Loading...
HomeMy WebLinkAboutResolution 394 - Country Meadows, Ph II - Tent Plan PLANNING COMMISSION RESOLUTION NO. ~~{~_ A RESOLUTION GRANTING APPROVAL OF A TENTATIVE PLAN FOR COUNTRY MEADOWS SUBDIVISION, PHASE II {Applicant: Wayne Christian) {37 2W IOBB Tax Lots 800 and 1900} BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. Nature of A lication. This is an application for approval of a tentative plan for a 33-lot subdivision in an R-1-10 district of Central Point, Oregon. The Planning Commission reviewed the application and tentative plan at a duly- noticed public hearing on August S, 1997. Section 2. Approval Criteria. The criteria for approval of this subdivision application are found in CPMC Title 16, relating to tentative plans and subdivisions, and in Title 17, relating to zoning and lot sizes. Section 3. Findin s and Conclusions. The Planning Commission finds and deter?~ines as follows: A. Tentative Plan Re uirements. The application and tentative plan herein are in the correct form and contain all of the information required for the same under CPMC Chapter 16.10. B. Area and Width of Lots. The subdivision lots all meet the R-1-10 district lot size requirements of 10,000 square feet for interior lots and 10,000 square feet for corner lots. The minimum width requirements are also met, with interior lots at least 60 feet wide and corner lots at least 70 feet wide. C. Blocks and Streets. The tentative plan proposal for the layout and dimensions of streets and blocks is in compliance with the requirements of CPMC Chapter 16.20 regarding streets and CPMC Chapter 16.24 regarding blocks. Section 4. Conditional A raval. The application for tentative plan approval. for the within subdivision is hereby approved, subject to the conditions listed on Exhibit "A" hereto, imposed under authority of CPMC 16.10.090. Passed by the Planning Commission and signed by me 'n authentication of its passage this ~n r~, day of ~ ' , 1997. Planning Commission Chairman 1 - PLANNING COMMISSION RESOLUTION NO. ~C.~ (082197) ATTEST://'~~ City Representative ....... `~- Approved by me this ~;~.~ day of I 1997. Planning Commission Chairman 2 - PLANNING COMMISSION RESOLUTION NO.~ (082197} City of Central Point E~-II~I'~ ~t ~ ~~ Planning Department PLANNING DEI'.ARTMENT RECOMMENDED CONDITIONS 1. Prior to final plat approval, the applicant shall submit to the City a copy of the proposed covenants, conditions and restrictions (GCBs) for the Country Meadows Subdivision, Phase III. 2. The applicant shall comply with all requirements of Jackson County Roads Depafiment and all other affected agencies as they pertain to the development othee Country Meadows Subdivision, Phase III. Evidence of such compliance shall be submitted to the City prior to final plat approval. ~. v..., F1~ CITY OF CENTRAL PO[NT DEPARTMENT OF PUBLIC WORKS STAFF REPORT for COUNTRY MEADOWS ESTATES PHASES 1, 2, 3 PW#97o2s Date: 07/09/97 Applicant: Wayne Christian 282•[ Bullock Road, Medford, OR 97504 {541 } 773-5171 Project: Subdivision Location: Hanley Road and Grant Raad Legal: T37S, R2W, Section 9 0C, Tax Lots 4800, 4801, 4803, 4804 - 9088, Tax Lots 700 90BC, Tax Lots 2000, 2900 Zoning: R-9-8 {phase 7}and R-'[-90 (phases 2 and 3} Lo#s: 86 tots[ (phase 9: 38 lots, phase 2 33 lots; and phase 3: '[ 5 tots} Units: 86 Residertiat (2 existing and 84 new} ", Plans: Country Meadows Estates, '[, 2, 3 - 6192197, revised 6!27!97 and 7107!97} Report By: Pau[ W. Worth, Public Works Techniaan Lee Brennan, Public Works Director Purpose Provide information #o the Planning Commission and Applicant (hereinafter referred to as `Developer"} regarding Public 1Norics standards and proposed new standards to be - included in the design. Gather information from the Deve[operlEngineercegarding proposed development. Special Requirements 't . Fxlsffncr lnfrastrrrcture:.The Developer's engineer shall provide suttab[e - .engineering eorfification and justification (i.e. calculations, analyses, plots, etc.,) " that all connei~ions to existing infrastnucture~'r.e. street water, sanitary-sewer, storm drain systems; natural drainage systems; eta, wilt not interfere with or provide for the degradation of the existing effective level of service or operation of the infrastructure faal'rt[es, and that the existing infrastructure faa['rties have erther adequate capaaties to ac~ammodate the flows andlor demands Imposed on the existing infrastructure as the result of the connection of the proposed • deve[opmenf s infras#ructure, or wit[ be improved by and at the expense of fhe Developer to accommodate the additional flows andlor demands; while" maintaining or improving the existing level of service of the affected faa[ity. w 2, ~Nfaste a s Developers engineer, at the developer's expense, dial[ develop suitable and City approved master plans for the storm drain collection, detention, ., ., 2 3 CourrtryMeadowsCslafes. Please I,.Z,3, P1i'D S1a,Q"Repor! July 09, ! 997 Page 7 and conveyance system, the sanitary sewer collection and conveyance system, and the water distribution system. The master plans should take into account the flows or demands of the proposed development,. any future development on neighboring properties, and any areas deemed by the City that will need to connect-info the proposed development's infrastructure. The prepared master plans should take into account any previous master plans that have been prepared and approved by the City. 3. Wafer Disfribufion S,ysfPm: The Developers of Country Meadows Estates, Quail Meadows, and Rosewood Estates Subdivisions steal! jointly design and construct, at their expense, a 12-inch-diameter waterline in Hanley RoadlPine Street from a point just west of Brandon Street near Jackson Creek, aligned along Hanley Road, and thence West through the proposed Country Meadows Estates Phase 1 Subdivision, and thence down along Grant Road to the connection with the existing 12-inch diameter terminus on the 16-inch-diameter line at the intersection of Beall Lane and Grant Road. The existing terminus of the 12-inch diameter line on Pine Streef/Hanley Road does not have enough capacity or sustained pressure to be able fo meet the fre flow requirements of these subdivisions, once they are completed. This will loop" the system in with the other main supply point= and allow for better pressure and capacity distribution once the line is completed as detailed above. The developers may present a phased approach to this 'loop" connection (developed in conjunction with the phases of the development of this area). The Developers of Country Meadows Estates and Quail Meadows Subdivisions shall jointly design and construct, at their expense, a 12-inch--diameter waterline from the Terminus on Grant Road near the proposed connection of Mendolia Way with Grant Road, along the eastern side of Grant Road to a point on Grant Road at the Northwest comer of Lat No. 1 of the proposed Quail Meadows Subdivision. The remainder of the water system in the proposed subdivisions-shall be of reinforced loop design (including a connection to the G-inch diameter line in Donna Way or other approved interconnection), where feasible, and shall generally conform to the Wafer System Plan, October 1979 and modificationsladditions to the master plan being considered by the City's PWO. 4. Flood Hazard Mifiaafion tNork Associated wit or ~~ek; The Developer shalt work with the City's (?WD staff and other regulatory agencies to develop • and implement a (food hazard mitigation plan for properties adjoining Hom ' • Creek as a part of this and abutting existing, proposed, and potential future developments. An acceptable setback requirement from the floodway of~Hom Creek should be placed in the property deed for these lots= unless a new ordinance covering setback(s) from the floodway is in effect at the time of the approve! of the final plat for this project. The Developer shall also work with the ., ., 2 4 Counlry~4feadowsEstate~ Phase 1,1,3, PWD Staf) Report July U9, 1997 Page 3 City's PWD in improving the flow capacity of Hom Creek to mitigate any current or future flood hazards associated with the floodway of Harn Creek. 5. Right-o~~Wa,Ks: Provide dedication far e~ansion of the right-~of way along Grant and Hanley Roads to 80 feet in width (40-feet each side of centerlinej. Provide suitable and acceptable easements far any public works infrastructure located outside the public right-of-way. 4. ~.andscape Buffers: Provide far City PWD and JC Roads approved, '[ 0 foot minimum width, landscaped buffers (including irrigated landscaping, sound wallslfences, and meadering sidewalks) along the applicable portions of Grant and Hanley Roads. 5. ]'raffic Study Developer shall, at the developer's expense, prepare an applicable and approved Traffic Impact Study. The developer shalt.implement and construct, as applicable, any associated infrastructure as recommended in the Traffic Impact Study or as determined by JC Roads and the City PWD. 6. ~r~~n CQptrol Plan: A suitable erosion control plan must be prepared and submitted to the Oregon Department of Environmental Quality (DEQ) for the construction of any improvements associated with Phis development The construction plans assoaated with this development will no# be approved by the City PWD until the City PWD receives a copy of the written approval of the erosion control plan by the DEQ. Genera! '[. Developer shall submit to the City's Public WorksDepartment {City's PWD} for review and approval, plans and speaf~cafions far all improvements proposed for construction or modifcations within the City or public rights-of-ways and easements. 2. Publicimprovements include, but are not limited.to, streets (including sidewalks= curbs and gutters and landscape buffers}; storm drainage snd sanitary sewer collection and conveyance systems; waterdistr~butian system (up~t4 the service meter and including fire protection); street lighting; and traffic control devices, .street signs and delineation. 3. All construction of public improvements shall conform ~to the City's Public Works . Standard Specifications and Details (City PWD Standards} and ot~er:.special .~ ., ., 2 5 t Cour+dyMeadows~slales; Pfrase 1,1,3, PWD 5[a,~'Repor•l July 09, .1997 Page 4 specifications, defails, standards, andlor upgrades as may be approved by the City~s Public Works Director. ~. During construction, changes proposed by the Developer shall be submitted in writing by the Developer's engineer to the City PWD for approval prior to installation. a. No construction shaft commence until the City PWD has reviewed, approved, and issued a Public Works permit for the proposed improvements. 6. The Developer shall pay for alt costs associated with the design and installation of the improvements specified on the approved plans. 7. Developer shah provide copies of any permits, variances, approvals, and conditions as may be required by other agencies, including, but not limited .to Oregon Department of Fish and Vllildlife (DFW}, Oregon Department of Environmental Quality (DEQ}, Oregon Division of State Lands (DSL}, U.S. Army Corps of Eng[neers (ACOE}, affected irrigation districts, and ~adcsan County Road and Park Services Department (,1C Roads}, 8. Prior to approval and acceptance of the project, the Developer's engineer or surveyor shall provide the Pubic Works Department with a digital drawing of the construction "as-builts' in ari AutoCAD oo_mpatible format. or as otherwise approved by the Public Works Director. - As-built drawings are to be provided to the City.which provide'red-line" changes to final approved construc#ion plans which [den#ify the locations and or elevations (as appropriate} of actual installed items, including, but not limited to, invert, inlet, and rim elevations; spot elevations ldenfified an drawings; road - alignmen~ wafer lines, valves, and~fire hydrants; water and sewer lateral stationing; mod'~icafions to street section; manhole and curb inlet locations; street light locations; other below grade utility line locations and depths; etc. Provide a'red-tine" hard copy (on My[ar}, or an approved alterna#ive format, of construction drawings, and an aa~ptab[e AutoCAD compatible drawing electronic file to the City at completion of construction. . 9.. The Developer's engineer or surveyor shall provide to the Public Works Department a drawing of the recorded Final Plat map reproduced on My[ar and 'in an acceptable electronic form in AutoCAD format. The Final Plat shat[ be tied to a legal Government-comer and the State Plane Coordinate System. 10. All elevations used on the construction plans, on temporary benchmarks, and on .~ ~ ~ 2 s Cour~try~:(cadowsE'srates, Phase 1,2,3, PIED SIa~]'Reporf July 09, 1997 Page S the permanent benchmark shat{ be tied into an established City approved benchmark and be so nofed on the plans. At least one permanent Benchmark shaft be provided for each phase of the proposed development, the locations of which shall be as jointly determined by the City PWD and the Developer's surveyor. . '{ 1. All fill placed in the development shall be engineered fill", and compacfed to City standards. All existing concrete, pipe, building materials, structures, clear and grub materials, and other deleterious materials shat( be removed from the . site and either recycled or properly disposed of in accordance with the requirements of the Oregon Department of Environmental Quality. , 12. Identify easement dedications and widths on the Plot Plan. 13. Easements for City infrastructure (i.e. sanitary sewer, water, and storm drain) should be a minimum of 15feet wide, and should not split Iot tines. Easements far storm drainage, sanitary sewer, and water lines should be dedicated to the Gity and not just a P.U.E. Centerline of buried infrastructure shall be aligned a minimum of fve {5) feet from the edge of the easement. If two or more City owned utilities are located within an easement, then a minimum of 2Q foot width should be required. 14. All design, construction plans and specifications; and as-built drawings should be prepared to aa;eptable professional standards. 15. All street and wafer improvement plans should be approved in writing by Fire District 3 prior to review by the City's PV1lQ.. 16. (f the proposed development places structures within the 104-year floodzone, the Developer's engineer will be required to explain and provide detail as to what affects wilt the placement of these structures have on the floodzone: what affect will it have on the floodplain elevation and floodzone boundary, and.what affects will the modification of the floodplain elevation and floodzone boundary have on the existing facilities and properties surrounding the proposed development. 17. Prior to theCity PWO fnal approval of the construction plans for the proposed improvements= the following should be submitted: Ct A copy of written approval from Fire District 3 of the final street. and water system improvement plans for the proposed development. ,;~~.. 27 CoualryMeadowsPs[a[e.~ p&ase 1,2,3, PW1l Stal}",Repar[ July Q9. 1947 Page 6 ^ The plans relating to•the sanitary sewers should be approved in writing by BCVSA, and the appropriate signature blocks should be completed on the plans. ^ Copies of written approvals andlor permits including conditions from the various agencies involved: DSL_, DFW, DEQ, andlor ACOE. 'l8. Field verify all existing infrastructure elevations and locations {i.e. pipe inverts, curb elevations, street elevations, etc.}, to which the proposed subdivision will connect into existing improvements, prior to final construction .plan design and submittal forfnal approval. 19. The Developer's engineer shall provide suitable engineering certification and justification {i.e. calculations, analyses, plots, etc.,) that all connections to existing infrastructure {i.e. street; water= sanitary sewer, storm drain systems; natural drainage systems; etc.,}will not interfere with the effective level of service or operation of the infrastructure facilities, and that the existing infrastructure faalities have adequate capaafies to accommodate the flows andlor demands imposed on the existing infrastructure as the result of the connection of the proposed developmen#'s infrastructure. 20. Overhead power tines. If applicable, coordinate efforts with Pacific Power and. Light, US West, and 7'CI Cable, to convert any overhead electrical power, telephone, or cable facilities within the proposed development to underground facilities, prior to the acceptance by the City PWD of the public irt~provements assodated with the proposed developmen#. Ali agreements and costs associated with the conversion of These faalities from overhead to underground faoi['~ies, shaft be by and between the utility owners and the Developer. 27. The acarrate locations of any existing underground and above ground public infrastructure, and the Location of tfie assoaated easements with these faalities, shah be aa.~urate[y portrayed {both fiorizontally and vertically) on the constnaction plans. • StreetslTraffic Existing Improvemen#s ~ Hanley Raad -Major Arterial. Current ROW 60' wide, varying street width, Right-of Way required: 80~oot width; 40- foot on either-side of centerline. Jurisdiction -Jackson County. - Grant Road -Current ROW: 60` wide, street width 25`. Right-of Way required: 80-foot width; 40-foot on either side of centerline. Jurisdiction - Jackson County. _ ~, „ ~ 8 v_ Courrlry+Meadows Estates, Plrvse 1.2,3, P1TrD Sfq(/"Reparl Jrrl}~ 09, 1997 Page 7 1. Construction drawings for this Tentative Plan shalt include a Street Lighting Plan and Traffic Control Plan in accordance with the requirements of the City PWD. The construction drawings shall include clear vision areas designed to meet the City"s PWD Standards. 25-foot unobstructed sight triangle areas shall be required at alt uncontrolled intersections. 55 feet shalt be required at arterial or secondary arterial intersections with the proposed streets of the subject subdivision. 2. The City PWD shaft, at the cost of the Developer, evaluate the strength of the native soils and determine the street section designs in accordance with the City PWD Standards. The City's engineering staff or selected engineering consultant {at Developer's expense}, shall evaluate the strength of the native soils and determine the street section desiggns in accordance with the City PWD Standards. Minimum street section shalt be as follows •• ~ 3-inches Class "8~ A.C. - 6-inches of 1 "-0" cxushed rock - 8-inches of 4"-~}" crushed rock {City of Medford specifications), woven geotextile fabric over compacted subgrade. Street section {excluding the asphalt concrete portion} shall be extended underneath and two (2}feet beyond the curb and Gutter portion of the street section fo provide befter s#ructural support for the curb section. 3. All improvements to Hanley and Grant Roads including, but not (invited to, street section, curios, gutters, sidewalks, bikeways, storm drainage, and traffic control and delineation, shall be coordinated and approved by the JC Roads and the City PWD, and constructed at the expense of the developer as part of the development of the subdivisions. Aoceleratian and deceleration lanes meeting JC Roads standards may need to be provided at the proposed development's intersections with Hanley and Grant Roads. At the City's option, the Developer may be required to defer the improvements along Hanley andlor Grant Roads until a later date, if any'or all of the improvements are to be deferred fo a later date, then the Developer will be required to enter into a suitable deferred improvement agreement with the City for~the developmeri~mprovement of the street section and appurtenances.(i•e• sidewalks, traffic lights, s#orm drainage, efc,) Along the development's frontages with Grant and Hanley Roads, as required and approved 6y the JC Roads and City PWD. 4. Stop signs shall be required and installed by the Developer at the intersections with Hanley and Grant Road and at the three way intersection of Mendotia Way and Blue Hearan Drive ~ .~ :~ 2 ~ CaunhyMeadowsRslales, Ahase 1,2,3, PFf'D S~afJ"Reporl July 09, 1997 Page 8 5. At the developer's option, the Developer may propose the use of a rolled curb, gutter, and sidewalk section (as developed and approved by the City PWD) in lieu of the current City PWD curb, gutter, and sidewalk standards. 6. It is suggested that a dedicated easement or piece of property be afforded on fats associated with the Country Meadow Estates subdivisions andlor the Quaif Meadows subdivision, that afford pedestrian and bicycle #raffic from Mendolia Way {Bachand Avenue)' to Donna Way. The location of bike/pedestrian ways shall be consistent with the Cify Comprehensive Plan and Master Transportation Plan as currently written or as being currently revised, It is suggested that these easements could be combined with utiiityeasements that will be required for utility interconnections or discharge paints. . 7. Due fa the relative closeness of the two proposed intersections to Grant Road of Blue Hearon Drive (of the proposed Country Meadow Estates subdivisions) and Quaif t.ane (of the proposed Quai[ Meadows Subdivision), it is suggested that a suitable, City approved semi-permanent barricade be installed across the western end of Blue Hearon Drive that affords pedestrian and bicycle traffic only, but prohibits normal vehicular traffic, The barricade could be constructed in such a manner that provides for lockable modification to allow the passage of emergency service vehicles, as required. The barricade would be appropriately landscaped 'and irrigated, ad provide for adequte ADA passage requirements. Storm Drainage, Irrigation Improvements Exis#ing Improvements - Hom Creek traverses the proposed development from south to north. Rogue River Valley Imgation District controls irrigation rights within the project area including conveyance of water in Hom Creek. 'l. Developer's engineer shall develop a master plan for the storm drain collection, retention, and conveyance system {SD System} which provides for storm water run-0ff from and run-on onto the proposed development {either surface run-on or culvert or creek/ditch conveyance}, any future development on adjacent properEies, conveyed storm drainage; or surface water flow (i.e. Horn Creek), and a~~iy areas deemed by the City that will need to connect-into the proposed development's SD System. 2. Developer's engineer shall determine haw SD system will work during 'l0-year and 100 year flood events associated with Hom Creek. Identify the HGL in Hom Creek during 10- and 't00 year event, and what affect will it have an the proposed outlets and storm drain system. System should be designed to ,;~~~ 30 CouncryMeaclowsFslales, Plrase 1,2.3. PF{?~ Sla,~'Repor[ July 09, 1997 Page 9 adequately drain 10-year storm without surcharging'or should be provided with adequafe storage to prevent surcharging; and be designed to prevent backflow of water from Ham Creek up into SD system during storm events. 3. During the design of the SD system, the Developer's engineer shall consider the effect of the proposed improvements and structures with regard to the '100-year base flood event floodway and floodplain of Horn Creek and the drainage ditches associated with Grant and Hanley Roads. The allowable flow rates into Hom Creek and the ditches along Grant and Hanley Roads from the proposed development shall nat be greater than the run-off flow cafes experienced from the property in its current status. The developer's engineer shali~provide suitable hydrological calculations and storm hydragraphs to depict the existing predeveiopment, and projected post development conditions of the development area on Hom Creek and the ditches along Hanley and Grant Roads. The Developer's engineer and the City PWD shall agree on the applicable nan-off coefficients, curve numbers, retardance, etc., to be used in the. Developer engineer's calculations. 4. Plans which propose to include the discharge to Hom Creek or the existing drainage ditches on Grant or Hanley Road, and any ranstnaction or modification within the floodway of Hom Creek or in the road ditches, shall be in compliance with DSL, ACOE, ODFW, DEQ, .1C Roads, andlor City PWD tas applicable) guidelines and requirements and any applicable conditions and or approvals, or these regulatory agencies. 5. Need plan and profile drawing of HGL's in Hom Creek, with indication of floodway and flood zone boundary during the 144 year flood event, taking into consideration potential development of the properties in the drainage-shed of Hom Creek upgradient of the proposed development. 6. All storm drain easements need to be 15fieet wide, and need clause in Tina[ property deeds or final CC&Rs to maintain driveable access to manholes for getting vactorfjetter to manholes and to discharge points in Hom Creek. Need copy of either document prior to approval of construction pfians. 7. The discharge point and potential retention of storm waterrun-off shall be designed to provide an aesthetically pleasing, useful, and low maintenance facility. 8. Prior to construction plan approval of the improvements for this Tentative Plan, the Developer's engineer shat( provide the City PWD with a complete set of hydrologic and hydraulic calculations and profile plots for sizing the SD system. The engineer shall use the rainfallCntensity curve obtained from the City PWD for hydrologic calculations, and the negotiated run-off parameters. / 3~ CountrykleadowsPsfafes, PFrasc 1,2,3, July 04, 1997 Pagc I D 9. The SD system shall be designed to carry runoff from a 10 year storm event if Q<100cfs. Use runoff for 50 year storm [f Q>~ 00 or < 200 cfs.: Use 100 storm runoff if Q is >200 cfs. ~ - 10. Minimum storm drain diameter shall be 15 inches. 11. Materials shalt be PVC (ASTM D 3034 with gaskets}, HDPE (meeting ODOT requirements for corrugated polyethylene storm sewer pipe, including a provision for premium water-#ight coupling bands), or approved equal. Provide concrete encasement or suitable reinforced concxete-pipe where required to prevent pipe deformation in areas of minimum cover. 12. Construct curb inlets with side inlet in curb section and grated inlet in the in gutter section. [f inlets/catch basins are to exceed 4.5 feet in depth from the lip of the inlet,-then the inlets and catch~•basins shall be designed to.afford suitable «man" entry info the inletslcatch basin for maintenancelcleaning purposes, 'l3. Developer's engineer shat( provide hydrology and hydraulic calculations and flow line plots for private and public storm drains. Plot HGL on profile or provide a separate profle drawing that indicates the HG[. on the profile. Pipes should - main#ain deaning velod#y and have adequate capacities without surcharging. . 't4. Due to the high level of groundwater in the areal the Developer may-wish to incorporate the use of a perforated SD system. tf so, then the perforated storm drain system shall be designed to have adequate capaaties to: d Convey the collected .groundwater and storm water with the minimum deaning velodties and without surcharging #he.col[ection and conveyance piping; and ~ - . Ct Minimize silts, sands, gravels, and fnes migration from the native soils inta the SO system. - The plotted HGL. shall include both the groundwater infltration, and the storm waterrun-off and run-on inflows into the SD system. '[ 5. A 30-foot~wide storm-drain access easement shalt be located on the tots ad~oining•Hom Creek to afford access to the main channel of Ham Creek. Gated access to accommodate a 15' wide access (beyond the top of bank of the Hom Creek channel) shall be provided through alt fence crossings o~ easements. J •~ 32 ~, _ CountrylvfeadowsEslales; Phase I,2,3, PWD Stcr~'Rcporc July 09, 1997 Page II 76. Gonsfruction of private storm-drains is discouraged by the City: However, if a private storm drain is to be constructed, the following information should be provided to the Gity: - How wilt the private storm drains be maintained, repaired, etc. - Alt roof and lot drainage should be drained to the curbiine when a standard curb and gutter section is used. - Provide invert elevations and lateral stationing for construction of private storm drain system. - Provide plan and profile views and elevations for any private storms drain system that may be proposed. '(7. Provide 0.2~'oot drop through aft manholes and curb inlets. ~8. Roof drains and underdrains 'shall not be directly connected to a public storm drain tines, and if a standard curb and gutter section is to be used, the roof drains and underdrains shall drain to the street at the curbfine, whenever possible. if a rotted curb and gutter section is to be used, then the roof drains and underdrain discharge tines shall either be connected to the rolled gutter section ufifizing a City PWD approved design, or they shalt be connected to a private storm drain system (with a Suitable easement dedication for the private storm drain faalittes} that ls.,atigned along the backside of the sidewalk andlor P.U.E., that discharges into a curb inlet or manhole that is part of the public storm drain system. 'l9. Curb and gutter sections shall not exceed 350 feet before entering a catch basin or curb inlet. 20. Developer shall be required to coo~nate with Rogue River Valley Irrigation District to resolve any lmgation rights or use of water from Hom Greek. Sanitary Sewer ladsting Facilities - ~ '15" -~ 18" BCVSA Gravity Sewer is looted in Grant Road. - 2'I "~- 24" BCVSA gravity sewer is located in Taylor Road • ~ ~- . 8-inch sanrtary sewer is Located in Donna Way :~.: 7. ~ Alf sanitary sewer collection and~conveyance system (SS System} .design, construction and testing shalt conform to the standards and guidelines of the Oregon DEQ, '[ 990 APWA Standards, Oregon Chapter, Bear Creek Valley Sanitary Authority (BCVSA), and the Gity PWD Standards, where applicable. 33 Cou~rtryMeadows$states, Phase 1,1,3, Pli?~ StaJ]~Reporl Jrr1y 09, 1947 Page 12 2. The Developer's engineer shaft provide ~hydrofogy and hydraulic calculations and flow Tine plots for existing and proposed sanitary sewers to both BCVSA and the City. Calculations and flow fine plots should include allowances for existing flows and projected future or existing development that will be connected to the system. Plot HGL on profile or provide a separate profile drawing that indicates the HGL on the profile. All pipes should maintain cleaning velocity and have adequate capacities without surcharging. 3. The construction plans and the as-built drawings shat[ identify lateral stationing for construction of sewer laterals. 4. The City upon completion of initiaf~construction plan review and preliminary approval, will forward the plans fo BCVSA for completion of the review process with DEQ. Upon completion of the review by BCVSA, completion of final revisions to the plans by the Developer=s engineer, and following the fnal approval and signature on the construction plans by BCVSA, the Public Works Director will approve the plans in final form. 5. ' All fasting and video inspection of lines and manholes shall be done in accordance with BCVSA requirements, at Developer's expense. The Developer shall provide BCVSA and the City with test reports, N reports and certification of the sewer system construction prior to final acceptance. 6. The SS System shall be designed in accordance with any master planning prepared by Bear Creek Valley Sanitary Authority (BCVSA) and/or the City to provide adequate capacity for the proposed development area, any future development on adjacent properties, and any existing sanitary sewer collection systems that may need #o connect~into the proposed development's SS System. [f a master plan for the proposed development area is unavailable, then a mas#er plan shall be prepared for the proposed development which accommodates the capacity needs for the proposed development as welt as the capaaty needs for the adjoining properties, and any additional flows as deterrnined by BCVSA and the City PWD. 7. Any proposals requesting the City, BCVSA, or adjacent landowners to share in costs for development of the sanitary sewer collection system to accommodate the upgrade of line sizing to handle the additional capacity requirements for surrounding development, shall include detailed engineering calculations and costs analyses. The Developer will be responsible to coordinate and develop any cost sharing agreements with any identified adjacent property ownersldevelopers and/or the City and BCVSA. J :. v ~. CourrtryMeadowsEslaies, Plrase 1.1,3, PWI~ Siat]"Rcpori July 09, 1997 Page 13 Water System Existing improvements - A 12 inch D.I. water line ends in the south side of Manley Road (approximately 30 feet east of the bridge at ,lackson Creek. - A 6 inch line ends at the cul-de-sac in Donna Way. A 8 inch line lies in Brad Way between Palo Verde Way and Strait Way. 1. A water distribution system shall be designed in accordance with the ~ 979 Water System Master Plan which accommodates the proposed development, any future development on adjacent property, and any areas deemed by the City that will need to connect-into the proposed development's water distribution system. 2. Developer's engineer shalt design the water system to provide a minimum flow of '1,000 gpm and conform to Fire District 3 requirements. Maximum spacing of ftre hydrants shall be 300 feet. Construction plans shall be reviewed and approved by Fire District 3 prior to submitting to DPW. 3. Specifications for the design and construction of the water system shall be in accordance with City PWD Standards or as may be adopted and approved by the Public Works Director. 4. Lateral f connection stationing and size shall be provided on construction plans and as-built drawings. 5. Developer's engineer shat[ provide a reinforced flow (looped") wafer system with connections at the ends of Mendolia Way, Blue Hearon Drive, and Quail Lane with connections to-the 12-inch-diameter lines to be installed in Grant and Hanley Roads. A reinforced how connection shall also be made between Diego Court and Mendolia Way. A reinforced flaw connection to the ~" line in Donna Way shall also be required. 6. Developer shall comply with Oregon Health Division (4HD} and City requirements for backflow prevention. An OHD approved back#law prevention assembly shall be installed immediately downstream of the water meter serving each dwelling unit. 7. Construction drawings shall include the size, type, and location of all •water . mains, hydrants, air valves, service connection, and other appurtenance details in accordance with City: PWD Standards and as required by the City PWD. ~~~ 35 Couniryh~cadowsRstalcs, Pkasc 1,2,3. PWI} S1afJ'Repor! July 09, 1997 Page I Q 8. All connections to the water supply system should comply wifh OHD requirements. Water will not be "fumed on" by the City until such requirements have been met to the satisfaction of the City's designated inspector (currently the Jackson County plumbing inspector}. 9. Water system shall be tested in accordance with City PWD Standards and requirements at Developer's expense and should be approved by the City. 10. Any proposals requesting the City to share in costs for devefopment of the wafer supply system to accommodate the insfallation of the 12-inch fines on Grant and Hanley Roads to afford proper capacities and pressures and for upgrade of line sizing fo handle the additional capacity requirements for any existing or future surrounding development, shall include detailed engineering calculations and costs analyses. The Developer will be responsible to coordinate and develop any cost sharing agreements with any identified adjacent property owners/developers andlor the City. Site wank, Grading and Design, and Utility Plans Existing Improvements - Ham Creek traverses the proposed development areas from South to North and wetlands identified as PSSC and PEMC are present on the property. Existing houses and outbuildings on property. 1. Developer shall provide a gradinglpaving plans} with the construction drawing submiftal to the City PWD. Plan(s) shall illustrate the location and elevations of the base flood event flood zone and floodway of creeks or streams in proximity to the devefopment {if applicable); curb elevations; finish grades; and building pad and lowest floor elevations. 2. Ail structures shall have roof drains, area drains, ancUor crawl spaces with positive drainage away from the building. if applicable, drain Tines shall be aannec#ed to the curb and guteer and discharge from the curb face or other approved discharge point or system. 3. Developer shalt provide the necessary rough" tot grading to assure that all Tots will drain properly to the curb and gutter, or to a drainage system that drains to the curb and gutter or public storm drain system, as approved by the City PWD. 4. Provide the City with copies of any required permits and approvals (including ~~~ 3s Courraylt-feadows~sfates, Phase 1,2,3. PF#'D Sla~Reporl July 09, 1997 Page 1 S any mitigating requirements yr conditions} from DSL, DEQ, and ACOE (including any mitigating requirements}, for any required wetland or flood hazard mitigation work to be performed as part of the proposed development, 5. Grading plans should have vriginallexisting grades and final grades platted on the plan. Typically, existing grade contour sines are dashed and screened back, and fnal grade contour lines are overlaid on top of the existing grades and are in a heavier tine width and solid. Contour lines should be labeled with elevations. 6. Indicate [ovation of street lights on plans, with table indicating stationing and offsets. 7. Provide City with a utility plan approved by each utility company which reflects ail utility crossings, transformer locations, valves, etc. 8. Utility [ovations shoutd be accurately depicted on the as-built drawings, or as a separate set of drawings attached to the as-built drawings. 9. Landscaped barriers shall be required on lots adjacent to, but not fronting, Grant and Taylor Roads Rights of WayslEasements 7. All easements for improvements dedicated to the City shall have a minimum 'l5 foot width and shalt be located (whenever possible} contiguously along the exterior boundaries of properties and shat[ not split lot lines. Pubtic utility easements shall have a minimum width of 10 feet 2. The City wilt require a 52 foot ROW width on local streets and 60 foot ROW on collector streets. 3, If applicable, Developer shall provide a Statement of Water Rights (on a City approved form}, for any affected properties. For properties determined to have water rights, the developer will coordinate with the State Watermaster the re- allocation of any waters attached to lands no longer irrigable as a result of the proposed development. , 4. Developer shall comply with all existing easement owner requirements regarding any proposed development that may overlap any existing easement. Any development proposed which overlaps or alters an existing easement should be CourrhyMcadowsEs(atr_r, Phase 1,2,3, PWD S(ajrRepor( July 09, 1997 Page 16 approved by the easement's owner in writing, and a copy of that written approval should be submitted to the City PWD prior to submission of construction plans far City PWD review and approval. 5. Afl existing easement locations and those proposed for this development shall be shown on fhe final plat with reference to the recordation number and Grantee. 6 Developer shall acquire suitable easements across private property not owned by the proposed development's property owners, for utility line alignments, the possible bikelpedestrian pathway discussed previous{y, and storm drainage discharge points. These easements shat{ lae secured prior to fnal construction plan approval. A copy of the recorded easement shall be submitted to the City PWD prior to Final Plat approval. 7. Hanley and Grant Roads•are currently designated in the City's comprehensive plan as a major and secondary arterial road, respectively. The comprehensive plan states that the right-of-way widths needed for a major arterial road are between 400 to 420 feet` and between 80 and 88 feet for a secondary arterial road. In review of the current right-of-way widths that are reasonably available on the connecting major arterial road to Hanley Road (West Pine Street}, the City's PWD has determined that an 80-foot wide right-of-way will be needed for Hanley Road, in lieu of the 400- to 4 40-footright-of way designated in the City's comprehensive plan. Sind the existing right-of way widths for both Grant and Hanley Roads is 60 feet, the Gity will require an additional 40-foot dedication for right-of-way along the boundaries of the proposed development that front these two roads. ~. 38