HomeMy WebLinkAboutResolution 348 - Lowe Partition~/
PLANNING COMMISSION RESOLUTION NO. '~ ~1~
A RESOLUTION GRANTING TENTATIVE PLAN APPROVAL
FOR A LAND PARTITION
(Applicants: Brian and Lori Lowe)
(37 2W 10 DC Tam Lot 7.00}
Recitals
1. Applicants have submitted an application for tentative
plan approval far a land partition on a 1.77-acre parcel, located
on the corner of Snowy Butte Lane and Beall Lane in the City of
Central Point, Oregon.
2. On April 2, 1996, the Central Point Planning Commission
conducted a duly-noticed public hearing on the application, at
which time it reviewed the City staff reports and heard testimoxay
and comments nn the application.
Now, therefore;
BE 7:T RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF
CENTRAL POINT, OREGON, AS FOLLOWS:
Section 1. A roval Criteria. The requirements for
approval of land partitions and tentative plans are set forth in
CPMC Title 16 and Title 17, relating to informational
requirements, zoning, lot dimension, access, and similar
requirements.
Section 2. Findings,,anc~ Conclusions. The Planning
Commission finds and determines as follows:
A. Tentative Plan Requirements. The application and
tentative plan are in the correct form and contain all of the
information required by CPMC Chapter 16.10.
B. Area and Width of Lot. This partitioning in an R-1-6
zone would create the following parcels:
Parcel 1: Approximately 50,644 square feet;
Parcel 2: Approximately 30,495 square feet.
Both parcels meet the minimum area (6,000 square feet far
interior lots and 7,000 square feet for corner lots) and width
(60 feet for interior lots and 70 feet for corner lots)
requirements for lots in the R-1--6 zone as set forth in CPMC
17.20.050, and such parcels meet the general requirements for
lots contained in CPMC 16.24.050.
1 - PLANNING COMMISSION RESOLUTION NO. 3 Y N (040996}
~x1~1BIT °A"
PUBLIC WORKS DI=PARTMENT
TENTATIVE FLAN CONDITIONS
for
LOWS LAND PARTITION
GENERAL
Note: Same general conditions may not apply to this subdivision
a ORS Chapter 468.740 requires that all developments which will disturb 5 ACRES OR MORE of
land adjacent to a stream which discharges to surface waters of the State of Oregon shall as a
part of the construction permitting process submit an HErosian Control Plan."
The "Erosion Control Plan" shall require a PIwRM(T from D1=Q. No construction on any Tentative
Plan storm drainage system can occur until authorization to do so has been granted by DEQ.
o Developer shall provide and install ladder rungs approved by the Central Point Public Works
Department for each sanitary sewer manhole with a depth greater than 3.0 feet to the flow line
of the manhole.
o Developer`s engineer shall design the water system to provide a minimum flow of 1000 g.p.m.
at each fire hydrant.
o Developer shalt construct all utilities, streets, and other structures discussed herein, within rights-
of-way owned, ar to be owned by the City of Central Point. in accordance with all rules,
regulations, ordinances, resolutions and other applicable requirements of the City of Central Point
for the construction of this development.
o This review for the Tentative Plan submitted by the applicant was done so in accordance with
all the rules, regulations and ordinances in effect as of the date of this review. Any modifications
by Developer of this project after City Planning Commission approval, could require resubmittal
of an application, and approval by the City Planning Commission based on the recommendation
of staff responsible for this review.
o Alf costs associated with this Development and the conditions placed on this Development shall
be the sale responsibility of the applicantlawner.
o No construction will begin on this project or any building until such time as plans and
specifications have been reviewed and approved by the Public Works Department and other
required divisions of the City and a Construction Permit has been issued for each portion of the
project requiring a permit.
o The Final Plat of this Subdivision shall not be approved by the Planning Commission until ail
conditions as herein stipulated and approved for this project have been met by construction and
acceptance thereof or bonding far construction.
a The City shall approve street stationing prior to Developer`s engineer designing the improvements
for this Tentative Pian.
SPI=CIFIC
` PUBLIC WORf~S DEPARTI11iENT
TENTAT#V~ PLAN CONDITIONS
LOWI~ LAND PARTITION
1(a} The construction of this development shall include the street subgrade, base rock, paving, lighting,
traffc control and delineation improvements, storm drain improvements, curblgutter, safety
improvements, ingress/egress improvements, sidewalks, and utility crossings to that portion of
Snowy Butte Road adjacent to T37S 1~2W, 90DC, Tax Lot 900, Parcels 1 and 2 of the partition
project.
(fal The developer can secure the above future improvements 6y signing an irrevocable letter of consent
to inclusion in a Local Improvement District to construct the above street improvement. The
Planning Department has the option to require this security for Beall Lane and Snawy Butte Road
improvements.
2. Applicant shall construct driveway access to Seafl Lane Parcel 2 in accordance with the Public
Works Standards and Design Guidelines and Jackson County Road Department. Fire access to both
parcels and required turn arounds may be required and shall be located as stipulated by the Public
Safety Department.
3. Applicant shall connect water service laterals to the existing water fine along Beall Lane with valuing
and backflow prevention as determined by the Public Works Department. The sizing and spacing
of fire hydrants and of service lateral for Parce! 2 shall be determined based on the Oregon Plumbing
Cade.
Show easement on Final Plat far any water laterals crossing adjacent property parcels.
4. The sanitary sewer serving all parcels shall be connected to the City sanitary sewer located in
Snawy Butte 13oad. The service lateral shalt be sized in accordance with the Oregon Plumbing Code.
Show easement on f=loaf Plat for any sewer laterals crossing adjacent property parcels.
5. Applicant shall construct an adequately sized storm drainage system to provide for runoff onto the
subject property and from each lat. As a part of the construction of the improvements for this
Tentative Plan, Applicant`s engineer shall provide a complete set of drainage calculations for sizing
the storm drainage system for this development. Applicant shall submit this information to the
Public Works Department at the time construction drawings for the project are submitted to the
Public Safety Department far permits for construction. The engineer steal! use the rainfall/intensity
curve obtained from the Public Works Department for hydrology calculations.
fi. A[I structures shall have roof drains, area drains, and crawl spaces with positive drainage away from
the structure and drain fines connected to a curb drain, or an approved storm sewer System.
Applicant shat! provide the necessary storm drainage improvements and lot grading to assure that
off streets, lots, and all properties will drain properly. Applicant shalt submit a grading plan with the
construction drawings and perform such grading and drainage
7. Applicant shaft instal! a 22,000 Lumen HPS Light on the existing tallest PP & L Power Pole located
near the Southwest property comer of Parce! #2. Applicant shall coordinate the installation with
Pacific Power and Light Company.
Applicant shall pay any additional costs associated with the installation.
'' E.owe Land Partition
Specific Tentative Plan Conditions
Page Twa
$. The property located at '[ 771 Beall Lane, owned by Paul and Roseann Wagner and further described
as T37S f~2W, Section 1ODC, Tax lot 100 is found to be ]ocated adjacent to a wetland identified
as PSSC on the Division of State lands (DSLy Wetland Inventory Map.
A Wetland Use Notification Porm has been filed with the Division of State Lands.
Applicant shall be required to obtain any permits required by DSL prior to beginning of construction
or issuance of a building permit.