Loading...
HomeMy WebLinkAboutResolution 572A - Human Bean:~1 of PLANNING COMMISSION RESOI.,U`I'ION N(). 572A A RESOLUTION CONDI"I'IONALLY APPROVING A SITE PLAN APPLICATION (Applicant (s}: 'Tozn Casey} {37 2W 02CC, Tax Lot 6700) Recitals 1. This mattez• came before the Planning Coznznission for hearing on June 3, 2003, on applicant's site plan application for a commercial drive-thru coffee building inthe TOD-EC district of the City. The Planning Commission reviewed the application and the City staff reports, and received comments from all persons wishing to be heard in favor of and opposed to the application. Now, therefore; BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. Criteria A licable to Decision. The following chapters of the Central Point Municipal Code apply to this application: A. Chapter 17.65, TOD-EC, Employment Commercial B. Chapter 17.67, Design Standards- TOD District; C. Chapter 17.72, Site Plan, Landscaping and Construction Plan Approval. Section 2. Findin sand Conclusions. The Planning Commission hereby adopts by reference all findings of fact set fozth in the City staff reports, and concludes that, except where addressed in the conditions to approval, the application and proposal comply with the requirements of the following chapters of the Central Point Municipal Cade: A. Chapter 17.65, relating to uses, lot size, lot coverage, setback, building height and screening in the TODWEC district; B. Chapter 17.67 relating to TOD Building Design Standards; C. Chapter 17.72 relating to Site Plan, Landscaping and Construction Plan Approval . 1 -PLANNING COMMISSION RESOLUTION NO. ~_572A~ (06/0312003 ) Section. 3. Conditional A~pz-oval. The application for site plan approval is hereby conditionally approved, subject to the conditions set forth on Exhibit "A" and "I3", wkaich is attached hereto and by this reference incorporated hc;rcin. Passed by the Planning Cozn~nission and signed by zne izz autlzenticatioci of its passage this _3rd day of June , 2043 ~ ? Planning Con~znission Chairman ATTEST: City I~e~z~sentative ppz•oved by me this _3rd_ day ofi June , 2003 Planning Cozninission Chairman 2 -PLANNING COMMISSION RESOLUTION NO. _572A~ (06/0312043 ) ZxFtibit ".~" RECOMMENDED PLANNING DEPARTMENT CONDITIONS OF APPROVAL The approval afthe Site Plan shall expire in one year an June 3, 20()4 unless an application for a building permit or an application for extension has been z•eceived by the City. `I'he applicant shall submit a revised site plan depicting any changes discussed and appraved at the public hearing within 60 days of Planning Comznissiozz approval. 2. The project must comply with all applicable local, state and federal regulations . The parking spaces must have a curb or bumper installed in order to delineate the drive-thru caffea access from customer parking. 4. A one-way sign will need to be installed on the alleyway. ~x~ii6it. "~" --~ -~ Cit of Central Point ry~, ~. -_ ..., ~~~ z Public Works De artment ~ --~ f ~ ~~~ '2r ~_'•~~ ~~~~ RnveriPierce '` 1'u61rc Wnrks Director O~E G'`Q~ Rick Bartle(( Supervisor Chris Clnyt°re .Sr. Tech,ricimr Ma 29 2003 Mike O,r° y ~ Tcchnicimr TO: Central Point Planning Commission cr"~~ cr°ves I'echnicinn FROM: Public Works De artment xnrerr Roever P .Secrelnry 11 SUBJECT: Public Hearin Site Plan Review for 37 2W 02 CC, Tax Lot 6700 ~ixn "~°'~"" g ~"' Secretn,y 1 Human Bean Drive-thru Coffee Building Applicant Tozx~. Casey P.O. Box 745 Jacksonville, Oregon 97530 Agent Same as Applicant Property Bill Patridge Owner 33 Granite Street Ashland, Oregon 97520 Pro e 37 2W 02CC, Tax Lot 6700 -~ 0.35 acres total. Description/ TOD-EC, Employment Commercial Zonin Human Bean Coffee Shop Standard Specif cations and Goads The Central Point Publze Works Department is charged with management of the City's infrastructure, including streets, waterworks, and storm water drainage facilities. In general, the Department's "Standard Specifications and Uniform Standard Details for Public Works Construction" shall govern how public facilities are to be constructed. The developer is encouraged to obtain the latest version of these specifications from the Public Works Department. I55 South Second Street • Central Point, OR 97502 • (541) 664-3321 ext. 241 • liax (541)664-6384 Central Paint Public Works is cozxrmitted to working with the Planning Department and developers to assure that all developzxzents are adequately served by public facilities. Public facilities not owned or maintained by the City of Central Point include: Power (PP&L), Gas (Avista), Communications (Qwcst}, and Sanitary Sewer {13CVSA). In working together it is the Department's expectation that the developer will feel free to call or~r the Department whenever the standard specifications are not, in the developer's opinion, adccluately zriceting the needs of the development. The Department will listen to the developer's concerns acrd work with the developer to achieve the best outcome. I-Iowcver, the Department is not obligated to assure a profitable development and will not sacrifice quality E'er tl~c sole purpose of reducing cost to tlzc developer. It is always the developer's obligation to provide the public improvements necessary, as determined by the Public Works Department, to serve the developzxrcnt. The Department and the develaper also have an obligation to assure that public facilities are constructed so that other properties are not adversely impacted by the development. Development Plans -Required Infarrnation It is essential that information presented on the plans be accurate and complete as they relate to existing and proposed public facilities, both surface and underground. All proposed new development shall meet the Department's standards, unless otherwise approved by the Depar-iment Director in writing. Calculations must be submitted to show the adequacy of proposed storm drainage facilities. All required a civil engineer registered with the State of Oregon must complete required traffic analysis, water flow analysis, and storm drainage analysis. Public T~Yorks Perrrait A Public Works Permit will only be issued after the Department Director approves the final construction drawings. After approval the fees associated with the development will be calculated and attached to the public works permit. All fees are required to be paid in full at the time the Public Works Permit is issued, except Public Works Inspection fees. After project completion during the final plat application process the Public Works Inspector will calculate the appropriate amount of inspection tirrie to access the developer. Before the final plat application is processed the developer must pay the relevant inspections fees, and bond for any uncompleted improvements (as determined by the Public Works Department). Human Bean Coffee Sloop -Plans 1. Three sets of construction drawings to be submitted for review by the Department. Human Bean Coffee Slrop -Water Connection 1. It is the understanding of the Public Works Department that provisions have been made to supply the proposed development with a water service connection through coordination with the water connection of an adjacent on-site development. All City of Central Point Public Works & Building Department standards must be addressed when completing any water service connection. I55 Soz.rth Second Street • Central Point, OR 97502 • (54l) 664-3321 ext. 241 • Fax (54].)664-5384 I.iruman Bean Coffee S/top --- Streets 1. A one -way sign will need to be installed in the adjacent alleyway 2. The on-site parking lot will be rcquirecl to have paz-kizlg bumpers to prevent taff c conilicts between parked cars & drive-thr•u vehicles. 3. A driveway apron will be required at the alley entrance on 6"' Street. The driveway apron should be constructed to Public Works Standards & Specifications. Human Bean Coffee Sliop ---- Sto~•rn Draira 1. All storm drainage was addressed during the construction of the adjacent on-site development. Purpose Provide information to the Planning Corramission and Applicant (hereinafter referred to as "Developer") regarding City Public Works Department {PWD) standards, requirements, and conditions to be included in the design and development of the proposed. Gather information fz-ozxa the Developer/Engineer regarding the proposed development. A City of Central Point Public Works Department Staff Report is not intended to replace the City's Standards 8c Specifications. Staff Reports are written in coordination with the City's Standards & Specifications to form a useful guide. The City's Standards & Specifications should be consulted for any information not contained in a Public Works Staff Report. 155 South Second ,Street • Central Paint, OR 97502 ®(541) 664-3321. ext. 241 • Fax {541)664-6384