Loading...
HomeMy WebLinkAboutResolution 347 - Hastings Site PlanPLANNING COMMISSION RESOLUTION NO. 347 A RESOLUTION CONDITIONALLY APPROVING A SITE PLAN APPLICATION (Applicant: John Hastings) (37 2W 3DD Tax Lot 6600) Recitals 1. This matter came before the Planning Commission for hearing on February 20, 1996, on applicant's site plan application for an addition to an existing structure at 150 North Front Street in a C-5 district of the City. The Planning Commission reviewed the application and the City staff reports, and received comments from all persons wishing to be heard in favor of and opposed to the application. NOw, therefore; BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. Criteria A livable to Decision. The following chapters of the Central Point Municipal Code apply to this application: A. Chapter 17.46, Thoroughfare Commercial District; B. Chapter 17.60, General Regulations; C. Chapter 17.64, Off-Street Parking and Loading; D. Chapter 17.72, Site Plan, Landscaping and Construction Plan Approval. Section 2. Findings and„Conclusions. The Planning Commission hereby adopts by reference all findings of fact set forth in the City staff reports, and concludes that, except where addressed in the conditions to approval, the application and proposal comply with the requirements of the following chapters of the Central Point Municipal Code: A. Chapter 17.46 relating to uses, lot size, lot coverage, setback, building height and screening in the C-5 district; B. Chapter 17.60 relating to paving and landscaping requirements; C. Chapter 17.64 relating to off-street parking and loading facilities; D. Chapter 17.72 relating to site plan requirements. 1 - PLANNING COMMISSION RESOLUTION NO. 347 (022296) Section 3. Conditional A raval. The wa.thin application for site plan approval is hereby canditianally approved, subject to the conditions set forth an Exhibit "A", which is attached hereto and by this reference incorporated herein. Passed by the Planning Commission and signed by me in authentication of its passage this ~^ day of . _~~J- ~~~~~ , 1995. Planning Commission Chairman ATTEST: City Rep ent five Approved by me this ~Z day of ~,~ , 1996. ~, ~ c ~ z Planning Commission Chairman 2 - PLANNING COMMISSION RESOLUTION NO. 347 (022295) EXHIBIT "A" CONDITIONS Hastings Furniture APPLICANT SF-tALL COMPLETE TI-IE FOLLOWING CONDITIONS IN ACCORDANCE WITH TFIE TIMING FACTORS AS NOTED. TIMING FArTQRS TF - 1 To be submitted as a part of construction pions and specifications for review by the City prior to issuing permits. TF - 2 To be completed prior to issuance of any Construction or Building Permits. TF - 3 To be completed prior to issuance of a Certificate of Occupancy. TF - 4 To be completed prior to Approval of the Final Plat. TF - 5 Ta be a continuous condition, to be set at the time of future land use action decisions. n r 1• 1. Applicant shall construct all utilities, streets, and other structures discussed herein, within rights-of-way owned, or to be awned by the City of Central Point, in accordance with all rules, regulations, ordinances, resolutions, standards and other applicable requirements of the City of Central Point far the construction of this development. 2. This review for the SITE PLAN submitted by Applicant was done sa in accordance with all the rules, regulations, ordinances and standards in effect as of the date of this review. Any modifications by Applicant of this project after City Planning Commission approval, could require re-submittal of an application, and approval by the City Planning Commission based on the recommendation of staff responsible for this review. 3. Applicant shall pay all casts associated with this development and the conditions placed on this development. 4. No construction will begin on this project anti! the Public Works Department and other pertinent departments or divisions of the City have reviewed the project plans and specifications and have issued a construction permit. Exhibit "A" -Page Twa 5. In accordance with the Comprehensive Plan, or Master Transportation Plan, TF 2 the construction of this development shall include future street subgrade, base rock, paving, lighting, traffic control and delineation improvements, storm drain, water and sewer improvements, including alleys, sidewalks, and utility crossings to Front Street. Developer has secured the above improvements by executing an agreement far consent to inclusion in a Local Improvement District to construct the above street improvements [1121194). 6a. TF 3 The City will inspect and test al[ existing improvements proposed for dedication to the City. The City will conduct the inspection and testing in the same manner, where practical, as required for new construction. Applicant shall repair or replace any improvements not meeting City standards for new construction. The City's inspection wilt include the existing pavement, base section and sidewalk improvements adjacent to Front Street. Applicant shall apply for a permit with the Oregon Department of Transportation and coordinate with the City for all existing and proposed improvements in the Front Street (Highway 991 Right of Way, dedicated to the City as part of this project. 6b. The alley shall be improved adjacent to the Tax Lot described in this Staff Report. tT37S R2W Map 3DD Tax Lot 6600 The improvements shall include a minimum of 2" of compacted asphaltic concrete, over 6 inches of compacted baserock, aver compacted subgrade from the existing pavement south of the property to the northerly property line. All construction shall be to City Standards and shall include drainage. [Paragraph 6b changed per Planning Commission Minutes dated 2/20/961 7. TF1 Applicant shall install an OSHD approved testable backflow device behind the City water meter for any system which connects to Applicant's irrigation system or any other water system which may be a potential cross-connection. Location, type(s) and size(s) of backflow prevention devices shall be shown on construction drawings. If Applicant currently has an approved device installed as required above, this condition is waived. Exhibit "A" -Page Three 8. TF1 Applicant shall provide the City with a complete set of construction drawings for the storm drainage system to serve this property. All roof drains, area drains, craw[ spaces, and parking lot drains shall have positive drainage away from any structures, and shall connect to the storm drainage system located in Front Street. 9. TF1 Applicant shall provide the City with a grading and drainage plan for the entire project. 10. TF3 Applicant shall past signs stating that the turnaround area at (rant of premises shall nat be blocked by parked vehicles. No backing or vehicle manuevers shall be permitted in the public right of way of Front Street {changed per Planning Commission Minutes dated 2120/96