HomeMy WebLinkAboutResolution 439 - Von Brandt Apartments Tent. Plan~~ r~~~)CiL.1
PLANNING COMMISSION RI?SOI_,IJTION NO. 439
A RESOLUTION GRE1N`I'ING "I"1-:NTATIVI~ PLAN APPROVAL
FOR A LAND 1'AR`1'I`I'ION
{Applicant (s) :Guy W. voz-z I3raEidt, von Brandt Apartments)
(37 2W03D13 `I'ax Lot 700)
Recitals
1. Applicant{s)has/have submitted an applicatioz~z for tentative plan approval for a land partition on
a 0.88-acre parcel, located at 443 North Second Street in the City of Central Poizat, Oz•cgan.
2. On February 2,1999, the Central Point Planning Commission conducted aduly-noticed public
hearing oz~ tl~e application, at which tune it reviewed the City staff reports and heard testimony and
comments on the application.
Now, therefore;
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL
POINT, OREGON, AS FOLLOWS:
Section 1. Approval Criteria. The requirements for approval of land paz•titions and tentative plans
are set forth in CPMC Title 16 and 17, relating to informational requirements, zoning, lot dinaension, access,
and sizmilar requirements.
Section 2. Finding and Conclusions. The Planning Commission finds and determines as follows:
A. Tentative Plan Re uirements. The application and tentative plan are in the correct form
and contain all of the information required by CPMC 1 x.10.
B . Area and Width of Lot. The partition would subdivide a 0.88 acre tax lot into two parcels;
one far an existing single family residence and the other to develop a 12 unit apartment
complex.
Section 3. Conditional Approval. The application for tentative plan for land partition is hereby
approved, subj ect to the canditions set forth on attachment "A" and those applicable conditions of the
Public Works staff report for the von Brandt Apartment pz•elizninary site plan.
Planning Commission Resolution No. 439 (02102199)
E'assedbytl:~ I'I~,~~t~t~gCcrlnn~i:~si(~~~~:~~~isi~;n~:cil~yz~~ci~7.,~~tl„a~lic•,~ii~~l:c~'it~~7~:ati~~t~~,~~~~:,
day of .~ ~.~_~ . , ~: ~ ~ `> ~' ' `~'. __~
ATTEST.
~ityRcp.~~~~n<<aiv: ~ ~ -
A~~roved by tx~e this _ clay c~ i`~
.-s , , i o
_ ~ "'c ~ r
Planning Commission esalutic~n No. 439 (02Jt}2/99)
ATTACHMENT ~
PLANNING DEPARTMENT RECOMMENDED CONDITIONS OF APPROVAL
1. The applicant shall comply with all requirements of affected public agencies and utilities
as they pertain to the development of the parcel. Cvidence of such compliance shall be
submitted to the City prior to final plat approval.
2. The applicant shall adjust the boundaries between Parcels 1 and 2 to allow for the
creation of a tat lot on Parcel #2 that would serve the needs of a 12 unit apartment complex.
G:1IPLANNMG199004TF. W FD
CITY OF CENTRAL POINT --
DEPARTMENT OF PUBLIC WORKS
STAFF REPORT
for
vonBrandt Apartment
Preliminary Site Pian
PW#98067
Date: January 26, 1999
Applicant: Guy W. "Noah" vonBrandt, 2568 Crater Lake Avenue, Medford, OR 97504
Agent: Philip A. Schwimmer, Architect, P.O. Box 1105, Jacksonville, OR 97530
Project: vonBrandt Apartments
Location: To the northwest of the Intersection of 2"d and Cherry Streets
Legal: T37S, R2W, Section 3DB, Tax Lot 700 ; 443 N. 2"~ street
Zoning: R-3
Acreage 0.88 acres
Units: 12 Apartments {1 building) Multi-Family Dwelling; and existing Residence
Plans: 1 page {Landscape and Site Plan, dated 8/24/98; prepared by Agent.
Report By: Lee N. Brennan, Public Works Director
Purpose
Provide information to the Planning Commission and Applicant (hereinafter referred to as "Developer")
regarding Public Works standards and additional standards and requirements to be included in the
design. Gather information from the DeveloperlEngineerregarding proposed development.
Special Requiremenfs
2nd Street lm rovements: The Developer shalt install sidewalks (including a suitable driveway
apron with 2Q-foot "throat"), along the property's frontage with 2"d Street. If applicable, the
Developer shall be responsible for contracting with Pacifc Power for the installation of a street
light near the driveway entrance of the Development to afford proper night lighting of the
entrance.
2. Drivewa s Access Roads and Parkin Areas: The driveways, access roads, and parking
and taming areas on the proposed development must be designed and positioned in a manner
that should accommodate the fuming movements and access of an AASHTO single unit truck
and the Fire District's requirements. All driveways, access roads, and parking areas should
either have asphalt or cement concrete surfaces.
3. Site Drainage/Storm Drafn Plan: The developer shall design and implement a site
drainagelstorm drain plan that corrects and enhances existing site drainage for the entire
property noted on the site plan. Sheet flaw surface drainage from the property onto the public
rights-of way, or onto neighboring properties is unacceptable. The storm drainage infrastructure
will be privately operated and maintained.
During the design of the storm drain collection and conveyance system {SD System), which
provides for storm water run-off from and run-on onto the proposed development {either surface
1 v ~.
~~onBrandt Apartments
Prellminarn Srte Plan Review
January 2~. I999
Page 2
run-on or GUlVert or Creek/d'rtch Conveyance), the DeVelOper Shall demonstrate that the Storm
water flows from the completion of the proposed development {and at any time prior to
completion of development) do not exceed predevelopment flows; or that existing capacity,
allowances, or provisions have been made (and approval of the applicable properties owners
and regulatory agencies has been obtained}, which accommodate any additional flow which
exceed predevelopment flows. The Developer and the City PWD shall agree on the applicable
run-off coefficients, curve numbers, retardance, etc., to be used in the engineering calculations.
Developer's engineer shall provide a site drainage plan with the facilities being designed, at a
minimum, to accommodate a 10 year storm event. The SD system must be designed to
adequately drain the 10-year storm event without surcharging or must be provided with adequate
storage #o prevent surcharging; and be designed to not impact existing private or public storm
drainage facilities. Any private storm drain system exceeding 3-inches in diameter shall be
designed to directly connect to the public storm drain system {at a manhole or curb inlet only},
and shall not be designed to discharge to the street surfaces. The potential retention of storm
water run-off shall be coordinated with aspects of the proposed development to provide an
aesthetically pleasing, efficient, non-hazardous, and low maintenance facility. If applicable, the
storm water retention facilities shall be suitably landscaped; designed to mitigate erosion and
sediment and hydrocarbon deposition; and to mitigate the "attractive nuisance" hazards
associated with these facilities. Catch basins, curb inlets, and area drains shall be designed for
sediment and petroleum hydrocarbon retention.
There is an existing storm water "ditch" that traverses the property from south to north, and
which discharges into an 18-inch pipe on the School District Property. The storm drainage plan
must allow for the conveyance of this and possibly other existing stormwater flows that run-onto
the property. The alignment and construction of the storm water conveyance pipe should not
underlie the proposed building.
The proposed plan also indicates that the stormwater will discharge to an "8" SD" {stormdrain)
pipe at the driveway entrance. The existing surface grade of the proposed development
apparently lies approximately 3 feet lower than the street elevation, which makes drainage to the
street unlikely due to the relative shallow location of the storm drain conveyance system on the
east side of 2"d Street. Any connection to the City storm drain conveyance system shall be at a
manhole or curb inlet, or as otherwise approved by the City Public Works Department (PWD).
Any storm water collection and conveyance facilities constructed within the public rights-of-way
shall be constructed in accordance with City PWD standards, including the provision for water-
tight joints.
4. Domestic Water Service and Fire Protection: The preliminary site plan indicates the location
of a fire hydrant on the propertyy. A minimum 6-inch diameter tap and service lateral will need to
be made to service this hydrant. The line and hydrant shall be placed within a 15-foo# wide
easement dedicated to the City. The City PWD is recommending that water service be provided
to the existing residence and the proposed apartment complex by the positioning of new meters
in the area just east of the proposed fre hydrant. The number and sizes of the meters will be
jointly determined by the Developer, and the City PWD and Building Department.
1 'vrtHrundl; ~JJarlmertl5
Preliminary Site Plan Rc>vic>u
Jantutrti~ 26, ! 999
Page 3
5. Connections fo City Infrastructure in 2"d _Streef: When we originally met with this developer in
August of last year, we indicated that any connections to infrastructure located in 2"d Street or
across 2"d Street would need to be made and completed prior to the commencement of the
overlay work scheduled for 2"d Street. This work has been postponed by the City's contractor
and is not scheduled for commencement until March. Thus all connections #a City
infrastructure, or any planned underground infrastructure Grassing of 2"d street must be
completed prior to commencement of the overlay work on 2"d street; no later than March 1, 1999.
6. Aboveground Utilities: If applicable, coordinate efforts with Pacific Power, US West, and
falcon Cable, to convert any overhead electrical power, telephone, or cable facilities within the
proposed development to underground facilities, prior to the acceptance by the City PWD of the
public improvements associated with the proposed development. All agreements and costs
associated with the conversion of these facilities from overhead to underground facilities, shall
be by and between the utility owners and the Developer. A power pole {PPL No. B1108~) and
telephone riser are located at the driveway entrance. These facilities must be relocated to afford
the required 20-foot wide driveway en#rance. Any relocated utility facilities on site should be
placed underground, as feasible.
General
Existing Infrastructure: The Developer shat[ provide suitable engineering certification and
justification (i.e. calculations, analyses, plots, etc.,) that all connections to existing infrastructure
{i.e. street; water, sanitary sewer, storm drain systems; natural drainage systems; etc.,) will not
interfere with or provide for the significant degradation (in the opinion of the Public Works
Director) of the existing effective level of service or operation of the infrastructure facilities, and
that the exis#ing infrastructure facilities have either adequate capacities to accommodate the
flaws andlor demands imposed on the existing infrastructure as the result of the connection of
the proposed development's infrastructure; or the existing facilities will be improved by and at the
expense of the Developer to accommodate the additional flows andlor demands while
maintaining or improving the existing effective level of service of the affected facility.
2. Develrrpmenf Plans: Developer shall submit to the City's PWD for review and approval, plans
and specifications for all improvements proposed for construction or modifications within the City
ar public rights-of-way and easements or for cannections to City infrastructure. Public
improvements include, but are not limited to, streets (including sidewalks, driveway aprons and,
curbs and gutters); storm drainage and sanitary sewer collection and conveyance systems;
water distribution system (up to the service meter and including fire protection); street lighting;
and traffic control devices, street signs, and delineation. All construction of public improvements
shall conform to the City's PWD Standards, the conditions approved and stipulated by the
Planning Commission, and other special specifications, details, standards, andlor upgrades as
may be approved by the City Administrator or his designee prior to the approval of the
construction plans for the proposed development. During construction, changes proposed by
the Developer shall be submitted in writing by the Developer's engineer to the City PWD for
approval prior to installation.
~.,.
~ 'arr Brrurdl.4 partnrerrts
Prclrn:inarv Siie Plcrrr h'ci~ietic•
lanrran~ 16, 1999
Page S
that will accommodate the turning movements and access of a single unit truck, without crossing
into an opposing lane or additional travel lane of traffic. The street section design for street
improvements or connections to be constructed within the City rights-of-way (i.e 2"° Street) shall
be as follows:
3-inches Class "B" A.C.
- fi-inches of 3/~"-0" crushed rock
- 8-inches of 4"-fl" crushed rock (City of Medford specifications},
- Woven geotextile fabric over compacted subgrade.
9. Utility Plans: We did not receive any utility plans for the proposed development. The utility
plans shall be drawn to scale with accurate horizontal and vertical depiction of utility lines and
appurtenances {transformers, valves, etc.}.
10. Puhlic Ufilify Easemenfs: A minimum 10-foot wide public utilities easement (PUE) shall be
dedicated along the proposed development's frontage with 2"d Street far the installation of public
utilities and should be located outside the public rights-of--way.
11. Clear Vision Areas: The construction drawings shat[ include clear vision areas {i.e. sight
triangles) at driveway entrances designed to meet the City's PWD requirements. The existing
hedge shall be trimmed/removed to afford the required sight distances/clearances, and to clear
the right-of-way.
12. Fire Nyclranfs: Provide locations of existing and any new required fire hydrants. if applicable,
steamer ports at hydrants located near the building shall face the buildings. Fire hydrants shall
be suitably protected from potential vehicle damage and encroachment.
13. Wafer S stem Cross Connection Confral: Developer shall comply wi#h Oregon Deal#h
Division (OHD) and City requirements for cross connection control. Water will not be "turned onn
by the City until such requirements have been met to the satisfaction of the City's designated
inspector.
1 ~. Water Sysfem: Construction drawings shall include the size, type, and location of all water
mains, hydrants, valves, service connection, meter, service laterals, and other appurtenance
details in accordance with City PWD Standards and as required by the City PWD and Building
Department.
15. Storm Drain S stem Desi n: Prior to construction plan approval of the improvements for this
development plan, the Developer's engineer shall provide the City PWD with a complete set of
hydrologic and hydraulic calculations and profile plots for sizing the site storm drain system, The
engineer shall use the rainfall/intensity curve obtained from the City PWD for hydrologic
calculations, and the negotiated run-off parameters.
16. Roof/Area Drains: All strut#ures shall have roof drains, area drains, and/or crawl spaces with
positive drainage away from the buildings. Roof drains shalt not be directly connected to the
i~onBrandt ~fpartmerrts
Preliminary Site Plan Review
January 26, 1999
Page 6
public storm drain system, but could be connected to the private storm drain catch basins.
17. Grading Plans: Grading plans should have original/existing grades and final grades plotted on
the plan. Typically, existing grade contour lines are dashed and screened back, and final grade
contour lines are overlaid on top of the existing grades and are in a heavier line width and solid.
Contour fines should be labeled with elevations.
18. Existi~ Easements: If applicable, Developer shall comply with all existing easement owner
requirements regarding any proposed development that may overlap any existing easement.
Any development proposed which overlaps or alters an existing easement should be approved
by the easement`s owner in writing, and a copy a# that written approval should be submitted to
the City PWD prior to submission of construction plans for City PWD review and approval. AI!
existing easement locations and those proposed for this development shall be shown on the fins[
plat with reference to the recordation number and Grantee.