Loading...
HomeMy WebLinkAboutResolution 467 - Tyerman Variance~~~~ 3 PLANNING COMMISSION RESOLUTION N0.467 A RESOLUTION GRANTING A VARIANCE {Applicant: Dr. Curtis L. Tyerman P.C.) {372W 11 BB Tax Lot 400) Recitals This matter came before the Planning Commission for hearing on November 2,1999, on applicant's application for a variance. Appl icant requested a variance from the parking and maneuvering requirements. The Planning Commission reviewed the application and the City staff reports, and received comments from all persons wishing to be heard in favor of and opposed to the application. Now, therefore; BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. Criteria A Iicable to Decision. The following chapters of the Central Paint Municipal Code apply to this application: A. Chapter 17.36, C-2, Commercial-Professional District; B. Chapter 17.80, Variances. Section 2. Findin sand Conclusions. The Planning Commission hereby adopts by reference all finding of fact set forth in the City staff reports, and concludes that applicant has demonstrated compliance with the requirements of CPMC Chapter 17.80, pertaining to variances. Section 3. Variance Granted. Appliance is hereby granted approval for the requested variance consisting of changing the required amount ofparking places from 11 to 9 and far employee maneuvering in the alley. Passed by the Planning Commission and signed by me in authentication of its passage this 2 day of November, 1999. ~~ Planning Commission Chair ATTEST: Approved by me this ~- ~ day of ~J~t~ Planni 199~.~ ssion Chair Page 2 - PIanning Goanmission Resolution No. 467 {11021999) Attachment A RECOMMENDED PLANNING CONDITIONS Of APPROVAL } . The approval aftlle Site Plans}1al1 expire in one yearon November 2, 2x00 unless an application for a Building permit Oran application forextension has been received by the City. T}-re applicant shall sub~rvta revised site plan depicting any changes discussed and approved atthe puBlicllear-ing within 30 days of P}arming Commission approval. 2. The project must comp}y wide a}} app}icab}e local, state and federal regulatioms . The project must meet the off-stxeet parking requirements for professional offices, and the parking, access and maneuvering areas shal} Be paved with durable materials far a!}-weather use and approved by the Public Works Department. 11CPPDPDC1City WidclPlanninb199(153~.WE'U ~~ 3i 1:171 t~l t.# rvlf~~ll r't)Ir~ll (~f:f'f~f: J~l4f_N7 ()f= f'U(.;(.1(; lNc~l:f~;~ S~Af=f= f~IPOR~I for l~yerrr~ar~ t7er~tal Clinic nliraC~1i11~t1~ B 348 Oak Street Gommerciai Facility Site Plan PW#99053 Date: Applicant: Property Owner: Agent: Project: Location: Legal: Zoning: Plans: Report By P(~rpose September 14, 1999 Curtis L. Tyerman, P.G., 57 North 2nd Street, Central Point, bR 97502 Same as Applicant Steven G. Sherbourne, 29 South Grape Sfreet, Medford, OR 97501 Dental Clinic Building 348 Oak Sfreet (SW corner of Oak and 4'" Sfreefs) T37S, R2W, Section 1188, Tax Lot 400 G-2 Site Plan w! building elevations submitted by Pacific Pioneer Design Group, dated fi128/99 Pau[ W. Worth, Public Works Technician Provide information to the Planning Commission and Applicant (hereinafter referred fo as "Developer"} regarding Public Works standards and additional standards and requirements to be included in fhe design. Gather information from the DeveloperlEngineer regarding proposed development. Special f~equlremenfs Oak Sfreef ancf Fourffr Sfreet Improvements: Sidewalks: if is recommended that the Developer be required to construct new 6-foot wide curbside sidewa]ks, wheel chair ramps and driveway aprons meeting City PWD standards along the Oak Street fran#age. Developer should also be required to remove and replace the existing sidewalk on the 4~' Sfreet frontage with a new 5-foot wide sidewalk, separated by fhe existing landscape strip between the curb and sidewalk. The landscaped strip on r4~' Street and the Right-of-Way (ROW} behind the Oak Street sidewalk shaft be planted and maintained in compliance with City Orc#inances and PWD standards. 2. AIIey lmpravemer7fs: The alley along the southern boundary of the property is unirr-proved. The plans indicate that there wit( be parking movements that will take access off the alley, which wit[ result in backing and taming movements in the alley. This is prohibited in the City's fvtunicipal Gode under Section 17.64.100 (1=} (3}, If access will be taken from the alley to the property, then it is recommended that the Developer be required to improve the alley to current PWD standards. Typically this requires a minimum of a 3-inch thickness of Class B asphalt over 6-inches of 314-inch-minus base rock and 8-inches of 4-inch-minus sub-base rock. Woven geotexfile fabric is required to be placed overtaying the subgrade. The broken concrete alley apron and sidewalk ~rril[ also require removal and replacement to current PWD standards. Construction of the alley apron to current standards will require that the existing catch basiralinlef be relocated to the north. .`~ Q ... ., r•,,~, ~tr)rrtt tiv,tter CC~llt~car~trt ;tnd Cc~rlvt'y4~rtCr: I~tcrlrtr[~s shalt a[sct bra constructed or reconstructed to txovrdc' for storm ~vafr'r canvey~trtce front srtrface drainage of thc~ alley and ~~d<acent parkrng <trc'a, so #hai the sc,ri<tt'r, cSrarrt~tge dogs riot shec~# flow across ttte srdcwafic/driveway at the alley entrance 3 Site Drairr~~e/Storrrr tJrairr Plart: ft is recosttntended that the developer design and intpfentent a site drainagetstorrn drain plan that corrects and enhances existing site drainage for the entire area noted on the site piart. Sheet (low surface drainage from the property onto the public rights-of-way (including the alley} or onto neighboring properties is unacceptable. The stornt drainacde infrastructure will be privately operated and maintained. A suitable system will need to be designed far a rrtinimunt 1Q-year storm event. The discharge paint and potential retention of storm water run-off shall be coordinated with aspects of the proposed development to provide an aesthetically pleasing, efficient, and low maintenance facility. The storm water retention facilities shaft be designed to rr~itigate erosion and sediment and hydrocarbon deposition, and to mitigate the "aftracfive nuisance' hazards associated with these facilities. The developer shall also secure written permission to connect/discharge into adjoining City storm water conveyance facilities. Catch basins, curb inlets, orifice boxes and area drains shaft be designed for sediment and petroleum hydrocarbon retention. The PIND will require a copy of the engineers hydrology and hydraulic computations. Drrvewa~s, Access Roads, and Parkinc~Areas: It is recommended that the driveways, access roads, and parking and Earning areas on the proposed development be designed and positioned in a manner that accommodate the turning movements and access of an AASI-tT0 single unit truck and the Fire District's requirements. All driveways, access roads, and parking areas should either Dave asphalt or cerrrent concrete surfaces. The driveway entrance "throat"off of Oak Street needs to be moved a minimum of Q feet to the west to meet the minimum setback of 30 feet from the property lines at the intersection of Oak and Fourth Streets. Driveway throat is narrow for two way driving. 5. ~xistfnq lrtfrasfructure: The Developer shalt provide suitable engineering cert€fication and justification {i.e. calculations, analyses, plots, etc.,) that aN connections to existing infrastructure (i.e. street; wafer, sanitary sewer, storm drain systems; natural drainage systems; etc.,) will not interfere with or provide for the significant degradation (in the opinion of the Public Works Director) of the existing effective level of service ar operation of the infrastructure faci{ifies, and that the existing infrastructure facilities have either adequate capacities to accommodate the flows andlor derrtands imposed on the existing infrastructure as the result of the connection of the proposed development's infrastructure; or the existing facilities will be {reproved by and at the expense of the Developer to accommodate tf~e addifionai flows andlor demands while maintaining or improving the existing effective level of service of the affected facility. Q. Ufilif ~asemertfs: A 10-foot wide public utility easement (f'Ufr) will be required along tine property's frontage with Oak and 4°i Streets. 7. Wafer Service: The Cify has no record of water service to Phis tax lot, t# is not known if a #ap to the water main in Oak street exists. If no existing service exists then all SDCs and associated fees for connection wit! be required. The Developer shalt determine with the t3uifding Department what size service line anti meter wilt be required to servir~ the proposed development J Y •) 1'~rtr { General Devefoprrrenf Plans: Developer shaft submit to file City's PWD for review and approval, engineered plans and specifications far all improvements proposed for construction or modifrcations within lire City or public rights-of-way and easements or far connections to Cify infrastructure. Plans shall show aft existing utilities and City facilities, existing contours, property lines, benchmarks and other physical site information needed for review. All plans submitted far PWO review shalt be presented in a common engineering scale sized to fit an 24- by 36-inch, D size drawing sheefs. PWD requires 3 sets of plans for review purposes. Public improvemen#s include, but are not limited to, streets (including sidewalks, curbs and gutters and landscape buffers}; alleys; storm drainage and sanitary sewer collection and conveyance systems; wafer distribution system {up to the service meter and including fire protection}; street lighting; and traffic cnntraf devices, street signs, and delineation. Alf construction of pubfic improvements shall conform to the City's PWD Standards, the conditions approved and stipulated by the Planning Commission, and other special SpecificatronS, de#aifs, sfandards, andlor upgrades as may be approved by the Cify Administrator or his designee prior to the approva[ of the construction plans for the proposed development. During construction, changes proposed 6y the Developer shalt be submitted in writing by the Developer's engineer to the City PWD for approval prior to installation. 2. Approvals: Fire District No. 3 (f€re hydrant placement, waterline sizing, and emergency vehicle access), Bear Creek Valley Sanifary Authority (BCVSA, for sanitary sewers}, and City of Medford Regional Water Reclamation Facility (commerciallindustria[ wastewater discharge permif} wriften approva# of construction plans shall be submitted to the City PWD prior to final construction plan review and approval by City PWD. 3. As-Builfs: Prior to approval and acceptance of the project, the Developer's engineer or surveyor shall provide the Public Works Department with "as-built" drawings. ~ If feasible, the Devefope~s engineer or surveyor should provide the drawings in bath a `hard Dopy" form (produced on Mylar°} and in a "digital" format compatible with AutaCAD°, or other farm as approved by the City PWD. As-built drawings are to be provided to the City which provide "red-line" changes to final approved construction plans which identify the locations and or elevations (as appropriate) of actual installed items, including, but not limited to, invert, inlet, and rim or lip elevations; spot elevations identified on drawings; water lines, valves, anti fire hydrants; water and sewer lateraE; modifications to street section; manhole and curb inlet; street light locations; other below grade utility linos; etc. Provide a "red-line" hard copy {on Mylar°}, or an approved alternative format, of construction drawings, and if feasible, an acceptable AutoCAD® compatible drawing electronic file to the Cify at comp€efion of construction and prior fo acceptance of public infrastructure facilities completed as part of the proposed development, or as otherwise approved by the City Administrator or his designee. ~. Elevafions: AI[ e€evatians used on the construction plans, on temporary benchmarks, and on the permanent benchmark shall be tied into an established Cify approved benchmark and be so noted on the plans. 36 ~; ._. .~. . , J `~ Fxis(rrrc~ Irrfr~~srrcrcfrrrC Ati <3i~pf,cat~IC, trC1d vi~rr(y all exl5tsng Ir~fr~~structure Clevt~llncis and locallor~s (r c prpe Inverts, curk~ elevatrons, slrcel elevattorls, e€c }, to whrch tf~e proposed developr~~ent wrll connect into exrstrng imprnven~ents, prior to frnal construction plan design and subml€tal for final approval The accurate locations of any existing underground and above ground public infrastructure, and the location of tl~e associated easements with these facilities, shall be accurately portrayed (both horizontally and veriically~ on t~~e construe€ion plans. G. Fi!! Placemer~f: Af! fill placed in the development shat4 be engineered fill that is suitably placed and compacted in accordance with pity PWD and C~uilding Department standards, except for the upper 1.5-feet of fill placed outside of public rights-of-way and that does not underlie building, Structures, or traveled vehicular access ways or parking areas, 7. Raad/DrivewaV/Parking Areas: The Deve4oper shaft evaluate the strength of the native soils and determine the access road, parking, and driveway section designs to handle the expected (Dads {including fire equipment} to be traveled on these private driveways, access roads, and parking areas, Need to provide section for review. The driveways, access roads, and frock parking and turning areas on the proposed development rr~ust be designed and positioned in a manner that will accommodate the turning movements and access of an AASf~TO Single Unit Truck without crossing into an opposing lane or additional (ravel lane of traffic. 8. UfilifV Puns: We did not receive any utility plans far the proposed development. The utility plans shat{ be drawn to scale with accurate horizonfal and vertical depiction of utility lines and appurtenances (transformers, valves, eic.}. As built drawings shall reflect alt utility locations; located both above and below ground. 9. Area Lighting Plan; Provide and implement an adequate area lighting plan for parking and public access areas, including the driveway entrance from 4~' Street, and if applicable, the alley as may be required by the City PWD. Plans should include the mast height, luminosity and effective light spread at ground level. Lighting shall be designed so as not to interfere with vehicle traffic on city streets. 10. Public Utility Easements: A minimum 1(~-foot wide public utilities easement (PUS} shall be dedicated on the proposed development for the installation of public utilities and shall be located outside the public rights-af-way. At a minimum, the PU1= should be aligned along the exterior boundaries of the property That border ~~' and Oak streets, if a PUS is not currently present in this area. 11 Clear Vision Areas: The site plan indicates that the proposed building is outside the sight- vision Triangle necessary for the alley connection to Oak Street. A 55-foot minimum sight vision triangle shat! be maintained at the property's corner of Fourth and flak Streets. 12. Fire HVdranfs: provide locations of existing and any new required f"sre hydrants. Fire Hydrants need to be connected to 8-inch-diameter and larger fines, if applicable, steamer ports at hydrants 4ocated near the building shat) face the buildings. Fire hydrants shall be suitably protected from potential vehicle damage and encroachment ~~ r~.r,, i 3 Wafc_ r Sysferrr Cross Corrnec(rorr Carrlrol Develt~per shtrll corr~piy wati~ Uregor~ f-teallfi Div€sron {Of~D) grid Ciiy requ€ren~enls for cross connection control Need to know protected activilres and wafer uses for existing and new cor~~nietcraf btn[dings to detern~rne requirements for cross connection control and fire protection. t3uild€ng service will f€kely require a backflow prevention assembly to be installed directly behind the City's meter. 1 ~. Wafer System: Construction drawings shalt include the size, type, and location of all water mains, hydrants, valves, service connection, meter, service laterals, and other appurtenance de#ai[s in accordance with City PWD Standards and as required by the City PWD. t5. Sanifa . Sewe,r_lndusfrial Discfrarge_Perrrrit; If applicable, obtain industrial discharge permit from City of Medford Regional Water Reclamation Facility {Medford RWRF). Obtain Medford RWRF's written approval to connect to the sanitary sewer system. Copy of application can be ob#ained from City PWD. T6. Roof/,4rea Drains: Atf s#ructures shaft have roof drains, area drains, andlor craw# spaces with positive drainage away from the building, Roof drains shall not be direr#ly connected to the public storm drain system. 17. Grading Plans: Grading plans should have original/existing grades and fina! grades plotted on the plan. Typically, existing grade contour tines are dashed and screened back, and fina! grade contour €ines are overlaid an fop of the existing grades and are in a heavier fine width and solid. Contour fines should be labeled with elevations. 18. Overhead Power Lines: if applicable, coordinate efforts with Pacific Power and fight, US West, and TC[ Cable, fo convert any overhead electrical power, telephone, or cable facilities within or adjoining the proposed development to underground facilities, prior to the acceptance by the City PWD of the public improvements associated with the proposed development. Alf agreements and costs associated with the conversion of these facilities from overhead to underground facilities, shall be by and between the utility owners and the Developer. 19. Sform_Drain Stisfem Des_gn: Prior to construction plan approval of the improvements for this development plan, the Developer's engineer shall provide the Cify PWD with a comple#e set of hydrology and hydraulic calculations and profile plots for sizing the site storm drain system. The engineer shall use the rainfalf(ntensifyrurve obtained from the Cify PWD for hydrology calculations, and the negotiated run-off parameters. 38 PLANNING COMMISSION RESOLUTION NO. 468 A RESOLUTION CONDITIONALLY APPROVING A SITE PLAN APPLICATION (Applicant {s}: Dr. Curtis L. Tyerman P.C.) (372 W 11 BB Tax Lot 400} Recitals l . This matter came before the Planning Gonlznission for hearing onNovember 2,1999, on applicant's site plan application fora 2250 square foot dental building in an C-2Commercial-Professional district of the City. The Planning Commission reviewed the application and the City staff reports, and received comments from all persons wishing to be heard in favor of and opposed to the application. Now, therefore; BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. Criteria Applicable to Decision. The fallowing chapters of the Central Point Municipal Cade apply to this application: A. Chapter 17.36, C-2 Commerical-Professional District B. Chapter 17.64, General Regulations; C. Chapter 17.64, Off-Street Parking and Loading; D. Chapter 17.72, Site Plan, Landscaping and Canstructian Plan Approval. Section 2. Findings and Conclusions. The Planning Commission hereby adopts by reference all finding of fact set forth in the City staff reports, and concludes that, except where addressed in the conditions to approval, the application and proposal comply with the requirements ofthe following chapters of the Central Point Municipal Code: A. Chapter 17.36, relating to uses, lot size, lot coverage, setback, building height and screening in the C-2 Commerical-Professional district; B. Chapter 17.60 relating to paving anal landscaping requirements; C. Chapter 17.64 relating to off-street parking and loading facilities; D. Chapter 17.72 relating to site plan requirements. Section 3. Conditional Approval. The application for site plan approval is hereby conditionally approved, subject to the conditions set forth in the Planning and Public Wa~lcs Staff Reports 1 -PLANNING COMMISSION RESOLUTION NO. 468 ( 11 021999 ) on Exhibit "A" and "B", which is attached hereto and by this reference incorporated hexein and the alley be improved belong the length ofthe property to handle employee parking. A 10 feet PL]E will be required along the property's frontage on Oak and Fourth, except for the portion in front of the dental building which will be reduced to 5 feet. . Passed by the Planning Commission and signed by me in authentication of its passage this 2 day of November, 1999. -- U~ o Planning Caznmissian Chairman ATTEST: City by me this _ a'~ day of ~1~sv-t~+.G~- , 19~`~ Planning Commission Chairman 2 -PLANNING COMMISSION RESOLUTION NO. 468_ ( 11 021999 } Attachment A RECOMMENDED PLANNING CONDITIONS OI; APPROVAL The approval of the Site Plan shall expire in one year on November 2, 2QQQ unless an application for a building permit oran application for extension has been received by the City. The applicant shall submit a revised site plan depicting any changes discussed and approved at the public hearing within 30 days of Planning Comrtrission approval. 2. The project must comply with all applicable local, state and federal regulations . 3. The project must meet the off-street parking requirements for professional offices, acrd the parking, access and maneuvering areas shall be paved with durable materials for all-weather use and approved by the Public Works Department. IICPi'Dr'DCICity WidclPlanning199U536.WPf] ~~ 31 CSI 1 1 t]t t:i N I Iv\E i't iIN 1 (~f_f'~f~ 1 rt~fEN7 Cif f'Uf3(_1{: Ih~C~f.h ti SZAFi= FtE=f'Oi11 far l~yermar~ t~er~tal Clinic 34II Oak Street Commercial Facility Site Plan PW#~99053 Date: Applicant: Property Owner Agent: Project: Lacafion: Legal: Zoning: Plans: Repor# By: Puroose 1~.ttachmen~ ~3 September 14, 1999 Gurus L. Tyerman, P.C., 57 North 2itl Street, Central Paint, bi; 97502 Same as Applicant Steven G. Sherbourne, 29 South Grape Street, Medford, Old 97501 Dental CIrnic Building 348 Oak Street (SW comer of Oak acid 4~' Streets) T37S, R2W, Section 1 X813, Tax Lot 400 C-2 Site Plan w! building elevations submitted by Pacific Pioneer Design Group, dated 6!28199 Paul W. Worth, Public Works Technician Provide information to the Planning Commission and Applicant (hereinafter referred to as "Developer"} regarding Public Works standards and additional standards and requirements to be mciuded in the design. Gather information from the Developerl~ngineer regarding proposed developmenf. Special Requirements Oak Sfreef arse! Faurr`h Sfreef (mpravements: Sidewalks: (t is recommended that the Developer be required to construct new 6-foot wide curbside sidewalks, wheel chair ramps and driveway aprons meeting City PWD standards along the Oak Street frontage. Developer should also be required to remove and replace the existing sidewalk an the 4~' Street frontage with a new 5-foot wide sidewalk, separated by the existing landscape strip between the curb and sidewalk. The landscaped strip on 4~' Street and the Right-af-Way {ROW} behind the Oak Street sidewalk shall be planted and maintained in compliance with City Ordinances and PWD standards. 2. Afle~lmt~ravernents: The alley along the southern boundary of the property is unimproved. The plans indicate that there will be parting movements tYiat will take access off the alley, which will result in backing and turning movemen€s in tFie alley- This is prohibited in the City's Municipal Code under Section 17.64.100 (E} (3}. if access wilt be taken from the alley to the property, then it is recommended that the Developer be required to improve the alley to current PWD standards. Typically this requires a minimum of a 3-inch thickness of Class B asphalt over 6-inches of 314-inch-minus base rock and 8-inches of 4-inch-minus sub-base rock. Wavers geotextile fabric is required to be placed overlaying tf-ie subgrade. The broken concrete alley apron and sidewalk will also require removal and replacement to current PWD standards. Construction of the alley apron tQ current standards w,rili require that the existing catch basin~nlet be relocated to the north- .`~ Q r .l,; .' ;~t<7rn1 tv,ttCr c;a!(c~cl,c~n ~~ru~} cornrtry~~nce i43c+lrfre5 sf~alf also tx~ ronstrcrcted or recons(ructed to ~~rourdr~' for slorrii tvalc~r convey~ar~ce front s~rr-face drarnage of the alley <~nd adjacent parff,ng area, so Ihaf the suriac~~ drarnagc~ dons r7ol sheet fioty across the srdewaffcldrrveway at the alloy enlranCe 3 Site Drairra_ge/Siornr Drairr Plart: ft rs recor7~n~ended that tf~e developer design and implement a site drainagelstarm drain plan that corrects and enhances existing site drainage for tf~e entire area noted an the site ptan Sheet flow surface drainage front tl~e properly onto ttie public rights-of-way {ir~cludrng the alley} or onto neighboring properties is unacceptable The storm drainage infrastructure will t?e privately operated and rt~aintained. A suitable system will need to be designed far a minimum tt?-year storm event. The discharge point and potential retention of storm water run-off shall be coordinated wffh aspects of the proposed development to provide an aestheticatfy pleasing, efficient, and law maintenance facility. The storm water retention facilities shaft be designed to mitigate erosion and sediment and hydrocarbon deposition, and to mitigate the "attractive nuisance' hazards associated with these facilities. The developer chaff also secure written permission to connect discharge into adjoining Cffy storm water conveyance facilities. Catch basins, curb inlets, orifice boxes and area drains shaft be designed for sediment and petroleum hydrocarbon retention. The f'WD will require a copy of the engineers hydrology and hydraulic computations. 4. Driveways, Access Roads and Parking Areas: (t is recommended that the driveways, access roads, and parking and turning areas on the proposed development be designed and positioned in a manner that accommodate the turning movements and access of an !'~SHTO single unit truck and the Ffre District's requirements. ,b,fl driveways, access roads, and parking areas should either have asphalE or cement concrete surfaces. The driveway entrance "throat"off of Oak Street needs to be moved a minimum of 6 feet to the west to meet the minimum setback of 30 feet from the property fines at fhe intersection of Oak and Fourth Streets. Driveway throat is narrow for two way driving. 5. E'xrsfin~ Infrastructure: The Developer shall provide suitable engineering certification and justification {i.e. calculations, analyses, plots, etc.,) that elf connections to existing infrastrucfure (t.e. street; water, sanitary sewer, storm drain systems, natural drainage systems; etc.,) will not interfere with or provide for the significant degradation (fn the opinion of the f~ubfic Works Director} of the existing effective level of service or operation of the infrastructure facilities, and that the existing infrastructure facilities have either adequate capacities to accommodate the flows andtor demands imposed on the existing infrastructure as the result of the connection of fhe proposed development's infrastructure; ar the existing facilities will be improved by and of the expense of the Developer to accommodate the additional flows and/ar demands while maintaining or improving fhe existing effective level of service of fhe affected facility. 6. UtiiifY Easemenfs: A 1 t?-foot wade public utility easement (PUf;} will be required along fhe property's frontage with Oak and 4`" Streets. 7 Wafer Service: The City has no record of wafer service io this tax lot. Ik is not known if a tap to the vrater main in Oak street exists. If no exfsfing service exists then all SDCs and associated fees for connection wit( be required. The Developer she!{ determine with the ~uifding Department what size service fine and meter will be required fa service ti7e proposed devefoprr,eni_ J .. ~ ^ . l ~. ., r •or... ,uy~h•nrh.-~ 1f JVVv General ~evelopnrenf Plans: Developer shall submit to the City's PWD for review and approval, engineered plans and specifications for aft improvements proposed for construction ar modifications within Ehe Gi#y ar public righfs-of-way and easements or for connections to City infrastructure. Plans shalt show all existing utilities and City facilities, existing contours, property fines, benchmarks and other physical site information needed for review. All plans submitted for PWD review shall be presented in a common engineering scale sized to fit on 24- by 3&-inch, D size drawing sheets. PWD requires 3 sets of plans for review purposes. Public improvemenfs include, but are not limited ta, streets (including sidewalks, curbs and gufters and landscape buffers); of€eys; storm drainage and sanitary sewer collection and conveyance systems; wafer distribution system (up to f#~e service meter and inc€uding fire protection}; street lighting; and fraffic control devices, street signs, and delineation. All construction of public improvemenfs shall conform to the City's PWD Standards, the conditions approved and sfipufafed by the Planning Commission, and other special specifications, defails, s#andards, and/or upgrades as may be approved by the City Administrator or his designee prior fo the approval of the construction plans for the proposed development. During construction, changes proposed by the Developer shaft be submitted in writing by the Developer's engineer to the City PWD for approval prior fo insfal[afion. 2. Approvals: Fire District l~lo. 3 (fire hydrant placement, waterline sizing, and emergency vehicle access), Bear Creek Valley Sanitary Authority {BCVSA, for sanitary sewers), and City of Medford Regional Wafer Reclamation Facility {commerciallindustrial wastewater discharge permit) written approva! of construction plans shalt be submit#ed to the City PWD prior to final construction plan review and approval by City PWD, 3. As-Builfs: Prior fo approval and acceptance of the project, the Developer's engineer or surveyor shaft provide the Public Works Department with ~as-built" drawings. if feasible, the Developer's engineer or surveyor should provide the drawings in both a hard copy" form (produced on Mylar/0} and in a `digital" format compatible with AufoCAD°, or other farm as approved by the City PWD. As-buflt drawings are fo be provided to fhe Cify which provide `red-line" changes to fnaf approved construction plans whiah identify the locations and or elevations (as appropriate} of actual installed items, including, buf not limited ta, invert, inlet, and rim ar lip elevations; spot e[evaffons identified on drawings; water fines, valves, and fire hydrants; water and sewer lateral; madificatians to street section; manhole and curb inlet; street light locations; other below grade utiGfy lines; efc. Provide a "red-line" hard copy (an Mylar°}, or an approved alternative format, of construct€on drawings, and if feasible, an acceptable AutoCAD° compatible drawing electronic fife To the City at completion of construction and prior to acceptance of public infrastructure facilities completed as part of the proposed development, or as otherwise approved by the City Administrator ar his designee. 4. Elevations: Afl e[evafians used on the consfrucfion plans, on Temporary benchmarks, and an the permanent bencf~mark shall be tied into an established Cify approved benchmark and tie so noted on The plans. 3s ~~ . . - ~. ...~~. , . ~1 ~.. ..., . , `, E~_rsfrnc~.lrr(r,~sfrrrcf[rrr" As tzpplrc~tttlc, Ireid verify ~tf{ exr>hng rnrrizslruClttrC elcv~~Irons artd {oc~~frorts (r c prpe reverts, curb eft'valiarts, street e#evatrons, etc ), fo w{trch i{ze proposed devefopn~ent wr{I connect into exrstrng irttprovernenls, prior io flea! construction plan design and submittal (or flea! approvat. 'f-he accurate locations of any existing underground and above ground public irtfrastruciure, and t{~e location of the associated casements wit{t these facilities, shall be accurate{y portrayed (both horizontally and verfica{{y) on lfte construction plans. ~ Fill Pl~cerrrent: All fill placed in the development shat{ be engineered €ill that is suitab{y placed and compacted rn accordance with City PWD and Building Department standards, except for the upper 1.5-feet of fill placed outside of public rights-of-way and that does not underlie building, structures, or traveled vehicular access ways or parking areas. 7. Road/Driveway/Parking Areas: The Developer shalt evaluate the strengftl of the native soils and determine Ehe access road, parking, and driveway section designs fo handle the expected {Dads (including fire equipment} to be traveled on these private driveways, access roads, and parking areas. Need to provide section for review. The driveways, access roads, and frock parking and turning areas on the proposed development must be designed and positioned in a manner that wi{{ accommodate the turning movements and access of an AASHTO Sing{e Unit Truck without crossing into an apposing lane or additional fravei lane of traffic. £3. Utility Plans: We did not receive any ufi{ity plans for fire proposed development. The utility p{ans shad be drawn to scale with accurate horizontal and vertical depiction of utility fines and appurtenances (transformers, valves, etc.}. As built drawings steal{ reflect all utility locations; located both above and below ground. 9. area Ligtrfinc~Plan: Provide and implement an adequate area fighting plan for parking and public access areas, inctuding the driveway entrance from 4'" Street, and if applicable, the alley as may be required by the City PWD_ Plans should include the mast height, luminosity and effective light spread at ground level. Lighting shall be designed so as not to interfere with vehicle traffic on city streets. i0. Puf~Iic Ufilit Easements: A minimum 10-foot wide public utilities easement (PUE} shall be dedicated on the proposed development for the installation of public utilities and shalt be located outside the public rights-of-way. At a minimum, the PUE should be aligned along the ex#erior boundaries of the property that border 4'~ and Oak streets, if a PUE is not currently present in this area. 11 Clear Vision Areas: The site plan indicates that the proposed building is outside the sight- vision Triangle necessary for the alley connection to Oak Street. A 55-foot minimum sight vision triangle steal{ be maintained at the property's corner of Fourth and Oak Streets. 12. Fire N~drants: Provide locations of existing and any new required fire hydrants. Fire t-iydrants need to be connected to 8-inch-diameter and larger lines. If applicable, steamer ports at hydrants located near the building shall face the buildings- Fire hydrants shall be suitably protected trout potential vehicle damage and encroachment .~ r~,r~. i ;? Wafer System Cross Canrrcctiorr Ca_rrfrol Developer sliali coriaply w:th C)regon f icalth Drvrsion (O1-iD) and City requirements for cross connecfior7 control Need Io know protected actrvitres and water uses for existrng and new contmercral btrrldrngs fo delern~ine requiren7enls for cross conneciron control and f€re protect:an. tuilding servrce wilt Irkely require a backflow prevention assembly to be installed directly behind the City's meter. i 4. Water S stem: Construction drawings shall include the size, Type, and location of all water mains, hydrants, valves, service connection, meter, service laterals, and other appurtenance details in accordance with Gity PWD Standards and as required by the City PWD. 15. Sanifa Sewer Industrial Dischar e Permit: if applicable, obtain Indus#rial discharge permit from Gity of Medford Regional Wafer Reclamation Facility (Medford RWRF}. Obtain Medford RWRF's written approval to connect to the sanitary sewer system. Copy of application can be obtained from City PWD. t6. Roof/Area Drains: Afl structures shall have roof drains, area drains, and/or crawl spaces with positive drainage away from the building. Roof drains shaft not be directly connected to the public storm drain system. t7. Grading Plans: Grading plans should have original/existing grades and final grades plotted on the plan. Typically, existing grade contour lines are dashed and screened back, and final grade contour fines are overlaid on top of the existing grades and are in a heavier fine width and solid. Contour Lines should be labeled with elevations. tB. OvertTead Pourer Lines: if applicable, coordinate efforts with Pacific Power and tight, US West, and TCi Cable, to convert any overhead electrical power, felephane, or cable facilities within or adjoining the proposed development to underground facilities, prior to the acceptance by the City PWD of the public improvements associated with fhe proposed development. Ali agreements and costs associated with the conversion of these facilities from overhead to underground facilities, shalt be by and between the utility owners and the Developer. 19. Storm Drain System Design: Prior to construction plan approval of the improvements for this development plan, the Developer's engineer sha11 provide the City PWD with a complefe set of hydrology and hydraeiic calculations and profile plots for sizing the site storm drain system. The engineer shall use the rainfall~ntensity curve obtained from the City PWD far hydrology calculations, and the negotiated run-off parameters. 38