Loading...
HomeMy WebLinkAboutApproval of this Public Works PermitApproval of this Public Works Permit is based on adherence to the following conditions: Public Works Permit Conditions of Approval 1. All work shall be in accordance with the City of Central Point Standards and Specifications for Public Works Construction. Jump plates with plate locks must be used and re -paving must occur within 10 working days after job completion in accordance with condition of approval () below. Re -paving must include re- establishment of all street markings that were removed or disturbed during work (i.e. emblems, hot tape, striping) These must be re-established to City standards. 2. Contractor shall provide traffic control at all times in accordance with the ODOT Short Term Traffic Control Handbook, 1996 and Pact VI MVTCD, 1988 and a traffic control plan must be submitted with the permit request. 3. Clear vision areas shall be established at intersections of streets, alleys and driveways in accordance with Table J-2, Drawing A-4. No obstructions greater than 3.5 feet in height shall be allowed other than existing trimmed trees or power poles. 4. Trench excavations shall be saw cut and backfilled with 1 sack cement/sand slurry. Prior to paving, slurry shall be excavated and trimmed to a solid surface at or below depth of asphalt. No paving shall be installed on loose material. 5. Repave trench with ODOT Class "C" asphaltic concrete according to ODOT 745.48 and 745.49. Required to patch a minimum of 6 inches on both sides of trench. 6. Provide 72 hours notification prior to beginning construction. 7. Call Public Works to schedule an inspection at least 24 hours prior to paving at 541.664.7602.