HomeMy WebLinkAboutResolution 327 - Rogue Valley Medical Ctr. - Site Plan~ ~, f; ,.~....
_,
PLANNING COMMISSION RESOLUTION NO. ~~
A RESOLUTION CONDITIONALLY APPROVING
A SITE PLAN APPLICATION
(Applicant: Rogue Valley Medical Center)
(37 2W 11BC, Tax Lot 5301, 5302)
Recitals
1. This matter came before the Planning Commission for
hearing on August 15, 1995, on applicant's site plan application
for an addition to the existing Valley Family Practice Medical
facility structure at 615 Second Street in the C-2(M) district of
the City. The Planning Commission reviewed the application and
the City staff reports, and received comments from all persons
wishing to be heard in favor cf and opposed to the application.
Now, therefore;
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF
CENTRAL POINT, OREGON, AS FOLLOWS:
Section 1. Criteria A licabie to Decision. The fallowing
chapters of the Central Point Municipal Code apply to this
application:
A. Chapter 17.37, C-2(M), Gammercial-Medical District;
B. Chapter 17.60, General Regulations;
C. Chapter 17.64, Off-Street Parking and Loading;
D. Chapter 17.72, Site Plan, Landscaping and Construction
Plan Approval.
Section 2. Findings and Conclusions. The Planning
Commission hereby adopts by reference all findings of fact set
Earth in the City staff reports, and concludes that, except where
addressed in the conditions to approval, the application and
proposal comply with the requirements of the fallowing chapters
of the Central Point Municipal Code:
A. Chapter 17.37 relating to uses, lot size, lot
coverage, setback, building height and screening
in the C-2(M) district;
B. Chapter 17.60 relating to paving and landscaping
requirements;
C. Chapter 17.64 relating to off-street parking and
loading facilities;
D. Chapter 17.72 relating to site plan requirements.
1 - PLANNING COMMISSION RESOLUTION NO. ~~ (081695)
Section 3. Conditional A royal. The within application
for site plan approval is hereby conditionally approved, subject
to the conditions set forth on Exhibit "A", which is attached
hereto and by this reference incorporated herein.
Passed by the Planning Commission and signed by me in
authentication of its passage this ~i _ day of
1995.
Planning Commission Chairman
ATTEST:
City Repr n a ive
Approved by me this ~_ day of _, 1995.
-- ~'~ ~~Q
Planning Commission Chairman
2 - PLANNING COMMISSION RESOLUTION NO. ~~ r_ (081695)
EXHIBIT "A"
CONDITIONS
RVMC Addition -Site Plan
APPLICANT SWALL COMPLETE TWE FOLLOWING CONDITIONS EN ACCORDANCE WITH TWE TIMING
FACTORS A5 NOTED.
TF - 1 To be submitted as a part of construction plans and specifications for
review by the City prior to issuing permits.
TF - 2 To be completed prior to issuance of any Construction or Building
Permits.
TF - 3 To be completed prior to issuance of a Certificate of Occupancy.
TF - 4 To be completed prior to Approval of the Final Plat.
TF - 5 To be a continuous condition, to be set at the time of future land use
action decisions.
1. Applicant shall construct ail utilities, streets, and other structures discussed
herein, within rights-of-way owned, or to be owned by the City of Central
Point, in accordance with ail rules, regulations, ordinances, resolutions,
standards and other applicable requirements a# the City of Central Point far the
construction of this development.
2. This review for the SITE PLAN submitted by Applicant was done so in
accordance with all the rules, regulations, ordinances and standards in effect
as of the date of this review. Any modifications by Applicant of this project
after City Planning Commission approval, could require re-submittal of an
application, and approval by the City Planning Commission based on the
recommendation of staff responsible for this review.
3. Applicant shall pay all costs associated with this development and the
conditions placed on this development.
4. No construction will begin on this project until the Public Works Department
and other pertinent departments or divisions of the City have reviewed the
project plans and specifications and have issued a construction permit.
5.
TF-1 Applicant shall provide a complete set of construction drawings for all new
construction of the sanitary sewer system for review and.. approval by the City
prior to issuance of a building permit. The property service line shall be located
and sized in accordance with the Oregon State Plumbing Code.
~~
RVMC-Addition
exhibit "A" -Page Two
6.
TF-1 Applicant shall provide the City with a complete set of construction drawings
for the storm drainage system to serve this property, including connection to
the City system. All roof drains, area drains, crawl spaces, and parking lot
drains shall have positive drainage away from the structures.
7.
TF-1 Applicant shall provide the City with a grading and drainage plan fnr the entire
project. Runoff and pipe sizing calculations prepared by Applicant's engineer
shall accompany this submittal. The engineer shall use the intensity-duration
curve obtained from the Public Works Department for determining the runoff
far this project. The grading and drainage plan shall indicate topography and
show elevations sufficient to evaluate the plan.
8.
TP 3 Remove existing curb cut and driveway located on S 4th Street and replace
with curb, gutter and sidewalk per City of Central Point Standards.
9.
TF 1 Applicant shall provide the City with the sizing requirements for the water
service for this development. Applicant shall anticipate a minimum of one
water meter for this development. Applicant may utilize the existing meter,
provided the service meets sizing requirements for the project.
Applicant shall install an 4SHD approved testable backflow device behind the
City water meter far any system which connects to Applicant's irrigation
system or any other water system which may be a potential cross-connection.
Location, type(s3 and sizes} of backflow prevention devices shall be shown on
the construction drawings.
Applicant shall provide the City with sizing requirements and flow calculations
for the fire systems including any mains and hydrants.
~~