Loading...
HomeMy WebLinkAboutResolution 313 - Lawrence Site Plan.~I ~ c,~~ t/ ~, PLANNING COMMISSION RESOLUTION N0. _3r3 A RESOLUTION CONDITIONALLY APPROVING A SITE PLAN APPLICATION (Applicant: Bab Lawrence) (37S 2W 10AB, Tax Lot 7700) Recitals ~.. This matter came before the Planning Commission for hearing on January 3, 1995, which hearing was continued until January 17, 1995, on applicant's site plan application for a 25-unit apartment complex on Haskell Street, near Oak Street, in an R-3 district of the City. The Planning Commission reviewed the application and the City staff reports, and received comments from all persons wishing to be heard in favor of and opposed to the application. Now, therefore; BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. Criteria A licable to Decision. The following chapters of the Central Point Municipal Code apply to this application: A. Chapter 17.28, R-3-Residential Multiple Family District; B. Chapter 17.60, General Regulations; C. Chapter 17.64, Off-Street Parking and Loading; D. Chapter 17.72, Site Plan, Landscaping and Construction Plan Approval. Section 2. Findin s and Conclusions. The Planning Commission hereby adopts by reference all findings of fact set forth in the City staff reports, and concludes that, except where addressed in the conditions to approval, the application and proposal comply with the requirements of the following chapters of the Central Point Municipal Code: A. Chapter 17.28 relating to uses, lot size, lot coverage, setback, building height and screening in the R-3 district; B, Chapter 17.60 relating to paving and landscaping requirements; C. Chapter 17.64 relating to off--street parking and loading facilities; D. Chapter 17.72 relating to site plan requirements. Section 3. Conditional A royal. The within application for site plan approval is hereby conditionally approved, subject to the following conditions. 1 - PLANNING COMMISSION RESOLUTION NO. 31~ (012495} Canda.tians 1. Tn order to ensure adequate fire protection facilities, a horizontal standpiping system shall be designed and installed, in accordance with NFPA 14. As--built drawings shall be submitted by a registered engineer, and required testing shall be performed and documented to the satisfaction of the Public Safety Department prior to covering of any piping. 2. All firefighting hydrants, standpiping, and the fire engine staging area shall be in place, protected from damage and operable prior to the erection of any combustible construction. A roadway accessing the fire hydrant and containing sufficient base rock shall be provided and shall be capable of supporting any implied loads of fire-fighting vehicles. All construction activity on site shall be in compliance with the applicable provisions of the Uniform Fire Code and generally accepted standards of good practice. 3. Prior to issuance of a Certificate of Occupancy, applicant shall: a. Comply with the minimum ~.0--foot standard far distances between covered parking structures and buildings for buildings 1 and 2. b. Ensure that the Red Maple trees illustrated on the plan are planted outside of the clear vision triangle as required by City standards. c. Provide two locked and covered bicycle parking spaces at each of the seven openings or stairwells of the structures for a total of fourteen covered and locked bicycle parking spaces. d. Applicant shall be responsible far street improvements, as that term is defined in the City Cade, to Haskell Street, where applicant's property is adjacent to Haskell Street. This obligation can be fulfilled by applicant signing an ~~Agreement for Consent to Inclusion in Local Tmprovement District". e. Applicant shall install a 9500 Lumen HPS street light at the northeast corner of Haskell and Oak Street, within the right-of--way, opposite the entrance to the apartment complex, and install all pads and conduits for street lights as a part of the construction of the development. Applicant shall coordinate the installation with Pacific Power and Light Co. f. Applicant shall provide traffic control and delineation for the portions of South Haskell Street adjacent to this project. All traffic control and delineation improvements shall be as approved by the Public Works Department. 2 - PLANNTNG COMMISSION RESOLUTION NO. ~~ (012095) 4. Prior to issuance of any building permits: a. Applicant shall provide a complete set of construction drawings for all new construction of the sanitary sewer system for review and approval by the City. Applicant shall construct a 6" diameter sanitary sewer to connect to the 8" sewer located on the west side of South Haskell Street. The property service line shall be located and sized in accordance with the Oregon State Plumbing Cade. b. Applicant shall provide the City with a complete set of construction drawings far the storm drainage system to serve this property, including connection to the City system. All roof drains, area drains, crawl spaces, and parking lot drains shall have positive drainage away from the structures, and shall connect to the storm drainage system located at the manhole in Haskell Street near the proposed driveway entrance. Applicant shall provide the City with a grading and drainage plan for the entire project. Runoff and pipe sizing calculations prepared by the applicant's engineer shall accompany this submittal. The engineer shall use the intensity-duration curve obtained from the Public Works Department for determining the runoff. The grading and drainage plan shall indicate topography and show elevations sufficient to evaluate the plan. c. Applicant shall provide a written certification from a registered engineer or architect which states that all requirements set forth in CPMC 8.24.10 for construction within a floodway or the 1Q0-year flood plain have been met. Such statement shall describe the relationship of floor and pad elevations to the flood plain elevation. 5. Applicant shall pay all costs and expenses associated with fulfilling each of the conditions. Passed by the Planning Commission and signed by me in authentication of its passage this ~~ day of , 1995. ~~~ ~ ~. Planning Commission Chairman ATTEST: City Re sen ative Approved by me this s~ day of 1995. C:E~~t~-.P.O Planning Commission Chairman 3 - PLANNING COMMISSION RESOLUTION NO. 31~ (012095)