Loading...
HomeMy WebLinkAboutKnife River Materials 2017 Road RehabilitationC'ONTR\CI FOR CONS FRUC'TION This contract, made and entered uito this "V day of \lar 2018, by and between the CITY OF CENTRAL POINT, OREGON. hereinafter called the'O\k NFR", and L I �I Inc.. dha Knife River blatenals , hereinafter called the "CONTRACTOR' bVITN ESSETH; Said Contractor, in consideration of the sum and or unit prices to be pard to him'her bt the Owner, and of the covenants and ani cements herein contained. hereby agrees, at his own proper cost and expense, to do all work and furnish all materials, supplies, supervision, labor, tools, equipment, transportation and incidentals, and .hall pay all applicable taxes and fees necessary for the completion of the construction of the _'017 Roadwa, Rehabi htation in the City of Central Point, Oregon, for said Owner. to the extent of the Proposal, with unit prices tilled in made and submitted by the Contractor on the 10th day of \-lay, 2018 all in full compliance with COV FRAC I DOC(VIFN'IS. which includes l he Performance Bond and the applicable portions of the City's Public W orks Standard Specifications and Details, included herewith, and in accordance with the Plans prepared by RH' for the City of Central Point, Public R arks Department, dated Spring, 2019, entitled. 2Roadwa, Rehabilitation which Plans acrd aforementioned Contract Documents are hereby referred to, and by reference made a part of this CONTR-\C T FOR CONSTRUCTION as fully and completely as if the same were fully set forth herein, and are mutually coopemtke herewith. In consideration of the faithful performance of the work herein set forth, and in accordance with the directions of the Engineer, and to his - satisfaction as provided herein, the Owner agrees to pay, to the Contractor the amounts bid in the Proposal, $'_01.745 00, adj usted in accordance with the General Conditions, and to make ,itch payments in the manner and at the times provided for in the General Conditions. Fhe Contractor agrees to complete the work within the time limits as specified herein and to accept as full payment the amounts set forth in the Proposal and computed in accord.mee with the Contract Documents It is agreed that the Contractor shall complete the work in all respects by 45 days atter the notice to proceed In the went the Contractor shall fail to complete the work within the time limits or the extended time limits agreed upon, liquidated danmgcs shall be paid to the Owner in the amount of $5011 00 per day until the work is completed as set forth in the Contract Documents and to the satisfaction of the Fngincer Sunday, and legal holidays will be excluded when determining day s in default. The Contractor agrees to hold harmless the Cin from, and to repair and replace (as directed by the City's Public Works Director) arts and all detects and deficiencies which develop in workmanship and, or materials for a period of'one 11) %ear or as stated in the special specifications after the date of the written notice trom the Engineer of the final acceptance of the project by the Coy IN 14'' CNESS TI IF RE OF, u.e, the partied hereto, each subscnt•es the same thi s 51 ' Ai 2018 041 \FR. City o[ Cen¢'ei Point r\ Iitle. � v CONI RACI OR LTNI. Inc. dba Knife River Lvlaterials /IC'ontpam \amel Cite !`,tin v\ 1 Ih'Wriy�oi'IS 01