Loading...
HomeMy WebLinkAboutResolution 286 - Forest Glen, Ph. IV Tent. Plan~. PLANNING COMMISSION RESOi~UTION NO. ~~, A RESOLUTION GRANTING APPROVAL OF ,A TENTATIVE PLAN FOR PHASE TV OF FOREST GLEN SUBbIVISION (Applicant: Noel Moore, dba W.L. Moore Canstructi.on Co.) (37 2W 11D Tax Lat 1300, 3.404, 1600) HE TT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL POINT AS FOLLOWS: Section 1. Nature of A licatian. This is an applicatian far approval of a tentative plan for a 42-lot subda.visa.an .i.rz axy. R-2 district of Central Point, Oregon. The Planning Commission reviewed the application and tentative plan at a public heaxirzg on April 5, 1994. section 2. Approval, Criteria. The criteria for approval of this appla.cati.an are found in CPMC Chapter_ 16, relating to tentative plans and subdivisions, and in Chapter 17, relating to zoning and lot sizes. ~~cf~_i~n 3. Findings and Conclusions. The Plan.ni.ng Commission finds axad determines as follows: A. Tentative Plaxz Recruirements. The applicatian and tentative plan herein are in the correct form and contain all of the information required far the same under CPMC Chapter 16.10. B. Aroma and Width of Lats. The subdivision lots average 8,215 square feet and all meet the R-2 district lot size requirements of 6,000 square feet far S_nterior Lots and 7,000 for car_ner lots found in CPMC 17.24.050. The minimum width requirements of CPMC 17.24.050 are also met, with in,teriar lots at Ieast 60 feet wide and corner lots at least 70 feet wide. C. Blocks and streets. The tentative plan proposal for the layout and dimensions of streets a.nd blocks is in compliance with the requirements of CPMC Chapter 16.2{1 regarding streets and CPMC Chapter 1.6.24 :regarding blocks, S_~c~ian 4. Conditional Ax~proval. The applicatian for tentative plan approval for Forest Glen Subdivision Phase TV is hereby approved, subject to the conditions listed on Exhibit "A" hereto, imposed under authority of CPMC 16.10.090, and subject also to the following: 1 ~ PLANNING COMMISSION RESOLUTION NO. ~/n (04.394} ~.. ~ ~ ~~i3~i rj 7 yy o ry .I. a/ t ~, ~ -,~~ _ ~ ,-i.. ~ a. °- ~,,,, ~~ ,,, ~ ~ ~ ~, , ~~rc~~ ~, ~ ~„~"3 ~ , ~ „~„ ~ ~. __ y _ r ~ ~ ~ i. ~ r-~ ~:- ~ ;"~1.'1' ' J ~~ ('i ff`-~i it ~i ~.i ~ ~~. ~"'°, r ~ ri, GY ~J' ~. ~. }. f Y ~" f / ~ l ~ `~ ~~ EXHIBIT "A " PUBLIC WORKS DEPARTMENT TENT. TIVE PLAN CONDITIONS r-OREST GLEN NO. IV `f . loll structures shaft have roof drains, area drains, and crawl spaces with positive drainage rtway cram tk~e structure anri drain lines connected to a curb drain, or an approved storm sewer. The developer shaft provide the necessary storm drainage improvements and iot ctracfing to assure that all streets, lots, and all properties will drain property. The developer shall submit a grading plan with the construction drawings and perform such grading and drainage improvements which satisfies this drainage condition leaving only minor grading reclraired for each lot during house construction. ?_. Tk,e City's Engineer shalt, at tha cast of the developer, evaluate the strength of the native sails and determine the s#reet section design in accordance with the Public Works Department Design Standards. The City's engineer shall use the fallowing street design criteria: Street Name Averacte Dafiy Traffic °~a Trucks f3ursell Load 5000 VTID rJ% Forest Glen Drive 2,500 VTID ~% I-leather I..ane 1000 VT/.D 2% 3. The construction drawings for this Tentative Pian shall include a Street Lighting Plan and a Traffic Control Plan in accordance with the requirements of the City of Central Point Public Works Department. Clear vision areas shall be shown on the construction drawings designed to meet the City's Public Works Standards. The developer shaft pay for aft costs associated witf~ the design and installation of the improvements specified on these plans. 4, indicate an the Final Plata 1 foot access control strip at the ends of Heather Lane ar~d Fsorest Glen Drive. 5. The construction drawings shad indicate type, size and location of water mains and fire hydrants Irl accordance with the.City'S p-ubliC Works Standards and the recommendation of the City's Fire Chief. E3. The developers engineer sl~all design the sewer system to serve the devetopment of this tram and all frtture development south and west of this tract extending all the way to the intersection of 13ursell Road and Bea11 Lane. 1. ~i~he developer shaft construct an adequately sized storm drainage system to provide for rt,naff oroto the subdivision property and from each lot. As a part of the construction of the frx~{,roverr,ents for this Tentative Plan, the Developer's engineer shaft provide a comlalete set ref cirainr,ge calculations for sizing the storm drainage system for this devetopment. The tar.=.veloper small cause this irafnrmation to be submitted to the Public Works Department at the tirt~e construction drawings for the Subdivision are submitted to the Public Works t?ei~artrr~ent for permits for construction of the Storm Drainage improvements. 59 l'aci~~ ~T~wr~ _ l.xhibit A l-crest C~fc~r~ f'h~~se lV ~. T#7e construction of this development shall include the street Subgrade, street base rock, street pavincT, street fighting, traffic control and defiineation improvements, curb/gutter, safety improvements, ingresslegress irr~provements, sidewalks, bikeways and utility crossings to the east side of Bursell Road including transitions beyond the project boundaries, and a right turn lane from Bursell Road to Forest Glen Drive. The construction of Forest Glen Drive shat! include a left tum lane to access Bursel! Road heading south. Forest Glen Drive shall be widened at Bursell Road to a 40' street curb to curb, 75' east of E3ursell Road. 9. The sanitary sewer serving this project shall connect to the proposed sewer for Forest Glen phase III. Do not connect to the BCVSA sewer in Bursell Road as shown on the Tentative Plan. if the construction of the 8" sewer line proposed to serve this development from Forest Glen Phase I11 does not occur prior to completion of the work proposed as part of this tentative plan, the developer shall construct the sewer line required to connect this development with the Forest Glen Phase I sewer and provide easements for said sanitary Sewer. t 0. T#re water system #or this development shall also connect to the existing water line stubbed out to south from Sydney Fstates. The developer shall provide an easement for this fiOnneCtinn. 11. -Tt7e developer shall provide a temporary turnaround at the end of Heather Lane io be designed according to the City's Public Works Department requirements. 12. The developer shall extend tt~e proposed storm drain line to Bursell Road to pick up the drainage from the roadside ditch. If the drainage improvements for Forest Gien Phase I11 tines not occur before the completion of the work proposed as part of this project, the develr~per shaif provide offsite drainage improvements and easements to meet City Public Works Department requirerr~ents. 13. T#~e developer shall modify the Cevelopment Flan to shown changes made in phases of Forest Glen already constructed, and include any changes proposed for future phases of Forest Glen. 1 ~. Driveways for Lot 129 and the house on the northeast side of the Forest Glen Drive/Bursell intersection shall access onto Forest Glen Drive at the distance away from Bursell Road as stipulated in the Public Works Standards. 1 5. Install #~us trrrrrouts for bus stops to be located according to Rogue Valley Transit District rec#uirnments. If additional right-of-way is required, the developer shall provide the right-of- way necessary to construct these turn-outs. ~~