HomeMy WebLinkAboutDCP111419
City of Central Point
Development Commission
Agenda
November 14, 2019
6:15 p.m.
Central Point
Central Point City Hall
140 South 3rd Street
Central Point, Oregon
Members: Hank Williams
Neil Olsen
Kelley Johnson
Taneea Browning
Rob Hernandez
Michael Parsons
Staff Liaison:
Chris Clayton
Meeting time, date, or location may be subject to change. Please contact the City Recorder at 541-423-1026 for additional
information.
I. MEETING CALLED TO ORDER
II. ROLL CALL
III. APPROVAL OF MINUTES
A. Community Development Commission - Regular Meeting - Jun 13, 2019 6:30 PM
IV. DISCUSSION ITEMS
A. Building Facade Grant Program Update(Presented by Humphrey)
B. Urban Renewal Funding - Highway 99 Corridor Discussion(Presented by
Clayton)
V. ADJOURNMENT
Individuals needing special accommodations such as sign language, foreign language interpreters or equipment for the hearing impaired must request such services at least 72 hours prior to the City Council meeting. To make your request,
please contact the City Recorder at 541-423-1026 (voice), or by e-mail to Deanna.casey@centralpointoregon.gov.
Si necesita traductor en español o servicios de discapacidades (ADA) para asistir a una junta publica de la ciudad por
favor llame con 72 horas de anticipación al 541-664-3321 ext. 201
CITY OF CENTRAL
POINT
Oregon
Regular Meeting Minutes
Thursday, June 13, 2019
I. MEETING CALLED TO ORDER
II. ROLL CALL
Attendee Name Title Status Arrived
Hank Williams Mayor Present
Neil Olsen Ward I Present
Kelley Johnson Ward II Late 6:42 PM
Brandon Thueson Ward III Present
Taneea Browning Ward IV Present
Rob Hernandez At Large Present
Michael Parsons At Large Present
Also present were City Manager Chris Clayton; Human Resource Director Elizabeth
Simas, Finance Director Steve Weber, Community Development Director Tom
Humphrey, Police Chief Kris Allison, and City Recorder Deanna Casey.
III. APPROVAL OF MINUTES
A. Community Development Commission - Regular Meeting - Apr 11, 2019 6:30
PM
Brandon Thueson moved to approve the April 11, 2019 Development
Commission Minutes.
RESULT: ACCEPTED AS AMENDED [UNANIMOUS]
MOVER: Brandon Thueson, Ward III
SECONDER: Taneea Browning, Ward IV
AYES: Williams, Olsen, Johnson, Thueson, Browning, Hernandez,
Parsons
IV. DISCUSSION ITEMS
A. Resolution No. 2019-03, Adopting Central Point Development Commission
Budget for Fiscal Year 2019-20, Making Appropriations, and Declaring Tax
Increment(Presented by Weber)
Finance Director Steve Weber explained that the Budget Committee met on May
13, 2019, reviewed and recommended approval of the 2019-2020 Development
Commission Budget.
3.A
Packet Pg. 2 Minutes Acceptance: Minutes of Jun 13, 2019 6:30 PM (APPROVAL OF MINUTES)
City of Central Point
Development Commission
June 13, 2019
Page 2
Mayor Williams opened the public hearing. No one came forward and the public
hearing was closed.
Michael Parsons moved to approve Development Commission Resolution
No. 2019-03 adopting the budget for fiscal year 2019-20, making
appropriations and declaring tax increment.
RESULT: APPROVED [6 TO 0]
MOVER: Michael Parsons, At Large
SECONDER: Taneea Browning, Ward IV
AYES: Williams, Olsen, Thueson, Browning, Hernandez, Parsons
AWAY: Kelley Johnson
B. Facade Improvement Application - Ravassipour(Presented by Humphrey)
Community Development Director Tom Humphrey presented the Commission
with a building façade improvement grant for 55 and 57 N. 2nd Street. The
applicant is proposing to remove and dispose of a rock wall, remove existing turn
and shrubs, repaint the façade, install new landscape in the front of the building
and repair portions of sidewalk. The work is estimated to cost $8,693. The East
Pine Street Building Façade grant program covers 50% of qualifying expenses
with a maximum of $10,000. The program has sufficient funds for the request. He
is bringing this request to the Commission because it is outside the original
scope of the program. The façade is not on Pine Street and the program has
never been asked to help with landscaping.
There was discussion regarding the location of the property not being located on
East Pine, but it is now a visible location because of the new light signal on Pine
Street. Landscaping has not been requested before because the properties on
Pine do not have landscapes. It was discussed that we could update the program
to include properties that are on the side blocks along Pine Street.
The intent of the program is to encourage businesses in the downtown area to
improve their facades. As businesses on Pine Street improve, businesses on the
side streets see those improvements and may want to make their buildings look
better. It is up to the Commission if we want to encourage improvements for
buildings that are not facing Pine Street.
At this time the Commission was in favor of the façade improvement, but not
comfortable applying the grant program to landscape items listed on the 2nd and
3rd Invoices.
Michael Parsons moved to approve the first invoice for the Façade
Improvement Application for 55 and 57 N. 2nd Street.
3.A
Packet Pg. 3 Minutes Acceptance: Minutes of Jun 13, 2019 6:30 PM (APPROVAL OF MINUTES)
City of Central Point
Development Commission
June 13, 2019
Page 3
RESULT: APPROVED [UNANIMOUS]
MOVER: Michael Parsons, At Large
SECONDER: Neil Olsen, Ward I
AYES: Williams, Olsen, Johnson, Thueson, Browning, Hernandez,
Parsons
V. ADJOURNMENT
The meeting was closed at 6:55 AM
The foregoing minutes of the June 13, 2019, Development Commission meeting were approved
by the Development Commission at its meeting of .
Dated: _________________________
Chair Hank Williams
ATTEST:
__________________________
City Recorder
3.A
Packet Pg. 4 Minutes Acceptance: Minutes of Jun 13, 2019 6:30 PM (APPROVAL OF MINUTES)
City of Central Point
Staff Report
ISSUE SUMMARY
TO: Community Development Commission
DEPARTMENT:
Community Development
FROM: Tom Humphrey, Community Development Director
MEETING DATE: November 14, 2019
SUBJECT: Building Facade Grant Program Update
ACTION REQUIRED:
Information/Direction
RECOMMENDATION:
Approval
The Development Commission modified the Building Façade Grant Program (Grant Program) in
early 2017 in an effort to broaden local business appeal. They placed less emphasis on historic
significance and more emphasis on the TOD design standards and the design guidelines of the
Central Point Downtown Revitalization Plan. Since that time the City has received three
applications a year for the past two years.
In 2017 the City processed applications from Converse Carpets, Table Rock Dentistry and
Mellelo Coffee dispersing approximately $16,032.23 with another $1477.00 awaiting receipts.
Total: $17,509.23
In 2018 the City processed applications from Fidelity Quick Print, Crater Café and Betty Barss at
21 S. Front Street dispersing $12,468.00 with another $5382.44 awaiting receipts. Total:
$17,850.44
In 2019 the City processed applications from Fidelity Quick Print (2nd), Ravassipour
Orthodontics, Ryan Kantor (Pfaff Building), Brodiart, LLC, and the Knight Building dispersing
$16,465.92 with another $3395.02 pending. Total $ 19,860.94
Given the continued positive response and the consistent number of applications and requests
for grant assistance, it is advised that the Development Commission continue to set aside Urban
Renewal money to promote the Façade Grant Program.
4.A
Packet Pg. 5
City of Central Point
Staff Report
ISSUE SUMMARY
TO: Community Development Commission
DEPARTMENT:
City Manager
FROM: Chris Clayton, City Manager
MEETING DATE: November 14, 2019
SUBJECT: Urban Renewal Funding - Highway 99 Corridor Discussion
ACTION REQUIRED:
Information/Direction
RECOMMENDATION:
Not Applicable
BACKGROUND INFORMATION:
Following internal discussions by Community Development, Public Works, and
Administration, the staff is recommending a Development Commission discussion
regarding the $100,000 economic incentive (housing) programmed the 2019/2020
Development Commission budget.
Included with tonight’s staff report is a 2005 Transportation Growth Management
(TGM) study that analyzed the future of the Highway 99 Corridor within the City of
Central Point. Although the TGM analysis has provided a “road map” for
transportation improvements along the Highway 99 Corridor, private property
development and redevelopment has primarily been driven by existing market forces
and land-use codes/zoning.
During our internal discussions, the idea of creating a Highway 99 Commercial
Corridor/Artisian Corridor master plan/vision was considered because of business
located in the city’s “Artisan Corridor” concept. More specifically, staff is interested
in creating not only a vision for the future of the Highway 99 Corridor, but for
creating Urban Renewal based economic incentives that could help spur private
property redevelopment and attract unique businesses that fit an established
vision/concept. Moreover, staff would propose that selected master planning
consultants study the possibility of altering existing zoning and development
requirements to offer further flexibility to potential developers. The ultimate goal of
the master planning initiative would be to generate economic market forces that
attract and retain the business type/model that the Development Commission desires
throughout the Highway 99 Corridor.
Based on the above, the staff is recommending the Development Commission allow
the advancement of a Request for Proposal (RFP), to which interested consultants
would respond regarding the potential master planning of the Highway 99 Commercial
4.B
Packet Pg. 6
District/Artisian Corridor. After receiving proposals, staff would bring
recommendations and cost proposals to the Development Commission for
review/further direction.
FINANCIAL ANALYSIS:
The 2019/2020 Development Commission Budget (attached) includes a line item in the
amount of $100,000 for the purposes of economic incentives (housing). Should the
Development Commission pursue master planning of the Highway 99 Corridor, these
funds would be repurposed.
LEGAL ANALYSIS:
Not Applicable.
COUNCIL GOALS/STRATEGIC PLAN ANALYSIS:
Strategic Priority - Economic Development:
Goal 1- Diversify the City’s local economy and economic base.
Strategies:
a. Provide an environment that encourages expansion of existing business and the
attraction of new jobs to the community - Promote “We are Ready for You!”;
b. Provide more employment opportunities for residents by attracting new business
(e.g. technology, specialty food production, medical);
c. Develop “Shovel Ready” sites;
d. Develop Blackwell Road exit area (transportation, aggregate mining, light/heavy
industrial);
e. Build and strengthen relationships with the local Chambers of Commerce (Central
Point Medford/Jackson County), Jackson County Fairgrounds, SOREDI, State of Oregon
Department of Commerce, and other state and local entities;
f. Maintain and expand public/private partnerships to demonstrate the community’s
commitment to and support for economic expansion;
g. Encourage the development of tourism in partnership with local Chambers of
Commerce;
h. Investigate the feasibility of developing a city-wide wireless system; i. Establish
sustainable funding sources and mechanisms to pay for community needs;
j. Encourage renovation and redevelopment to increase tax base;
4.B
Packet Pg. 7
k. Explore creating an enterprise zone;
l. Explore “Tax Increment Financing” (Urban Renewal).
Goal 2 – Develop Central Point’s business base Strategies:
a. Target, Recruit, and Incubate small businesses, new employers, non profits;
b. Create partnerships with financial institutions to assist in attracting and growing
business;
c. Develop fee structure to encourage new business;
d. Incubate start ups in partnerships with high school;
e. Create management mentoring programs to assist struggling local business in
partnership with the Central Point chamber and Medford/Jackson County Chamber of
Commerce.
STAFF RECOMMENDATION:
Staff is recommending that the Development Commission consider appropriating funds
for the purpose of master planning the Highway 99 Corridor.
RECOMMENDED MOTION:
I move to direct staff to prepare a request for proposal (RFP) for master planning the
Highway 99 Corridor.
ATTACHMENTS:
1. Central Point Highway 99 Corridor Plan - TGM
2. FY19-20 Budget
4.B
Packet Pg. 8
Central Point Highway 99 Corridor Plan
Draft Final Plan
Task 7/ODOT TGM ATA #24370
Prepared for:
City of Central Point
June 13, 2005
In association with
DKS Associates
4.B.a
Packet Pg. 9 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Acknowledgements
Project Management, City of Central Point
Tom Humphrey, Planning Director
Project Management, ODOT TGM Program
Shirley Roberts, TGM Grant Manager
Consultant Team
Otak, Incorporated
Tom Litster, Urban Design and Project Management
Kate Schwarzler, Landscape Architecture
Anne Samuel, Landscape Architecture
Mandy Flett, Project Assistant
DKS
Brian Copeland, P.E., Traffic Engineer
Alan Snook, Transportation Planner
Advisory Committee
Barry Robino
Ron Converse
Craig Randolph
John Hastings
Louis Colosimo
Dave Duste
Vicki Robinson
Conrad Morse
Bret Moore
David Gremmels
Chris Galpin
Ron Lankford
John Hamlin
Ken Johnson
Don Pfaff
Bill Willets
4.B.a
Packet Pg. 10 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 1
otak
Introduction
The City of Central Point has taken over jurisdiction of Highway 99 (Front Street) from the
Oregon Department of Transportation. With jurisdiction comes greater flexibility in design,
traffic control techniques and potential improvements to the old highway as a community street,
seen as more of a multi-modal seam than an auto-dominated edge. Local business owners have
expressed concern about accelerated traffic speeds, unattractive highway appearance, noise and
hazards to automobile and pedestrian safety. The City has actively engaged business owners and
citizens in the process of creating a visionary yet practical corridor plan that best benefits them
and has a positive reflection on Central Point.
The creation of a corridor plan for near-term and long-term improvements is expected to tie
three Transit-Oriented Development (TOD) areas and the increasingly successful businesses
along the highway into a consolidated Central Business District (CBD). The Central Point
Highway 99 Corridor Plan, will be used to establish a concept for future development, introduce
Smart Growth techniques (i.e. traffic calming, safer pedestrian access, better and continuous
sidewalks, etc.) and aesthetic streetscape improvements. The plan will also provide a rough
schedule for public improvements.
4.B.a
Packet Pg. 11 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 2
otak
The Front Street Final Plan and the Future Street Section Options are refinements of
broadly supported ideas developed during the Community Design Dialogue held February
14-18, 2005. The plan identifies four near-term projects that could be implemented as
funding becomes available. Budget level cost estimates have been provided for each project,
along with a list of potential federal, state, and local funding programs.
Long-term projects may be developed using the recommended street improvement options
from the Corridor Street Tool Kit. These projects might occur with redevelopment of
existing parcels or as individual business owners express an interest in improving their street
frontages or providing safer pedestrian access to their businesses.
Final Plan
The Final Plan for Front Street extends from Crater High School and the Twin Creeks TOD
to Cupp Street. With the exception of recommended improvements along the existing
railroad tracks, the plan is limited to improvements within the street right-of-way.
Improvements associated with the railroad include:
• Fencing to discourage pedestrians (particularly students) from crossing both the tracks
and Front Street at random and unpredictable places.
• A multi-use pathway parallel to the tracks to accommodate pedestrian movements
between Pine Street and transit-oriented developments north and south of Pine Street.
Within the street right-of-way, key improvement opportunities include:
• Gateway medians.
• Frontage improvements to Fire Station #3.
• Enhanced pedestrian crossings.
• Continuous pedestrian sidewalks and pathways.
• Narrower curb-to-curb distances and travel lane widths.
• On-street parking at selected business locations.
• Landscape improvements to the street edges, e.g., street trees and landscape planter
strips.
Key objectives of these improvements are:
• Slow traffic speeds with 35 mph being the target speed for a Central Business District.
• Improve pedestrian safety, comfort, and access to businesses.
• Enhance the visual identity and image of the Central Business District.
Four pilot projects are identified on the Final Plan. During the Design Dialogue Week, these
projects had strong support from the affected property owners and consensus support from
the Advisory Committee. See the Front Street Final Plan for approximate locations of each
project.
4.B.a
Packet Pg. 12 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 3
otak
Project 1 – North Gateway
Crater High School and Twin Creeks TOD
Gateway treatments at the north end of the plan area can be implemented in conjunction
with reconstruction of Front Street to accommodate the rail crossing and the entry into the
Twin Creeks TOD. Implementation will provide traffic calming effects for vehicles entering
the Central Business District from Highway 99 and improve pedestrian access to Crater
High School. Elements of the gateway include:
• Fully signalized intersection as part of the planned reconstruction of Front Street.
• Landscape medians.
• Marked crosswalk at the Twin Creeks entry.
• Off-street pathway as a frontage improvement for Crater High School.
• Off-street pathway parallel to the existing railroad tracks.
• Street lighting along the school frontage.
Estimated Cost – The order of magnitude construction cost for the project (including
contingency) is $195,000 -$205,000, exclusive of any utility line or utility pole relocation
costs (to be determined during preliminary engineering). This assumes roadway
reconstruction and traffic signal are part of the already planned improvements to the
highway at the Twin Creeks development. Cost includes landscaped median and curb
construction, pathway adjacent to the highway and street lighting, as well as allowances
landscape maintenance during the plant establishment period.
Project 2 – Enhanced Streetscape and Pedestrian
Crossing
Rogue Valley Creamery
The Rogue Creamery is one of the primary visitor attractions in Central Point. The nearby
Red Oak Glass is also growing attraction in the City. The intent of the project is to provide:
• A “signature” streetscape element for those businesses.
• Safer pedestrian crossing linking businesses on the east and west side of Front Street.
• On-street parking opportunities for customers.
• New parking and service access points consistent with on-going site planning efforts by
the Rogue Creamery.
• Additional traffic calming measures in combination with the North Gateway project.
Due to horizontal curvature of Highway 99 north of the proposed pedestrian crossing, sight
distance should be evaluated during final design to ensure adequate pedestrian visibility at
this location.
Estimated Cost – The order of magnitude construction cost for the project (including
contingency) is $250,000 – $275,000. This assumes the work can be done in conjunction
with planned on-site parking and access improvements for the Rogue Creamery as a
4.B.a
Packet Pg. 13 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 4
otak
coordinated effort between the City and business owners. Cost includes landscaped median
and curb construction, roadway pavement overlay as needed, pavement striping, and
pedestrian crossing signals. It also includes allowances for maintenance during the plant
establishment period.
Project 3 – Enhanced Streetscape and Pedestrian
Crossing
Front and Bush Streets/Fire Station #3
Improvements at this location will link the existing small shopping center with future
retail/commercial development on the west side of Front Street. Additionally some
dangerous turning movement conflicts between vehicles would be eliminated. On-street
parking could be provided for customers of both commercial developments. Key elements
of the project include:
• Potential on-street parking for both commercial developments.
• Enhanced pedestrian crossing that could eventually provide safe pedestrian access for
the Snowy Butte TOD residents.
• A “signature” streetscape element.
• Additional traffic calming measures in combination with the South Gateway project.
An additional benefit is eliminating dangerous left turns from the shopping center parking
lot onto Front Street where there are poor sight lines to and from moving traffic. Left turn
movements would be directed to the Bush Street intersection, while right-turn in and right-
turn out would continue at the existing Front Street driveways.
Associated improvements will provide requested frontage improvements for Fire Station #3.
Fire station improvements would include striping or pavement texturing to mark the station
driveway and flashing traffic lights activated when emergency vehicles are entering or exiting
the facility.
Estimated Cost – The order of magnitude construction cost for the project (including
contingency) is $250,000 – $265,000. This estimate does not include any street frontage or
on-street parking improvements that may be agreed to in the future Snowy Butte
development. Cost includes landscaped median and curb construction, roadway curbs and
driveway aprons, roadway pavement overlay as needed, pavement striping, pedestrian
crossing signals, and Fire Station #3 frontage improvements. It also includes allowances for
landscape maintenance during the plant establishment period.
Project 4 – South Gateway
Front and Cupp Streets
The Cupp Street intersection is an opportunity to create a second gateway into the Central
Business Distric (CBD). Pedestrian crossing movements are very low at this intersection,
4.B.a
Packet Pg. 14 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 5
otak
but the gateway medians will have a positive effect on reducing vehicle speeds entering the
CBD. Traffic calming will be even greater in conjunction with Project 3 (see above).
Unlike the North Gateway, this project would not include a traffic control signal or a
marked crosswalk. In fact, a marked crosswalk is not recommended given the vehicle speeds
approaching this intersection and the lack of other Enhanced Pedestrian Crossing elements,
such as curb extensions, pedestrian activated signals, or embedded flashers in the crosswalk
area to alert motorists to pedestrian movements across the roadway.
Affected property owners were not available during scheduled meeting times for review and
comment on this project. Consequently, the City should pursue discussion and agreement
with those owners prior to funding this project for future construction.
Estimated Cost – The order of magnitude construction cost for the project (including
contingency) is $80,000 – $100,000. This does not include any roadway or curb construction
cost associated with a decision to narrow the overall curb-to-curb distances. Cost includes
landscaped median and curb construction, roadway pavement overlay as needed, and
pavement striping. It also includes allowances landscape maintenance during the plant
establishment period.
Implementation
The following are suggested steps for implementing the street improvement
recommendations in the Central Point Highway 99 Corridor Plan. Actual implementation
may be influenced by the availability of funding and opportunities in the future to link these
street enhancements to other City roadway projects or redevelopment or business expansion
at specific businesses.
Right of Way Verification
Before selecting a suggested project or improvement option from the Corridor Street Tool
Kit, the exact highway right-of-way for Front Street should be determined. That
information has not been available, to date, in this project. The assumed right-of-way is 85
feet based on current GIS mapping and a visual analysis of the properties fronting the old
highway. Visual analysis also suggests there may be some intrusions of private parking or
building elements into the actual highway right-of-way. These conditions may be a
constraint on future implementation of the cross-section or tool-kit options.
Establishing a Design Theme for Front Street
We suggest the City and the corridor business community undertake a joint effort to
establish a design theme for the Front Street within the Central Business District. The intent
is to maintain some visual unity for the streetscape as improvements occur incrementally
over a period of years. The design theme might articulate a palette of materials or design
details applicable to the following:
• Paving materials for crosswalks at enhanced pedestrian crossings.
4.B.a
Packet Pg. 15 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 6
otak
• Plant materials for landscape medians. A suggestion during the Design Dialogue Week
was for these materials to represent an agricultural or rural theme either in choice of
plant materials or form of the plant massings.
• Establish a preferred street tree palette for the corridor.
• Identify locations to introduce the same ornamental lighting being used along Pine
Street. An example location might be along the pathway improvements for Crater High
School where it would function largely as pedestrian scale lighting. Another example
might be at enhanced pedestrian crossings to provide an additional visual marker for
those pedestrian crossings. This lighting would not replace current roadway lighting
designed to meet the foot candle requirements of roadway lighting for a 5 lane street.
Pilot Projects
The numbering of the pilot projects on the Schematic Corridor Plan (page x) indicates our
suggested order of implementation.
North Gateway (Project 1)
This project could be constructed in 2005 or early 2006 along with the highway work needed
to accommodate the new rail crossing and entry into the Twin Creeks development.
Construction mobilization and roadway reconstruction cost could be largely absorbed by the
highway project. The City expects approval of the rail crossing soon.
Rogue Creamery Enhanced Pedestrian Crossing (Project 2)
This timing of this project is linked to final decisions by the Creamery to proceed is site
improvements for parking and circulation. If that business is not fully ready to proceed at a
time that other pilot projects could be funded and implemented it should not be construed
that this project needs to precede them for any reason.
Bush Street Enhanced Pedestrian Crossing (Project 3)
This project includes improvements to the street frontage of Fire Station #3. These
elements could be completed independently of the median and pedestrian crossing
improvements. In addition to available funding, key triggers for implementation are:
• Readiness of shopping center owners to move forward with the project.
• More certainty about the development plans for the Snowy Butte TOD.
South Gateway (Project 4)
Given that no confirmation of support for the project was conclusively reached with
affected property owners, this is noted as the last project to implement. However, if the City
finds support and agreement with the property owners they could advance implementation
of this project, potentially completing it in conjunction with the North Gateway.
If agreement with owners for a gateway median at this location cannot be reached, we
suggested looking further south to the Beale Street intersection for opportunities to establish
a southern entrance for business district.
4.B.a
Packet Pg. 16 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 7
otak
Additional Street Improvement Costs
The following average cost items are intended to be a guideline in preliminary project
planning and reflect cost items which may or may not be necessary to the implementation of
the suggested projects. If any of these elements apply, their average costs should be added
to the order of magnitude costs based on determination of the quantities of each project.
• Moving the roadway curb lines to narrow the overall distance – $14 per lineal foot.
• Relocating existing utility poles – confirm cost and agreements with local utility provider.
• Planting for sidewalk landscape strip – $2.50 per square foot.
• Ornamental shrubs – $30 each.
• Street tree – $300 each.
• Textured pavement for crosswalks – $12,000 to $15,000 each location.
• Pedestrian crossing signals – $30,000 to $65,000 each location depending on device
selected. Options include overhead mast arm signal and in-pavement flashers.
• Street lighting – $4,000 to $5,000 each location.
Undergrounding Overhead Utilities
Input from the Advisory Committee and the public consistently noted the unattractive visual
qualities of existing utility poles and overhead wiring. Many of the poles also compromise
the walking space of existing sidewalks and would not be in conformance with current ADA
Accessibility Guidelines. One option to address both issues would be to place overhead
utilities underground as part of a major roadway or sidewalk reconstruction project.
Many communities have initially explored undergrounding existing utility lines, but few have
actually implemented due to high cost and other construction complications. The cost can
vary considerably depending on the complexity of the work and technical requirements of
the utilities. However, the cost can be as high as $400 – 500 per lineal foot for both sides of
the street. It is unlikely that only one side of the street could be done.
Other potential complicating factors include:
• Power lines are considered distribution lines and are difficult to place underground.
While technically feasible, the cost will increase significantly.
• Existing franchise agreements between the City and utility providers must be thoroughly
researched and understood. Often these agreements are not well written with regard to
cost responsibilities for undergrounding utilities.
• New electrical services will have to be provided to existing businesses fronting the
highway. This often triggers a requirement for the businesses to make electrical
upgrades to meet current codes. Without a very specific and favorable franchise
agreement, this becomes an additional City cost.
• Considerable space is required for underground vaults and service access to them from
the sidewalk areas. This may require purchasing additional right-of-way or easement
agreements from property owners.
4.B.a
Packet Pg. 17 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 8
otak
Bike and Transit Routes
Rogue Valley Transit District (RVTD) currently provides bus service to stops at Pine and
Second Street. Current planning envisions extending service west on Pine Street to serve the
Twin Creeks TOD. Two options are being considered for the return route to Pine and
Second Streets (illustrated on Future Bike and Transit Plan). A long-term possibility is
express route service along Highway 99, but no potential stop locations have been
determined.
Adding bike lanes to Front Street is not a recommended improvement. Within the current
curb-to-curb distances, the lanes would be substandard and the differential between the
average vehicle speeds and bike speeds. Safe and continuous north to south bike travel can
be provided along two parallel routes:
• Second Street, with bikes and vehicles sharing a travel lane.
• A multi-use pathway west of the existing railroad tracks and connecting Crater High
School with the Twin Creeks TOD and the future Snowy Butte TOD. A fence
separating the railroad lines and the pathway will be required.
4.B.a
Packet Pg. 18 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 9
otak
Insert Final Plan
4.B.a
Packet Pg. 19 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 10
otak
Insert Figure Implementation
4.B.a
Packet Pg. 20 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 11
otak
Bike and Transit
4.B.a
Packet Pg. 21 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 12
otak
Street Cross-Section Options
Cross-Section options illustrate the existing curb-to-curb distance of approximately 64 feet
and a cross-section that narrows the curb-to-curb distance to 58 feet. The key difference
between the two options is the ability to provide wider sidewalks and/or on-street parking
bays with a curb-to-curb distance of 58 feet.
Narrowing the Curb-to-Curb Distance
Travel lanes would be striped at narrower widths but the number of travel lanes would
remain unchanged. While narrower lanes and curb-to-curb distances typically have a positive
traffic calming effect, this would be major reconstruction of the existing roadway. It could
be accomplished in phases over a period of years. Additionally, the curb-to-curb distance
does not need to be uniform throughout the plan area, provided sufficient transition and
taper areas, per accepted traffic engineering and roadway design standards, are provided
between 64-foot and 58-foot segments.
Providing On-Street Parking
Adding on-street parking to Front Street is another potential benefit of narrowing the
existing curb-to-curb distance to approximately 58 feet (see Figure 3). On-street parking is
safest at vehicle speeds of 35 mph or less. Achieving the cumulative effects of traffic calming
measures (slowing vehicle speeds), including the calming effect of on-street parking itself, are
essential to implementing this parking option within the revitalizing Central Business District
defined by Front Street.
Traffic calming measures identified in the Corridor Tool Kit include:
• Narrower travel lanes and curb-to-curb distances.
• Curb extensions and marked pedestrian crosswalks.
• Landscaped medians.
• Street trees and other landscaping along the street edges.
• On-street parking.
Corridor Street Tool Kit
The Corridor Street Tool Kit illustrates recommended street improvement options that can
be implemented through the four pilot projects (see Front Street Final Plan) or in the future
as improvement opportunities are identified. The tool kit is based on the following key
principles:
• Maintaining acceptable access to existing businesses.
• Reducing vehicle speeds with the Central Business District.
• Providing on-street parking opportunities for businesses that might benefit from it.
• Designing streets for pedestrian use (pedestrians as the “design vehicle”).
• A feeling of walking comfort and safety.
• Aesthetic enhancements for the streetscape.
4.B.a
Packet Pg. 22 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 13
otak
Insert Figure C.
4.B.a
Packet Pg. 23 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 14
otak
Insert Figure D
4.B.a
Packet Pg. 24 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
Final Plan
Central Point Corridor Plan 15
otak
Insert figure D1
4.B.a
Packet Pg. 25 Attachment: Central Point Highway 99 Corridor Plan - TGM (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
FORM
LB-30
REQUIREMENTS DESCRIPTION
Adopted Budget
Second Preceding First Preceding This Year Proprosed By Approved By Adopted By
Year 2016-17 Year 2017-18 2018-19 Budget Officer Budget Committee Governing Body
PERSONAL SERVICES
1 -$ -$ -$ Salaries & Wages -$ -$ -$
2 -$ -$ -$ City Taxes & Benefits -$ -$ -$
3 -$ -$ -$ -$ TOTAL PERSONAL SERVICES -$ -$ -$
MATERIALS AND SERVICES
4 1,052$ 970$ 1,500$ 970$ Advertising/Legal Notices $2,000 2,000$ 2,000$
5 -$ 4,000$ 10,000$ 5,200$ Professional Services $10,000 10,000$ 10,000$
6 -$ -$ 45,000$ -$ Contract Services, Admin. Staff $45,000 45,000$ 45,000$
7 224$ 2,411$ 400$ 3,000$ Office Supplies $400 400$ 400$
8 -$ -$ 300$ -$ Postage $500 500$ 500$
9 -$ -$ 300$ -$ Phone/Internet/Dues $250 250$ 250$
10 1,276$ 7,381$ 57,500$ 9,170$ TOTAL MATERIALS AND SERVICES $58,150 58,150$ 58,150$
CAPITAL OUTLAY
11 -$ -$ 50,000$ 50,000$ Alley Improvement (1st to 2nd Street) North -$ -$ -$
12 402,582$ 3,524,618$ -$ -$ East Pine Streetscape & Signals (Engineering)-$ -$ -$
13 -$ -$ -$ -$ East Pine Streetscape & Signals Construcion (Phase 1)-$ -$ -$
14 6,605$ 24,902$ 35,000$ 21,925$ Economic Incentive Program (Façade)35,000$ 35,000$ 35,000$
15 -$ -$ 50,000$ -$ Pine Street Plaza Design 50,000$ 50,000$ 50,000$
16 -$ -$ 100,000$ -$ Economic Incentive Program (Housing)100,000$ 100,000$ 100,000$
17 409,187$ 3,549,520$ 235,000$ 71,925$ TOTAL CAPITAL OUTLAY 185,000$ 185,000$ 185,000$
DEBT SERVICE
18 -$ -$ 5,000$ 5,000$ City Loan, Interest Only 125,000$ 125,000$ 125,000$
19 4,832$ 2,500$ 19,000$ 19,000$ Streetscape Reimbursement -$ -$ -$
20 21,485$ 196,591$ 224,000$ 206,725$ FY16-17 Bond 233,295$ 233,295$ 233,295$
21 26,317$ 199,091$ 248,000$ 230,725$ TOTAL DEBT SERVICE 358,295$ 358,295$ 358,295$
TRANSFERRED TO OTHER FUNDS
22 -$ -$ -$ -$ -$ -$ -$
23 -$ -$ -$ -$ -$ -$ -$
24 -$ -$ -$ -$ TOTAL TRANSFERS -$ -$ -$
25 45,500$ -$ OPERATING CONTINGENCY 50,000$ 50,000$ 50,000$
26 3,669,977$ 290,751$ Ending balance (prior years)27 -$ 408,460$ UNAPPROPRIATED ENDING FUND BALANCE 292,415$ 292,415$ 292,415$
28 4,106,757$ 4,046,743$ $586,000 $720,280 TOTAL REQUIREMENTS $943,860 $943,860 $943,860
Historical Data
Actual Budget For Next Year 2019-20
Projected This Year
2018-19
REQUIREMENTS SUMMARY
Central Point Development Commission - General Fund
4.B.b
Packet Pg. 26 Attachment: FY19-20 Budget (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)
RESOURCES
General Fund
1 272,112$ 3,669,977$ 174,000$ 290,750$ 1. Available cash on hand* (cash basis) or 408,460$ 408,460$ 408,460$
2 -$ -$ -$ -$ 2. Net working capital (accrual basis)-$ -$ -$
3 4,344$ 4,100$ 6,000$ 7,500$ 3. Previously levied taxes estimated to be received 7,500$ 7,500$ 7,500$
4 5,037$ 31,327$ 6,000$ 5,915$ 4. Interest 5,000$ 5,000$ 5,000$
5 -$ -$ -$ -$ 5. Transferred in, from other funds -$ -$ -$
6 6. OTHER RESOURCES -$ -$
7 -$ -$ -$ -$ 7. Loan (City of Central Point)-$ -$ -$
8 3,634,000$ -$ -$ -$ 8. 2017 IGA Loan -$ -$ -$
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 3,915,493$ 3,705,404$ 186,000$ 304,165$ 29. Total resources, except taxes to be levied 420,960$ 420,960$ 420,960$
30 400,000$ 416,115$ 30. Taxes estimated to be received 522,900$ 522,900$ 522,900$
31 191,264$ 341,339$ 31. Taxes collected in year levied
32 4,106,757$ 4,046,743$ 586,000$ 720,280$ 32. TOTAL RESOURCES 943,860$ 943,860$ 943,860$
*Includes ending balance from prior year
Projected This Year2018-19
FORM
LB-20 Central Point Development Commission
Second Preceding
Year 2016-17
Budget for Next Year 2019-20Historical Data
Actual
First Preceding
Year 2017-18
Adopted Budget
This Year
2018-19 RESOURCE DESCRIPTION Proposed ByBudget Officer Approved ByBudget Committee Adopted ByGoverning Body
4.B.b
Packet Pg. 27 Attachment: FY19-20 Budget (1222 : Urban Renewal Funding - Highway 99 Corridor Master Planning Discussion)