff Report dated April 15, 2020
(Attachment "E").
b. Satisfy conditions of approval in the Jackson County Roads and Engineering Staff
Report, dated April 27, 2020 (Attachment "F").
c. Comply with conditions of approval provided by the Rogue Valley Sewer Services in a
letter dated April 10, 2020 (Attachment "G").
ATTACHMENTS:
Attachment "A" — Tentative Plan Map
Attachment `B" — Application Narrative
Attachment "C" — Traffic Impact Analysis, dated 02-24-2020
Attachment "D" — Planning Department Supplemental Findings
Attachment "E" — Parks & Public Works Department Staff Report, dated 04-15-2020
Attachment "F" — Jackson County Roads and Engineering Department Staff Report, dated 04-27-2020
Attachment "G" — Rogue Valley Sewer Services Staff Report, dated 04-10-2020
Attachment "H" — Resolution No. 879.
ACTION:
Consideration of Resolution No. 879 for the Table Rock Crossing Subdivision Tentative Plan and 1)
approve; 2) approve with revisions: or 3) deny the application.
RECOMMENDATION:
Approve the Table Rock Crossing Subdivision Tentative Plan per the Staff Report dated May 5, 2020.
N.T.S.
-• R
IC+
Mr9
MOtr6P !IT[
m1 W
WYAIdI Rp,Ap' �o"A
VICINITY ^MAP
TENTATIVE PLAT
TABLE ROCK CROSSING SUBDIVISION
UXATrfl %
AAAOTi I er LA }AN:AoOR A -01 -XM
IN TNL FW 1/a or sECrlor+ I, r375. Wtw. WN,
OITY of CE1 RAL PCJkT, SACnSON [OU1RY, OR,
AeZXAN V-0WflL8
SOLIIIe 7ALCu !LC
2,.0- 901 4410
Ur01OW1. 041.aH 92,521
0411 f7a-Os20
.>:tJBYEm
Ii0)rOUHR t ASi0C1ATCi, OIC.
sw POU 2,[w aNlvr, SUIIC 201
6110040, onroo" 97604
Mil 14-4441
A"Mi
XWYK fl.1 W" A OCYCLOPLIENT
37 A. "AIRAL 0+213
X162,0$10, 0RC9011 gloat
(,71 f1 961-4070
Attachment I'A-1"
'I I01lDl--
''I
D IN
lll`�---
r .7.
=TUR INTSAYAL 1'
=TUR
. s'
NOTIS,
1. Ikkp0Af!!-[pay{ fA1PH1/T
d 6nq PrIR[.IT[0 AS R.3.
SCHOOL 70X9 Ma
IAANMTION DISTAKr
SANITATION DISTAKT RV.s.s
AREA Sol ACRES
ZONINO C4
C1(I57I149 USE - YACAM
RIIOMS10 US[ - CONYERCUIL
g
d
NOFl.IAL
CYO
RpRVN
C+f+-f 4%, —
X4911 I.
hp6.- H1w"I f
Y. 41
r
ale }
--PI
Sy �• ,r,.,
—
`4,
49,802 tq`_Ff
I " �� i
I Ml 1
'
� '•�• -
_ _ ��;
279.0'
I 1 • • . "
a,;'sz•SI.1v.� ;n2,
N
^'
'Sq
40,010 Sq F1
.848 .IFI
)!-41.179 $q FI r 1 ,i
ZPAI}1111GN"-7'LAT
(PARCEL 1- Of
NO" P--08••2020]
0
m�•
pN
I { ! yS . - "
.I"'
�;
,�
2
Ij
22$1700 Sq
Ft I v T7.749 Sq F1 �-
()
1
.�.�..�41,�
O
Til-
vQ
(oLA
Jj
a
I4 ..
Sq F! , ;Y
f
i.a��' �? 5•..,�
1 7 5'
m �r �
ti
f >r l f�7 .�
,i,
EASE 211.26''.,
-•._ ,An
g
d
NOFl.IAL
CYO
RpRVN
C+f+-f 4%, —
X4911 I.
hp6.- H1w"I f
128,07' t
Nf19.39'ZA"E 568,56'
-----------
I
-- -
I
Y. 41
r
ale }
--PI
Sy �• ,r,.,
—
`4,
49,802 tq`_Ff
I " �� i
I Ml 1
'
s
279.0'
4411 > > ,
N
^'
'Sq
40,010 Sq F1
.848 .IFI
)!-41.179 $q FI r 1 ,i
128,07' t
Nf19.39'ZA"E 568,56'
-----------
I
-- -
I
r�
I
7
I
II
Attachment "A-2"
GoO I
i
a
R
� o ^
9
A o o
^
✓`'S
z
O
5
z �
}
1 �
3-
3
i
I
r�
I
7
I
II
Attachment "A-2"
GoO I
i
a
R
� o ^
- NORTH
A o o
^
✓`'S
z
O
5
z �
}
1 �
Attachment "A-3"
m
.I.
#
n
Z
9 tZi 0
m
r NORTH
Z P n
z c
_ � lr�l�
� �t
t�
-
I _• �It
`�
0
a
+L:
Z �
L
$
n
I
i �
i
Attachment "A-3"
m
.I.
#
n
Z
9 tZi 0
m
r NORTH
Z P n
z c
-
0
a
Z �
$
n
Attachment "B"
South Salem LLC
Crossroads Community Shopping Center
A Commercial Subdivision
ROGUE PLANNING 6 DEVELOPMENT SERVICES, LLC
February 20, 2020
FINDINGS of FACT
Tentative Plan Application for an eight -lot subdivision for a phased
Community Shopping Center
Subject Property
Address:
Map & Tax Lot:
Comprehensive Plan Designation:
Zoning:
Property Owner:
4245 Table Rock Road
37 2W 01 C; 700 (Parcel 1)
Commercial: Tourist and Office
C-4: Tourist and Office
South Salem LLC
PO BOX 4460
Medford, OR 97501
Agent: Rogue Planning & Development Services, LLC
Amy Gunter
33 N Central Avenue, Suite 213
Medford, OR 97501
Land Surveyor: Hoffbuhr and Associates
Darrell Huck
880 Golf View Drive, Suite 201
Medford, OR 97504
Request: .
Request for Tentative Plan approval to allow for an eight -lot subdivision to accommodate for a
Community Shopping Center. The Crossroads Community Shopping Center conceptually demonstrates
the layout and development of the property. Subsequent applications for Site Plan and Architectural
Review approval to allow for the development of the lots within the subdivision as the development
plans progress will be obtained.
Page 1 of 18
Property Description:
The subject property is located at 4245 Table Rock Road, Central Point
Oregon, (37S 2W 01C; TL#700). The property is Parcel #2, vacant, 7.01 -
acre parcel at the southwest corner of Table Rock Road and Biddle Road.
A partition to divide a two -acre parcel at the northwest corner of the
property and develop a car wash and oil change facility. (This plat has not
been recorded yet but is anticipated in this month — see figure 4).
The subject property is bound by Table Rock Road along the east property
line and Biddle Road along the north property line. Hamrick Road is
approximately 360 -feet to the south of the subject property.
There are existing and proposed private retail streets that extend from
Hamrick Road to the property's west boundary. Along the west boundary
of the subject property, shared with the property to the west, a private
retail street was approved with the previous partition and site plan
review approval.
Figure 1: Vicinity Mop
1
Table Rock Road is a County Arterial and is maintained bylackson County. Figure 2: Centroi Point Zoning Map
Biddle Road is a County Minor Arterial and it is also maintained by Jackson County. There are curb, gutter,
sidewalk, and utilities present along the frontages. The driveway curb cut was relocated to the western
property line as part of the frontage improvements.
The property is at the edge of the city of Central Point Urban Growth Boundary and the city limits. The
property is zoned Commercial /Tourist (C-4). The adjacent property to the south (TL#3900) is outside of
the City limits but is shown as the City of Central Point, Manufacturing (M-2). The property to the north
and northwest, across Biddle Road, is a mixture of General Commercial and Residential. The properties
to the east, across Table Rock Road, are zoned Jackson County Commercial. The Rogue Valley Airport,
airport -related businesses, hotels, and office buildings are further east on Biddle Road.
There are no floodplains, wetlands or other significant natural features on the property that would
prevent the development of the property. There is a grove of large stature pine and cedar trees on the
property. These trees have been evaluated by an arborist and it is recommended that the trees be
removed.
Page 2 of 18
`4246 Table Rock Rock Rd.
uw :1.1V 11C, rRo !W
•I
1
I
I - G
. i
Figure 3:2018 Aerial Image
i. 'i9.5 Aa, gLd1 �1pA
pp law
r �5 y7'i1't
lO
ni.]] O9)
n . I PARC{L 1 -A
rl ` WIN Cson..
3/Y 193,e
�. �nql. ow•uT9_�9. _. � i �'�
FDA
. P-03-2ws)
f/R lam
A 5�it
1
(11411 UYr11T RO. 29-29999, O.R.)
a
2
uar
JP0ASRCE�Lp
AC
I
lr�to frFq. (A9R11CimIG]
sAR3(E . Ai .
x I
!
w !
w
t I
AS ---
r •) '•SEI:ROTEI-
E Or C7 if.—'r_'_- moi•
'UG
7lNI11 ALY io11/A1,Yr Oi 'TRACT 11' KR IMSYIMW
-SNM O"R. APO YOLOIIL AM MOF W OX
/p 1 xereYalY N&W [rm arm'It M.Wj
MI A/R MX
1—V37�.E7i.
jI MST. MO. GO.OR44 CAL TM yam`
Figure 4: Survey Plot of Parcel l
Page 3 of IS
Detailed proposal:
The proposal is to subdivide the 7.01 -acre parcel (Figure 4) into an eight -lot subdivision to accommodate
a Neighborhood Shopping Center, the Crossroads Community Shopping Center.
Parcel 1 is a recently approved partition and site plan and architectural review, conditional use permit
for an oil change and carwash facility (PAR -19002 and SPAR -19002).
The proposed subdivision provides for eight developable parcels that comply with site design and layout
standards in the C-4, Commercial: Tourist and Office zone for the development of neighborhood
shopping center. Footprints areas totaling 54,595 square feet are proposed. The proposed uses include
an anchor store, mixed uses (office, retail, other sales), fast food with drive-thru. The shopping center
provides a group of commercial building areas of various sizes and types of building area to
accommodate development of allowed uses within a shopping center.
As the individual uses develop, Site Plan and Architectural Review will be proposed to demonstrate that
the development complies or can demonstrate compliance with the layout proposed herein or with a
revision that demonstrates compliance with the city of Central Point standards for commercial
development. No buildings will exceed the maximum height in the zone of 60 -feet.
A private retail street is proposed to provide internal circulation. The private retail street will be extended
through the property, and to connect to the existing east/west private retail street that extends to
Hamrick Road. The retail street also intersects with the approved north/south retail street that provides
access to and from Biddle Road. This portion of the private retail street is along the west property line
of Parcel 1 on the partition plat in Figure 4.
Adequate transportation facilities are provided within the public rights-of-way and via the private retail
street to accommodate the anticipated vehicular traffic. A Traffic Impact Analysis for the Community
Shopping Center has been provided with the application. The TIA addresses the uses and the future trip
generation. The intersections of the private retail street exceed the minimum separation of 300 -feet.
The block length through the private retail street is 652.95 -feet. This slightly exceeds the maximum block
length for vehicular traffic. This is due to a jog in the retail street to separate the intersection on Table
Rock Road to accommodate turning and stacking movements for future traffic impacts. Pedestrian and
bicycles will be able to traverse the interconnected parking lot system to reduce distances traveled.
There are transit accommodations along Table Rock Road. A new stop was installed with the
development of Hamrick Road and Table Rock Road with the development of Costco, less than 500 -feet
south of the subject property.
We believe the proposed subdivision of the C-4 zoned land will accommodate at neighborhood shopping
center that will provide convenience shopping for the day to day needs of the consumers in the
immediate neighborhoods. The proposed layout accommodates for building areas that exceed 50,000
Page 4 of 18
square feet and are less than the maximum of 100,000 square feet of gross floor areas. There is one
anchor tenant space proposed in the concept layout that is less than 60 percent of the total gross floor
area.
Thank you for your consideration.
Respectfully,
Amy Gunter
Rogue Planning & Development Services, LLC
541-951-4020
Attachments:
Land Partition Findings of Fact
Assessor Map: Attachment A
Legal Description: Attachment B
Existing Deed: Attachment C
Tentative Partition Plat
Conceptual Subdivision Layout
Conceptual Grading & Drainage Plan: C.1
Conceptual Utility Plan: C.2
Findings addressing the criteria from the City of Central Point Land Development ordinance can be
found on the following pages. For clarity, the Central Point Land Development Ordinance criteria are in
Times New Roman font and the findings in Calibri.
Page 5 of 18
Findings of Fact
16.10 - Tentative Plans
Finding:
The proposal is to allow for a subdivision of the 7.01 -acre parcel at the intersection of Biddle Road and
Table Rock Road. A tentative subdivision plan demonstrates the layout of the proposed commercial
subdivision. There are no minimum lot dimensions, lot areas, lot coverages, in the C-4 zone. The
subdivision layout provides for the adequate area to development the property to the standards of a
neighborhood shopping center.
A proposed conceptual development plan of a neighborhood shopping center has been provided with
the application. The shopping center site plan provides for the development of the east to west private
retail street that crosses the property to connect with the east west connection that exists across the
adjacent properties to the west and leads to Hamrick Road.
The Shopping Center layout is intended to accommodate a gross floor area of not less than 50,000 and
not more than 100,000 gross floor area. The shopping center is conceptually proposed to provide for
54,595 square feet of structures with lot areas, drive isles and access, parking areas, and landscape
buffer areas devoted to development of permitted and conditional uses of the C-4 zoning district.
Each lot of the subdivision will provide for a separate site design review application as necessary by the
standards. Future lot development will demonstrate compliance with the conceptual development
plan and associated Traffic Impact Analysis.
A private retail street is proposed to provide internal circulation. The private retail street will be extended
through the property, and to connect to the existing east/west private retail street that extends to
Hamrick Road. The retail street also intersects with the approved north/south retail street that provides
access to and from Biddle Road. This portion of the private retail street is along the west property line
of Parcel 1 on the partition plat in Figure 4.
Adequate transportation facilities are provided within the public rights-of-way and via the private retail
street to accommodate the anticipated vehicular traffic. A Traffic Impact Analysis for the Community
Shopping Center has been provided with the application. The TIA addresses the uses and the future trip
generation.
Utility, access and maintenance easements for the private retail street that is proposed through the
community shopping center will be provided with the survey plat map.
A separate application for the development of a Firestone Complete Auto Care and Tire facility with
associated site improvements has been filed. This development and the associated private retail street
Page 6 of 18
provide the vehicular, pedestrian and bicycle connection through the property to the retail street
network in the vicinity.
16.10.070 Explanatory information.
A. A vicinity map showing all existing subdivisions, streets and unsubdivided land ownerships adjacent
to the proposed subdivision and showing how proposed streets may be connected to existing streets;
Finding:
A vicinity map from the Jackson County Assessor is included in the application. The existing private retail
street system through the adjacent properties to the west will connect through the development.
B. Proposed deed restrictions in outline form;
Finding:
The property has existing deeds and easements. These will continue and will be demonstrated on the
final plat of the partition plan.
The public utility easements will remain along the frontages of the property. Private utility easements
will be provided within the subdivision and provided for on the final partition plat.
The easement for the retail street will be created providing cross access, mutual ingress/egress,
maintenance, and other standard access easement language.
A title report associated with the approved minor land partition is set to be recorded in February. A
revised title report will provide for the easements of record on the 7.01 -acre parcel. The draft subdivision
plan provides for public utility easement in the private retail street, public access of the private retail
street, access from the private retail street to the development pads of the Community Shopping Center.
C. Approximate centerline profiles showing the proposed finished grade of all streets, including the
extensions for a reasonable distance beyond the limits of the proposed subdivision;
Finding:
The property is nearly level and the centerline profile of the Private Retail Street that connects to an
existing Private Retail Street appears unnecessary.
D. The approximate location and size of all proposed and existing water and sewer lines and storm
drainage systems. (Ord. 1650(part), 1990).
Finding:
Page 7 of 18
A preliminary grading and utility plan is provided with the application. The utility plan provides details
regarding where the connections for the proposed water, sewer and storm drainage lines of the private
retail street. Conceptual stub out locations for the Community Shopping Center pad lots are provided.
16.24.010 Blocks --Length, width, and shape.
The lengths, widths, and shapes of blocks shall be designed with due regard to providing adequate building
sites suitable to the special needs of the type and use contemplated, needs for convenient access,
circulation, control and safety of street traffic and limitations and opportunities of topography.
Finding:
The lengths, widths, and shapes of the block are designed with regards to providing adequate building
sites for the development of a Neighborhood Shopping Center. The access points onto Biddle Road and
Table Rock Road are dictated by the standards of Jackson County. The proposed private retail street
intersections dictate the block lengths and dimensions.
16.24.020 Blocks --Sizes.
Blocks shall not exceed twelve hundred feet in length except blocks adjacent to arterial streets or unless
the previous adjacent layout or topographical conditions justify a variation. The recommended minimum
distance between intersections on arterial streets is three hundred feet.
Finding:
No block length in the development exceeds 1200 -feet. Two of the blocks are adjacent to arterial
streets and the separation from the intersection of the arterial streets increases the block length and
perimeters. The intersections of Table Rock Road and Biddle Road and the private retail streets exceed
300 -feet.
The proposed private retail street connections through the community shopping center slightly exceed
the block perimeters with 2,200 -feet. This is due to the shifting of the private retail street intersection
south of the Biddle Road and Table Rock Road intersections. The jog in the retail street adds additional
distance.
The proposed block lengths through the development exceed the 600 -foot block length rule. The
intersection of the private retail street that traverses Parcel 2, the 7.01 -acre area of the commercial
subdivision and community shopping center, will have a more than 600 -foot block length to Table Rock
and Biddle Road. Additionally, the block perimeter exceeds 2,000 feet. This is due to the separation
standards from the intersection to the street and the sight -lines on Table Rock Road. The private retail
street and connected parking lot system allow for pedestrians and bicycles to cross the site without
following the block boundaries, only automobiles will be restricted to the private retail street and arterial
street intersections.
Page 8 of 18
The intersection of the retail street that traverses Parcel 2, will have a more than 600 -foot block length
to Table Rock and Biddle Road. This is due to the presence of the major arterial streets, and intersection
alignment issues, separation from the intersection to the street, and sight -lines on Table Rock Road and
Biddle Road.
16.24.030 Blocks --Easements.
A. Utility Lines. Easements for electric lines or other non -city -owned public utilities may be required, and
shall be a minimum of ten feet in width located on the exterior portion of a single property. Easements for
city utilities (i.e., water, storm drain and sanitary sewer mains) shall be a minimum of fifteen feet in width
located on the exterior portion of a single property. Tie -back easements six feet wide by twenty feet long
shall be provided for utility poles along lot lines at change of direction points of easements.
1. Structures Located within a City Utility Easement.
a. Except for public utilities and for signs when developed in accordance with Chapter
15.24 (Sign Code), no person shall locate, construct, or continue to locate a structure (as
defined in Chapter 16.08) within a city utility easement (as defined in Chapter 16.08),
except as provided in subsections (A)(1)(b) and (A)(2) of this section.
b. Notwithstanding the foregoing, the city may approve fencing, concrete block
walls/fencing, retaining walls, and similar fencing/wall structures that are otherwise in
compliance with the building code, and with the clearance provisions noted herein, over an
easement subject to the following requirements:
i. Said fencing or wall structures that interfere with the installation, maintenance,
access, or operation of a public utility or city utility may be removed by the utility
provider or the city at the sole cost of owner.
ii. Any replacement or relocation of the fencing or wall structures shall be at the
sole cost of the property owner or occupant.
iii. Owners and occupants of property shall not be entitled to compensation for
damages related to removal of the fencing or wall structures.
2. Grass, Asphalt, and Concrete Installed within a City Utility Easement.
a. Subject to the limitations of the building code, lawful owners and occupants of property
may install grass, asphalt and concrete within a city utility easement.
b. In the course of installing, accessing, maintaining, or operating its facilities in a city
utility easement, a public utility or the city, as the case may be, may move or remove any
asphalt, concrete, or vegetation located within said easement. After the same are moved or
removed and after completion of the necessary work, the grass, asphalt or concrete shall
be repaired and replaced in a reasonable manner at the sole cost of the public utility or city.
Page 9 of 18
c. Owners and occupants of property shall not be entitled to compensation related to
damages to grass, asphalt, or concrete so long as the repairs and replacement are done in a
reasonable manner and in a reasonable time frame.
Finding:
It is not anticipated that there will be any construction within public utility easement excepting the
circumstances outlined herein.
B. Watercourses. Where a subdivision is traversed by a watercourse, drainage way, channel or stream,
there may be required a stormwater easement or drainage right-of-way conforming substantially with the
lines of such watercourse, and such further width as will be adequate for the purpose. Streets, parkways
or access roads parallel to major watercourses may be required.
Finding:
Not applicable.
C. Pedestrian Ways. in any block over seven hundred fifty feet in length a pedestrian way may be required.
The minimum width of the pedestrian right-of-way must be at least six feet in width which shall be hard
surfaced through the block and curb to curb in order to provide easy access to schools, parks, shopping
centers, mass transportation stops or other community services. If conditions require blocks longer than
twelve hundred feet, two pedestrian ways may be required for combination pedestrian way and utility
easement. When essential for public convenience, such ways may be required to connect to cul-de-sacs.
Long blocks parallel to arterial streets may be approved without pedestrian ways if desirable in the
interests of traffic safety.
Finding:
Pedestrian access is provided through the proposed Community Shopping Center development parking
areas. The pedestrian sidewalks are provided at six -feet within the development and have clear access
to both arterial streets. Sidewalks are provided along both sides of the private retail street and
sidewalks to city standards are or will be provided around the perimeter of the development as the
properties develop.
16.24.040 Lots --Uses.
A. The city may, in its discretion, deny approval for the creation of any lot by any manner if the effect of
such creation of lot would be to facilitate perpetuation of a nonconforming use.
Finding:
The uses proposed and futures uses are all conforming uses in the C-4 zone.
B. No lot shall be created unless it is in compliance with all applicable provisions of this code.
Page 10 of 18
Finding:
All proposed lots will comply with the standards of the C-4 zone.
The Commercial Site Design Standards found in 17.75.035, detail that there are no minimum lot areas,
width or depths.
Future site development through Site Plan and Architectural Review will demonstrate compliance with
any yard setback standards, building heights and other requirements from the commercial design
standards.
16.24.050 Lots --Size and determination.
Lot sizes shall conform with the zoning ordinance and shall be appropriate for the location of the
subdivision and for the type of development and use contemplated. In the case of irregular lots, the width
shall be measured along the front building line. In no case shall the average depth be more than two and
one-half times the width. Corner lots for residential use shall have sufficient width to permit appropriate
building setback from and orientation to both streets.
Finding:
No minimum lot sizes in the zone.
A. In areas that cannot be connected to sewer lines, minimum lot sizes shall be sufficient to permit sewage
disposal by an engineered system in accordance with Department of Environmental Quality, Jackson
County environmental quality section, and public works standards. Such lot sizes shall conform to the
requirements of the Jackson County environmental quality section.
Finding:
Adequate public sewer service is available to the proposed lots within the subdivision.
B. Where property is zoned and planned for business or industrial use, other widths and areas may be
required, at the discretion of the city. Depth and width of properties reserved or laid out for commercial
and industrial purposes shall be adequateto provide for the off-street service and parking facilities required
by the type of use and development contemplated.
Finding:
The Crossroads Community Shopping Center's is a neighborhood shopping center. The conceptual
development plan demonstrates that adequate parking areas and drive aisles for the potential uses
within the shopping center are provided.
16.24.060 Through lots.
Page 11 of 18
Through lots shall be avoided except where essential to reduce access to primary or secondary arterial
streets or streets of equivalent traffic volume, reduce access to adjacent nonresidential activities, or to
overcome specific disadvantages of topography and orientation. A planting screen easement of at least ten
feet may be required along the line of lots abutting such adjacent street. There shall be no right of access
across such planting screen easements.
Finding:
Not applicable
16.24.070 Lot side lines.
The side lines of lots shall run at right angles to the street upon which the lots face, as far as practicable,
or on curbed streets they shall be radial to the curve.
Finding:
All lot lines run at right angles to the streets and private retail street.
16.24.080 Large lot subdivision.
In subdividing tracts into large lots which at some future time are likely to be resubdivided, the location
of lot lines and other details of the layout shall be such that the resubdivisions may readily take place
without violating the requirements of these regulations and without interfering with the orderly
development of streets or other utilities. Restrictions of building locations in relationship to future rights-
of-way shall be made a matter of record if the city considers it necessary.
Finding:
Not applicable
16.36.030 Requirements.
A. All major and minor land partitions may, as a condition of approval, provide for improvements
including curbs, gutters, asphalt streets, sidewalks, underground utilities and such other improvements as
shall be deemed appropriate and necessary by the city council as a condition of approval, with all such
improvements to meet the standards required for subdivisions under this title.
Finding:
The majority of the public infrastructure was recently installed with the frontage improvements along
Table Rock Road. Utilities are available in the public right-of-way of the roads and in the proposed 15 -
foot wide public utility easements along the frontages of the property. The future sidewalk
connections will be installed along the frontages as the sites develop.
Underground utilities installed in streets will be constructed before the surfacing the retail street.
Stubs for service connections for underground utilities will be placed to reduce the necessity for
Page 12 of 18
disturbing the street improvements when future service connections are made. Easements for public
and private utilities will be provided on the subdivision plat.
A private, 12 -inch water line that exists within the existing east / west private retail street. An eight -
inch line connects to the site's northern boundary. A water circulation plan under the direction of the
City of Central Point Public Works Director will be completed to provide hydrants and adequate service
connections throughout the development area.
The property is within the Phase 2 Stormwater Quality Area and a stormwater management plan that
complies with the Rogue Valley Stormwater Quality Design Manual for water quantity and quality is
provided. The proposal for the private retails street accommodates much of the stormwater generated
on as an above bioswale. Each lot will need to address their stormwater facilities. These will likely
include above ground swales in conjunction with underground detention facilities. The Stormwater
service is available to the site from a 24 -inch storm drain line that exists 260 -feet west of the project
site within the existing private driveway.
Sanitary sewer service is available to the west of the project site. This 8 -inch line will be extended
through the private retail street to accommodated the development of each of the sites.
B. In the case of major partitions, all streets or roads shall be improved to meet the standards required
for subdivisions under this title, and shall be dedicated to the city in the same manner as subdivision
roads and streets.
Finding;
The request is for Subdivision. The subdivision request includes a private retail Street to provide east to
west connectivity through the site.
Biddle Road is a County Minor Arterial and was recently improved from the intersection of Biddle and
Table Rock Road, west to the 1-5 freeway interchange. Table Rock Road is a County Arterial. Table Rock
Road also was recently improved with curb, gutter, sidewalk, storm drainage, and street lighting. Both
Table Rock Road and Biddle Road are maintained by Jackson County.
The Private Retail Street is not proposed to be dedicated to the City but is proposed to be installed per
the improvement standards.
Required by five-foot curb tight sidewalks are proposed along the north side of the private retail street
with a ten -foot landscape buffer between sidewalk and lot development areas. The south side of the
private retail street proposes a five-foot hardscape planter and a five-foot sidewalk. The site plan
accommodates a six-foot sidewalk in both instances due to anticipated code changes that will require a
six-foot sidewalk. Until that time, a five-foot sidewalk and larger planter areas will be provided.
Page 13 of 18
C. Partition improvements shall be constructed prior to approval of the final partition plat unless, in the
city's sole discretion, deferral is allowed. In all cases of deferral, the applicant shall either execute an
agreement for improvements and comply with the bond requirements of
Section 16.1.2.070 and 1 G.12.080 of this title, or shall execute a deferred improvement agreement, which
shall be in a form and contain such terms as are specified by city and shall be recorded and be binding
upon and run with the land and bind the applicant and all successors in interest.
Finding:
All subdivision related improvements will be constructed to provide vehicular access through the
property. Permits for the driveway access from Table Rock Road will be obtained from Jackson County.
The landscape is proposed along Table Rock Road frontage behind the sidewalk. The vegetation will be
irrigated and maintained in a weed -free condition.
C-4, Tourist and Office Professional District:
17.44. Community shopping centers which may include any of the permitted uses in this section
and may also include but not be limited to:
a. Supermarkets;
b. Department stores;
c. Sporting goods;
d. Books and stationery;
e. Gifts, notions and variety;
f. Florists;
g. Leather goods and luggage;
h. Pet sales and related supplies;
i. Photographic supplies;
j. Health food;
k. Self-service laundry;
1. Antique shop;
m. Delicatessen;
n. Pastry and confectionery;
o. General apparel;
p. Shoes and boots;
q. Specialty apparel;
r. Jewelry;
s. Clocks and watches, sales and service;
t. Bakery, retail only;
u. Bicycle shop;
v. Audio, video, electronic sales and service;
w. Printing, lithography and publishing;
Finding:
Page 14 of 18
The proposal use of the property is for a neighborhood shopping center, the Crossroads Community
Shopping Center. The envisioned uses fall with the categories listed as permitted uses in the C-4
district.
All development of the individual lots within the subdivision will demonstrate compliance with the
standards 17.44, 17.64, 17.75 and the development standards for public infrastructure improvements
of the city of Central Point.
Design and Development Standards
17.75.031 General connectivity, circulation and access standards.
The purpose of this section is to assure that the connectivity and transportation policies of the city's
Transportation System Plan are implemented. In achieving the objective of maintaining and enhancing
the city's small town environment it is the city's goal to base its development pattern on a general
circulation grid using a walkable block system. Blocks may be comprised of public/private street right-
of-way, or accessways.
Finding:
The Table Rock Road frontage of the subdivision was recently improved Biddle Road is proposed to be
improved as the site develops. Throughout the development, there is a primary east to the west
connection provided via the private retail street. The private retail street will have street -like
improvements installed along the north side of the the development because of the proposed
development of Phase 1(Premier Oil) and Phase 2, Firestone. The retail street is proposed to have a five-
foot curbside sidewalk and a ten -foot landscape buffer to the parking areas. Along the south side, a
temporary bioswale to accommodate storm drainage facilities.
A. Streets and Utilities. The public street and utility standards set forth in the City of Central Point
Department of Public Works Standard Specifications and Uniform Standard Details for Public Works
Construction shall apply to all development within the city.
Finding:
Table Rock Road along the frontage of the property has been improved with curb, gutter, sidewalk, utility
installations, etc.
The private retail street is proposed to be connected to the existing private retail street that exists as an
east/west connection from Hamrick Road (where parallel to Table Rock Road) as part of a pending
commercial shopping center proposal for the 7.01 -acre parcel. This private retail street will intersect
with a north/south, private retail street connection (approved access for Premier Oil).
Landscape medians and buffering and an interconnected five -foot -wide sidewalk system are provided
through the development to provide pedestrian connectivity to the public street system. (Note: the
conceptual subdivision plan demonstrates a six -foot -wide sidewalk through the development, this is in
Page 15 of 18
the event of anticipated code changes). As proposed with the individual developments, a five-foot
sidewalk is proposed.
The proposed development will comply with all utility standards set forth in the City of Central Point
Department of Public Works Standard Specifications and Uniform Standard Details for Public Works
Construction.
B. Block Standards. The following block standards apply to all development:
1. Block perimeters shall not exceed two thousand feet measured along the public street right-of-
way, or outside edges of accessways, or other acknowledged block boundary as described in
subsection (B)(4) of this section.
Finding:
The proposed private retail street connections through the community shopping center slightly
exceed the block perimeters with 2,200 -feet. This is due to the shifting of the private retail street
intersection south of the Biddle Road and Table Rock Road intersections. The jog in the retail
street adds additional distance.
2. Block lengths shall not exceed six hundred feet between through streets or pedestrian
accessways, measured along street right-of-way, or the pedestrian accessway. Block dimensions
are measured from right-of-way to right-of-way along street frontages.
Finding:
The proposed block lengths through the development exceed 600 -feet.
The intersection of the retail street that traverses Parcel 2, will have a more than 600 -foot block
length to Table Rock and Biddle Road. This is due to the presence of the major arterial streets,
and intersection alignment issues, separation from the intersection to the street, stacking
distances, and sightlines on Table Rock Road and Biddle Road.
3. Accessways or private/retail streets may be used to meet the block length or perimeter standards
of this section, provided they are designed in accordance with this section and are open to the
public at all times.
Finding:
A private retail street system is used to attempt to meet the block length and perimeter
standards. The retail street has been designed per the requirements of this code.
Page 16 of 18
4. The standards for block perimeters and lengths may be modified to the minimum extent
necessary based on written findings that compliance with the standards are not reasonably
practicable or appropriate due to:
Finding:
The proposed block lengths through the development exceed the 600 -foot block length rule. The
intersection of the private retail street that traverses Parcel 2, the 7.01 -acre area of the
commercial subdivision and community shopping center, will have a more than 600 -foot block
length to Table Rock and Biddle Road. Additionally, the block perimeter exceeds 2,000 feet. This
is due to the separation standards from the intersection to the street and the sight -lines on Table
Rock Road. The private retail street and connected parking lot system allow for pedestrians and
bicycles to cross the site without following the block boundaries, only automobiles will be
restricted to the private retail street and arterial street intersections.
C. Driveway and Property Access Standards. Vehicular access to properties shall be located and
constructed in accordance with the standards set forth in the City of Central Point Department of Public
Works Standard Specifications and Uniform Standard Details for Public Works Construction, Section
320.10.30, Driveway and Property Access.
Finding:
The proposed civil improvements throughout the development will comply with all utility standards set
forth in the City of Central Point Department of Public Works Standard Specifications and Uniform
Standard Details for Public Works Construction. The Traffic Impact Analysis will be reviewed by Jackson
County Roads. The driveway access reservation will be made with Jackson County Roads upon approval
of the development.
D. Pedestrian Circulation. Attractive access routes for pedestrian travel shall be provided through the
public sidewalk system, and where necessary supplemented through the use of pedestrian accessways as
required to accomplish the following:
Finding:
There will be a complete sidewalk system along both public street frontages of the property. Through
the development, there are private retail streets and an interconnected parking lot system proposed.
These streets are proposed to have landscape buffers and sidewalk systems with sidewalk and parking
lot crossings that are distinguished from the driving surface to provide pedestrian connectivity through
the property.
Pedestrian scale streetlights and directional signage will provide interest and safety for pedestrians.
E. Accessways, Pedestrian. Pedestrian accessways may be used to meet the block requirements of
subsection B of this section. When used pedestrian accessways shall be developed as illustrated in Figure
Page 17 of 18
17.75.01. All landscaped areas next to pedestrian accessways shall be maintained, or plant materials
chosen, to maintain a clear sight zone between three and eight feet from the ground level.
Finding.
The pedestrian accessways provided through the development in the parking areas and along the Private
Retail Street will reduce the block length as a pedestrian can bisect the development vs. an automobile
which must stay on the driving surfaces.
All landscape areas will be professionally designed, installed and maintained. The plant materials
sections provide for clear sight zones and to provide safety and security throughout the sight. Vision
clearance triangles will be maintained at the intersections.
F. Retail Street. Retail streets may be used to meet the block requirements of subsection B of this section.
When used retail streets shall be developed as illustrated in Figure 17.75.02.
Finding
The private retail street is proposed to attempt to meet the block requirements of subsection B. The
retail street is proposed to connect to existing retail streets developed on the adjacent properties. Utility,
access and maintenance easements for the private retail street that is proposed through the community
shopping center will be provided with the survey plat map.
Page 18 of 18
IL
LOT NUMn
OFFIC_ I RECORD OF DESCRIF JON,
OFFICE OF COUNTY ASSESSOR, JACKS
S&CMU f TOWWMP- 2
LOT
RP 1 173
362k l l L1600
MC. IM0. A' W& A S J
.M. 1 MAP NO. 11_
• ,• r nA h f t u jv DEED
cis ms+s� NOWLEGAL DESCR1pTION PURPOSES 'MAR If.
HU -11
Commencing a the northeast corner o l i r Sec. 1916
11, Tarp 36 South, Range 2 west of the W.M., and from said 1960
corner running 1962
West on the north boundary of said claim 29 chains
and 76 links; thence
south 53 chains and 71 links; thence
south 89*45' east along south boundary of claim
29 chains and 76 links to the southeast corner of said
claim; thence
north on the east boundary of said claim 53 chains
and 83 links to the place of beginning.
Excepting that portion of said premises Bold to Scott
V. Davis, described as the '"soLth half of the east half"
of D.L.C. h2, in Twrp 36 South, of -Range 2 West of -the
W.M., 80 acres, more or less, together with a strip of
land 25 feet 3n width, beginning at the southeast corner
of the north half of the east half of said D.L.C. and
running thence
north to the intersection of the County Road.
Also, excepting land described in Vol. 202 page 281,
of the Deed Records of JC0,
Less tax lot 362W11-1801
94{ 4,9
960 1
962 r
Bf
Q.R.
-'r3-09930
i EXHIBIT "A"
I Oeginni.ng at the north&ast corner of donation land
I claim 110. 42, tcainship 36 youth. rangy 2 west of the
Willamette Meridian in .7ackson county. Oregon; thenro
west along the north boundary of said claim, 27 chains
and 74 links; thence south,. 53 chains and 71 linksr
thence south 89'45' east along the south hpunddrY
south -
of said claim, 29 chains and 76 links to the south-
east coxnar•ol said claim: thence north an the east
boundary of said claiie, 53 chains and 83 links to the
r place of beginning, containing 160 acrds, more ar less.
EXCEPTING TLIEREFROM that portion of said premises sold
to Scott V. Davis. described as the "southhalf of the
4 east half". of donation land claim no. 32 .in township•
36 south,. range 2 -went of the Willamette Meridian,
containing So.acrea, morn or less, together with a
strip of land -25 feet in width, beginning at the
E
southeast corner of -the' north half of the east'half :'
1
of donation land claim, and ruining then an north.
.said
to an intersection with the original southwesterly
right-of-K&Y liaa of Takla Rock. (county) road_'
AtiO EXCEPTION THERDFlO 6 the following desciihed tract,-
-
' Saginning at a concrote monument with brOnxe disc
I
' located at the YsortheasL Corner of donation -land.
claim no_ 42, tcunuhip 36 south,' range west•.eP the '
F7iliamette Maridian in Jackson county, Oregon, thence
S
eleng.khe north of said claim, -'south 89'52'35"
-boundary
pest, 323.74•feet;'thenee south 0'25'20" east, 264,12 .
Eeats thence south •37139'3()m Qast'- 39.81 feet; thenca
south 0.52' east 193.72 fest; thence ngttli'89°34'20"
east, 295.49 feat to the eaot boundary Of said' Claim;
-Was
t
thence north 0"06'40" t,.497.'80 fest to the point
7
of heginniny, containing 3,:50 acres,. more or less.
a
TOGETHER with a'mutual ingress -egress eaefNnent 20 feet
in with, being 10 feet on eacil side of the follaxing
. cantaxlina, to -wit:
Commencing at the northeast corner of donation land
Claim no. 42, township 36 south, range -2 west of the
i
Willamette Nexidian in Sackson county, Oregon; thence
i thong the north boundary of said claim.,south 89'52'35"
wes*, 323.74 feet; thence south 0°25'20" east, 264.11
feet to the true point of beginning of said easenent;
thence south 37°39130" east, 39,81 feet-; thence south
+ 0°52' east, 20.00 feet and there terminating.
I
Exhibit "A"
Page 1 of 2
i
i
Together wide an easement for the purpose of repairing, nain�
taining and operating the irri9ati0n ditches and control valvas
'ahlell nre located on the remaining property of sellers so that
purchaser may be able to irrigate the orchard piaVerty which is
+ the subject of this sale. Said easement, in any event, shall
II terminate not later than June 1, iy98_
I, .That par't.-lying rcLYhi, pul3iic roads_ ;
`! 2. %' xis ti rig,, rights. of saay' for c7itctees epi canals_
fi r3;. itzgh of Ftaajy fps titre' traria e
" amission •acid di�trltyntie)n
.off-'eIectrtCity,• wind,:_ve�'.btlaer gees' rantsQ to:
TiCe•,Caixfntnia,Cr 'H a'
egon Pow�ei Cniapanyr ai Cai„i,fgrnia
.by : iristruman "recorded A AI..18 "19 53 n 4 '
vo.iwae 379'i gage..g69 of ,,�4e eed ,r ' i
t • c:aiRtt Jv;.; :. ' drfasrda Gi dacissp•
';yyyN, r;.�:�•• Y.. Oregosi.:•. _ S-'-"�Yr.;'- i'.;;.w.�... ��;•.:;.; n� ''' '/ �`�'�`ti:
}i'. ':]n-� {, J. -:F :r. x.[• .n• Ya'-�1�"' r r'k^-�n.F-'•l ' - r• -'l •� .. ?,r ," < �;5: •-r
fffff '•° .!�•...5. kr.:� ,...err:':•.. y.r`{�,y;=�-: icy{�t .r:...rf• i' 1��7rc ti F!'.
Rig h.t 'ai:'Way ' for the ttaasmi ss inn'; r • - i,.: �,f� •r;. ;
f' and;:distrib Q<,
t% eotxiciiy; • attd fCr D v
-.j:F •� fix• �uxposBs. "granted t;o'.ti r:.r
..;fr.k.i.• .. •i?r � j' �•.C7 dC
FAC .-POVO.r and., Light• 4�vrapaa ,: 'd4r�7OX4t34i]', by' I P. AA j �.�•i4
1 5 n5 Erwnent xecoxcied-March `Ilu; 97D
' :of file official'•-
oOxds, #..7ac]CEc
o
• :Y{; ; ; • p;R'. ca�inEy' ' Oregon. ,.�•r, 9, {
' .1�,.i• Ye'i-,". :;,: i;sy:� -y r:� f,; 1., ; :,� l; .r�
.s•r.'• z}S,'..t The e££eet
G. said ert L•i Vii; �; ' '%' � • ,, � �•. ]� � �
PxeP jh:'; er'saiae::Poxiafi'ttiezea; •{
" 'lying' tai tlii11 the boun4ari es n -'the "Taf�1e'.heck maps odeszent,'' .:. �. !
Colfsaay , ' and right -T, urns .d' ass
tberofra¢s_ . :.'an ace
a,r a,SSment:.?Cesu.ir�q`.•• .y.�,Y�=
Ir( - -.��;�. ' .. .. .,:•�.; i.k.'{'.�,+7 ir2;:�-T �' • 1.r,�';i �ir.N'��t .: `\�1y-=pilir. 1Y..7; !'}�r• 1-
••r 'r .:...;r2.
te,•..'•-
=� •,. :
p Exhibit ^A'.,
i Page 2.of 2
PARTITION PLAT NO.
LOCATED IN,
IN THE SW 1`4 OF SECTION 1, T37S, R2W, WM,
CITY Or DEN7TRAL POINT, JACKSON COUNTY, OR.
FOR_
SOUTH SALEM, L,LC.
P.O. go)( -60
MEDFORD, OR- 97501
FOUND BRASS DISC
NC CORNER OF
DLC NO, 56 PER
1997 JACKSON COUNTY
[� pf-[STAB
.. _.-. -•_ •-._. .. `��
F.
.- - _...gt'bi'1iY 329.45'
EDi
PEp /N (674
�
r.
`E
v; ti•
(tat [ w nJ4141U,1 eU'AA[SS rum)
(TRACT 0 Or INET. NO. 2015-041455 O.R.) +.I
PARCEL 2M_{
471 5a" ..
E
PARCEL 1
w6
R.
d1 AC�
�p
CA rR3S V91 170 r5
9
I
:.WD[S5-[wtl:6 LNEwOAIr
`_
� c
8 ;a c9rltiT mpr
77.70- .7c.[aayzw[u s4splsm w
✓i{ [,M_I [CD Gf f[fA�Li[ ODDI1�C4f >F
j
]
I I
s/x 1e7se [
aa' I,.frurl4Ai.14 w.w.e[_grr_1y�1, Mw xe4ya>3�1� P%..r.:
NOTE
ED
PEP
(PARCEL 3 Or PARTRION PLAT W. P-0-2004)
SIN 1ENI5e ,
i
1. THE PROPERTY IS SUBJECT TO AN ACCESS EASENENT i
CREATED PER INSTRUMENT NO. 2W1-OT391 B, DEED
RECORDS OF JACKSON COUNTY. OREGON THE EASEMENT
BONG CREATED HEREON SArSFIES THE CONDIRON OF
PARAGRAPH B2. WHERDJY 111E LOCATION OF THE
EASEMENT SHALL BE DETERMINED SY SCUM 5ALEM LLC
AT THE TIME IT SUBMITS PLANS FOR OEVELOPMENT.
• I
ygyfl{RtT 4CID14P[A OF "TRACT B' PER IW1RbvFNt +I
gpwjt p} AI10 YOLUNE 495. PA6i 75, D.R. :I 1
HOFFBUHR & ASSOCIATES, INC.
880 GOLF VIEW DRIVE, SUITE 201
MEDFORD'OREGON 97504
(541)779-4041
BY: DARRELL LHUCK PLS No. 2023
SCALE: 1 Inoh = 100' JULY 29, 2019
BASIS OF BEARING. SURVEY NO. 10429
o = Sel 5/5"s24" Iron r.Irf...I g pin wllh p1®tic cap
clamped "D. Huck LS 2023".
X( = Se1 5/9"x30"Iron minloreing ph wllh P1.01. cap
e1..p.d "D. Huck LS 2023'.
• = Found 5/0" Iron robot per Survey No. 22744
unleee nol.J olherwlee
rqund bra%D col) monam4nt
PUE = Eoeemenl far paw le 011114m, rearm drnlmge. Irrtgallon,
poo, Toler. V*w1c. tMpTlen., cab:4 I.!nl.lan and
conllory ewer. 9onflnEe{lon and malnl.nonae
O.R. = Offl.lal Record., Jack— County, Or.
D.R. = Deed Record,, Jackean County, Or,
S/N = Survey Number
[-] - R.cord per Survey No. 16429
I -I = RaaOrd per Survey No. 16058
W M O G IAN LOT 'DO
'e" 40%41
rtFAY
i (GC41 tP 11' CONSTRUCTION)
di
Yi'3��k'r1�t71l� [TC.f�
tt7Q7,
fiFirii[T4S4S»�T7<I17 LT7iSy#
�iiTf?Sll':=iT11TS�!!'R� - f?'IF!7i1
Lfignp
Rd��T ?
�tTwl lir?: TIrRs cy ArmorAme ,
I Ell
Ify.thl la. be
>�ssrr :s
ml py rig[
SURVEYOR
�`It4�ll"i3
r.
v; ti•
F
R
(INSTRUMENT N0. 99-28959, CH.)
PARCEL 2M_{
471 5a" ..
i
tT05
Aor".
o le...,)
�p
CA rR3S V91 170 r5
I
:.WD[S5-[wtl:6 LNEwOAIr
`_
� c
8 ;a c9rltiT mpr
j
]
I I
NOTE
ygyfl{RtT 4CID14P[A OF "TRACT B' PER IW1RbvFNt +I
gpwjt p} AI10 YOLUNE 495. PA6i 75, D.R. :I 1
HOFFBUHR & ASSOCIATES, INC.
880 GOLF VIEW DRIVE, SUITE 201
MEDFORD'OREGON 97504
(541)779-4041
BY: DARRELL LHUCK PLS No. 2023
SCALE: 1 Inoh = 100' JULY 29, 2019
BASIS OF BEARING. SURVEY NO. 10429
o = Sel 5/5"s24" Iron r.Irf...I g pin wllh p1®tic cap
clamped "D. Huck LS 2023".
X( = Se1 5/9"x30"Iron minloreing ph wllh P1.01. cap
e1..p.d "D. Huck LS 2023'.
• = Found 5/0" Iron robot per Survey No. 22744
unleee nol.J olherwlee
rqund bra%D col) monam4nt
PUE = Eoeemenl far paw le 011114m, rearm drnlmge. Irrtgallon,
poo, Toler. V*w1c. tMpTlen., cab:4 I.!nl.lan and
conllory ewer. 9onflnEe{lon and malnl.nonae
O.R. = Offl.lal Record., Jack— County, Or.
D.R. = Deed Record,, Jackean County, Or,
S/N = Survey Number
[-] - R.cord per Survey No. 16429
I -I = RaaOrd per Survey No. 16058
W M O G IAN LOT 'DO
'e" 40%41
rtFAY
i (GC41 tP 11' CONSTRUCTION)
di
Yi'3��k'r1�t71l� [TC.f�
tt7Q7,
fiFirii[T4S4S»�T7<I17 LT7iSy#
�iiTf?Sll':=iT11TS�!!'R� - f?'IF!7i1
Lfignp
Rd��T ?
�tTwl lir?: TIrRs cy ArmorAme ,
I Ell
Ify.thl la. be
>�ssrr :s
ml py rig[
SURVEYOR
�`It4�ll"i3
o
a
0
0
o
0
PRELIMINARY - NOT FOR CONSTMICTION - FOR REVIEW and DISCUSSION PURPOSES ONLY
gg a> DD -�
it elf -n
A I<�4� ♦ mm S
00 ..�
--4D
0
11
0
j tl
N
i
e
wP�2VT: II IRW F/�g111V idl:
PBnm�i!^rl
yyy
gym.
{
�
�
Mea-a.onersoi
q
�,I
II S9�I� ii�@
m
i
WGIe�Ctoir-
372C 7W
gg a> DD -�
it elf -n
A I<�4� ♦ mm S
00 ..�
--4D
0
J�
!
RIDDLE ROAD`
�.
_
BLDG I I\
I
I
g
I f
Dm
ilt
III
�;I
i I
F
'^I
I
l
Diq
14
>
jl
.111111 VIM
f
F
1
�
ID
I
m
I
o
I
I I
II
I
kk
�I
II
j
372W01CTL3800
l
-
- - -- - - -
—ICTL3900
J
.
�
�-
372
f
I
I
jIII� JII
jjj
� m
p Z
1 a
yA
ZZ i p D m
7 A T 22
K
Z Z
,_
•�.._.,
2 Z?
d
in
hlcNwrM
z z A
E-
Ij!�
Attachment "C"
Table Rock Road
Commercial Development
Type III Procedure
Traffic Impact Analysis
February 28, 2020
Prepared By: T unsPoPUTIOn
L L C
flTl1Tumi Upson TumfPOP TMION .1monzRIN6, L L
Table Rock Road
Commercial Development
Type III Procedure
Traffic Impact Analysis
February 28, 2020
Prepared By:
f ❑uua-ftm Uuon T.?ANSPOP rWIUH-[NCJn-'-'-pima, L L
TABLE OF CONTENTS
I. EXECUTIVE SUMMARY.......................................................................................................................5
II. INTRODUCTION....................................................................................................................................6
Background..............................................................................................................................................6
ProjectLocation.......................................................................................................................................6
ProjectDescription...................................................................................................................................6
III. EXISTING YEAR 2020 NO -BUILD CONDITIONS..........................................................................9
SiteCondition...........................................................................................................................................9
RoadwayCharacteristics..........................................................................................................................9
TrafficCounts..........................................................................................................................................9
Intersection Capacity and Level of Service............................................................................................ l l
Year 2020 No -Build Intersection Operations.........................................................................................12
Year 2020 No -Build 9511 Percentile Queuing.........................................................................................12
CrashHistory ..........................................................................................................................................14
BiddleRoad Access Point......................................................................................................................15
IV. DESIGN YEAR 2025 NO -BUILD CONDITIONS.............................................................................16
Design Year 2025 No -Build Description...............................................................................................16
Design Year 2025 No -Build Intersection Operations.............................................................................16
Design Year 2025 No -Build 9511 Percentile Queuing..........................................................16
..................
V. SITE TRAFFIC......................................................................................................................................19
TripGeneration......................................................................................................................................19
Trip Distribution and Assignment............................................................:..:..........................................19
ProposedAccess Points..........................................................................................................................19
VI. DESIGN YEAR 2025 BUILD CONDITIONS...................................................................................2I
Design Year 2025 Build Description.....................................................................................................21
Design Year 2025 Build Intersection Operations...................................................................................21
Design Year 2025 Build 95t1 Percentile Queuing..................................................................................21
DesignYear 2025 Access Points............................................................................................................23
TableRock Road Sight Distance ........................ :...................................................................................
23
Design Year 2025 Build Turn Lane Criterion........................................................................................23
VII. FUTURE YEAR 2038 NO -BUILD AND BUILD CONDITIONS...................................................25
Future Year 2038 No -Build and Build Descriptions..............................................................................25
Future Year 2038 No -Build and Build Intersection Operations...........:.................................................25
Future Year 2038 No -Build and Build 9511 Percentile Queuing...................................:.........................26
Future Year 2038 Build Turn Lane Criterion.........................................................................................27
Future Year 2038 Access Operations.....................................................................................................27
VIII. CONCLUSIONS................................................................................................................................30
LIST OF TABLES
Table 1: Roadway Classifications and Descriptions........................................................................................9
Table 2: HCM Level of Service Designations for Stop -Controlled Intersections.........................................1 l
Table 3: HCM Level of Service Designations for Signalized Intersections.................................:................1 l
Table 4: Year 2020 No -Build Intersection Operations, PM Peak Hour........................................................12
Table 5: Year 2020 No -Build 95' Percentile Queue Lengths, PM Peak Hour.................:............................12
Table 6: Study Area Intersection Crash Rates, 2013-2017............................................................................14
Table 7: Crash History by Type, 2013-2017.................................................................................................14
Table 8: Design Year 2025 No -Build Intersection Operations, PM Peak Hour............................................16
Table 9: Design Year 2025 No -Build 95`h Percentile Queue Lengths, PM Peak Hour.................................17
Table 10: Development Trip Generations.....................................................................................................19
Table 11: Design Year 2025 Build Intersection Operations, PM Peak Hour................................................21
Table 12: Design Year 2025 Build 95th Percentile Queues, PM Peak Hour..................................................22
Table 13: Future Year 2038 No -Build and Build Intersection Operations, PM Peak Hour ..........................25
Table 14: Future Year 2038 No -Build and Build 95`h Percentile Queue Lengths, PM Peak Hour................26
FIGURES
FIGURE1:
Vicinity Map..................................•......................................................................................._.7
APPENDIX B:
FIGURE2:
Conceptual Site Plan................................................................................................................
8
FIGURE 3:
Year 2020 No -Build Traffic Volumes, PM Peak Hour..........................................................10
APPENDIX E:
FIGURE 4:
Design Year 2025 No -Build Traffic Volumes, PM Peak Hour..............................................18
FUTURE YEAR 2038 NO -BUILD SYNCHRO AND SIMTRAFFIC OUTPUT
FIGURE 5:
Development Trip Assignments, PM Peak Hour...................................................................20
FIGURE 6:
Design Year 2025 Build Traffic Volumes, PM Peak Hour....................................................24
FIGURE 7:
Future Year 2038 No -Build Traffic Volumes, PM Peak Hour...............................................28
FIGURE 8:
Future Year 2038 Build Traffic Volumes, PM Peak Hour..........:.:........................................29
APPENDICES
APPENDIX A:
TRAFFIC COUNT DATA, SEASONAL ADJUSTMENTS
APPENDIX B:
CRASH DATA, ITE TRIP GENERATIONS
APPENDIX C:
EXISTING YEAR 2020 NO -BUILD SYNCHRO AND SIMTRAFFIC OUTPUT
APPENDIX D:
DESIGN YEAR 2025 NO -BUILD SYNCHRO AND SIMTRAFFIC OUTPUT
APPENDIX E:
DESIGN YEAR 2025 BUILD SYNCHRO AND SIMTRAFFIC OUTPUT
APPENDIX F:
FUTURE YEAR 2038 NO -BUILD SYNCHRO AND SIMTRAFFIC OUTPUT
APPENDIX G:
FUTURE YEAR 2038 BUILD SYNCHRO AND SIMTRAFFIC OUTPUT
APPENDIX H: TURN LANE GRAPHS
APPENDIX I: AGENCY REQUIREMENTS
I. EXECUTIVE SUMMARY
Summary
Southern Oregon Transportation Engineering, LLC prepared a traffic analysis for a proposed
commercial development on the southwest corner of Table Rock Road and Biddle Road in Central
Point, Oregon. Phase 1 on the subject property has already been approved and includes a quick
lube and automated carwash. The remaining site is proposed to include 54,595 square feet (SF) of
commercial development or shopping center uses. Access to the site is proposed from Biddle Road
and Table Rock Road. North -south (N -S) and east -west (E -W) internal roads are also proposed to
Biddle Road and Hamrick Road.
The proposed 54,595 SF commercial development is estimated to be constructed by the year 2025
and generate 229 primary trips to the transportation system during the p.m. peak hour. Phase 1,
which includes a quick lube and automated car wash, is included as additional background traffic in
the existing year 2020 no -build, design year 2025 no -build, and future year 2038 no -build
scenarios. Five study area intersections were evaluated under existing year 2020, design year 2025,
and future year 2038 conditions to determine what impacts the proposed 54,595 SF commercial
development may have on the transportation system.
Conclusions
The findings of the traffic impact analysis conclude that the proposed commercial development can
be approved with recommended improvements without creating adverse impacts to the
transportation system. Results of the analysis are as follows:
1. All study area intersections operate acceptably under existing year 2020 and design year 2025
no -build and build conditions during the p.m. peak hour. The intersection of Hamrick Road /
East Pine Street exceeds its performance standard under future year 2038 no -build and build
conditions. By the future year 2038, improvements are planned in the local area, including a
Gebhard Road extension to East Pine Street with signalization. When this occurs, traffic is
expected to decrease specifically in the eastbound left and southbound right turn movements at
Hamrick Road / East Pine Street. It is our expectation that future mitigation for this
intersection, with different improvement scenarios, will be determined when the City prepares a
Transportation System Plan (TSP) Update in the next few years.
2. Right turn lane criterion was evaluated at proposed access points on Biddle Road and Table
Rock Road. A right turn lane is not shown to be warranted on Table Rock Road under any
analysis scenario. A right turn lane is shown to be warranted on Biddle Road under year 2025
build conditions. If acquiring off site right of way to construct this turn lane proves to be
difficult, this improvement can be delayed until the property to the west develops. This is not
considered a high-level safety concern.
3. Queue lengths in the future year 2038 build scenario are shown to potentially impact the full
movement access (referred to as the N -S Internal Road) with Biddle Road. It is concluded that
the full movement access may need to be restricted by this time. This should be further
discussed with Jackson County.
The proposed 54,595 SF commercial development on the southwest corner of Biddle Road and
Table Rock Road is shown to be in compliance with the Central Point Comprehensive Plan and
Land Development Code. Streets that serve the subject property will accommodate projected
p.m. peak hour traffic volumes within acceptable levels of service with identified improvements.
5.D. TBAIIfpoRT!lTIOII -[IIGInF-[JtIM6, LLC I February 28, 2020 1 Table Rock Commercial Dev TIA 15
II. INTRODUCTION
Background
Southern Oregon Transportation Engineering, LLC prepared a traffic analysis for a proposed
commercial development on the southwest corner of Biddle Road and Table Rock Road in Central
Point, Oregon. A quick lube and automated car wash are pre -approved on the northwest corner of
the property (as Phase 1 development) and expected to be constructed in 2020. The remaining
property is proposed to include 54,595 SF of commercial development.
A limited traffic analysis is required by the City of Central Point in their land development code
section 17.05.900 to address impacts for a type III procedural application. Jackson County also
requires an analysis because Table Rock Road and sections of Biddle Road within the study area
are under County jurisdiction. The scope of the analysis includes evaluating impacts to the
surrounding transportation system under existing, development build year, and future year
conditions. The study area was determined by the City and County to include all access points to
the site and the following intersections:
1. Hamrick Road / East Pine Street
2. Meadowbrook Drive / Biddle Road
3. Table Rock Road / Biddle Road
4. Hamrick Road / Table Rock Road
Access to the site is proposed from Biddle Road and Table Rock Road. North -south (N -S) and
east -west (E -W) internal roads are also proposed to Biddle Road and Hamrick Road.
Project Location
The subject property is located on the southwest corner of Biddle Road and Table Rock Road on
Township 37S Range 2W Section 01, tax lot 700 in Central Point, Oregon. Refer to Figures l
and 2 for a vicinity map and site plan.
Project Description
The subject property is zoned C-4 for tourist and office -professional commercial developments. It
is currently vacant. Phase 1 development, which included a quick lube and automated car wash,
was approved in 2019 and is scheduled to be constructed in 2020. For purposes of this analysis,
Phase 1 development was considered as background traffic in year 2020 no -build, design year 2025
no -build, and future year 2038 no -build scenarios. Remaining site development includes 54,595 SF
of commercial or shopping center uses. The commercial development is estimated to generate 229
primary trips to the transportation system during the p.m. peak hour.
I.O. TA4tiiPUATgTlgti,[fIGIN-CFRIHG, LLC I February 28, 2020 1 Table Rock Commercial Dev TIA 16
Figure 1 : Vicinity Map
SOUTHIAH 0 -u -con
T-RAMSPOW-ATION Ih HUAIK, LLC
Medford, Oregon 97504
ph 541.608.9923 fax 541, 535.6873
email: kim.parducclOgmail.com
Table Rock Road
Commercial Development
Traffic Impact Analysis
Central Point, Oregon
Figure 2: Conceptual Site Plan
S O UT -H -u h 0 -A -M"
T-AANSP0-RTATION I11GINUAW, LL(
Medford, Oregon 97504
ph 541.608.9923 fax 541.535.6873
email., kim.parduccic@gmail.com
com
Table Rock Road
Commercial Development
Traffic Impact Analysis
Central Point, Oregon
III. EXISTING YEAR 2020 NO -BUILD CONDITIONS
Site Conditions
The subject property is located on the southwest corner of Biddle Road and Table Rock Road on
Township 37S Range 2W Section 01, tax lot 700 in Central Point, Oregon. The site is currently
vacant. Access is proposed on Biddle Road and Table Rock Road.
Roadway Characteristics
The project study area includes intersections and driveways on Hamrick Road, Table Rock Road,
Meadowbrook Drive, Biddle Road and East Pine Street. A full movement access on Biddle Road
(through a N -S Internal Road) and a right -in, right -out, left -in access on Table Rock Road is
considered in the analysis for site circulation. Study area intersections and driveways are
analyzed in accordance with City of Central Point and Jackson County standards.
Table 1 provides a summary of existing roadway classifications and descriptions in the study
area.
Table 1 - Roadway Classifications and Descriptions
Roadway
Jurisdiction
Functional
Classification
Lanes
Operational
Standard
Posted Speed
(hII'iI)
East Pine Street
City of Central Point
Minor Arterial
5
LOS D
V/C 0.95
35
Biddle Road
Jackson County
Minor Arterial
5
V/C 0.95
35-45
Hamrick Road
City of Central Point
Local
2
LOS D
30-40
Meadowbrook Drive
City of Central Point
Local
2
LOS D
25
Table Rock Road
Jackson County
Minor Arterial
2-5
V/C 0.95
45
Traffic Counts
Manual traffic counts (3-6pm) were collected in August of 2019 at study area intersections with
the exception of Hamrick Road/Table Rock Road, which was counted in February of 2020. Year
2019 counts were seasonally adjusted and then increased by 2% to account for one year of
growth, which is consistent with growth in the Exit 33 Interchange Area Management Plan
(IAMP) and Costco study. In comparing 2019 counts to more recent 2020 counts, it doesn't
appear that growth is occurring at that high of a rate but 2% is used to develop year 2020, design
year 2025, and future year 2038 no -build conditions to be consistent with other analyses in the
area. Additional background growth included approved Phase 1 development trips. Refer to
Figure 3 for year 2020 no -build traffic volumes during the p.m. peak hour. Counts are provided
in Appendix A.
f.0. T PotifPORF/RFIOd -EnclntcRlnc, LLC I February 28,20201 Table Rock Commercial Dev TIA 19
Figure 3: Year 2020 No -Build Traffic Volumes, PM Peak Hour
r �
f � i
BEEBE ROAD
'
5
M
alio 66
J 66 z 60 J 511 O
567 7 �' 552—rte 679
10 I 1 2 Cy _ _ --
= B DDLE RD
• r
,r ,'- .
QT TO S�A
0
S 0 UT -LILA H O -R-16 0 H
T-A-ANSPORTAT10H LPiG111IMK, LL(
Medford, Oregon 97504
ph 541.608.9923 fax 541.535.6873
emaih kim.parducci@agmail.com
_!o'"`1
r `
O+
LLJ
�— 710 �-- r 1 756 489
560 � 2) I 4 320 Z= r 40 ,
19 1 102 /
r
Site ..:�
4
Y
U
O
a
w
J
'low—'�* z .`
Table Rock Road
Commercial Development
Traffic Impact Analysis
Central Point, Oregon
0
1O
Intersection Capacity and Level of Service
Intersection capacity calculations were conducted utilizing the methodologies presented in the
Highway Capacity Manual (HCM 6`h Edition). Capacity and level of service calculations for
signalized and unsignalized intersections were prepared using "SYNCHRO" timing software.
Level of service quantifies the degree of comfort afforded to drivers as they travel through an
intersection or along a roadway section. The level of service methodology was developed to
quantify the quality of service of transportation facilities. Level of service is based on total delay,
defined as the total elapsed time from when a vehicle stops at the end of a queue until the vehicle
departs from the stop line. Level of service ranges from "A" to 'T", with "A" indicating the most
desirable condition and 'T" indicating an unsatisfactory condition. The HCM LOS designations
for stop -controlled intersections are provided in Table 2. The HCM LOS designations for
signalized intersections are provided in Table 3.
Table 2 — ACM Level of Service Designations for Stop -Controlled Intersections
Level of Service
Delay Range
A
<10
B
>10— 15
C
>15-25
D
>25 — 35
E
>35 — 50
F
>50
Table 3 -- HCM Level of Service Designations for
Signalized Intersections
Level of Service
Delay Range
A
<10
B
>10-20
C
>20 — 35
D
>35 — 55
E
>55 — 80
F
> 80
Streets within the study area are under City of Central Point and Jackson County jurisdiction.
The City of Central Point requires all study area intersections to operate at acceptable levels of
service (LOS). The minimum acceptable level of service for signalized intersections and
unsignalized intersection movements is LOS "D". Jackson County's operational standard
considers a volume -to -capacity (V/Q ratio standard. The acceptable performance standard for
signalized and unsignalized intersections per the Jackson County Transportation System Plan is a
v/c ratio no greater than 0.95 within the boundary of the Metropolitan Planning Organization
(MPO) and 0.85 outside of the MPO boundary. All intersections under Jackson County
jurisdiction are within the MPO. Mitigation is, therefore, required at study area intersections
operating below a LOS "D" if under City jurisdiction and a v/c ratio of 0.95 if under Jackson
County jurisdiction.
f.0. TAAMfDOATlITIOH �IIGIHF�ItIHG, L LC I February 28, 2020 1 Table Rock Commercial Dev TIA Ill
Year 2020 No -Build Intersection Operations
Study area intersections were evaluated under existing year 2020 no -build conditions during the
p.m. peak hour. Results are summarized in Table 4.
951h Percentile Exceeded or
Movement
Table 4 - Year 2020 No -Build Intersection Operations, PM Peak Hour
Queue Lengths Blocked Roadway
Intersection Performance
Traffic
Year 2020 No -Build
Standard
Control
300 -
Hamrick Road / East Pine Street LOS D, V/C 0.95
Signal
C, 0.85
Meadowbrook Drive / Biddle Road LOS D, V/C 0.95
TWSC
C, 0.19 SBL
Table Rock Road / Biddle Road V/C 0.95
Signal
0.63
Hamrick Road / Table Rock Road V/C 0.95
TWSC
0.31 EBL
N -S Internal Road / Biddle Road V/C 0.95
TWSC
C, 0.06 NBL
LOS = level of service, V/C = volume -to -capacity, TWSC = two-way stop controlled, EBL = eastbound left, SBL = southbound left,
NBL = northbound left
Note: Exceeded performance standards are shown in bold, italic
Results of the analysis show all study area intersections operate acceptably (within performance
standards) under existing year 2020 no -build conditions during the p.m. peak hour. Refer to
Appendix C for synchro output sheets.
Year 2020 No -Build 95th Percentile Queuing
Queuing is the stacking up of vehicles for a given lane movement, and it can have a significant
effect on roadway safety and the overall operation of a transportation system. Long queue
lengths in through lanes can block access to turn lanes, driveways, and minor street approaches,
as well as spill back into upstream intersections. As a result of this, the estimation of queue
lengths is an important aspect of the analysis process for determining how a transportation
corridor operates.
Queue lengths are reported as the average, maximum, or 95`x' percentile queue length. The 95`h
percentile queue length is used for design purposes and is the queue length reported in this
analysis. Five simulations were run and averaged in SimTraffic to determine 95h percentile
queue lengths. Queues were evaluated at study area intersections under existing year 2020 no -
build conditions. Queue lengths were rounded up to the nearest 25 feet (single vehicle length)
and reported in Table 5 for the p.m. peak hour.
Table 5 — Year 2020 No -Build 95`h Percentile Queue Lengths, PM Peak Hour
Intersection /
Available Link
951h Percentile Exceeded or
Movement
Distance (Ft)
Queue Lengths Blocked Roadway
East Pine Street / Hamrick Road
Eastbound Left
400
300 -
Eastbound Through/Right
675
175 -
Westbound Left
300
25 -
Westbound Through/Right
825
250 -
Northbound Left'
450
250 -
Northbound Through/Right'
450
75 -
Southbound Left/Through
350
125 -
Southbound Right
200
225
f.0. TA71 IPLIPTATIOn LLC I February 28, 2020 1 Table Rock Commercial Dev TIA 112
Table 5 Continued — Year 2020 No -Build 95" Percentile
Queue Lengths, PM Peak Hour
Intersection /
Available Link
95' Percentile Exceeded or
Movement
Distance (Ft)
Queue Lengths Blocked Roadway
Meadowbrook / Biddle Road
Eastbound Left
200
50 -
Eastbound Through/Right
825
0 -
Westbound Left
385
25 -
Westbound Through/Right
1100
0 -
Northbound Left
100
25 -
Northbound Through/Right
425
25
Southbound Left
100
50 -
Southbound Through/Right
375
50 -
Table Rock Road / Biddle Road
Eastbound Left
425
225 -
Eastbound Through/Right
525
125 -
Eastbound Right
200
50 -
Westbound heft
150
75 -
Westbound Through/Right
1400
200 -
Westbound Right
250
125 -
Northbound Left
425
125 -
Northbound Through/Right
1025
150 -
Southbound Left
650
150
Southbound Throughtiti t
650
200 -
Hamrick Road / Table Rock Road
Eastbound Left
225
100 -
Eastbound Right
1000
50 -
Northbound Left
300
50
Northbound Through
400
0
Southbound Through/Right
1025
25 -
N -S Internal Road / Biddle Road
Eastbound Through/Right
500
0 -
Westbound Left
100
25 -
Northbound Left
400
50 -
Northbound Right
too
50 -
Note: Exceeded performance standards are shown in bold, italic
1. Planned improvements (south approach restriped with a left tum and through/right lane) considered in place
Results of the queuing analysis show no study area intersection queue lengths are exceeded under
existing year 2020 no -build conditions during the p.m. peak hour. Queue lengths were field
verified specifically at the signalized intersections of Hamrick Road / Pine Street and Table Rock
Road / Biddle Road during the peak hour, and then adjusted in our model (with decreased
saturation flow rates) until the output was consistent with observations. The eastbound left and
eastbound through queue lengths on Biddle Road at Table Rock Road were the only queues that
reported lower 95"' percentile queue lengths, but the reported max queue lengths were a good
match to field conditions so those queues are reported in Table 5. Refer to Appendix C for a full
queuing and blocking report.
S.O. TRAHfr70J1TATIOH �IIGItlFFJ?ING, LCC I February 28,20201 Table Rock Commercial Dev TIA 113
Crash History
Crash data for the most recent 5 -year period was provided from ODOT's crash analysis unit.
Results were provided for the period of January 1, 2013 through December 31st, 2017. Crash data
was analyzed to identify crash patterns that could be attributable to geometric or operational
deficiencies, or crash trends of a specific type that would indicate the need for further
investigation at an intersection. Study area intersection crash rates were also compared to 90a`
percentile rates using the HCM prediction model. Tables 6 and 7 provide a summary of results.
Crash data is provided in Appendix B.
Table 6 - Study Area Intersection Crash Rates, 2013-2017
Rear-
End
Turning
/Angle
Other
Pedestrian/
Bicyclist
Intersection 2013 2014 2015 2016
2017
Total
Crashes
ADT
Crash
Rate
ODOT
90m %
Hamrick / E Pine Street 5 2 1 7
5
20
26,650
0.411
0.860
Meadowbrook / Biddle 1 0 0 1
Table Rock / Biddle 3 3 4 7
0
4
2
21
13,700
25,800
0.080
0.446
0.408
0.860
Hamrick / Table Rock 0 0 0 0
0
0
12,200
0.000
0.293
Table 7 - Crash History by Type, 2013-2017
14
0
Hamrick / Table Rock
0
0
Intersection Collision Type
0
0
Severity
0
The highest crash frequency occurred at the intersections of Hamrick Road / E Pine Street and
Table Rock Road / Biddle Road. At Hamrick Road / E Pine Street, 65% of collisions were
turning or angle collisions, 30% were rear -end, and 5% were fixed -object. At Table Rock Road /
Biddle Road, 86% were rear -end collisions and 10% were turning or angle. Of the rear -end
collisions, 12 of 17 were northbound on Table Rock Road and five were southbound likely from
congestion on Table Rock Road. Turning and angle collisions were split from the north and
south and involved permissive left turning vehicles. Turning movement and angle collisions are
common at signalized intersections with protected/permissive turning movements and at
unsignalized intersections with center turn lanes. Rear -end collisions are common under
congested conditions. More than half of the collisions resulted in injury at Table Rock Road /
Biddle Road and 50% at Hamrick Road / East Pine Street, but none resulted in fatalities. There
was a more serious injury (INJA) at Table Rock Road / Biddle Road in September of 2015
involving a driver northbound with a driver making a southbound left turn movement. The
southbound left turning driver failed to yield right-of-way. None of the study area intersection
crash rates reached the 90'h percentile rate or were identified as a SPIS site.
Widening improvements on Table Rock Road south of Biddle Road and intersection striping
changes have occurred since the last year of available crash data was reported (2017).
Congestion, specifically along Table Rock Road, has decreased as a result of widening
S.D. T PmfPOJ?TATION LLC I February 28, 2020 1 Table Rock Commercial Dev TIA 114
Rear-
End
Turning
/Angle
Other
Pedestrian/
Bicyclist
Non-
Injury
Injury
Fatal
Hamrick / E Pine Street
6
13
1
0
10
10
0
Meadowbrook / Biddle
0
1
1
0
1
1
0
Table Rock / Biddle
18
2
1
0
7
14
0
Hamrick / Table Rock
0
0
0
0
0
0
0
The highest crash frequency occurred at the intersections of Hamrick Road / E Pine Street and
Table Rock Road / Biddle Road. At Hamrick Road / E Pine Street, 65% of collisions were
turning or angle collisions, 30% were rear -end, and 5% were fixed -object. At Table Rock Road /
Biddle Road, 86% were rear -end collisions and 10% were turning or angle. Of the rear -end
collisions, 12 of 17 were northbound on Table Rock Road and five were southbound likely from
congestion on Table Rock Road. Turning and angle collisions were split from the north and
south and involved permissive left turning vehicles. Turning movement and angle collisions are
common at signalized intersections with protected/permissive turning movements and at
unsignalized intersections with center turn lanes. Rear -end collisions are common under
congested conditions. More than half of the collisions resulted in injury at Table Rock Road /
Biddle Road and 50% at Hamrick Road / East Pine Street, but none resulted in fatalities. There
was a more serious injury (INJA) at Table Rock Road / Biddle Road in September of 2015
involving a driver northbound with a driver making a southbound left turn movement. The
southbound left turning driver failed to yield right-of-way. None of the study area intersection
crash rates reached the 90'h percentile rate or were identified as a SPIS site.
Widening improvements on Table Rock Road south of Biddle Road and intersection striping
changes have occurred since the last year of available crash data was reported (2017).
Congestion, specifically along Table Rock Road, has decreased as a result of widening
S.D. T PmfPOJ?TATION LLC I February 28, 2020 1 Table Rock Commercial Dev TIA 114
improvements. Costco traffic has also normalized in the area. No further investigation is shown
to be necessary.
Biddle Road Access Point
A full movement access on Biddle Road has been approved for Phase 1 development, which will
eventually become a N -S Internal Road that connects to an existing E -W Internal Road from
Hamrick Road to the subject property. The existing E -W Internal Road currently ends just west
of the subject property but will be extended to the N -S Internal Road as part of the proposed
54,595 SF shopping center development. The full -movement access on Biddle Road will be
located approximately 525 feet west of Table Rock Road (measured from stop bar) and 485 feet
east of Meadowbrook Drive. The traffic movements that need to be monitored include the
eastbound left, through, and right turn queue lengths on Biddle Road at Table Rock Road, and the
westbound left turn queue length on Biddle Road at Meadowbrook Drive. Queue lengths from
these traffic movements could spill back and impact the Biddle Road access. An aerial is shown
below.
storage
stnrage, -
100' .. -
« J 425'
RL eill
`storage ref
Kew N -S Phase 1
x Internal Road y . site driveway '
The westbound left turn movement at Meadowbrook Drive is shown to have a 95l' percentile
queue length of 25 feet under existing conditions. Similarly, the eastbound left, through, and
right turn movements are shown to have 95h percentile queue lengths of 225 feet, 125 feet, and
50 feet, respectively. Queue lengths were field verified to make sure the model simulations were
reporting accurate queue lengths. Results show that no existing queue length from either
direction is shown to reach or impact the proposed development access on Biddle Road under
year 2020 no -build conditions (including Phase 1 development) during the p.m, peak hour.
I.O. T R,71lfPO-RTllTlgti -[H6INFCJR1ll6, L LC I February 28, 20201 Table Rock Commercial Dev TIA 115
IV. DESIGN YEAR 2025 NO -BUILD CONDITIONS
Design Year 2025 No -Build Description
Design year 2025 no -build conditions represent development build year conditions for a study
area without consideration of proposed development trips. This condition is evaluated to
determine how a study area will be impacted by area background growth. Background growth in
the analysis, as previously stated, was kept consistent with growth used in the I-5 Exit 33 IAMP
and Costco study for consistency. Growth (-2% per year) was determined using model runs
provided by ODOT's Transportation Planning Analysis Unit (TPAU). Additionally, trips from
Phase 1 development (quick lube and automated car wash) were included. Refer to Figure 4 for
design year 2025 no -build traffic volumes during the p.m. peak hour.
Design Year 2025 No -Build Intersection Operations
Study area intersections were evaluated under design year 2025 no -build conditions during the
p.m. peak hour. Results are summarized in Table 8.
Table 8 — Design Year 2025 No -Build Intersection Operations, PM Peak Hour
Performance Traffic
Intersection Standard Control Year 2025 No -Build
Hamrick Road / East Pine Street
LOS D, V/C 0.95
Signal
C, 0.90
Meadowbrook Drive / Biddle Road
LOS D, V/C 0.95
TWSC
C, 0.22 SBL
Table Rock Road / Biddle Road
V/C 0.95
Signal
0.69
Hamrick Road / Table Rock Road
V/C 0.95
TWSC
0.37 EBL
N -S Internal Road / Biddle Road
V/C 0.95
TWSC
C, 0.07 NBL
LOS=Level of Service, V/C=Volume-to-Capacity, TWSC=Two-way stop controlled, EBL=eastbound left, SBL=southbound left,
NBL=northbound left
Note: Exceeded performance standards are shown in bold, italic
Results of the analysis show all study area intersections continue to operate acceptably (within
performance standards) under design year 2025 no -build conditions during the p.m. peak hour.
Refer to Appendix D for synchro output sheets.
Design Year 2025 No -Build 95th Percentile Queuing
Five simulations were run and averaged in SimTraffic to determine 95`' percentile queue lengths
at study area intersections under design year 2025 no -build conditions. Queue lengths were
rounded up to the nearest 25 feet (single vehicle length) and reported in Table 9 for the p.m. peak
hour.
f.0. TJ?AnfP0,PTlIT10n LLC I February 28, 2020 1 Table Rock Commercial Dev TIA 116
Table 9 — Desiz2 Year 2025 No -Build 95" Percentile
Queue Lengths, PM Peak Hour
Intersection !
Available Link
95' Percentile Exceeded or
Movement
Distance (Ft)
Queue Lengths Blocked Roadway
East Pine Street / Hamrick Road
Eastbound Left
400
450 -
Eastbound Through/Right
675
225 -
Westbound Left
300
25 -
Westbound Through/Right
825
275 -
Northbound Left)
450
275 -
Northbound Through/Right'
450
75 -
Southbound Left/Through
350
125 -
Southbound Ri ht
200
275 -
Meadowbrook / Biddle Road
Eastbound Left
200
50 -
Eastbound Through/Right
825
0 -
Westbound Left
385
25 -
Westbound Through/Right
1100
0 -
Northbound Left
100
25
Northbound Through/Right
425
25 -
Southbound Left
100
50
Southbound Through/Right
375
50
Table Rock Road / Biddle Road
Eastbound Left
425
275 -
Eastbound Through/Right
525
150 -
Eastbound Right
200
50 _
Westbound Left
150
75
Westbound Through/Right
1400
200 -
Westbound Right
250
125
Northbound Left
425
125
Northbound Through/Right
1025
150 -
Southbound Left
650
175 -
Southbound Through/Right
650
225 -
Hamrick Road / Table Rock Road
Eastbound Left
225
100 -
Eastbound Right
1000
50 -
Northbound Left
300
50 -
Northbound Through
400
0 -
Southbound Through/Right
1025
25 -
N -S Internal Road / Biddle Road
Eastbound Through/Right
500
0 -
Westbound Left
100
25 -
Northbound Left
400
50 -
Northbound Right
100
50 -
Note: Exceeded performance standards are shown in bold, italic
1. Planned improvements (south approach restriped with a left tum and through/right lane) considered in place
Results of the queuing analysis show no study area intersection queue length is exceeded under
design year 2025 no -build conditions during the p.m. peak hour. The eastbound left turn queue
length on Biddle Road at Table Rock Road increases from 225 feet to 275 feet, but this is still
well below the 425 feet of available storage length. The westbound left turn queue length on
Biddle Road at Meadowbrook Drive stays the same (25 feet). The westbound left turn queue
length on Biddle Road at the N -S Internal Road also stays the same (25 feet). The N -S Internal
Road, therefore, continues to operate acceptably as a full movement access on Biddle Road under
design year 2025 no -build conditions during the p.m. peak hour. Refer to Appendix D for a full
queuing and blocking report.
f.0. Tannsvonrnr19n �nc�n��ainc, LLC I February 28,20201 Table Rock Commercial Dev TTA 117
Figure 4: Design Year 2025 No -Build Traffic Volumes, PM Peak Hour
BEEBE ROAD.
SOT TO '
BIDDLE RD
l � h
sour -W -1-D" H- Non
TD-AMSPOW-flTIUM -MINTI-Dent. LLC
Medford, Oregon 97504
ph 541.608.9923 fax 541.535.6873
email: kim.parducciOrgmail.com
rim Zen '
}� 170 J 540
355 45
110
•mak _b<
t
I
- 1
Table Rock Road
Commercial Development
Traffic Impact Analysis
Central Point, Oregon
V. SITE TRAFFIC
Trip Generation
Trip generation calculations for the proposed 54,595 SF commercial development were prepared
utilizing the Institute of Transportation Engineers (ITE) Trip Generation, 10''' Edition. ITE rates
were used for land use code 820 — Shopping Center. Pass -by trips were considered in accordance
with ITE recommended practices. No internal trip reductions were taken. Table 10 provides a
summary of trip generations. ITE graphs are provided in Appendix B.
Table 10—Development Trip Generations
Land Use Unit She PM Peak PM PM Peak Sour
Rate Trips
Total
% In In % Out Out
820 — Shopping Center 1000 SF 54.595 Fitted
347
0.48 167 0.52 180
34% Pass -by
(118)
(59) (59)
Total Primary Trips
229
108 121
SF = Square Feet
Trip Distribution and Assignment
Development trips were distributed in accordance with existing traffic volumes within the study
area and engineering judgement. Roadway volumes were compared in the local project vicinity
to estimate the percentage of trips going to and coming from Hamrick Road, East Pine Street,
Biddle Road, Meadowbrook Drive, and Table Rock Road. This resulted in 15% to/from the north
on Hamrick Road, 30% to from the west on East Pine Street, 5% to/from Meadowbrook Drive,
15% to/from the north on Table Rock Road, 10% to/from the south on Table Rock Road, and
20% to/from the east on Biddle Road. Refer to Figure 5 for shopping center development trip
distributions and assignments during the p.m. peak hour.
Proposed Access Points
Under design year 2025 no -build and
build conditions, a full movement access
via a N -S Internal Road exists at Biddle
Road. A second access is proposed on
Table Rock Road under design year 2025
build conditions approximately 450 feet
south of Biddle Road and 600 feet north
of Hamrick Road. This access is
proposed as a right -in, right -out, left -in
access.
f.0. TAAMfPOPUTION -CHOH-CO ic, LLC I February 28, 2020 1 Table Rock Commercial Dev TIA 119
Figure 5: Shopping Center Trip Assignments, PM Peak Hour
BEEBE ROAd
fFi
A.
t0
LU
"m JIB
ANOT�T0—'
a
DDLE RD
SouTuI-An OP.160H
T-DAHSPOWAT10H -EMG HU-nW, LL(
Medford, Oregon 97504
ph 541.608.9923 fax 541.535.6873
email: kim. parducci a gmaif. com
Table Rock Road
Commercial Development
Traffic Impact Analysis
Central Point, Oregon
UI
�Q
i qra
SouTuI-An OP.160H
T-DAHSPOWAT10H -EMG HU-nW, LL(
Medford, Oregon 97504
ph 541.608.9923 fax 541.535.6873
email: kim. parducci a gmaif. com
Table Rock Road
Commercial Development
Traffic Impact Analysis
Central Point, Oregon
VI. DESIGN YEAR 2025 BUILD CONDITIONS
Design Year 2025 Build Description
Build conditions represent no -build conditions for a study area with the addition of proposed
development trips considered. Build conditions are compared to no -build conditions to determine
what impacts and/or mitigation measures will result from proposed development. Build
conditions in year 2025 are for a 54,595 SF commercial/shopping center development.
Design Year 2025 Build Intersection Operations
Design Year 2025 build traffic volumes were evaluated at study area intersections during the p.m
peak hour to compare impacts. Results are summarized in Table 11.
Table 11— Design Year 2025 Build Intersection Operations, PM Peak Hour
Intersection
Performance
Standard
Traffic
Control
Year 2025 Build
Hamrick Road / East Pine Street
LOS D, V/C 0.95
Signal
C, 0.94
Meadowbrook Drive / Biddle Road
LOS D, V/C 0.95
TWSC
C, 0.28 SBL
Table Rock Road / Biddle Road
V/C 0.95
Signal
0.72
Hamrick Road / Table Rock Road
V/C 0.95
TWSC
0.38 EBL
N -S Internal Road / Biddle Road
V/C 0.95
TWSC
C, 0.20 NBL
Site Access / Table Rock Road
V/C 0.95
TWSC
0.06 EBR
LOS=Level of Service, V/C=Volume-to-Capacity, TWSC=Two-way stop controlled, EBL=eastbound left, EBR=eastbound right
SBL=southbound left, NBL=northbound left
Note: Exceeded performance standards are shown in bold, italic
Results of the analysis show all study area intersections continue to operate acceptably (within
performance standards) under design year 2025 build conditions during the p.m. peak hour.
Small changes occur at the signalized intersections of Hamrick Road/ E. Pine Street and Table
Rock Road / Biddle Road, but both continue to meet their performance standard. The new site
driveway on Table Rock Road is shown to have minor delay with the critical movement being the
eastbound right turn movement. The critical movement (northbound left) v/c ratio at the N -S
Internal Road intersection with Biddle Road increases from a v/c ratio of 0.07 (LOS C) to 0.20
(LOS C) as a result of proposed shopping center development, but continues to meet the County
performance standard. Synchro output sheets are provided in Appendix E for further reference.
Design Year 2025 Build 95th Percentile Queuing
Five simulations were run and averaged in SimTrafffc to determine 95h percentile queue lengths
at study area intersections under design year 2025 build conditions. Queue lengths were rounded
up to the nearest 25 feet (single vehicle length) and reported in Table 12 for the p.m. peak hour.
f. 0. TItmyfPugTATIOII �nGInFdJtIHG, LLC I February 28, 2020 1 Table Rock Commercial Dev TIA 121
Table 12 — Design Year 2025 Build 95" Percentile Queue Lengths, PM Peak Hour
Intersection ! Available Link 95' Percentile Exceeded or
Movement Distance (Ft) Queue Lengths Blocked Roadway
East Pine Street / Hamrick Road
Eastbound Left
400
450
Eastbound Through/Right
675
250
Westbound Left
300
25
Westbound Through/Right
825
300
Northbound Left'
450
350
Northbound Through/Right'
450
75
Southbound Left/Through
350
175 -
Southbound Richt
200
300
Meadowbrook / Biddle Road
Eastbound Left
200
50
Eastbound Through/Right
825
0
Westbound Left
385
25
Westbound Through/Right
1100
0
Northbound Left
100
25 -
Northbound Through/Right
425
25 -
Southbound Left
100
50 -
Southbound Throueh/Rieht
375
50 -
Table Rock Road / Biddle Road
Eastbound Left
425
275 -
Eastbound Through/Right
525
175 -
Eastbound Right
200
50 -
Westbound Left
150
75 -
Westbound Through/Right
1400
225 -
Westbound Right
250
125 -
Northbound Left
425
150 -
Northbound Through/Right
1025
150 -
Southbound Left
650
175 -
Southbound Through/Right
650
250 -
Hamrick Road / Table Rock Road
Eastbound Left
225
100 -
Eastbound Right
1000
50 -
Northbound Left
300
50 -
Northbound Through
400
0 -
Southbound Throueh/Rieht
600
25 -
N -S Internal Road / Biddle Road
Eastbound Through/Right
500
25 -
Westbound Left
100
50 -
Northbound Left
400
75 -
Northbound Right
100
75 -
Site Access / Table Rock Road
Eastbound Right 200 50
Northbound Left 450 25 -
Southbound Through/Right 450 0 -
Note: Exceeded performance standards are shown in bold, italic
I Planned improvements (south approach restriped with a left turn and through/right lane) considered in place
Results of the queuing analysis show small increases in queue lengths at study area intersections
under design year 2025 build conditions during the p.m. peak hour. The northbound left turn
queue length on Hamrick Road at East Pine Street increases to 350 feet from additional traffic
using the E -W Internal Road when leaving the commercial development. Similarly, the
northbound left and right turn queue lengths on the N -S Internal Road at Biddle Road increase as
f. 0. Tl7AHfPOJtrvr1on LLC I February 28,20201 Table Rock Commercial Dev TIA 122
a result of additional traffic from the commercial development, but no significant changes are
shown to occur. Refer to Appendix E for a full queuing and blocking report.
Design Year 2025 Access Points
Site access points under design year 2025 build conditions are shown to operate acceptably with
additional traffic from shopping center development. The full movement access on Biddle Road,
which becomes the N -S Internal Road connection to the E -W Internal Road from Hamrick Road,
experiences a small increase in delay (northbound left turn movement) of 17 seconds to 20
seconds with a v/c ratio increase of 0.07 to 0.20, but these are considered minor changes. The
new site access on Table Rock Road is shown to have an average delay of 11 seconds in the
eastbound right turn movement and 9 seconds in the northbound left turn movement. Our
simulations and intersection operations output show both access points on Biddle Road and Table
Rock Road operating acceptably with build out of the shopping center in year 2025. Nothing
indicates a need to restrict the full movement access on Biddle Road as a result of shopping
center traffic under this analysis scenario. If, at any time, queue lengths on Biddle Road increase
to a point that having a full movement access between Table Rock Road and Meadowbrook Drive
becomes problematic, however, the County has the right to restrict access to the N -S Internal
Road. Until that occurs, there's a benefit to having more access options for drivers because it
preserves capacity at surrounding intersections.
Table Rock Road Sight Distance
The new site access on Table Rock Road is proposed as a right -in, right -out, left -in access. The
movements that need visual clearance include the eastbound right and northbound left turn
movements. Table Rock Road is straight and flat in this section. Sight distance is unrestricted
for both movements and shown to be adequate.
Design Year 2025 Build Turn Lane Criterion
Right Turn Lane
Right turn lane criterion was evaluated on Biddle Road at the N -S Internal Road and on Table
Rock Road at the proposed site driveway during the p.m. peak hour to determine whether right
turn deceleration lanes are necessary under design year 2025 build conditions for the eastbound
and southbound movements, respectively. Results of the analysis show criterion is met on Biddle
Road and, therefore, warrants a deceleration lane. This may be determined to be difficult,
however, because the street frontage needed for the turn lane is off site. From our perspective,
the right turn lane is not a high safety concern because there are two eastbound travel lanes on
Biddle Road, which reduces the potential for rear -end collisions. If the off-site frontage is not
able to be obtained for a right turn lane and Jackson County cannot condemn it, then construction
of a right turn lane can be delayed until the property to the west develops without creating
significant safety concerns. Criterion was not shown to be met on Table Rock Road. Refer to
Appendix H for right turn lane graphs.
U7. TAINIfPu-RTAT10H �IIGIN��IIIIIG, LLC I February 28, 20201 Table Rock Commercial Dev TIA 123
Figure 6: Design Year 2025 Build Traffic Volumes, PM Peak Hour
'PA
BEEBE ROAD - _ -- _44
•
Y ti ti• O.` ..r. -, •. 1Aw
Q1
n v +iy f UJB
7 r n d _ J
l� S
420 � 51 .� CO! �_- � �__ �� Q 190J �55�
55 y r 740 = 65; 7(�2 , * '97 62 1 �. -3 50
220 ! 11 I ( �' ,K9 1 w I10 1
LJLJI
PINE STREET - BIDDLE RD
�r
r
,SNOT- TO -
5 "
i
S O UTTI-U H O -A -16 O M
T-A-INSPOW-flTION MIMI-1-RIN6, LI_(
Medford, Oregon 97504
ph 541.608.9923 fax 541.535.6873
email,- kirn.parducci(Ogmail.corn
Table Rock Road
Commercial Development
Traffic Impact Analysis
Central Point, Oregon
VII. FUTURE YEAR 2038 NO -BUILD & BUILD CONDITIONS
Future Year 2038 No -Build and Build Description
Future year 2038 no -build conditions represent development build year conditions without
consideration of build development trips. Future year 2038 build conditions represent no -build
conditions with the addition of development trips considered. Growth between design year 2025
and future year 2038 was developed using a 2% annual growth, as stated previously in this report.
Study area intersections were then balanced. Refer to Figures 7 and 8 for future year 2038 no -
build and build traffic volumes during the p.m. peak hour.
Future Year 2038 No -Build and Build Intersection Operations
Study area intersections were evaluated under future year 2038 no -build and build conditions
during the p.m. peak hour. Results are summarized in Table 13.
Table 13 — Future Year 2038 No -Build and Build Intersection Operations, PM Peak Hour
Intersection
Performance
Standard
Traffic
Control
Future Year
2038 No -Build
Future Year
2038 Build
Hamrick Road / East Pine Street
LOS D, V/C 0.95
Signal
D, 1.12
E, 1.14
Meadowbrook Drive / Biddle Road
LOS D, V/C 0.95
TWSC
C, 0.38 SBL
C, 0.53 SBL
Table Rock Road / Biddle Road
V/C 0.95
Signal
0.90
0.93
Hamrick Road / Table Rock Road
V/C 0.95
TWSC
0.61 EBL
0.64 EBL
N -S Internal Road / Biddle Road
V/C 0.95
TWSC
C, 0.09 NBL
D, 0.25 NBL
Site Access / Table Rock Road
V/C 0.95
TWSC
NA
0.07 EBR
LOS=Level of Service, V/C=Volume-to-Capacity, TWSC=Two-way stop controlled, EBL=eastbound left, EBR=eastbound right
SBL=southbound left, NBL=northbound left
Note: Exceeded performance standards are shown in bold, italic
Results of the analysis show the signalized intersection of Hamrick Road / East Pine Street
exceeding its performance standard under future year 2038 no -build and build conditions. All
other study area intersections are shown to operate acceptably with and without proposed
shopping center development trips. By the future year 2038, planned improvements in the local
area, including a Gebhard Road connection to East Pine Street, are expected to re-route traffic at
the intersection of Hamrick Road / East Pine Street. Re-routing is specifically expected to
decrease traffic in the eastbound left and southbound right turn movements. Once these
improvements are in place, it can be determined whether additional mitigation is necessary at
Hamrick Road / East Pine Street. If the Gebhard Road connection does not occur by the future
year 2038, then required mitigation will likely include a second eastbound left turn lane on East
Pine Street and possibly an additional westbound receiving lane for the southbound right turn
movement on Hamrick Road. These improvements have been previously discussed in the Exit 33
IAMP and other studies. It is our conclusion that specific mitigation for this intersection, if
shown to be necessary, will likely be determined when the City prepares a Transportation System
Plan (TSP) Update in the next few years. Refer to Appendices F and G for synchro output sheets.
S.O. TannfPOATJlTIO/1 �nGIHFFAInG, LLC I February 28, 20201 Table Rock Commercial Dev TIA 125
Future Year 2038 No -Build and Build 951h Percentile Queuing
Five simulations were run and averaged in SimTraffic to determine 95`'' percentile queue lengths
at study area intersections under future year 2038 no -build and build conditions. Queue lengths
were rounded up to the nearest 25 feet (single vehicle length) and reported in Table 14 for the
p.m. peak hour.
Table 14 — Future Year 2038 No -Build and Build 95" Percentile Queue Lengths, PM Peak Hour
Intersection 1 Available Link 95" Percentile 950' Percentile Exceeded or
Movement Distance (Ft) Queue Lengths Queue Lengths Blocked Roadway
No -Build Build
East Pine Street / Hamrick Road
Eastbound Left
400
600
625 Bank Driveway
Eastbound Through/Right
675
275
300 -
Westbound Left
300
100
100 -
Westbound Through/Right
825
525
625 -
Northbound Left'
450
375
500 E -W Internal Road
Northbound Through/Right'
450
100
175 -
Southbound Left/Through
350
250
275 -
Southbound Right
200
325
325 Right Turn Storage
Meadowbrook / Biddle Road
Eastbound Left
200
75
75 -
Eastbound Through/Right
825
0
0 -
Westbound Left
385
25
25 -
Westbound Through/Right
1100
0
0 -
Northbound Left
100
25
25 -
Northbound Through/Right
425
25
25 -
Southbound Left
100
50
50 -
Southbound Through/Right
375_
50
50 -
Table Rock Road / Biddle Road
Eastbound Left
425
275
325 -
Eastbound Through/Right
525
200
225 -
EaAbound Right
200
75
75 -
Westbound Left
150
75
100 -
Westbound Through/Right
1400
300
300 -
Westbound Right
250
225
250 -
Northbound Left
425
200
250 -
Northbound Through/Right
1025
225
225 -
Southbound Left
650
250
250 -
Southbound Through/Right
650
350
425 -
Hamrick Road / Table Rock Road
Eastbound Left
225
200
225 -
Eastbound Right
1000
200
175 -
Northbound Left
300
50
50 -
Northbound Through
400
0
0 -
Southbound Through/Right
1025/600
25
25 -
N -S Internal Road / Biddle Road
Eastbound Through/Right
500
25
25 -
Westbound Left
100
50
50 -
Northbound Left
400
50
75 -
Northbound Right
100
50
75 -
Site Access / Table Rock Road
Eastbound Right
200
-
50 -
Northbound Left
450
-
25 -
Southbound Through/Right
450
-
0 -
Note: Exceeded performance standards are shown in bold, italic
I. Planned improvements (south approach
restriped with
a left turn and
through/right lane) considered in place
5.0. T gmifG0AT11T10d -IMO 1F-CJNH6, LLC I February 28, 2020 1 Table Rock Commercial Dev TIA 126
Results of the queuing analysis show three traffic movements exceed their available storage
lengths at the intersection of Hamrick Road / East Pine Street under future year 2038 no -build and
build conditions. These include the southbound right turn, eastbound left turn, and northbound
left turn movements. No other traffic movements at study area intersections are shown to exceed
their storage length. Refer to Appendices F and G for a full queuing and blocking report.
Future Year 2038 Build Turn Lane Criterion
Right Turn Lane
Right turn lane criterion was evaluated on Biddle Road and shown to be met under design year
2025 build conditions, so this was not re-evaluated under fixture conditions. Turn lane criterion
was evaluated on Table Rock Road at the proposed site access under future year 2038 build
conditions. Results of the analysis show criterion is not met on Table Rock Road as a result of
shopping center development and a turn lane is not warranted. Refer to Appendix H for right turn
lane graphs.
Future Year 2038 Access Operations
Under future year 2038 no -build and build conditions, a full movement access on Biddle Road
and a right -in, right -out, left -in access on Table Rock Road was considered. Both access points
were evaluated and shown to operate acceptably (within City of Central Point and Jackson
County performance standards). The eastbound left turn queue on Biddle Road at Table Rock
Road is shown to increase from 275 feet to 325 feet under build conditions. The available storage
distance, assuming 100 feet of storage for the westbound left turn movement on Biddle Road at
the N -S Internal Road, is approximately 425 feet. This leaves approximately 100 feet of margin
before the back to back queue lengths overlap within the available storage length. Based on this,
it is our conclusion that the N -S Internal Road access on Biddle Road may need to be restricted
under future year 2038 build conditions. It is our recommendation to discuss this further with
Jackson County.
The right -in, right -out, left -in site access on Table Rock Road is located over 400 feet south of
Biddle Road. The northbound left turn queue length on Table Rock Road at Biddle Road is the
queue that could potentially impact the northbound left -in movement at this access. The
northbound left turn queue length at Table Rock Road / Biddle Road is reported to increase from
200 feet to 250 feet under future year 2038 build conditions, which is well below the allowable
storage length. Based on this, it is our conclusion that the proposed site access can remain as
evaluated without creating any adverse impacts to the transportation system.
f.0. TnnNfDORTnTIOH �nGInF�JtInG, LLC I February 28,20201 Table Rock Commercial Dev TIA 127
Figure 7: Future Year 2038 No -Build Traffic Volumes, PM Peak Hour
r i
OF
-•BEEBE RaAD f •� - I~ - w f A
~ _ A
to) 60
Iso W
295 ( ,
.ET BIDDLE RD ��,TV
�r -- HAMRICK RD-- -
SOUTAIAH HIM"
TAMSDOATATI0h 1i9GltiIUM, LLC
Medford, Oregon 97504
ph 541.608.9923 fax 541.535.6873
email.' kim.parducci cr gmail. com
75 W
ii
R__ i
Table Rock Road
Commercial Development
Traffic Impact Analysis
Central Point, Oregon
Figure 8: Future Year 2038 Build Traffic Volumes, PM Peak Hour
4
-fop 4k It I
BEEBE ROADS
1z. -r.. I
U D _
65 = h41 5] ❑ 9811 235 .375
950 - 5
8 1 ❑ 772 62 48fl _.. .10
o�
H v�D vl x J X
LU
PINE STRE BIDDLE RD
0
i
SOS
10 s
0 �40 1� —� a5 tf
35
F - _ .. HAMRICK RD
178 LU
130� _j
14
N T TO SCAL �.
MUT41-1-Dn OX60" Table Rock Road
T-A-fl"SPO -ATIon 1WHIUM, LL( Commercial Development
�► Medford, Oregon 97504 Traffic Impact Analysis
ph 541.608.9923 fax 541.535.6873 p Y
email' kim.parducciC gmail.com Central Point, Oregon
a
VIII. CONCLUSIONS
Conclusions
The findings of the traffic impact analysis conclude that the proposed commercial development can
be approved with recommended improvements without creating adverse impacts to the
transportation system. Results of the analysis are as follows:
All study area intersections operate acceptably under existing year 2020 and design year 2025
no -build and build conditions during the p.m. peak hour. The intersection of Hamrick Road /
East Pine Street -exceeds its performance standard under future year 2038 no -build and build
conditions. By the future year 2038, improvements are planned in the local area, including a
Gebhard Road extension to East Pine Street with signalization. When this occurs, traffic is
expected to decrease specifically in the eastbound left and southbound right turn movements at
Hamrick Road / East Pine Street. It is our expectation that future mitigation for this
intersection, with different improvement scenarios, will be determined when the City prepares a
Transportation System Plan (TSP) Update in the next few years.
Right turn lane criterion was evaluated at proposed access points on Biddle Road and Table
Rock Road. A right turn lane is not shown to be warranted on Table Rock Road under any
analysis scenario. A right turn lane is shown to be warranted on Biddle Road under year 2025
build conditions. If acquiring off site right of way to construct this turn lane proves to be
difficult, this improvement can be delayed until the property to the west develops. This is not
considered a high-level safety concern.
3. Queue lengths in the future year 2038 build scenario are shown to potentially impact the full
movement access (referred to as the N -S Internal Road) with Biddle Road. It is concluded that
the full movement access may need to be restricted by this time. This should be further
discussed with Jackson County.
The proposed 54,595 SF commercial development on the southwest corner of Biddle Road and
Table Rock Road is shown to be in compliance with the Central Point Comprehensive Plan and
Land Development Code. Streets that serve the subject property will accommodate projected
p.m. peak hour traffic volumes within acceptable levels of service with identified improvements.
f. 0. Tigti PTNIOtl {NGINFFltING, LLC I February 28, 20201 Table Rock Commercial Dev TIA 130
Table Rock Road
Commercial Development
Type III Procedure
APPENDICES A -I
February 28, 2020
Due to the length of the document of the
document Appendices A-1 have been
removed and are available upon request.
Prepared By:
f DuTapm ❑,uron TunfP&PUTIonr - r►Grn �nr�, C C C
�QUl"A�-RM LI��GQ�
T�IAHf PQAiA]'IQrr �NGI1lAAA1HG, L � C
Medford, Oregon 97544
Phone 541.608.9933 Fax 541.535.6873
Email: Kim.parducci@gmaii.com
Attachment "M
PLANNING DEPARTMENT SUPPLEMENTAL FINDINGS OF FACT
AND CONCLUSIONS OF LAW
File No.: SUB -20001
Before the City of Central Point Planning Commission
Consideration of a Tentative Plan for the Table Rock Crossing Subdivision
Applicant:
South Salem, LLC
PO Box 4460
Medford OR 97501
Findings of Fact
and
Conclusion of Law
PART 1
INTRODUCTION
The applicant submitted a tentative plan application (Type III) for the Table Rock Crossing Subdivision to
subdivide 7.01 acres into eight (8) commercial lots ("Application"). The property is located within the
Tourist and Office Professional (C-4) zoning district.
A subdivision tentative plan is reviewed as a Type III application. Type III applications are reviewed in
accordance with procedures provided in Section 17.05.400, which provides the basis for decisions upon
standards and criteria in the development code and the comprehensive plan, when appropriate.
The standards and criteria for the proposal are set forth in CPMC Title 16, Subdivisions, and Chapter
17.75, Development and Design Standards. The following findings address each of the standards and
criteria as applies to the subdivision tentative plan.
PART 2
SUBDIVISIONS
Title 16 of the Central Point Municipal Code (CPMC) establishes standards and criteria for land
division applications including tentative plans and final plats. The sections of CPMC 16 applicable to
the Application are:
Chapter 16.10 - Tentative Plans.
This section of code provides design standards and principles of acceptability, the information
required on a tentative plan map and other supplementary material that may be required for review
of the application.
Finding CPMC 16.10: The tentative plan, as represented by Attachment "A-1 " of the Planning
Department Staff Report dated April 28, 2020, has been reviewed for compliance with the
Page 1 of 3 Findings & Conclusions of Law File No.: SUB -20001
requirements of Chapter 16.10 and found to contain all the necessary information. As a condition
of approval, the applicant is required to submit a subdivision plat name from the Jackson County
Surveyor.
Conclusion CPMC 16.10: Complies as conditioned.
CPMC 16.20.020 Streets – Generally
Streets created by subdivisions and partitions shall be designed and constructed in conformance
with the requirements of the city's comprehensive plan, this code, the city's public works
standards, and all conditions established by the city.
Finding CPMC 16.20: Access to the proposed subdivision will be provided by a new Retail
Street, which provides access to Table Rock Road and Biddle Road with a connection to Hamrick
Road through existing developments to the west. The Retail Streets are designed to minimum
construction standards, provides landscape rows and sidewalk connections throughout the site.
Internal circulation will be provided by access easements
Conclusion CPMC 16.20: As evidenced by the Tentative Plan and Parks & Public Works Staff
Report referenced above, the proposed retail streets are designed and planned for construction
consistent with City standards.
Chapter 16.24, Blocks and Lots—Design Standards
The lengths, widths and shapes of blocks shall be designed with due regard to providing adequate
building sites suitable to the special needs of the type and use contemplated, needs for convenient
access, circulation, control and safety of street traffic and limitations and opportunities of topography.
Finding CPMC 16.24: While the proposed perimeter block length of 2,152 feet exceeds the maximum
perimeter block length of 2, 000 feet, the standards may be modified due to traffic safety concerns. The
intersection of the private street along Table Rock Road was increased from the 300 foot minimum to
455 feet to increase safety and traffic movement along Table Rock Road, and accounts for the
increase in perimeter block length.
Conclusion CPMC 16.24: Complies.
PART 3
ZONING ORDINANCE
The purpose of Title 17 of the CPMC is to encourage the most appropriate use of land, promote orderly
growth of the city, and promote public health, safety, convenience and general welfare. The sections of
CPMC 17 applicable to the application are:
Chapter 17.05, Applications and Types of Review Procedures
This Chapter establishes standard decision-making procedures that enable the city, the applicant, and
the public to review applications and participate in the local decision making process. There are four
Page 2 of 3 Findings & Conclusions of Law File No.: SUB -20001
(4) types of review procedures, Type I, II, II, and IV that are applied to land use and development
applications in Table 17.05. 100. 1. It also establishes when a Traffic Impact Analysis (TIA) is
required.
Finding CPMC 17.05: As identified in Table I, Section 17.05.100.1 a subdivision tentative plan is
reviewed using Type III procedures. The application has been noticed and processed in accordance
with the Type III review procedures per Section 17.05.400. A TIA was submitted by Southern Oregon
Transportation for the proposed development in accordance Section 17.05.900.
Conclusion CPMC 17.05: Complies.
Chapter 17.75, Design and Development Standards
CPMC 17.75.031 General Connectivity, Circulation and Access Standards
The purpose of this section is to assure that the connectivity and transportation policies of the city's
Transportation System Plan are implemented. In achieving the objective of maintaining and enhancing
the city's small town environment it is the city's goal to base its development pattern on a general
circulation grid using a walkable block system. Blocks may be comprised of public/private street
right-of-way, or accessways.
Finding CPMC 17.75.031: The proposed development will use private retail streets to provide
connections to the public streets. The private streets will also permit the development to meet the
perimeter block length standards and provide connections from Hamrick Road through existing
developments to the west
While the proposed perimeter block length of 2,152 feet exceeds the maximum perimeter block length
of 2, 000 feet, the standards may be modified due to traffic safety concerns. The intersection of the
private street along Table Rock Road was increased from the 300 foot minimum to 455 feet to
increase safety and traffic movement along Table Rock Road, and accounts for the increase in
perimeter block length.
The Retail Streets are designed to minimum construction standards, provide landscape rows and
sidewalk connections throughout the site. Internal circulation for vehicles and pedestrians will be
provided by access easements
Conclusion CPMC 17.75.031: Complies.
PART 4
SUMMARY CONCLUSION
As evidenced in Planning Department Supplemental Findings, the proposed tentative plan application for
the Table Rock Crossing Subdivision is, as conditioned in the Staff Report dated May 5, 2020, in
compliance with the applicable criteria set forth in Title 16 and Title 17 of the Central Point Municipal
Code.
Page 3 of 3 Findings & Conclusions of Law File No.: SUB -20001
Public Works Department
April 15, 2020
AGENDA ITEM:
CENTRAL
POINT
PUBLIC WORKS STAFF REPORT
SUB- 20001 —8 lot commercial subdivision
Traffic:
Attachment "E"
Matt Samitore, Director
The applicant is proposing an 8 lot commercial subdivision. The City uses the Institute of
Transportation Engineers (ITE) Volume 10 for scoping Traffic Impact Analysis (TIA). The
threshold is 25 PHT, on a particular intersection, or can be required as part of a conditional use
permit. A TIA was completed by Southern Oregon Transportation for this use. Access to the
site is controlled by Jackson County Roads on both Table Rock Road and Biddle Avenue. They
are allowing right in and out on and left in on both movements. The TIA also points out that at a
future year more improvements are needed at Hamrick and Biddle/Pine. The City is working
on a plan to expand the intersection as well as future north bound movements via a Gebhard
Road project. Both are scheduled to be completed during the planning horizon.
Existing Infrastructure:
Water: There is 8 inch waterline in the private drive to the west of the development
Streets: Table Rock and Biddle Road are major arterial streets owned and maintained by
Jackson County. The private drive to the west is a private retail street.
Storm Water: There is 24" Storm Drain line in the private drive that has adequate capacity for
the proposed development. Jackson County also has a line on Biddle that may be
accessible.
Issues:
There are two main issues:
Reciprocal Access — The application shows public access thru the subject site. Permanent
easements for the development of the private retail street and the access to the west are
needed for access, circulation and vehicular movements.
2. Storm Utility Connection - The proposed development shows connection to the Jackson
County storm drain system. There is limited capacity in this system, so it will be
necessary for the applicant to coordinate with Jackson County to determine if any of the
storm run-off associated with this development can be connected to the existing system.
April 27, 2020
Page 2 of 2
machine width (normally 10'-12') for a travel lane restoration. Drag boxes or other pull -type
asphalt spreaders will not be permitted for longitudinal trench pavement replacement.
8. Per Oregon Revised Statute 209.150, any survey monuments of record removed, disturbed or
destroyed within the permit area must be referenced prior to construction and replaced after
construction by a registered professional land surveyor. All costs associated with this surveying
work are the responsibility of the permit holder
9. Biddle Road is a County Minor Arterial and is maintained by the County. The Average Daily
Traffic count was 9,984 for eastbound lanes 450 east of Hamrick Road on July 31, 2018 and
9,677 for westbound lanes on July 31, 2018 450 feet east of Hamrick Road.
10. Table Rock Road is a County Arterial and is maintained by the County. The Average Daily
Traffic count was 20,723 750 north of Biddle Road on July 9, 2018.
11. If county storm drain facilities are to be utilized, the applicant's registered Engineer shall provide
a hydraulic report and plans for review and approval by Jackson County Roads. Storm
drainage runoff is limited to that area currently draining to the County storm drainage system.
Upon completion of the project the developer's Engineer shall certify that the construction of the
drainage system was constructed per the approved plan. A copy of the certification shall be
sent to Chuck DeJanvier at Jackson County Roads.
12. We would like to be notified of future development proposals, as county permits may be
required.
13. We concur with any right-of-way dedicated.
Sincerely,
r ( -µ /
Chuck DeJanvier, PE
Construction Engineer
I:\Engineering\Development\CITIES\CNTRLPT\SUB-20-001-revision 1.doc
'tol SEWS.
April 10, 2020
Attachment "G"
ROGUE VALLEY SEWER SERVICES
Location 138 West Vilas Road, Central Point, OR - Mailing Address: P,O Box 3130, Central Point, OR 7502-0005
Tel. (541) 664-6300, Fax (541) 664-7171 www.RVSS.us
Justin Gindlesperger
City of Central Point Planning Department
155 South Second Street
Central Point, Oregon 97502
Re: SUB -20001, Table Rock Crossing, Tax Lot 700, Map 37 2W 01C
The existing property currently does not have sewer service. There is an existing 8 inch sewer main
and manhole just west of the subject property. Sewer service for the proposed development will
require a sewer main extension into the property from the existing manhole. Sewer connection
permits will be issued upon acceptance of the sewer main and payment of related fees.
Rogue Valley Sewer Services requests that approval of the application be subject to the following
conditions:
1. The applicant must provide sewer construction plans prepared per RVSS standards for
review and approval.
Feel free to call me with any questions.
Sincerely,
Nicholas R. Bakke, PE
District Engineer
K:\DATA\AGENCIES\CENTPT\PLANNG\SUBDIVISION\2020\SUB-2000I_TABLE ROCK
CROSSING.DOC
Conditions of Approval:
1. PW Standards and S ecifications — Applicant shall comply with the public works
standards and specifications for construction within the right of way.
2. Jackson County — Applicant shall obtain all the necessary approvals from Jackson County
Roads for the construction of a new access for the private retail street on to Table Rock
Road and for any public utility connections.
3. Landscape Row - The applicant will be required to install a landscape row with street
trees on the Biddle Road and Table Rock Road frontage. Maintenance of that landscape
row is required by the adjoining property owner, in this case each individual lot, per
CPMC.
4. Storm Water Quality - The project is within the Phase 2 stormwater quality area and will
require a stormwater management plan that is in accordance with the Rogue Valley
Stormwater Quality Design Manual (RVSQDM). An operations and maintenance
agreement for all new stormwater quality features is required. Construction on site must
be sequenced so that the permanent stormwater quality features are installed and
operational when stormwater runoff enters.
Erosion Control. — The proposed development will disturb more than one acre and will
require an erosion and sediment control permit (NPDES 1200-C) from the Department of
Environmental Quality (DEQ).
JACKSON COUNTY
Road s
April 27, 2020
Attention: Justin Gindlesperger
City of Central Point Planning
140 south Third Street
Central Point, OR 97502
RE Subdivision tentative plat for an 8 -lot commercial subdivision on
Table Rock Road at Biddle Road— county -maintained roads.
Planning File: SUB -20-001- Revision 1; 37 -2W -01C Tax Lot 700
Dear Justin.
Attachment "F"
Roads
Engineering
Chuck DeJanvier
Consrnicrion Engineer
200 Antelope Road
White City, OR 97503
Phone: (541) 774-6255
Fax: (541) 774-6295
i dejanvca@jacksoncounty.org
www.jacksoncounty.org
Thank you for the opportunity to comment on consideration of a Subdivision tentative plan for an
8 -lot commercial subdivision on an approximately 7 -acre property within the C-4 zoning district at 4245
Table Rock Road. Jackson County Roads offers the following comments:
Prior to opening of this phase, Jackson County requests the Biddle Road full movement access
be modified to a right -in, right -out, left -in (RIROLI) lane. The turn and receiving lanes shall have
adequate queuing to ensure safe and efficient operation of the intersection during the first year
of opening. This work will require a Minor Road Improvement Permit from Jackson County.
2. Prior to opening of this phase, Jackson County requests construction of a right -in, right -out, left -
in (RIROLI) lane on Table Rock Road. This work will require a Minor Road Improvement Permit
from Jackson County.
3. The applicant shall submit construction drawings including the median designs for review,
comment and approval prior to the project pre -construction meeting
4. Jackson County reserves the right to restrict the left -in accesses at any time if either became a
safety concern in the judgement of Jackson County. Further it is likely this restriction will be
required at one or both locations within 20 years.
5. If frontage improvements are required, the applicant shall obtain a minor road improvement
permit from Jackson County Roads Sidewalk placement on Biddle Road frontage if required
should be directly behind the curb. Jackson County Roads does not maintain planter strips.
6. Roads requires the removal of any existing driveways not being used on either Table Rock
Road or Biddle Road and replacing them with new curb, gutter and sidewalk. If curb, gutter and
sidewalk is not existing, it will be required.
7. Utility Permits are required from Roads for any utility work within the county road right-of-way.
On longitudinal trenches within a travel lane 100' or greater in length, unless otherwise
approved by the Engineer, the existing pavement shall be removed and replaced to full paving-