Loading...
HomeMy WebLinkAboutResolution 383 - Beall Estates, Ph. III - Tent. Plan<~, PLANNING COMMISSION RESOLUTION NO. ijy~~ A RESOLUTION GRANTING APPROVAL OF A TENTATIVE PLAN FOR BEALL ESTATES SUBDIVISION, PHASE III (Applicants: Nae1 Maare and Bret Moore) {37 2W 12C Tax Lot 34D4) BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1 Nature of Application. This is an application far approval of a tentative plan far a 30-lot subdivision in an R-2 district of Central Point, Oregon. The Planning Commission reviewed the app~.icatian and tentative plan at a duly-noticed public hearing on May 6, 1997. Section 2 Approval Criteria. The criteria for approval of this subdivision application are found in CPMC Title 16, relating to tentative plans and subdivisions, and in Title 17, relating to zoning and lot sizes. Section 3 Findings and Conclusions. The Planning Commission finds and determines as follows: A. Tentative Plan Requirements. The application and tentative plan herein are in the correct farm and contain all of the information required for the same under CPMC Chapter 16.10. B. Area and Width of Lats. The subdivision lots all meet the R-2 district lot size requirements of 6,000 square feet for interior lots and 7,000 square feet for corner lots. The minimum width requirements are also met, with interior lets at least 60 feet wide and corner lots at least 70 feet wide. C. Blocks and Streets. 'Fhe tentative plan proposal far the layout and dimensions of streets and blocks is in compliance with the requirements of CPMC Chapter 16.20 regarding streets and CPMC Chapter 16.24 regarding blacks, Section 4 Conditional Approval. The application far tentative plan approval for the within subdivision is hereby approved, subject to the conditions listed on Exhibit "A" hereto, imposed under authority of CPMC 16.10.090. Passed by the Planning Commissionfand signed y me in authentication of its passage this 1~1 ~ day of ~~_., , 1997. Planning Commission Chairman 1 - PLANNING COMMISSION RESOLUTION NO. '~~~a {051297) ATTEST: ~~ ~ ... City Representative ,ir Approved by ttte tha,s ~,~ day o~ ~'~~{,;~,~__.- 1997. P1.anning Commission Chaa,rman 2 - PLANNING COMMISSION RESOLUTION NO. ?~ '~ (051297) EXI~IIBIT A. PLANNING DEPARTMENT RECOMMENDED CONDITIONS 1. The applicants shall comply with all requirements of BCVSA, Fire District #3, Jackson County Roads Department, Rogue River Valfey Irrigation District and any other affected agencies as they pertain to the development of the subdivision. Evidence of such compliance shall be submitted to the City gnor to final plat approval. 2. The applicants shall submit a park development plan to the Planning Department indicating the manner and schedule by which the neighborhood park within the subdivision will be developed. This shall include any proposed landscaping, irrigation, natural azeas, architectural features and play equipment. 3. 'I'he applicants shall submit a copy of the recorded covenants, conditions, and restrictions {CC&Rs) for the subdivision to the Planning Department. 4. The applicants shall comply with all requirements of the Division of State Lands for the project as indicated by its response to the Wetland Land Use Notification Form. 5. The approval of the tentative plan shall become void one yeaz following the date of~such approval unless an application for a final plat has been submitted to the Planning Department. 6. The subdivision shall be developed in accordance with the tentative plan as approved by the Planning Commission. Modifications to the tentative plan shall be subject to further review and approval by the Planning Commission. - Beal! Estates Phase 111 PWD Staff Report on 7"entative Plat Apri130, ~ss~ Page 2 of oak trees located on the northwest portion of the proposed park site. 2. The Developer shall work with the City to obtain an easement through the existing subdivision to the North of the proposed subdivision to obtain pedestrian/bicycle access from lsorest Glen Drive to the proposed park location. General ~ . Developer shall submit to the City's Public Works Department {City's PWDy far review and approval, plans and specifications #or all improvements proposed for construction or modifications within the City or public rights-of- ways and easements. 2. Public improvements include, but are not limited to, streEts {including sidewalks, curbs and gutters); storm drainage and sanitary sewer coI[ection and conveyance systems; water distribution system {up to the service meter and including fire protection); street lighting; and traffic control devices, street signs and delineation. 3. All construction of public improvements shall conform to the City's Public Works Standard Specifications and Details {City PWD Standards) and other special specifications, details, standards, andlor upgrades as may be approved by the City`s Public Works Director. 4. During construction, changes proposed by the Developer shall be submitted in writing by the Developer's engineer to the City PWD for approval prior to installation. 5. No construction shall commence until the City PWD has reviewed, approved, and issued a Public Works permit for the proposed improvements. g Beall Estates Phase !!! PWD Sfaff Deport on 7"entative Plaf Apri130, 1937 Page 4 1 1 . All fill placed in the development shall be "engineered fill", and compacted to City standards. All existing concrete, pipe, building materials, structures, clear and grub materials, and other deleterious materials shall be removed from the site and either recycled ar properly disposed of in accordance with the requirements of the Oregon Department of Environmental Quality. 12. Identify easement dedications and widths on the Plot Plan. 13. Easements for City infrastructure (i.e. sanitary sewer, water, and storm drain) must be a minimum of 15-feet wide, and should not split lot lines. Easements far storm drainage, sanitary sewer, and water lines should be dedicated to the City and not just a P.U.E. Centerline of buried infrastructure shall be aligned a minimum of five {5y feet from the edge of the easement. 14. All design, construction plans and specifications, and as-built drawings must be prepared to acceptable pro#essional standards. 15. All street and water improvement plans must be approved in writing by Fire District 3 prior to review by the City's PWD. 16. If the proposed development places structures within the i 00-year flaodzone, haw does the placement of these structures modify the floadzone. What affect will it have on the #[oodplain elevation and flaodzone boundary, and what affects will the modification of the f[oodplain elevation and floodzone boundary have on the existing facilities and properties surrounding the proposed development. 17. Prior to the City PWD final approval of the construction plans for the proposed improvements, the following must be submitted: ^ A copy of written approval from Fire District 3 of the final street and water system improvement plans for the proposed development. ~~ Beall Bstates Phase 111 PWO Staff Report an Tentative Plat .4pri130, 1997 Page 6 Streets/Traffic Existing Improvements _ Beall Inane -Secondary Arterial. ROW 60' wide, pavement 30' wide. Jurisdiction -Jackson County. - Woodridge Drive -ROW 50' wide, street width 3fi' - Gatepark Drive -ROW 50' wide, street width 36' 1. Construction drawings for this Tentative Plan shall include a Street Lighting Plan and Tra#fic Control Plan in accordance with the requirements of the City PWD. The construction drawings shall include clear vision areas designed to meet the City's PWD Standards. 25-foot unobstructed sight triangle areas shall be required at all uncontrolled intersections. 55 feet shall be required at arterial intersections. 2. The City PWD shaft, at the cost of the Developer, evaluate the strength of the native soils and determine the street section designs in accordance with the City PWD Standards. The City's engineering staff or selected engineering consultant {at Developer`s expense), shall evaluate the strength of the native soils and determine the street section designs in accordance with the City PWD Standards. Minimum street section shall be as follows: - 3-inches Class "B" A.C. - 4-inches of 1 "-0" crushed rock - S-inches of 4"-0"~ crushed rock (City of Medford specifications?, woven geotextile fabric over compacted subgrade. , Street section (excluding the asphalt concrete portionl shall be extended underneath the sidewalk portion of the street section to provide structural support for the sidewalk section. 3. All improvements to Beall Lane including, but not Limited to, street section, curbs, gutters, sidewalks, and traffic control and de{ineation, shall be coordinated and approved by the JC Roads and the City PWD. Acceleration and deceleration lanes meeting JC Roads standards may need to be provided at the proposed development's intersection of Circlewood Drive with Beall Lane. i3 Beall Estates Phase 111 PW,Q Staff Report an Tentative Plat ApriI30, 1997 Page 8 3. Need plan and profile drawing of HGL in Elk Creek channel and indication of floodway and flood-zone boundary during the ~ 00-year flood event. The City DPW does not have a complete copy of the fiood study work performed on Elk Creek in this area. Was the flood study done with the inclusion of the proposed development? If the proposed development was not included in the original study, then a revised study (with the inclusion of the proposed development and surrounding future developments (if applicable} wilt need to be performed. 4. Easements need to be i 5-feet wide, and need clause in final property deeds or final CC&Rs to maintain driveable access to manholes for getting vactor/jester to manholes. Need copy of either document prior to approval of construction plans. 5. During the design of the SD System, the Developer`s engineer shall consider the effect of finished lot elevations with regards to the floodway and ~ 00 year floadplain for Elk Creek and the drainage ditch on the east side of the proposed development. The allowable flow rates into Elk Creek or into the unnamed ditch from the proposed development shall not be greater than the run-of# flow rates experienced from the property in its current status. The Developer's engineer must provide suitable hydrological calculations and storm hydrographs to depict the existing condition and the finished condition of the proposed development.. The Developer's engineer and the City PWD shall agree on the applicable run-off coefficients, curve numbers, retardance etc., used ire the Developer engineer's calculations. Provide analysis of the drainage ditch along the east side of the development as weft as Elk Creek. fi. Plans which propose to include discharge to Elk Creek or the existing drainage ditch and any construction thereof, shall be in compliance with DSL, ACQE, ODFW,.and DEQ guidelines and requirements. Any modifications to the drainage ditch and Elk Creek shaii be done in accordance with any requirements and applicable conditions of the DSL, AC4E, andlor DEQ. 7. The discharge point and ~iotential retention 'o# storm water run-off shall be coordinated with aspects of the proposed park to provide an aesthetically pleasing, useful, and Iow maintenance facility. 15 Beall Estates Phase Ill PWIa Staff Report on Tentative Plat April 30, 1397 Page 10 ^ Convey the collected groundwater and storm water with the minimum cleaning velocities and without surcharging the collection and conveyance piping; and ^ Minimize silts, sands, gravels, and fines migration from the native soils into the SD system. The plotted HGL shat( include both the groundwater infiltration, and the storm water run-off and run-on inflows into the SD system. 15. All storm drain easements must be 15-feet wide, and include a clause to maintain driveable access to manholes for getting a suitable truck mounted vactor/fetter machine to manholes, clean-outs, or inlets. i 6. As illustrated on the tentative plat, a 30-foot wide storm drainage easement shall be located on the northern portion of. lots 49, 50, and. 51 to afford access to the llk Creek channel. i 7. Construction of private storm drains is discouraged by the City. However, if a private storm drain is to be constructed, the following information must be provided to the City: - How will the private storm drains be maintained, repaired, etc. - All roof and lot drainage must 6e drained to the curbline. - Provide invert elevations and lateral stationing for construction of private storm drain system. - Provide plan and profile views and elevations for any private storms drain system that may be proposed. 'l 8. Provide 0.2-foot drop through all manholes and curb inlets. 19. Roof drains and underdrains shall not be directly connected to public storm drain lines, and shall drain to the street at the curbline, whenever possible. Lots should be raised if necessary. Building foundation under drains (and these type of facilities only} may drain to private storm drain lines that ~~ Beal! Estates Phase 111 PWD Staff Report on Tentative Plat Apri130, 1397 Page 72 4. The City upon completion of initial construction plan review and preliminary approval, will forward the plans to BCVSA for completion of the review process with D~Q. Upon completion of the review by DE~a and BCVSA, completion of final revisions to the plans by the Developer`s engineer, and following the final approva! and signature on the construction plans by BCVSA, the Public Works Director wit! approve the plans in final form. 5. A!1 testing and video inspection of lines and manholes shaft be done in accordance with BCVSA requirements, at Developer`s expense. Thy Developer shall provide DSQ, BCVSA, and the City with test reports, TV reports and certification of the sewer system construction prior to final acceptance. 6. The SS System shalt be designed in accordance with any master planning prepared by Bear Creek Valley Sanitary Authority (BCVSA} and/or the City to provide adequate capacity far the proposed development area, any future development on adjacent properties, and any existing sanitary sewer collection systems that may need to connect-into the proposed development's SS System. if a master plan for the proposed development area is unavailable, then a master plan shall be prepared far the proposed development which accommodates the capacity needs far the proposed development as well as the capacity needs for the adjoining properties, and any additional flows as determined by BCVSA and the City PWD. 7. Any proposals requesting the City ar BCVSA to share in costs #or development of the sanitary sewer collection system to accommodate the upgrade of line sizing to handle the additional capacity requirements for surrounding development, shall include detailed engineering calculations and costs analyses. The Developer will be responsible to coordinate and develop any cost sharing agreements with any identified adjacent property ownersldevelopers. i~ Beall Estates Phase !ll PWD Sfaff Report on Tentative Plaf Aprr130, 1997 Page 14 5. Specifications for the design and construction of the water system shall be in accordance with City PWD Standards. 6. Lateral I connection stationing and size shall be provided on construction plans and as-built drawings. 7. Developer's engineer shall provide a reinforced flaw ("looped") water system with connections at Woodridge Drive, Gatepark Drive and the existing 12 inch City water line in Beall Lane. 8. Developer shall comply with Oregon Health Division (OHD} and City requirements for backflow prevention. An OHD approved backflow prevention assembly shall be installed immediately downstream of the water meter serving each dwelling unit. 9. Ganstructian drawings shall include the size, type, and location of all water mains, hydrants, air valves, service connection, and other appurtenance details in accordance with City PWD Standards and as required by the City PWD. 10. All connections to the water supply system must comply with OHD requirements. Water will not be "turned an" by the City until such requirements have been met to the satisfaction of the City's designated inspector (currently the Jackson County plumbing inspector). 11. Water system shall be tested in accordance with City PWD Standards and requirements at Developer's expense and must be approved by the City. ~~ Beall Estates Phase 111 PWD Staff Report an Tentative Plat Apri130, 1997 Page 16 6. Need to place street lights on plans, with table indicating stationing and offsets. 7. Provide City with a utility plan approved by each utility company which reflects all utifity crossings, transformer locations, valves, etc. 8. Utility locations must be accurately depicted on the as-built drawings, or as a separate set of drawings attached to the as-built drawings. Rights of Waysl~asements 1. A!l easements for improvements dedicated to the City shalt have a minimum 15 foot width and shall be located {whenever possible) contiguously along the exterior boundaries of properties and shall not split lot lines. Public utility easements shall have a minimum width of 10 feet. 2. The City will require a 50 foot ROW width on local streets and 60 foot ROW on collector streets. 3. Developer shall provide a Statement of Water Rights {on a City approved farm), for the affected property (Tax lot 3404}. For properties determined to Dave water rights, the developer will coordinate with the State Watermaster, the re-allocation of any waters attached to lands no longer irrigable as a result of the proposed development. 4. Developer shall comply with all existing easement owner requirements regarding any proposed development that may overlap any existing easement. Any development proposed which overlaps or alters an existing easement must be approved by the easement's owner in writing, and a copy of that written approval must be submitted to the City PWD prior to submission of construction plans for City PWD review and approval: 5. Al! existing easement locations and those proposed for this development ~~