HomeMy WebLinkAboutResolution 339 - Buntin Tent. PlanSection 3. Conditional Approval. The application for
tentative plan for land partition herein is hereby approved,
subject to the conditions set forth on Exhibit "A", attached
hereto and by reference incorporated herein, imposed under
authority of CPMC Chapter 16.36.
Passed by the Planning Commission and signed by me in
authentication of its passage this ~ day of
1996.
a/~ .~
Planning Commission Chairman
ATTEST:
City Repr nt five
Approved by me this ~ day of g ~, 1996.
~~~ ~~~~
Planning Gammissian Chairman
2 -- PLANNING COMMTSSION RESOT,UTION NO. 339 (020196)
EXHIBIT "A"
PUBLIC WORKS DEPARTMENT
TENTATIVE PLAN CONDITIONS
BRIARWOOD VILLAGE PARTITION, COUNTRYSIDE II SUBDIVISION
GENERAL
o ORS Chapter 468.740 requires that all developments which will disturb 5 ACRES OR
MORE of land adjacent to a stream which discharges to surface waters of the State of
Oregon shall as a part of the construction permitting process submit an "Erosion
Control Pfan."
The "Erosion Control Plan" shall require a PERMIT from DEQ. No construction on any
Tentative Plan storm drainage system can occur until authorization to do so has been
granted by DEQ.
o Developer shall install ladder rungs approved by the Central Point Public Works
Department for each sanitary sewer manhole with a depth greater than 3.0 feet to the
flow line of the manhole.
o Developer`s engineer shall design the water system to provide a minimum flow of 1000
g.p.m. at each fire hydrant.
o Developer shat( construct all utilities, streets, and other structures discussed herein,
within rights-af-way owned, or to be owned by the City of Central Point, in accordance
with all rotes, regulations, ordinances, resolutions and other applicable requirements
of the City of Central Point for the construction of this development.
o This review far the Tentative Plan submitted by the applicant was done so in
accordance with all the rules, regulations and ordinances in effect as of the date of this
review. Any modifications by Developer of this project after City Planning Commission
approval, could require resubmittal of an application, and approval by the City Planning
Commission based on the recommendation of staff responsible for this review.
o AEI costs associated with this Development and the conditions placed on this
Development shall be the sole responsibility of the applicant/owner.
o No construction will begin on this project or any building until such time as plans and
specifications have been reviewed and approved by the Public Works Department and
other required divisions of the City and a Construction Permit has been issued for each
portion of the project requiring a permit.
o The Final Plat of this Subdivision shall not be approved by the Planning Commission
until all conditions as herein stipulated and approved far this project have been met by
construction and acceptance thereof, ar bonding for construction.
o The City shall approve street stationing prior to Developer's engineer designing the
improvements for this Tentative Plan.
SPECIFIC
PUBLIC WORKS DEPARTMENT
TENTAT[VE PLAN CONDITIONS
BRIARWOOD VILLAGE PARTITION, COUNTRYSIDE fl SUBDfVISION
Specific:
1(a) The construction of this development shall include the street subgrade, base rack, paving,
fighting, traffic control and delineation improvements, storm drain improvements, curblgutter,
safety improvements, ingresslegress improvements, sidewalks, and utility crossings to that
portion of Briarwood Drive and Hopkins Road adjacent to the partition project.
1(b} Developer shall be required to construct sidewalks in accordance with Public Works Standards
and Specifications.
2. Developer shall construct driveway accesses to Parcels 1 and 2 in accordance with the Public
Works Standards and Design Guidelines. Fire access to parcel 1 and 2 shall be located as
stipulated by the Public Safety Department.
Developer shall construct a 40' driveway (throat width) for parcel #2 with turnarounds
adjacent to both sides of the driveway sufficient to allow vehicles access to Hopkins Road
without backing into the street. Permanent signs shall be installed on property prohibiting
backing out.
3. Developer shall connect separate water service laterals for Parcels 1 and 2 to the existing
angle meter valve on Briarwood Drive with valuing and backffow prevention in accordance
with Public Works Standards. Service laterals shall be sized in accordance with the Oregon
Plumbing Code.
Applicant shall provide and show easements on Final Plat and Plot Pfan #or wafer lines
crossing the adjacent parcel (#11
4. Separate sanitary sewer services serving each parcel shall be connected to the 8" sanitary
sewers located in Briarwood Drive or Hopkins Road. The service lateral shall be sized in
accordance with the Oregon Plumbing Code and Public Works Standards.
Applicant shalt provide and show easements on Final Plat and Plot Pfan for any sewer service
lines crossing adjacent parcels.
5.(a} Developer shall construct an adequately sized storm drainage system to provide for runoff
onto the subject property and from each lat. As a part of the construction of the
improvements for this Tentative Plan, Developer's engineer shalt provide a complete set of
drainage calculations for sizing the storm drainage system for this development. Developer
shall submit this information to the Public Works Department at the time construction
drawings for the project are submitted to the Public Works Department for permits far
construction of the storm drainage improvements. The engineer shall use the rainfaillintensity
curve obtained #rom the Public Works Department for hydrology calculations.
6. Ail structures shall have roof drains, area drains, and crawl spaces with positive drainage
away from the structure and drain lines connected to a curb drain, or an approved storm
sewer. Developer shall provide the necessary storm drainage improvements and lot grading
to assure that all streets, lots, and all properties will drain property. Developer shall submit
a grading plan with the construction drawings and perform such grading and drainage
Briarwood Village Partition, Countryside ll Subdivision
Page Two -Tentative Plan Conditions
improvements which satisfies this drainage condition leaving only minor grading required for
each lot during house construction.
7. Applicant shall install a 9500 Lumen Street Light on the existing PP & L Power Pole #810663
located on the Southwest corner of Parcel #2 and Hopkins Road. Applicant steal[ coordinate
the installation with Pacific Power and Light Company. Typically, there is no charge for
installation on existing poles. However, applicant will be required to pay any additional costs.