PLANNING COMMISSION RESOLUTION NO. 453
A RESOLUTION GRANTING 'I"ENTATIVE PLAN APPROVAL
FOR A LAND SUBDIVISION
(Applicant (s) : W.L. Moore Properties, LLC & Joh~~ I7~~ke )
(372W03 Tax lot 4403, Bohnert Estates )
RecitaFs
1. Applicant(s) has/have submitted an application for tentative pla~~ approval for a land partition
on a 12.7-acre parcel, located north of Taylor Road and west of Haskell Street in the R-2 zoning
district in the City of Central Point, Oregon.
2. On June 1, 1999, the Cezatral Point Planning Commission conducted aduly-noticed public
hearing on the application, at which time it reviewed the City staff reports and heard testimony and
comments on the application.
Now, therefore;
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL
POINT, OREGON, AS FOLLOWS:
Section 1. Approval Criteria„ The requirements for approval of land partitions and tentative
plans are set forth in CPMC Title 16 and 17, relating to informational requirements, zoning, Iot
dimension, access, and similar requirements.
Section 2. Finding and„Conclusions. The Planning Commission finds and determines as
follows:
A. Tentative Plan Requirements. The application and tentative plan are in the correct
form and contain all of the information required by CPMC 16.10.
B. Area and Width. of Lot. This partitioning in an R-2, Residential Two-Family zone
would create the following parcels:
Parcel 1: Approximately 14,535 square feet;
Parcel 2: Approximately 23,873 square feet;
Parcel 3: Approximately 10,683 square feet.
Parcel 4: Approximately 9,896 square feet.
Parcel 5: Approximately 9,863 square feet.
Parcel 6: Approximately 9,831 square feet.
Parcel 7: Approximately 9,893 square feet.
Parcel 8: Approximately 14,139 square feet.
Parcel 9: Approximately 15,680 square feet.
Punning Commission Resolution No. 453 (06011999 }
Parcel 8: Approxianatcly 14,139 square feet.
Parcel 9: Approxiantatcly 15,680 square feet.
Parcel 10: Appraxianately 9,674 square feet.
Parcel 11: Approxianatcly 9,674 square feet.
Parcel 12: Approxianatcly 9,559 square feet.
Parcel 13: Approximately 9,645 scluarc feet.
Parcel 14: Approximately 9,760 square feet.
Parcel I5: Approximately 9,760 square feet.
Parcel 16: Approximately 15,680 square Rect.
Parcel 17: Approximately 15,680 square feet.
Parcel 18: Approximately 9,760 square feet.
Parcel 19: Approximately 9,760 square feet.
Parcel 20: Approximately 9,645 square feet.
Parcel 21: Approximately 9,645 square feet.
Parcel 22: Approximately 9,760 square feet.
Parcel 23: Approximately 9,760 square feet.
.Parcel 24: Approximately 9,645 square feet.
Parcels 1 and 2 and 3 rneetthe aninirnum area (6,000 square feet for interiat lots and 7,000 square
feet for corner lots) and width (60 feet for interior lots and 70 feet for corner lots} requirements for lots
in the R-2, Residential Two-Family zone as set forth in CPMC 17.24, and such parcels meet the general
requirements for lots contained in CPMC 16.24.050. Parcel one meets the area and width requirements
far flag lots contained in CPMC 16.36.040.
C. Access to Flag Lot. CPMC 16.36.040 requires an access of at least 20 feet in width, paved
with cement or asphaltic surface, for all flag lots created bypar-tition. The tentative plan submitted herein
provides fora 20-foot wide access, to be paved with concrete, which satisfied the City code requirement.
Section 3. Conditional Approval. The application for tentative plan for ]and partition herein is
hereby approved, subject to the conditions set forth in Exhibits "A" arxd "B",narration and material
submitted by Herb Farber, a bikeway, and a mutual agreement (to be resolved} on sidewalk repairs. The
garages onOtto 1=3oulevard steal l have a 20 foot setback from the sidewalk and the City and the Developer
shall reach an agreement regarding the flood plain. The utilities steall remain above ground until the
completion ofthe "I,aylor• Road improvements. All exhibits attached hereto or by reference incorporated
herein, are imposed under authority of CPMC Chapter 16.36.
Passed by the Planning Commission and signed by me in authentication of its passage this ~'~'
day of M , 199~'~
~~%~A_s
Planning Commission Resolution No. 453 (06011999 }
~'laa~aiin~ Coataat~issic~n Chair
Approved by ane; this
~T~
day of I~t , 199~.~
Plaaaa~ia~~; Coanmissioa~ Chair
Plann€ng Commission Resolution No. _453 (06011999 )
A TTF CT
Exhibit B
CITY OF CENTRAL POINT
DEPARTMENT OF PUBLIC WORKS
REVISED STAFF REPORT
for
BOHNERT ESTATES
TENTATIVE PLAN REVIEW
PW#99003
Date: May 28, 1999
Applican#: W.L. Moore Construction, LLC, 1461 McAndrews Road, Medford, Oregon 97501
Agent: Herb Farber, Farber Surveying, 120 Mistletoe St., Medford, Oregon 97501
Property
Owner:
Project:
Location
Legal:
Zoning:
Area:
Units:
Plans:
Report By
Purpose
W.L. Moore Properties, LLC, and John A. Duke, 1461 McAndrews Rnad, Medford, Oregon
97501
Bohnert Estates
North of Taylor Road, East of the Intersection of Brad Way.
T37S, R2W, Section 3, tax lot ~~43.
R-2
8.7 Acres (approximately}.
24 lots, single family residences
1 page entitled "Tentative Plat of Bohnert Estates, 24 lots, dated May 22, 1999 prepared
by Farber and Sons, Inc.
Les N. Brennan, Public Works Director
Provide information to the Planning Commission and Applicant (hereinafter referred to as "Developer"}
regarding City Public Works Department (PWD) standards, requirements, and conditions to be included in
the design and development of the proposed residential subdivision. Gather information from the
DeveloperlEngineer regarding the proposed development.
The proposed subdivision is in an area north of Taylor Road that is in an area of the City that has not
undergone thorough master planning of public infrastructure:
C~ City PWD staff are unaware of any street network master planning that has been reviewed
and adopted by the City for this area of the City.
a The City's current Water Master Plan illustrates a 12-inch diameter "grid" far the general
area, with a 12-inch-diameter water line aligned near the eastern border of the subject
property.
~ BCVSA's master planning for this area only indicates the existing lower bear creek
interceptor.
~ City PWD staff are unaware of any storm drainage or flood controllconveyance master
planning performed for this area of the City.
However, it is our understanding that the Developer (wha owns or has an option to purchase land on
neighboring properties) is in the process of performing the master planning required. Unfortunately,
because of the current lack of thorough master planning for this portion of the City, 'r# is difficult if not
impossible to determine the required public infrastructure needs and requirements far the proposed
development. In particular:
~~
E3ofviert Estates
Tentative Plan Review
PWD ,staff Report
Ma}r 25, 1999
Page Z
^ Streets:
- The proposed development indicates a wider street right-af-way on Ot#a Boulevard
which may correspond to classification of Otto Boulevard as a "collector" street.
However it is unknown how this "collector" s#reet is planned to connect to either
Highway 99 or Gran# Road; or on the planned alignment and configuration of the
remainder of Otta Boulevard through the properties to the north of the proposed
development.
- The proposed intersection connection of Otto Boulevard to Taylor Road does not
provide for the minium intersection separation distance of 300 feet to potentially
500 feet (if Brad Way were to be reclassified as a "collector" street as part of the
LSNP work being currently performed} required for the separation of the proposed
Otto Boulevard intersection and the existing Brad Way intersection located to the
west of the proposed development along Taylor Road.
-- The City and the Developer are actively participating in a project involving
developing a transit oriented type development for #his area of the City, and the
Ci#y is working with RVCOG and others to complete the Ci#y's Transportation
System Plan (TSP) and Local Street Network Plan (LSNP} to determine the
specifics and efficient layout of the City's s#reets and transportation system. The
results of this work will likely dicta#e the layout and classification of the streets
adjacent to and associated with this development.
- It is possible, based on the limited access available #o Taylor Road, that the future
access connection to the properties to the west and northwest of the proposed
development would require access through Benston Drive, thus potentially
classifying these streets as "collectors", which would require additional right-of-way
dedica#ion and a wider street section for the development of these streets.
However, the Developer is willing to stipulate tha# the street network system would
not be developed so tha# Benston Drive would become a collector street as the
result of fu#ure developmen#.
^ Domestic Wa#er:
-- The "grid" system identified in the water master plan could be modified to
potentially have the 12-inch-diameter water line aligned along Otto Boulevard; but
designations of practical, feasible routes (typically aligned under streets} for
interties afi this 12-inch-diameter water main to the existing 12-inch water line along
Highway 99, and the future 12anch-diameter water line installation along Grant
Road, north of Taylor Road, need to be determined prior to development of this
water line "grid".
^ Storm OrainagelFlood Control:
- Because of problems and inconsistencies noted in the review and analysis of other
floodplain and floodway analyses work performed by FEMA on other portions of
Griffin Creek, the PWD is recommending that a supplemental and/ar reanalysis of
the Griffin Creek FIRM floodway and floodzone studies be performed, with
participation by the Developer. The supplemental flood study would involve the
.~. si
13ofrnert Estates
Tentative Plan Review
P IUD Staff Report
May 25, 1999
Page 3
reach of Griffin Creek from Taylor Road to the point where Griffin Creek
discharges under the railroad and highway crossings should be performed to
identify floodway and flood zone boundaries, problem areas of flood conveyance,
and potential mitigating measures which could be implemented prior to or
concurrent with the development of the lands in this area to reduce the flooding
potential and narrow the "area of special flood hazard" associated with Griffin
Creek and raise the City's "Community Rating System" standard which could result
in lower flood insurance rates far the affected City residents. The existing "area of
special flood hazard" associated with Griffin Creek, as mapped by FEMA, nearly
encompasses the entire proposed development.
- A storm drainage master plan should be developed which illustrates how areas will
drain to Griffin Creek and the required pipe sizes that will need to be installed to
convey storm water run-off and surface drainage from the outlying areas to the
west and east of Griffin Creek, to Griffin Creek.
Based an the limited master planning that has been performed, and on the assumption that this
development will be approved by the Planning Commission prior to the completion of the required
infrastructure master planning, PWD staff have made some conservative recommendations and
requirements as part of this staff report. If results, findings, and recommendations of the on-going
infrastructure master planning indica#e that less conservative assumptions and measures are required,
then the recommendations and requirements of this staff report could be modified by either staff approval
or by Planing Commission action, as required by law.
The City PWD is recommending that if the proposed development is approved then the proposed
Development should be conditioned with requirements that are forthcoming from required traffic impact
and street networking analyses, the TOD study, and flood studies that are currently under development or
that will be completed as part of conditional approve[ of this and other planned or approved development
in this area of the City. It is also recommended that this Development be conditioned with the
requirement to participate in and pay an allocated portion of the cost for preparation of the traffic impact
study and street network analysis and to complete floodway and floodzone supplemental analyses of
Griffin Creek. It is proposed that the allocation of costs associated with the traffic impact study and street
network analysis would be based on the #ax lot(s) size in ratio to the total area to be developed that is
encompassed by these reports. The requirements, recommendations, and suggestions stated in this staff
report are based on these premises.
It should be noted that this staff report only addresses the first 24 lots, as subsequent development on the
property to the north may will require supplemental or revised conditions of approval.
Specie! Requirements
Existing Infrastructure: The Developer shall demonstrate that all connections to existing
infrastructure (i.e. streets; water, sanitary sewer, storm drain systems; natural drainage systems;
etc.,) will not interfere with or provide for the degradation of the existing effective level of service
or operation of the infrastructure facili#ies, and that the existing infrastructure facilities have either
adequate capacities to accommodate the flows and/or demands imposed on the existing
infrastructure as the result of the connection of the proposed development's infrastructure, or will
.. ~ti
Bohnerf Estates
Tentative Plan Review
PWD Staff Report
May 25, 1999
Page 4
be improved by and a# the expense of the Developer to accommodate the additional flows andlor
demands; while maintaining or improving the existing level of service of the affected facility, as
approved by (as applicable), the regulatory agency, utility owner, andlor property owner involved.
2. Rights-of Way and Easements: Taylor Road is designated as a secondary arterial type street.
Developer should provide dedication for expansion of the right-of way slang Taylar Raad to a
minimum of 88-feet in width {44-feet each side of centerline). Since the existing right-of-way width
far Taylor Road is 70 feet {40-feet north of centerline}, the City will require a minimum of an
additional ~-foot dedication for right-af-way along the Developer's property frontage with Taylar
Road. This requirement of right-af-way dedication may be increased or decreased in width
pending the conclusions and recommended street crass-sections to be provided in the traffic
impact analysis and street network plan studies as approved by the City, that are to be prepared
for the studied streets.
The Developer should provide suitable and acceptable easements (minimum 15-foot in width} for
any existing public works infrastructure, or public works infrastructure required for the
development, that are located outside the public rights-of--way.
A separate 90-foot minimum width public utilities easement (P.U.E.} should also be dedicated by
the Developer for utility installation outside the Taylor Road right-of-way along the property's
exterior frontage wi#h Taylor Road. Other P.U.E. are also required far dedication along the
proposed streets in accordance with City PWD standards.
3. Traffic Study: As previously discussed with the Developer, a separate traffic impact study and
street network analysis will not be required fior this development at this time. The City is working
with the Developer and other developersllandowners in the northwest portion of the City to
coordinate and develop a traffic impact study and street network analysis for the area based on
projected development of the properties in the immediate vicinity of the proposed development.
Therefore, it is the City PWD recommendation that the Developer should pay an allocated portion
of the cost for preparation of this traffic impact study and street network analysis report.
It is proposed that the allocation of cost would be based on the tax lot(s) size in ratio to the total
area remaining to be developed within the study area. It is anticipated that this report will need to
be completed during the master planning work associated with the upcoming development
planned for the property to the north of the subject development.
4. Sfreet Lavout: As noted above, the proposed intersection connection of Otto Boulevard to Taylor
Road does not provide for the minimum intersection separation distance required. Depending on
the conclusions derived from the street network analysis of the traffic study described above, the
orientation and layout of the streets may need to be modified from the street layout presented in
the tentative plan. In particular would be the potential requirement for the movement of the Otto
Boulevard intersection along Taylor Road so that the intersection either is moved further to the
east, away from the Brad Way intersection to obtain the required separation, or to move the
intersection to the west, and align Otto Boulevard with Brad Way. Both scenarios would require
the Developer to obtain land which he does not currently con#roI and which he may not be able to
obtain. The traffic study may identify other traffic control measures which could be installed on
Taylor Road, Otto Boulevard, andlor Brad Way, which might mitigate the safety and traffic
J /
Bohnert Pstates
7'extative Plan Review
PWD StaJj"Report
May 13, 1999
Page S
conveyance concerns that would be the result of the lack of the required spacing between
intersections.
5. Otto Boulevard Callecfar Street Designation It is the City's PWD recommendation that if Otto
Boulevard is to function and be classified as a "collector street", as described in the City's
comprehensive plan, as currently required by ODOT for the development of collector streets and
the provision for alternative modes of transportation. then the traveled way width (measured from
curbface-to-curbface) shall include provisions for a minimum of two 'I2-foot-wide travel lanes,
traffic turning lanes (14 feet in width, as required}, and bicycle lanes B feet in width as measured
from the curb face. !t is also the City's PWD recommendation that if street parking were required
by the developer on Otto Boulevard, that the street section width be increased by 6 or 12 feet,
depending on if the Developer would request parking on one or both sides of the street. The total
right-of-way dedication required for this "collector street" must include the development of 4.5 foot
minimum width sidewalks, and a 2.5 foot-wide strip of land (which is located behind the sidewalk
within the right-of--way far installation of water meter service boxes, fire hydrants, street light
bases, etc}, on both sides of the street.
The City's PWD and Planning Department are working with consultants on revising street-section
requirements to possibly include the incorporation of a planter strip between the curb and the
sidewalk. This planter strip would be a minimum of 3-feet wide and provide a space for placing
"street trees", and other decorative plantings, and allow for provision of a "safety buffer" between
the curbline and the sidewalk for pedestrians. This would require supplemental righ#-of-way
designation and increase in sidewalk widths from the ~i.5-foot-width minimum to a b-foot-width
minimum. The Developer is encourage to look at and possibly incorporate this type of "neo-
classic" street design into the proposed subdivision.
As illustrated on the tentstive plan, additions! turn lane and entrance lane street section width (and
corresponding right-of-way width} may be required on Otto Boulevard at the intersection with
Taylor Road.
6. Benston Drive Callectc,r Street Designation If Benston Drive is to be classified as collector
streets to accommodate the projected future traffic flows from surrounding development, then the
PWD is recommending that the street section width and required right-of-way dedications would
be similar to the requirements fisted above for collector street designation of Otto Boulevard.
7. Improvements an_d Access to Taylor Raad: Taylor Road along the frontage of the subject tax
lot is a rural road that does not meet City or County urban standards. The road will need to be
improved, as a minimum, to meet City standards. The Developer will be responsible for, as a
minimum, all "half-street" improvements to Taylor Road along the proposed development's
property frontage with Taylor Road, and any applicable taper or end sections. The improvements
include, but are not limited to, street section, curbs, gutters, sidewalks (preferably meandering
sidewalks set back a minimum of 3-feet from the back of curb), an irriga#ed landscape buffer, bike
laneslways, street lighting, storm drainage, and traffic control and delineation, which shall be
coordinated and approved by the JC Roads and the City PWD, and designed and constructed at
the expense of the Developer as part of the development of the proposed residential subdivision.
The planned street section for Taylor Road will have acurb-to-curb width ranging from 60 to 72
feet. The actual paved street width required will be determined by the estimated traffic flows
:~~- ~~
Bohnert Estates
Tentative Plan Review
PWI? Sta~Repor•t
May 25, 1999
Aage 6
expected for the intersection presented in the traffic study and impact report to be completed for
this area, and the road design determined by the City PWD. Sidewalks will need to be 6-feet in
width.
We are also recommending that no permanent access be allowed onto Taylor Road from the
Development's property. This will require that lots ~ and 2 will need to have access on Otto
Boulevard, and remove any existing access to Taylor Road. A suitable fence {constructed in
accordance with City requirements} should be installed along the property's frontage with Taylor
Road, with a provision that no gates be allowed to be constructed in the fence which would allow
ingress or egress to Taylor Road. If the Developer will require temporary construction access to
Taylor Road to facilitate construction equipment traffic, then the City PWD would concur with this
temporary access if it is approved and as permitted by the Jackson County Roads and Parks
Services {JC Roads).
As approved by the City Administrator, the Developer may request or be required to defer any or
all of the required improvements along Beall Lane until a later date. If any or all of the
improvements are to be deferred to a later date, then the Developer wi[I be required to enter into a
suitable deferred improvement agreement with the City/County for the development/improvement
of the street section and appurtenances {i.e. sidewalks, curb, gutter, street lights, landscape
buffer, storm drainage, etc.) along the development's frontages wi#h Beal[ Lane, as required and
approved by the JC Roads and City PWD.
$. Other Roadwa !m rovements; The Development will likely impact off-site arterial and collector
roadways and intersections including, but not limited to, Grant/Taylor, TaylorlHaskefl,
Haskell/Pine, Pine/Highway 99 and Grant/Beall roads and intersections. The extent of these
impacts is unknown at this time, but will be quantified as a part of the pending traffic study
(discussed in item 3 above}. It is recommended that if the City does not have a street SDC for
collector and arterial streets improvements established at the time of building permit issuance for
this proposed development, that the Development will be responsible for its cost share of the
improvements made to the transportation system to mitigate the impacts to the system, as noted in
the traffic impact study. The cost share attributable to the impacts presented by this Development
will be quantified in the trafFc s#udy.
9. ;Erasion Control Plan: To meet current DEQ requirements, and pending federal mandated
Phase 11 Storm Water Quality requirements, a suitable erosion control plan, utilizing best
management practices and procedures, must be prepared and submitted to the Oregon
Department of Environmental Quality {DEQ) and the City PWD for review and approval for the
construction of any improvements associated with this development. The construction plans
associated with this development will not be approved by the City PWD until the City PWD
receives a copy of the written approval of the erosion control plan by the DEQ. The approved
erosion control plan must then be implemented to control and mitigate construction site storm
water run-off, erosion control, sift and sand migration, nuisance dus# generation and migration,
and pollution prevention.
'10. Griffin Creek Setbacks :The Developer should address the requirements of CPMC Chapter
'17.f0 pertaining to setbacks from floodways and creek banks, and CPMC Chapter 8.24 pertaining
6~
F}ohnert Estates
Tentative Plan Revietiv
PWD Sia~'1Zeport
May 2S, 1999
Page 8
was not the result of the flow demands of the development, but is the direct result of providing
additional capacity for the supplemental demands that may be placed on the water distribution
system caused by additional surrounding future development (that is not related to the proposed
development), or to address existing capacity shortcomings.
The reimbursement methodology for water line up-sizing includes payment of the estimated
material cost differences for the 8-inch-diameter versus 12-inch-diameter pipe and appurtenances.
This reimbursement methodology is very similar to the methodology used by the Medford Water
Commission for this same type of water line up-sizing. The methodology involves the City staff
performing a pipe material take-off and determining the quantities of pipe materials needed. City
staff will then obtain price quotes for the materials from two local material vendors. The staff will
then average the quoted prices and develop a materials cost sheet for the 8-inch-diameter pipe
and appurtenances and the 12-inch diameter pipe and appurtenances. The difference in the total
materials costs obtained for the 8-inch-diameter and the 12-inch-diameter water line and
appurtenances would be the amount that was eligible for reimbursement to the Developer. The
reimbursement can be by direct reimbursement to the developer, or by credits issued against
copection of City wa#er distribution system development charges (SDC) for the proposed
development. Direct reimbursement can only be accomplished if adequate funds are available in
the City's water distribution SDC fund and the funds have been identified and approved for
reimbursement to a particular development in the fiscal year in which reimbursement is requested.
13. RRVID Facilifies: If the development will require the alteration or modification of existing Rogue
River Valley Irrigation District {RRVID) irrigation facilities, then the Developer should be required to
coordinate with and perform the required alterations/modifications to accommodate the proposed
development and maintain the RRVID facilities, as approved by RRVID.
14. Sight-Triangles: Field review of the subject property`s access to Taylor Road indicate that
sight-triangles can be developed only with significant tree and other vegetation removal an the
Development`s property and on Tax Lot ~~402 to afford the proper sight vision triangles for a
collector street connection (Otto Boulevard) to a secondary arterial street (Taylor Road). This
type of street intersection requires establishment and maintenance of a minimum 55-foot sigh#
triangle, unless o#herwise permitted by the PW Director in accordance with AASHTOIITE
standards. The location of the sight vision triangles shall be illustrated on the construction plans
prepared and submitted for the proposed development. The sight vision triangle areas should be
cleared of any obstructions prior to the commencement of construction work on this project.
General
Alf construction of public improvements shall conform to the City's PWD Standards, the conditions
approved and stipulated by the Planning Commission, and other special specifications, details,
standards, and/or upgrades as may be approved by the City Administra#or or his designee prior to
the approva! of the construction plans for the proposed development. During construction,
changes proposed by the Developer shall be submitted in writing by the Developer's engineer to
the City PWD for approval prior to implementation.
2. Developer shall provide copies of any permits, variances, approvals, and conditions as may be
required by other agencies, including, but not limited to, the Oregon Department of Fish and
~~.. 6~
Rohnert Estates
Tentative Plan Revretiv
PWD 5tafj"Repw•t
May 25, 1999
Page 9
Wildlife (DFW}, Oregon Department of Environmental Quality (DEQ), Oregon Division of State
Lands (DSL}, U.S. Army Corps of Engineers (ACOE), affected irrigation districts, and JC Roads,
as applicable.
3. Prior to approval and acceptance of the project, the Developer's engineer or surveyor shall
provide the Public Works Department with "as-built" drawings. if feasible, the Developer's
engineer or surveyor should provide the drawings in both a "hard copy" form (produced on Mylar®)
and in a "digital" #ormat compatible with AutoCAD~, or other form as approved by the City I'WD.
As-built drawings are to be provided to the City which provide "red-line" changes to final approved
construction plans that identify the locations and or elevations (as appropriate) of actual installed
items, including, but not limited to, invert, inlet, and rim or lip elevations; spot elevations identified
on drawings; road alignment; wa#er lines, valves, and fire hydrants; water and sewer lateral
stationing; modifications to stree# section; manhole and curb inlet locations; s#reet light locations;
other below grade utility line locations and depths; etc. Provide a "red-line" hard copy (on
Myla~), or an approved alternative format, of construction drawings, and if feasible, an acceptable
AutoCAD~' compatible drawing electronic file to the City at completion of construction and prior to
acceptance of public infrastructure facilities completed as part of the proposed development, or as
otherwise approved by the City Administrator or his designee.
~4. All elevations used on the construction plans, on temporary benchmarks, and on the permanent
benchmark shat[ be tied into an established City approved benchmark and be so noted on the
plans. At least one permanent benchmark shall be provided for the proposed development, the
location of which shall be as jointly determined by the City PWD and the Developer.
5. If applicable, all existing concrete, pipe, building materials, structures, clear and grub materials,
and other deleterious materials shall be removed from the site and either recycled or properly
disposed of in accordance with the requirements of the DEQ.
6. Easements for City infrastructure (i.e. sanitary sewer, water, and storm drain [if applicable]) should
be a minimum of 15-feet wide, and should not split lot lines. Easements for public storm drainage,
sanitary sewer, and water fines should be dedicated #a the City and not just a P.U.E. Centerline
of buried infrastructure shall be aligned a minimum of five (5) feet from the edge of the easement.
If two or more City owned utilities are located within an easement, then a minimum of 20-foot width
for the easement should be required. Easement dedications in final deeds or CC&Rs need a
statement which should clearly indicate that easements must be maintained with suitable,
driveable vehicular access to City public infrastructure facilities, as determined by the City PWD.
7. Prior to the City PWD final approval of the construction plans for the proposed improvements, the
following should be submitted:
^ A copy of written approval from Fire District 3 of the final street and driveway layout, site
access, fire hydrant placement, and water system improvement plans for the proposed
development.
^ The plans relating to the sanitary sewers should be approved in writing by BCVSA, and
the appropriate signature blocks should be completed on the plans.
?3ohnert Estates
Tentative Plan Review
PWD Staff Report
May 25, 1999
Page 1 D
^ A copy of written approval from JG Roads regarding Taylor Road improvements (as
applicable) and temporary construction access connections to Taylor Road.
$. Field verify all existing infrastructure elevations and locatians (i.e. pipe inverts, curb elevations, top
of banks, ditchlchannel inverts, street elevations, etc.), to which the proposed development's
infrastructure will connect into existing improvements, prior tv final construction plan design and
submittal for final approval.
9. Overhead power lines. If applicable, coordinate efforts with Pacific Power and Light, US West,
and TCI Cable, to convert any overhead electrical power, telephone, or cable facilities within or
adjoining the proposed development to underground facilities, prior to the acceptance by the City
PWD of the public improvements associated with the proposed development. All agreements and
costs associated with the conversion of these facilities from overhead to underground facilities,
shall be by and between the utility owners and the Developer.
10. The accurate locations of any existing underground and above ground public infrastructure, and
the location of the associated easements with these facilities, shall be accurately portrayed (both
horizontally and vertically) on the construction plans, as-built drawings, and final plat map, as
applicable.
~ 1. The Developer's engineer or surveyor shall provide to the Public Works Department a drawing of
the recorded Final Plat map reproduced on Myla~' and in an acceptable electronic form in
AutoCAD® format. The Final Plat shall be tied to a legal Government corner and the State Plane
Coordinate System. The Final Plat shall either reflect or be later modified to reflect any applicable
"red-line" changes noted in the construction "as-builts", at the discretion of the City Administrator
or his designee, and as permitted bylaw.
'12. If applicable, Developer shall provide a Statement of Water Rights {on a City approved form), for
any affected properties of the proposed development that have existing water rights, or which are
going to obtain water rights. Far properties determined to have water rights, the developer will
coordinate with the State Watermaster the re-allocation of any waters attached to lands no longer
irrigable as a result of the proposed development.
StreetslTraffic
Existing Improvemen#s - Taylor Road -Secondary Arterial. Current ROW 60' wide, varying
street width. Right-of Way required: 44 feet north of centerline.
Construction drawings for this Tenta#ive Plan shall include a Street Lighting Plan and Traffic
Delineation Plan in accordance with the requirements of the City PWD. Additional street lights will
also need to be installed at the intersection of Otto Boulevard and Taylor Road, along Taylor
Road, and the s#reets and intersections of the proposed subdivision in accordance with City
requirements. The street lights an Taylor Road will be at approximate 200-foot spacings. Street
lights installed within the Development shall be placed in a "zig-zag" pattern along the streets and
a# maximum 200-foot spacing (as measured from light post to light post) to afford proper lighting of
the public rights-of--way. The Street Ligh#ing Plan shall be of a design and at locations as
approved by the City PWD and Pacific Power.
J r - ~ V
13ol~nert Estates
Tentative Plan Review
PWD Stafj"Report
May 25, 1999
Page 11
2. The City PWD, at the cast of the Developer, shall evaluate the strength of the native soils and
determine the street section designs for the subdivision's streets and Taylor Road in accordance
with the City PWD Standards. The City's engineering staff or selected engineering consultant (at
Developer's expense}, shall evaluate the strength of the native soifs and determine the street
section designs in accordance with the City PWD Standards. Minimum street section for the
subdivision streets shaft be as follows:
- 3-inches Class "B" A.C.
- 6-inches of 314"-g" crushed rock
- 8-inches of 4"-0" crushed rock (City of Medford specifications},
- Woven geotextile fabric over compacted subgrade.
Minimum street section for Taylor Road shall be as follows:
- 4-inches Class "B" A.C.
- 8-inches of 314"-0" crushed rock
- 14-inches of 4"-0" crushed rock (City of Medford specifications},
- Woven geotextile fabric aver compacted subgrade.
Street section (excluding the asphalt concrete por#ion) shall be extended underneath and a
minimum of two feet beyond the curb and gutter section.
3. As applicable, s#op signs and traffic delineation (i.e. "stop bars") shall be required and installed by
the City PWD {at the Developer's expense} at the proposed development's intersection with
Taylor Road, and the intersections with Otto Boulevard.
Storm Drainage, Irrigation Improvements
1. The developer shall develop a plan for the storm drain collection and conveyance system which
provides far run-off from and run-on onto (including surface water conveyance) the proposed
development, any future and existing development on adjacent properties, and any areas deemed
by the City that will need to tie-into the proposed development's storm water collection and
conveyance system {i.e tax lots to the west of the proposed development).
2. Storm drainage conveyance pipe stub-outs, through suitable easements in the development, will
need to be provided and storm dram conveyance lines may need to be up-sized as necessary to
accommodate existing and future developed property storm water run-off from the applicable tax
lots {i.e. "Area of Benefit"} located to the west of the proposed development. if the storm drain
lines are needed to be up-sized from the size necessary to accommodate the proposed
development and the storm water fifows from the existing development of the tax lots (i.e. "Area of
Benefit"} in the vicinity of the proposed development, to provide additional capacity to
accommodate the projected future developed flows of the Area of Benefit tax lots, then the PWD
would propose to compensate the Developer far the upsizing above a minimum pipe size of 24-
inch-diameter as per the methodology approved by the City Council.
J
~ohnert Estates
Tentative Plan Review
PWD Staff Report
May 25, 1999
Page 12
3. During the design of the storm drain collection and conveyance system (SD System), the
Developer shall demonstrate that the storm water flows from the completion of the proposed
development (and at any time prior to completion of development) do not exceed predevelopment
flows; or that existing capacity, allowances, or provisions have been made (and approval of the
applicable properties owners and regulatory agencies have been obtained), which accommodate
any additional flow which exceed predevelopment flaws. The Developer and the City PWD shall
agree on the applicable run-off coefficients, curve numbers, retardance, etc., to be used in the
engineering calculations.
4. Developer's engineer steal[ provide a site drainage plan with the facilities being designed, at a
minimum, to accommodate a 10 year storm event. The SD system must be designed to
adequately drain the 10-year storm event without surcharging or must be provided with adequate
storage to prevent surcharging; and be designed to not impact exis#ing public storm drainage
facilities. Any private storm drain system exceeding 3-inches in diameter shat! be designed to
directly connect to the public storm drain system (at a manhole or curb inlet only), and shall not be
designed to discharge to the street surfaces.
5. Roof drains and underdrains shall not be directly connected to public storm drain lines, and shall
drain either to an on-site private storm drain system or discharge at the curb face.
6. Any discharge points of the storm water facilities shall be designed to provide an aesthetically
pleasing, useful, and low maintenance facility, that are designed to mitigate erosion, damage, or
loss during a 100 year storm event associated with Griffin Creek, as applicable; and that mitigate
the "attractive nuisance" hazards associated with these types of facilities. Developer's engineer
steal! determine how SD system will work during 10-year and 100 year flood events associated
with Griffin Creek. Identify the HGL in Griffin Creek during the 10-and 100-year storm events,
and what affect it will have on the proposed outlets and storm drain system. System should be
designed to adequately drain 10-years#orm without surcharging or should be provided with
adequate storage to prevent surcharging; and be designed to prevent backflow of water from the
creeks up into SD system during storm events.
7. Prior to City PWD construction plan review, the Developer shall provide the City PWD with a
complete set of hydrologic and hydraulic calculations and profile plats for sizing the SD system,
which shall incorporate the use of the City PWD's rainfall/intensity curve, and City approved run-
off coefficients, curve numbers, retardance, pipe roughness coefficients, etc., that are used in the
engineering calculations.
$. Storm drain pipe materials shall be PVC, HDPE, or reinforced concrete, with water-tight joints
meeting the requirements of ASTM D3212, F477, and C-443M, as applicable. Provide concrete
(in areas within the rights-of--way) orsand-cement slurry (in areas outside the rights-of-way)
encasement where required in areas of minimum cover.
9. If inletslcatch basins are to exceed 4.5 feet in depth from the lip of the inlet to the bottom of the
catch basin, then the inlets and catch basins shall be designed to afford suitable "man" entry for
maintenancelcieaning purposes.
- ~i
Rohnert Estates
Tentative Plan Review
PWD Staj}'Reporl
May 25, 1999
Page 13
10. Developer's engineer shall provide hydrology and hydraulic calculations and flow line plots far
private and public storm drains. Plot FiGL on profile or provide a separate profile drawing #hat
indicates the HGL on the profile. Pipes should maintain cleansing velocity {minimum 2.0 feet per
second} and have adequate capacities without surcharging during the design s#orm.
11. The Developer may wish to incorporate the use of a perforated SD system. If so, then the
perforated storm drain system shall be designed to have adequate capacities to:
C] Canvey the collected groundwa#er and storm water with the minimum cleaning velocities
and without surcharging the collection and conveyance piping; and
C7 Minimize silts, sands, gravels, and fines migration from the native soils into the SD system.
The plotted HGL shat[ include both the groundwater infiltration, and the storm water run-off and
run-on inflows into the SD system.
12. Maintain a minimum 0.2-foot drop between inlet and outlet pipe inverts in manholes and curb
inlets, unless flow-through velocities during the design storm event exceed 3.0 feet per second
(fps). If flow velocities exceed 3.0 fps and the inlet pipe is in relatively direct {i.e. 180 ~ 5 degree}
horizontal alignment with the outlet pipe, then as a minimum, the pipe slope shall be maintained
through the base of the manhole or curb inlet. If flow velocities exceed 3.0 fps, and there is other
than relatively direct horizontal alignment between the inlet and outlet pipes, then a minimum of a
0.1-foot drop between inlet and outlet pipe inverts in manholes or curb inlet must be maintained.
A bottom channel shall be formed in the manhole or curb inlet base to mitigate transitional losses
and enhance flaw through the manhole or curb inlet.
13. Sheet flaw surface drainage from the property onto the public rights-of--way or onto neighboring
properties is unacceptable, with the exception of surface drainage from front yards. The City has
been permitting a variance from this requirement {and the municipal code) in regards to allowing
surface drainage from front yards of residential development.
Sanitary Sewer
1. Ali sanitary sewer collection and conveyance system {SS System} design, construction and testing
shall conform to the standards and guidelines of the Oregon DBQ, 1990 APWA Standards,
Oregon Chapter, Bear Creek Valley Sanitary Authority {BCVSA}, and the City PWD Standards,
where applicable.
2. The construction plans and the as-built drawings shall identify lateral stationing for construction of
sewer laterals.
3. The City upon completion of initial construction plan review and preliminary approval, will forward
the plans to BCVSA for completion of the review process. Upon completion of the review by
BCVSA, completion of final revisions to the plans by the Developer's engineer, and following the
final approval and signature on the construction plans by BCVSA, the Public Works Director will
approve the plans in final form.
"~ 2
L3o'anert Estates
Tentative flan Review
PWD Staf}"Report
May 25, 1999
Page 14
4. All testing and video inspection of (fines and manholes shall be done in accordance with BCVSA
requirements, at the Developer's expense. The Developer shall provide BCVSA and the City with
test reports, TV reports, and certification, as applicable of the sewer system construction prior to
final acceptance.
Water System
- Existing 12-inch-diameter water line installed in Taylor Road.
1. The water system shat[ be designed to provide the required fire flow demand capacities for the
proposed development, which meet Fire District 3 requirements, with fire hydrant placement as
approved by the City PWD and Fire District 3. Maximum spacing of fire hydrants shall be 300
feet, unless o#herwise approved by Fire District No. 3 and City PWD. If feasible, the water
system shah be of reinforced flow {"looped") design, with valved connections {taps or direct
connections} to the existing 12-inch-diameter waterline in Taylor Road. Water service lateral
connection sta#ioning and size shall be provided on construction plans and as-built drawings.
2. Developer shall comply with Oregon Health Division {OHD) and City requirements for backflow
prevention.
3. Water service meter boxes shall be City PWD specified "Christy" brand meter boxes, that
accommodate the Sensus touch-read equipment. City PWD will perform all "hot" connections to
active water lines {including service lateral taps), unless otherwise approved by the Public Works
Director.
Site work, Grading, and Utility Plans
Grading plans should have original/existing grades and final grades plotted on the plan. Typically,
existing grade contour lines are dashed and screened back, and final grade contour lines are
overlaid on top of the existing grades and are in a heavier line width and solid. Contour lines
should be labeled with elevations.
2. All structures shall have roof drains, area drains, andlor crawl spaces with positive drainage away
from the building.
3. Provide City with a utility plan approved by each utility company which reflects all utility line
locations, crossings, transformer locations, valves, etc.
4. Utility locations must be accurately included on the as-built drawings, or as a separate set of
drawings attached to the as-built drawings.
5. AI[ fill placed in development shall be engineered fill that is suitably placed and compacted in
accordance with City PWD and current adopted UBC standards, except for the upper 1.5-foot of
fill placed outside of public rights-of--way and that does not underlie buildings, structures, or
vehicular access ways or parking areas.
~~