HomeMy WebLinkAboutResolution 354 - Greenpark Village, No. 5 Tent. Plan
PLANNING COMMISSION RESOLUTION NO. 354
A RESOLUTTON GRANTING APPROVAL OF A TENTATIVE PLAN
FOR GREENPARK VILLAGE SUBDIVISION, UNTT NO. 5
(Applicant: Louis Mahar)
(37 2W 12C Tax Lot 3460}
BE IT RESOLVED IiY `I'HE PLANNING COMMISSION OF THE CITY OF
CENTRAL POINT, OREGON, AS FOLLOWS:
Section 1. Nature of Application. This is an application
for approval of a tentative plan for a 37-lot subdivision in an
R-1-6 district of Central Point, Oregon. The Planning Commission
reviewed the application and tentative plan at a duly-noticed
public hearing on June 18, 1996.
Section 2. Approval Criteria. The criteria for approval of
this subdivision application are found in CPMC Title 16, relating
to tentative plans and subdivisions, and in Title 17, relating to
zoning and lot sizes.
Section 3. Findings and Conclusions. The Planning
Commission finds and determines as follows:
A. Tentative Plan Re uirements. The application and
tentative plan herein are in the correct farm and contain all of
the information required for the same under CPMC Chapter 16.14.
B. Area and Width of Lots. The subdivision lots all meet
the R-1-6 district lot size requirements of 6,000 square feet for
interior lots and 7,004 square feet for corner lots. The minimum
width requirements are also met, with interior lots at least 60
feet wide and corner lots at least 70 feet wide.
C, Blocks and Streets. The tentative plan proposal far the
layout and dimensions of streets and blocks is in compliance with
the requirements of CPMC Chapter 16.20 regarding streets and CPMC
Chapter 16.24 regarding blocks.
Section 4. Conditional Approval. The application for
tentative plan approval for the within subdivision is hereby
approved, subject to the conditions listed on Exhibit "A" hereto,
imposed under authority of CPMC 16.14.490.
Passed by the Planning Commission and signed by me in
authentication of its passage this ~___ day of ,
1996. -
~~-
Planning Commission Chairman
1 _ PLANNING COMMISSION RESOLUTION N0. 354 (070$95}
ATTEST:
City Repre nta ive
Approved by me this ~/o day o~ , I99f,,
Panning Commission Chairman
2 -- PLANNING COMMISSION RESOLUTION NO. 354 (070896)
EXHtB1T "A"
PUBLIC WORKS DEFARTMhNT
TENTATIVE PLAN CONDITIONS
GREEN PARK, UNIT 5
GENERAL
o ORS Chapter 468.740 requires that all developments which will disturb 5 ACRES OR
MORE of land adjacent to a stream which discharges to surface waters of the State of
Oregon submit an "Erosion
Control Plan."
The "Erosion Contro[ Plan" shall require a PERMIT from DEQ. No construction activity
on any Tentative Plan can occur until authorization to da so has been granted by DEQ.
Developer shall provide a copy of the DEQ permit to the City prior to beginning
construction.
o Developer shah provide and install ladder rungs approved by the Central Point Public
Works Department for each sanitary sewer manhole with a depth greater than 4.0 feet
to the flow line of the manhole.
o Developer`s engineer shall design the water system to provide a minimum flow of 1000
g.p.m. at each fire hydrant.
o Developer shall construct all utilities, streets, and other structures discussed herein,
within rights-of-way owned, or to be owned by the City of Central Point, in accordance
with all rotes, regulations, ordinances, resolutions and other applicable requirements
of the City of Central Point far the construction of this development.
o This review for the Tentative Plan submitted by the applicant was done so in
accordance with all the rules, regulations and ordinances in effect as of the date of this
review. Any modifications by Developer of this project after City Planning Commission
approval, could require resubmittal of an application, and approval by the City Planning
Commission based on the recommendation of staff responsible for this review.
o Ail casts associated with this Development and the conditions placed on this
Development shall be the sole responsibility of the applicant/owner.
o No construction will begin on this project or any building until such time as plans and
specifications have been reviewed and approved by the Public Works Department, DEQ
and other required divisions of the City and a Construction Permit has been issued for
each portion of the project requiring a permit.
a The Final Plat of this Partition shall not be approved by the Planning Commission until
a[I conditions as herein stipulated and approved for this project have been met by
construction and acceptance thereof, or bonding for construction.
o The City shall approve street stationing prior to Developer's engineer designing the
improvements far this Tentative Plan.
PUBLIC WORKS DEPARTMENT
TENTATIVE PLAN CONDITIONS
GREEN PARK SUBDIVISION, UNIT 5
1. All structures shall have roof drains, area drains and crawl spaces with positive
drainage away from the structure to drain lines connected to a curb drain, or an
approved storm sewer. The developer shall provide the necessary storm drainage
improvements and stabilization materials lot grading to assure that all streets, lots, and
all properties will drain properly and provide foundation support. The developer shall
submit a grading plan with the construction drawings and perform such grading ,
compaction, material stabilization and drainage improvements which satisfies the
drainage and stabilization condition leaving only minor grading required far each lot
during house construction.
2. The City's engineer shall, at the cost of the developer, evaluate the strength of the
native soils and determine the street section design in accordance with the Public
Works Department Design Standards. The engineer shall use the following design
criteria:
Street Name
Wedgewood Drive
Paisley Court
Angela Court
Glengrove Avenue
Gatepark Drive
Average Da
2, 800 VTID
~ ,000 VTID
1,000 VTID
2, 500 VTID
2,500 VTID
°1 TC.tas~
2%
2 °/n
2%
5%
2 ~~fl
3. The construction drawings for this Tentative Plan shall include a Street Lighting Plan
and a Traffic Control Plan in accordance with the requirements of the City of Central
Point Public Works Department. The construction drawings shall include clear vision
areas designed to meet the City's Public Works Standards. The developer shall pay for
all costs associated with the design and installation of the improvements specified an
these plans.
4. Developer shall jointly, with Crown West Properties (Forest Glen 8~, construct a box
culvert across Elk Creek at Glengrove Avenue, sized to carry a 100 year storm as
stipulated in CPMC 8.24. Developer shall indicate the 100 year horizontal flood plain
boundary on construction drawings and on Final Plat. Top of bank shall also be shown
an construction drawings.
5. The construction drawings shall indicate type, size and location of water service,
water mains and fire hydrants in accordance with the City's Public Works Standards
and the recommendation of the City's Fire Chief. All water systems shalt be designed
for loop construction where feasible.
6. The developers engineer shaft design the sewer system to serve the development of
this tract and all future development west of this tract which these improvements will
serve. The sanitary sewer design shall be approved by DEQ prior to approval of
construction plans by the Public Works Director.
7.{a1 The developer shall construct an adequately sized storm drainage system to provide
for runoff onto the subdivision property and from each lot. As a part of the
Green Park Subdivision, Unit 5
May 22, 1996
Exhibit "A " -Page Two
construction of the improvements for this Tentative Plan, the developer's engineer steal!
provide a complete set of drainage calculations far sizing the storm drainage system
for this development. The developer shall submit this information to the Public Works
Department at the time storm drain construction drawings for the subdivision are
submitted to the Public Works Department for construction permits. The engineer shall
use the rainfall/intensity curve obtained from the Public Works Department for
hydrology calculations.
7.~b1 Developer shall execute a development plan with the Planning Department which
incudes a street protection plan and storm drainagelsedimentation protection during
construction and building activities. Developer shall warrantee all improvements for
a period of two years after acceptance.
8. The construction drawings shah include the locations of the driveways far lots 978, 180,
185, 186, 189, 194, & 208 conforming with the Public Works Standards. Accesses shall be
located the farthest distance away from intersection.
9. Developer shat! provide the City's Public Works Department with an aerial photograph or
topographic map which delineates the boundaries of the project and any wetlands in the
immediate vicinity. Developer shall be responsible for demonstrating compliance with all
permits required by DEQ or DSt_ far construction of this subdivision.
Developer shah provide the City with copies of permits and conditions required for this
development.
10. The Developer shall coordinate with the 'developer to the north' (Glengrove Avenue}, and
to the 'developer to the west' (Gatepark Drive} for the design of the utilities and streets for
this subdivision. Included with the construction drawing wi11 be a separate drawing which
details required coordination.
11. Deleted per Planning Commission Minutes, June 18, 1996
12. Shawn an Final Plat a f1'1 one foot access control strip at the end of Gatepark Drive.
13. Prior to acceptance of street improvements including all water, sanitary sewer, storm
drainage and utilities. Developer shall provide "As Constructed" drawings an Mylar.
"As Constructed" drawings shall include all field revisions including final invert
elevations of sewer and storm systems, street grades and curb elevations.
Additionally, Developer shall provide an AutoCad compatible digitized copy of the "as
constructed" drawings and Final Plat. Digitized copy shall be presented in DWG or DXF
format.