Loading...
HomeMy WebLinkAboutResolution 387 - Rosewood Estates (Page) PUD PLANNING COMMISSION RESOLUTION NO. ~?~) , A RESOLUTION APPROVING A PRELIMINARY PLAN FOR A PLANNED UNIT DEVELOPMENT, INCLUDING VARIANCES {Applicant: Dallas Page) (37 2W 10 Tax Lot 5900) BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. Nature of Application„and Procedural Background. This matter came before the City on applicant's Planned Unit Development ("PUD" hereafter) application far a 29-unit single- family townhouse development called Rosewnnd Estates on 5.74 acres in an R-1 district and for variances to City Standards pertaining to cul-de-sac streets, types of dwellings, minimum lot areas, let widths, minimum setbacks, lot coverage, and special setback requirements. The project is located at 3436 Hanley Road. On May 20, 1997, the Central Paint Planning Commission held a duly-advertised public hearing wherein it considered the application, the City staff reports, and written comments and testimony from all interested persons in favor of and opposed to the application. The hearing was continued to June 3, 1997. Section 2. Criteria A licable to Decision. The following chapters of the Central Point Municipal Code apply to this application: A. Chapter 1.24, Public Hearings Procedures; B. Chapter 17.20, R-1, Residential Single-Family District; C. Chapter 17.60, General Regulations; D. Chapter 17.64, Off-Street Parking and Loading; E. Chapter 17.68, Planned Unit Developments (PUD}; and F. Chapter 17.80, Variances. Section 3. Findings,„an,d,„C,onclusions. The Planning Commission. hereby adepts by reference ali findings of fact set forth in the City staff reports, and concludes that, except where addressed in the conditions to approval, the application and proposal comply with the requirements of the following chapters of the Central Point Municipal Code: A. Chapter 17.20, relating R-1 zoning district; B. Chapter 17.60, relating requirements; C. Chapter 17.64, relating loading facilities; and to allowed uses in the to paving and landscaping to off-street parking and 1 -~ PLANNTNG COMMISSION RESOLUTION NO. ~~~~ (060597) D. Chapter 27.68, relating to Planned Unit Developments. E. Chapter 17.80, relating to variances. Section 4. Conditional A~~roval. The within application for a Preliminary Development Plan for a Planned unit Development is hereby conditionally approved, subject to the conditions set forth on Exhibit T°A", which is attached hereto and by this reference incorporated herein. Section 5. Variances Granfed. The requested variances are hereby granted, subject to the conditions of approval for the Preliminary Development Plan for the PUD. Passed by the Planning Commission and signed by me in authen ication of its passage this /` ~"' day of ` ~_~ , 1997. Planning Commission Chairman ATTEST: ~~~!~i-~C ~i City Representative Approved by me this ~°~`~~ day of ~r~r~-~-- 1997. ~.Q,~ ~ Planning Commission Chairman 2 _ PLANNING COMMISSION RRSOLUTION NO. ~-'~~- (060597) %~:~~-IIB~~.' . f~.~,~~< '"fir C[TY OF CENTRAL POINT ~EPAfi'TfVIEfVT 4F PUBLIC WORKS REVlSFl7 STAFF REPORT fior ROSEWOOD ESTA7-FS SUBDIVISION PW#I97014 -. .... City a~:CeitTT~'~a3:'~.aiz~~t}}t: i~ax~nuig Depen.t Date: 05f 14197 Applicant: Parthenon Construction cfo Dallas Page, 900 Windemar, Ashland, OR 97520 Project: Subdivision, 2 Phases Locatian: Hanley Rd. near W. Pine St. Legal: 1"375, R2W, Section 10CA, Tax lolls} 5900 Zoning: R-1-8 i,.ots: 29 (two phases} Units: 29 Pad-lots--Residential ' Plans: Rasewoad Estates Tentative Plan, 02f'i 8f97, Eagle EyE Surveying Report gy: Rabert W. Pierce, Public Works Technician Lee Brennan, Public Works Director Purpose Provide information to the Planning Commission and Applicant thereinafter refierred to as "Developer"} regarding Pubic Works standards and proposed new standards to be included in the design. Gather information from the Developer/Eng[neer regarding proposed development. Special Requirements 7. Developer shall prepare and submit, for City Public Works Department (PWD} review and approval, a suitable landscape plan for the proposed development. The plan shalt be prepared and implemented by and at the expense ofi the Developer. At a minimum, the landscape plan shall include provisions fior landscaping the "retention areas and berms"; provide for a landscape buffer within the public right-ofi-way along Hanley Road; and provide details for the connectiontseparation of the development to the existing City park located adjacent to- the northern portion of the proposed development. ~~~ 0~7 f7osewood Esfates Revised PWD Staff Report on Tentative Plat May 14, i337 Page 2 2. A suitable erosion control plan must be prepared and submitted to the Oregon Department of f=nvironmental Quality {DEQ) for the construction of any improvements associated with this development. The construction plans associated with this development wi![ not be approved by the City PWD anti[ the City PWD receives a copy of the written approval of the erosion cantrol plan by the DPQ. General 1. Developer shall submit to the City"s Public Works Department {City's PWD) for review and approval, plans and specifications for all improvements proposed for construction or modifications within the City ar public rights-af~ ways and easements. 2. Public improvements, where applicable, include, but are not limited to, streets {including sidewalks, curbs and gutters); storm drainage and sanitary sewer collection and conveyance systems; water distribution system (up to the service meter and including fire protection); street lighting; and traffic control devices, street signs and delineation. 3. All construction of public improvements within the City shall conform to the City"s Public Works Standard Specifications and Details (City PWD Standards} and other special specifications, details, standards, andlar upgrades as may be approved by the City's Public Works Director. 4. During construction, changes proposed by the Developer shall be submitted in writing by the Developer`s engineer to the City PWD for approval prior to installation. ~. No construction shalt commence anti[ the City PWD has reviewed and approved a professionally prepared set of engineered construction plans and specifications (stamped by an Oregon registered professional engineer}, and the City PWD has issued a Public Works permit for the proposed improvements. ..~~ 08 Rase wood Estates Revised PWD Staff Report on Tentative Plat May 1~, 1397 Page 3 6. The Developer shall pay for all costs associated with the design, specification, and insfiallation of the improvements specified on the approved plans. 7. Developer shall provide copies of any permits, variances, approvals, and conditions as may be required by other agencies, including, but not limited to Oregon Department of Fish and Wildlife {DFW}, Oregon Department of Environmental Quality {DEQ}, Oregon Division of State Lands {DSL}, U.S. Army Corps of Engineers {ACOI }, affected irrigation districts, and Jackson County Road and Park Services Department {JC Roads}, 8. Prior to approval and acceptance of the project, the Developer`s engineer or surveyor shall provide the Public Works Department with a digital drawing of the construction "as-buitts" in an AutoCAD compatible format. As-built drawings are to be provided to the City which provide "red-line" changes to final approved construction plans which identify the locations and or elevations {as appropriate} of actual installed items, including, but not limited to, invert, inlet, and rim elevations; spot elevations identified on drawings; road alignment; water Lines, valves, and fire hydrants; water and sewer lateral stationing; modifications to street section; manhole and curb inlet locations; street light locations; other below grade utility tine locations and depths; etc. Provide a "red-tine" hard copy. (on Mylar} of construction drawings, and an acceptable AutoCAD compatible drawing electronic file to the City at completion of construction. 9. The Developer's engineer or surveyor shall provide to the City`s PWD a drawing of the recorded Final Plat map reproduced on Mylar and in an acceptable electronic form in AutoCAD format. The Final Plat shat! be tied to a legal Government corner and the State Plane Coordinate System. 10. , All elevations used on the construction plans, on temporary benchmarks, and on the permanent benchmark shall be tied into an established benchmark acknowledged and approved by the City's PWD. Ali elevations used on the construction plans shall reflect true elevations based an the said City PWD approved benchmark and vertical datum. An equation station will not be -- Rosewood Estates FZevised PWU Staff Repor7 on Tentative Plat May 74, 7397 Page G acceptable. At least one permanent Benchmark shall be provided for tine proposed development, the location of which shah be mutually determined by the City`s PWD and the developer`s surveyor. Alf adjustments to alignmenfi or gradient shall be noted on the "red-line as-built" drawings. The nearest City PWD approved Benchmark is a brass disk an the North curb of County Bridge #1 16 on W. Pine Street. Elevation 1274.83 1 1. All fill materials placed in the development shall be "engineered fill", and compacted to Gity standards. All existing concrete, pipe, building materials, structures, clear and grub materials, and other deleterious materials shall be removed from the site and either recycled or properly disposed of in accordance with the requirements of the DEQ. 12. identify easement dedications and widths on the Final Plat and Construction Drawings. 13. Easements far City infrastructure {i.e. sanitary sewer, water, and storm drain} must be a minimum of 15-feet wide, and should not split let lines. Easements far pubNc storm drainage, sanitary sewer, and water lines should be dedicated to the City and not just a public utilities easement {PUE}. Centerline of buried infrastructure shall be aligned a minimum of five {5} feet from the edge of the easement. PUEs must be have a minimum 14-foot width. Easement dedications in final deeds ar in CC&Rs need statement which clearly states that easements must be maintained for suitable, driveable access, as determined and appraved by the City PWd, 14. Al( design, construction plans and specifications, and as-built drawings must be~ prepared to acceptable professional standards. 15. A!! street and water improvement plans must be appraved in writing by hire District 3 prior to review by the City`s PWD. 1 b. It appears that the proposed development places improvements and structures within the 1 d0-year floodzone. The developers engineer must state and certify what affect does the placement of these improvements and y _ ~a ~..i ., .r ~ ~ . l~'r r ., . ~:~.. ~.l'k~ , Rosewood Estates Revised PWD Staff Report on tentative Plar May ]4, 1397 Page 5 structures have on the ffoodplain elevation and floodzone boundary, and what affects will the modification of the ffoodplain elevation and floodzone boundary have on the existing facilities and properties surrounding the proposed development. The Developer's engineer shall determine the existing Base Flood Elevation contours and illustrate the existing boundaries of the Floodpfain and Floodway fora 100 year storm event along Jackson Creek on the construction plans submitted for the development for City's PWD review and approval. The drawings shaft also indicate the revised Base Flood Elevation contours and boundaries of the Floodpfain and Floodway expected to occur following the completion of any development within the identified floodzone (also referred to as the "Area of Special Flood Hazard"}. 17. All work shall be performed in accordance with the requirements of the City's Municipal Code; in particular, the recently revised chapter pertaining to Flood Damage Prevention and Hazard Mitigation (Chapter 8.24}. 1$. Street fights and fire hydrants sllali not be placed within PUEs. 19. Prior to the City PWD final approval of the construction plans for the proposed improvements, the following must be submitted: ^ A copy of written approval from Fire District 3 of the final street and water system improvement plans for the proposed development. ^ The plans relating to the sanitary sewers must be approved in writing by SCVSA, and the appropriate signature blocks must be completed on fine plans. . ^ Copies of written approvals and/or permits from the various agencies involved: DSI,, DEW, DFQ, andfor ACOE. 20. f=ield verify a!i existing infrastructure elevations and locations (i.e. pipe . inverts, curb elevations, street elevations, etc.}, to which the proposed subdivision will connect into existing improvements, prior to final construction plan design. ~~~ ~~ Rosewood Pstates Revised PWf~ Staff Report on Tentative Piaf May 14, 7337 Page 6 21. The Developer`s engineer shall provide suitable engineering certification and justification (i.e. calcu[atians, analyses, plats, etc.,l that all connections to existing infrastructure ~i.e. street; water, sanitary sewer, storm drain systems; natural drainage systems; etc.,) will not interfere with the effective level of service or operation of the infrastructure facilities, and that the existing infrastructure facilities have adequate capacities to accommodate the flows andfor demands imposed an the existing infrastructure as the result of the connection of the proposed development's infrastructure. Streets/Traffic l=xisting Improvements - Hanley Road -Major Arteria{. RAW 80' wide, pavement 25' wide. Jurisdiction -Jackson County. - Brandon Street -Local Street. R4W 50' wide pavement 30' wide. Jurisdiction -City of Central Paint. 1. Construction drawings for this Tentative Plat shall include a Street Lighting Plan in accordance with the requirements of the City's PWD. The construction drawings shall include clear vision areas designed to meet the City's PWD requirements. A minimum 25-foot unobstructed sight triangle area shalt be required at the uncontrolled intersection with Brandon Street, and a minimum 55-foot unobstructed sight triangle shall be required at intersection with Hanley Road. 2. All improvements for connection to Brandon Street and Manley Road, and any improvements to Hanley Road, including, but not limited to, street section, curbs, gutters, landscape buffer, sidewalks, and traffic control and delineation, shalt be coordinated and approved by the JC Roads and the City's PWD. 3. Stop signs shall be required at tE~e intersections with Brandon Street and l~an(ey Road. ~~~ ~~ Rosesvoad estates Revised PWD Staff Report an Tentative Plat May 14, 1397 Page 7 4. The Developer`s engineer shat( evaluate the strength of the native soils and determine the street section designs to handle the expected loads (including fire equipment} to be traveled on these private roads. 5. All roadways should be designated as private roads and not public rights-of- way, unless otherwise approved by the City's Director of Public Works. 6. Recommended minimum Curb to Curb width of private streets is 24 feet. 7. Enter into a suitable deferred improvement agreement for the development/improvement of the street section and appurtenances (i.e. sidewalks, street lights, etc.} for Hanley Road, along the development`s frontage with Hanley Road, as required by JC Roads, and City DPW. Storm Drainage Existing Improvements _ Open ditch along Hanley - Jackson Creek through center of proposed. 1. Developer's engineer shall develop a site master plan far the storm drain collection, retention, and conveyance system (SD System) which provides for storm water run-off from and run-on onto the proposed development {either surface run-on or culvert or creek/ditch conveyance); any future development on adjacent properties; conveyed storm drainage; and surface water flow {i.e. Jackson Creek). 2. Developer's engineer shall determine haw SD system will work during 'l 0- year and '100 year flood events associated with Jac{cson Creek. What is HGl- in Jackson Creek during 10- and 100-year event, and what affect will it have on the proposed outlets and storm drain system. System must be designed to adequately drain 10-year storm without surcharging or must be provided with adequate storage to prevent surcharging; and be designed to prevent backflow of storm water from Jackson Creek up into SD system during the ~ 00 year base flood event. ~~~ ~~ Rosewood Estates Revised POND Staff Report on reniatrve Plat May 14, 7997 Page 8 3. During the design of the SD System, the Developer`s engineer shall consider the effect of the proposed improvements and structures with regards to the base flood floodway and floodplain for Jackson Creek and the drainage ditch on the west side of the proposed development. The allowable flow rates into Jackson Creek or into the ditch along Hanley Road from the proposed development shall not be greater than the run-off flow rates experienced from the property in its current status. The Developer`s engineer must provide suitable hydrological calculations and storm hydrographs to depict the existing condition and the finished condition of the proposed development. The Developer`s engineer and the City PWD shalt agree on fibs applicable run-off coefficients, curve numbers, retardance etc., used in the Developer engineer's calculations. Provide analysis of the drainage ditch along Hanley Road as wel! as Jackson Creek. 4. Plans which propose to include discharge to Jackson Greek or the existing drainage ditch and any construction thereof, shall be in compliance with DSL, ACOE;, ODFIN, D1=Q, JC Roads, and/or City PWD (as applicable} guidelines and requirements. Any modifications to the drainage ditch and Jackson Creek shat! be done in accordance with any requirements and applicable conditions of the DSL, ACOI=, ODPW, DE=Q, JC Roads, andlor City PWD {as applicable). 5. The discharge point and potential retention of storm water run-off shall be coordinated with aspects of the proposed development to provide an aesthetically pleasing, useful, and low maintenance facility. The storm water retention facilities shall be suitably landscaped and designed to mitigate erosion, and sediment and hydrocarbon deposition into Jackson Creek, and to mitigate the "attractive nuisance" hazards associated with these facilities. fi. Prior to construction plan approval of the improvements for this Tentative Plat, the Developer's engineer shall provide the City PWD with a complete set of hydrologic and hydraulic calculations andprofile plots for sizing the SD system. The engineer shat[ use the rainfall/intensity curve obtained from the City PWD for hydrologic calculations, and the negotiated run-off parameters. v .; ~ ~, Rosewood Estates Revised PWD Staff Report on Tentative Plat May 14, 1997 Page 3 7. The SD system shall be designed to carry runoff from a 10 year storm event if Q < 100cfs. Use runoff for 50 year storm if Q> 100 or c 200 cfs. Use 100 storm runoff if Q is > 200 cfs. 8. Minimum storm drain diameter for improvements within the City's jurisdiction shall be 15 inches. Materials shall be PVC {ASTM D 3034 with gaskets), HDPL {meeting ~ODOT requirements for corrugated polyethylene storm sewer pipe, inc{uding a provision for premium water-tight coupling bandsl, ar approved equal. Provide concrete encasement where required to prevent pipe deformation in areas of minimum cover. 9. Developer`s engineer shall provide hydrology and hydraulic calculations and flow line plots for private and public storm drains. Plat HGE. on profile or provide a separate profile drawing that indicates the HGL. on the profile. Pipes must maintain cleaning velocity and have adequate capacities without surcharging. 10. due to the high level of groundwater in the area, the Developer may wish to incorporate the use of a perforated SD system. If so, then the perforated storm drain system shall be designed to have adequate capacities to: d Convey the collected groundwater and storm water with the minimum cleaning velocities and without surcharging the collection and conveyance piping; and ~ Minimize silts, sands, gravels, and fines migration from the native soils into the SD system. The plotted HG[_ shall include both the groundwater infiltration, and the storm water run-off and run-on inflows into the SD system. 11. Construction of private storm drains is discouraged by the City. However, if a privatQ storm drain i`s to be Eonstructed, the following information must be provided to the City: - How will the private storm drains be maintained, repaired, etc. - All roof and lot drainage must be drained to the curbline. a 1 •) Rosewood ~srates Revised PWD Staff Report on Tenrarive f}!ar May 14, 1997 Page 10 - Provide invert elevations and lateral stationing for construction of private storm drain system. - Provide plan and profile views and elevations for any private storms drain system that may be proposed. 12. Deed restriction or GC&Rs shall include a covenant or restriction that prohibits the introduction of substances other than storm water, irrigation water, ar fresh water into any private or public storm drain system ~ 3. Roof drains and underdrains shall not be directly connected to public storm drain lines, and shall drain to the street at the curbline, whenever possible. E.ots should be raised if necessary. Building foundation under drains land these type of facilities only} may drain to private storm drain lines that discharge onto the streets, or into a storm drain curb inlet or manhole only; must be approved before construction by the City PWD; and must be identified and accurately portrayed on as-built drawings. 14. Curb and gutter sections shall not exceed 354 feet before entering a catch basin or curb inlet, within the City`s jurisdiction. 15. Storm water run-off from the proposed development into the public SD system associated with Brandon Street shall be minimized and be as approved by the City PWD. Sanitary Sewer Existing Facilities - 8-inch diameter sanitary sewer along east side of Brandon Street. - 8-inch-diameter sanitary sewer along the west side of Hanley Road. ~ . Af! sanitary sewer collection and conveyance system (SS Systems design, construction and testing shall conform to the standards and guidelines of the Oregon Df=Q, 1990 APWA Standards, Oregon Chapter, Bear Creek Valley .~ r - .~.. v ~, x~ ~1~3~T .,.~fi Rosewood Estates Revised PWD Staff Report on Tentative Plat May 14', T997 Page 1 T Sanitary Authority (BCVSA}, and the City PWD Standards, where applicable. 2. The Developer`s engineer shall provide hydrology and hydraulic calculations and flow line plats for existing and proposed sanitary sewers to both BCVSA and the City. Calculations and flaw Tine plots should include allowances far existing flows and projected future or existing development that will be connected to the system. Plot HGL. on profile or provide a separate profile drawing that indicates the HGL on the profile. All pipes must maintain cleaning velocity and have adequate capacities without surcharging. 3. The construction plans and the as-built drawings shat[ identify lateral stationing far construction of sewer Laterals. 4. The City upon completion of initial construction plan review and preliminary approval, will forward the plans to BCVSA for completion of the review process with DEQ. Upon completion of the review by DEQ and BCVSA, completion of fins[ revisions to the plans by the Developer`s engineer, and following the final approval and signature on the construction plans by BCVSA, the Public Works Director will approve the plans in final form. 5. A[I testing and video inspection of lines and manholes shall be done in accordance with BCVSA requirements, at Developer`s expense. The Developer shall provide DEQ, BCVSA, and the City with test reports, TV reports and certi#ication of the sewer system construction prior to final acceptance. 6. The SS System shalt be designed in accordance with any master planning prepared by Bear Creek Valley Sanitary Authority (BCVSA} and/or the City to provide adequate capacity far the proposed development area, any future development on adjacent properties, and any existing sanitary sewer collection systems that may need to connect-into the proposed development's SS System. 7. Any proposals requesting the City or BCVSA to share in costs for development of the sanitary sewer collection system to accommodate the ~/ Y ~ ~ f 1 a . L"'..,~ ~. Rosewood Estates Revised PWD Staff Report on ~"entative Plat May 74, 1337 Page 12 upgrade of line sizing to handle the additional capacity requirements for surrounding develapment, shall include detailed engineering calculations and costs analyses. The Devebper will be responsible to coordinate and develop any cost sharing agreements with any identified adjacent property ownersldevelopers. Water System Existing Improvements - An 8-inch-diameter water fine along west side of Brandon Street. A 12-inch-diameter identified far installation on Hanley Road. 1. A water distribution system shall be designed in accordance with the 1979 Water System Master Plan which accommodates the proposed development, any future development on adjacent property, and any areas deemed by tl•re City that will need to connect-info the proposed development's water distribution system. The designed water distribution system shall include the installation of the 12-inch-diameter water distribution line and appurtenances from a point Located near the intersection of Brandon Street and West Pine Street, to a paint on Hanley Road near the northeast corner of the develapment. 2. Any proposals requesting the City to share in casts far development of the water distribution system to accommodate the upgrade of line sizing to handle the additional capacity requirements for surrounding development 4i.e., from 8-inch-diameter to 12-inch diameter, snail include detailed engineering calculations and costs analyses. The Developer will be responsible to coordinate and develop any cost sharing agreements with any identified adjacent or neighboring property ownersldevelopers 3. Developer's engineer shall design the water system to provide a minimum flow of 1,000 gpm and conform to f=ire District 3 requirements. Maximum spacing of fire hydrants shall be 340 feet. Construction plans shall be reviewed and approved by l=ire District 3. ~~~ ~~ h'osewood Estates f~evised P4VD Staff Report on Tentative Plat May 14, 1997 Page 13 4. Specifications for the design and construction of the water system shat( be in accordance with City PWD standards and requirements. 5. Lateral /connection stationing and size shat( be provided on construction plans and as-built drawings. 6. Developer's engineer shall provide a reinforced flow ("looped"} water system with connections to the water distribution facilities at Hanley Road and Brandon Street. 7'. Qeveioper shall comply with Oregon Health Division {OHD) and City requirements for backflow prevention. An OHD approved backflow prevention assembly shat! be installed immediately downstream of the water meter serving each dwelling unit. 8. Construction drawings shalt include the size, type, and location of all water mains, hydrants air valves, service connection, and other.appurtenance details in accordance with.City PWD Standards and as required by the City PWD. - 9. A[[ connections to the water supply system .must comply with OHD requirements. Water will not be "turned on" by the City unt'rt such requirements have"been'met to the satisfaction of the City's designated inspector (currently the Jackson County plumbing inspectarj..., 10. Water system shag be tested in accordance with City PWD Standards and requirements at Developer's expense and must be approved by the City. Site work, Grading and Utility Plans -;,:. Existing Improvements - Jackson Creek flows North through the center of ., .` the property . - Existing house and garage on property ,~-., ~ ~, r~.~~~?.~r3x'~' Rosewood Estates Revised PWO Siaff Repar7 on Tentative Plat May 14, 1397 Page 14 Existing barn on property T . Developer shall provide a gradinglpaving plan{s) with the construction drawing submittal to the City PWD. Plan(s) shall illustrate the location and elevations of the existing and post-development base flood event flood zone and flaodway of streams in proximity to the development {if applicable}; curb elevations; finish grades; and building pad and lowest floor elevations. 2. All structures shall have roof drains, area drains, andlor crawl spaces with positive drainage away from the building. Drain lines shall be connected to the curb and gutter and discharge from the curb face. 3. Developer shall provide the necessary "rough" lot grading to assure that alf cats will drain properly to the curb and gutter, ar to a drainage system that drains to the curb and gutter. 4. Provide the City with copies of any required permits and approvals (including any mitigating requirementsor conditions} from DSf., DEQ, and AC4E (including any mitigating requirements), for any required wetland or flood hazard mitigation work to be performed as part of the proposed development. 5. Grading plans must have originailexisting grades and final grades plotted an the plan. Typically, existing grade contour lines are dashed and screened back, and final grade contour lines are overlaid on top of the existing grades and are in a heavier line width and solid. Contour lines must be labeled with elevations. . 5. Provide for landscaped sound buffer (with or without sidewalks} along Hanley Road. Coordinate design with JC Roads and City PWD. 7. Need to place street tights on plans, with table indicating stationing and offsets for locations. Since the proposed streets are private streets, and not City streets, the costs for installation, operation, and maintenance of the ~:~ ~.. `~ f•7asewood Estates f?evised PWD Staff Report on 7-enratrve !'lot May 14, 1397 Page 15 street lights shall not be borne by the City. 8. Provide City with a utility plan approved by each utility company_ which reflects all utility crossings, transformer locations, valves, etc. 9. Utility locations must be accurately included on the as-built drawings, or as a separate set of drawings attached to the as-Built drawings. Rights of Ways/<=asements 1. Ail easements for improvements dedicated to the City shall have a minimum 15 foot width and shall be IocatEd (whenever possible} contiguously along the exterior boundaries of properties and shall not split lot lines. Public utility easements shall have a minimum width of 10 feet. 2. Hanley Road is currently designated in the City's comprehensive plan as a major arterial. The comprehensive plan states that the right-of-way widths needed for a mayor arteria! are 160-110 feet. In review of the current right- of-ways widths and the right-of-way widths that are reasonably available on the connecting major arterial (West Pine Street}, the City's PWD has determined that an 80-foot wide right-of way is required for this portion of Hanley Road. Since the existing right-of-way width far Hanley Road is 60- feet, the City will require an additional 10-foot dedication for right-of-way along the western boundary of the applicant's property< 3. Developer shad comply with a(( existing easement owner requirements regarding any proposed development that may overlap any existing easement. Any development proposed which overlaps or alters an existing easement must be approved by the easement's owner in writing, and a copy of that written approva! must be submitted to the City's F'WD prior to submission of construction plans for City's PWD review and approval. 4. Private easements shall be located contiguously along the exterior boundaries of single properties. v .. ~.~j Rosewood Estates Revised F'WO Staff Report do tentative Plat May 14, 1997 Faye 18 5. if applicable, the Developer shall provide a Statement of Water Rights (on a City approved form), for the affected property. For properties determined to have water rights, the developer will coordinate with the State 1Natermaster, the re-allocation of any waters attached to lands no longer irrigable as a result of the proposed development. 6. Developer shall comply with all existing easement owner requirements regarding any proposed development that may overlap any existing easement. Any development proposed which overlaps or alters an existing easement must be approved by the easement`s owner in writing, and a copy of that written approval must be submitted to the City FWD prior to- submission of construction plans for City PWD review and approval. 7. All existing easement locations and those proposed for this development shat{ be shown on the final plat with reference to the recordation number and Grantee, L/ V 4 EXHIBIT D RECOMMENDED PLANNING DEPARTMENT CONDITIONS Oh' APPROVAL I . The applicant shall submit an open space management plan to the Planning Department indicating the marraer and schedule by which open space areas witl~in the subdivision will be developed. This shall include any proposed landscaping, irrigation, architectural~'eatures and play equipment. All landscaping shall be continuously maintained in a healthy, growing condition and shall be served by an automatic irrigation system. 2. The applicant shall include within the covenants, conditions, and restrictions (CC&Rs) for the subdivision provisions governing the use, maintenance and improvement of common open space areas and authorizing the city to enforce these provisions. A copy of the recorded CC&Rs shall be submitted to the Planning Department. 3. The applicant shall submit a fencing plan to the Planning Department specifying the type and location of all fencing for the subdivision. 4. Boats, trailers, campers and similar recreational vehicles may only be stored in the area specifically designated on the site plan for such storage. 5. A homeowners' association shall be established for the proposed subdivision far the purpose of permanently maintaining all of the subject property, including common open space areas, individual residences and accessory structures. A copy of the recorded bylaws of the homeowners' association shall be submitted to the Planning Department. G. The applicant shall comply with all requirements of the Division of State Lands for the project as indicated by its response to the Wetland Land Use Notification Form. 7. The approval of the preliminary development plan far the planned unit development is contingent upon approval of the associated zone change by the City Council. If the City Counci! denies the zone change, the approval of the preliminary development plan far the planned unit development shall become void. S. The approval of the preliminary development plan shall become void six months following the date of such approval unless an application for a final development plan has been submitted to the city containing in final form the information required in the preliminary plan. 9. The development of each residential lot within the planned unit development shall be limited to single-family attached dwellings with allowed accessary uses. I0, The PUD shall be developed in accordance with the preliminary development plan as approved by the Planning Commission. Modifications to the preliminary development shall be subject to further review and approval by the Planning Commission. c ~ ~~ l~t~~C3i'~lf'~" ~~ Ilii.~" rune 5, 199"7 '~: ~i~y of C~b~;ral Point. 15~ ~. Sec;;,~~ fit. C~n~r~l I?c~il~, C7~2 9'7 aC12 _ Ro~ev~ood P~tat~s ~2~~C1~t3~.E~: R.esolu~ion Approving .~ Preliminary Plan for a PUI~r Including Variance I~ssA~.t~~.~>~~: Attach Exhibit --~-- .~ Condi~,ion~ o~ Approval ~° S-i.r~cerel . ~ougla~ t•~. Engle ME.Id Enc