PLANNING COMMISSION RESOLUTION NO. 610
A RESOLUTION CONDITIONALLY APPROVING
A SITE PLAN APPLICATION
(Applicant (s}: PacLand}
(37S 2W Parcnt Tax Lot 100)
Recitals
I . This xxxatter came before the Planning Commission for hearing on March I Sth & March 30,
2004, an applicant's siteplan application far a Wal-Mart Super Center inthe C-4 zonitxg district ofthe
City. The Planning Cozr~mission reviewed the application and the City staffrepazts, azxci received comzxzents
from all persons wishing to be heard in favor of and opposed to the applicationx.
Now, therefore;
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL
POINT, OREGON, AS FOLLOWS:
section 1;_, Criteria Applicable to Decision. The fallowing chapters of the Central Point
Municipal Code apply to this application as determined by the Planning Commission:
A. Chapter 17.44, Tourist and Office-Professional District
B. Chapter 17.60, General Regulations;
C. Chapter 17.64, Off-Street Parking and Loading;
D. Chapter 17.72, Site Plan, Landscaping and Construction Plan Approval.
Section 2. Findin sg and Conclusions. The Planning Commission kzereby adopts by
reference all findings offact set Earth in the amended City staffreports, and concludes that, except where
addressed in the conditions to approval, the application and proposal comply with the requirements of the
following chapters of the Central Point Municipal Code:
A. Chapter 17.44, relating to uses, lot size, lot coverage, setback, building height and
screening in the C-4 district;
B. Chapter 17.60 relating to paving and landscaping requirements;
C. Chapter 17.64 relating to off-street parking and loading facilities;
D. Chapter 17.72 relating to site plan requiz-ezxxezxts.
Section 3. Conditional Approval. The application for site plan approval is hereby
conditionally approved, subj ect to the conditions set forth on Exhibit "A" and "B" which is attached hereto
1 -PLANNING COMMISSION RESOLUTION NO. _610 _ (03302004 }
and by this reference incorporated herein.
Passedbythe Planning Commmission and sig~ieci by~ne in aufhenficafion of ifs Massage Phis ~~`''
day of _ ,4,~r ~ ~ , 20'oa--.
f ~ / ~ ~J
Planning Co~m~mission Chairman
Approved by me this _~~'`` day of ~-'' ~ E , 20~ 4-.
Planning Commission Chai~n.an
2 -PLANNING COMMISSION RESOLUTION NO. 610 (03302001 }
AT"i'EST:
EXHIBIT A
PLANNING COMMISSION CONDITIONS OF APPROVAL
1. The approval of the Site Plan shall expire i~~ one year on April G, 2005 unless an
application for a building permit or an application for extensian leas been received by
the City.
2. The approval of the tentative plan shall expire in one year on April G, 2005 unless an
application far final plat or an extension has been received by the City. Reciprocal
Easement Agreements shall be obtained and recorded prior to or in conjunction with
the recording of a final plat. The applicant shall submit a copy of the proposed
agreements to the city prior to recordation.
3. The tentative and final plats shall depict utility easements requested by the City, RVS
and WP Natural Gas. Any changes to utility layout including fire hydrants shall
require subsequent approval by the respective service provider.
4. The project must comply with all applicable local, state and federal regulations
including, but not limited to, those of ODOT, ODF&W, DEQ, DSL, RVS and FD#3.
5. The applicant shall submit a more detailed landscape and irrigation plan far City
review and approval in conjunction with building permit inspection and site
improvements. Said plan shall include the addition of street trees along each street
frontage in keeping with the City's tree ordinance. Trees recommended by the
Planning Commission are cypress along Hamrick Road and Magnolia along East
Pine Street, both of which shall be a minimum of 1.S caliper. An ongoing property
maintenance plan is required to ensure the survivability of attractiveness of the site's
vegetation.
6. The applicant shall prepare and submit a complete sign `package' far review and
approval by the city planning and building departments prior to the issuance of any
building permits far store front or freeway signs. Furthermore, the applicant shall
prepare and submit a lighting design plan for review and approval by City staff using
lighting fixtures for the parking lot that are similar to those used in the Central Paint
TOD developments.
7. The applicant shall be responsible to implement and/or bond far transportation
improverrzents that are recommended in the East Pine Street Corridor Plan including,
but not limited to; 1) participating in the construction of a new traffic signal at Beebe
and Ham~ck Roads.
8. The project developer shall incorporate a more robust set of storm water treatment
and infiltration measures into the site design. Post-construction best mazlagement
practices (BMPs) and mitigation measures shall include, but are not limited to;
constructing dete~ztion facilities adequate to detain 40-50 percent of the two-year
storm, implementation of water quality treatment devices in addition to `natural
storm water bio-filters', acquisition of a DEQ erosion control permit (1200-C),
development of stream buffers and the installation of catch basin inserts.
9. The applicant shall not promote or allow overnight Recreational Vehicle parking on
site. The applicant is solely responsible far the enforcement of this condition.
10. The developer shall be responsible for the design and construction of a landscaped
berm and a wall along the northern and eastern boundaries of the property that will
sufficiently mitigate impacts of new noise and light generated by development on the
site. The construction of the wall along Hamrick Raad shall be similar in construction
and architectural appeal to that of Pheasant Creek Estates on Hanley Road. The color
of said wall shall compliment those being proposed for the super center building.
11. All new tenants to the Pear Blossom Plaza will be required to apply far individual
business licenses through the City of Central Point. This will enable to City to
determine whether individual uses being proposed are consistent with the G4 zoning
district and could result in further planning and/or building department review.
EXIIXt31'l' I3
_~
U
o~
Z
~~
ity of Central Point
Public Works Department
Robert Pierce
Public if'orks Director
Rick Bartlett
Supervisor
Chris Clayton
Deputy Director
Jae StrahC
City Er:girreer
Mike Ono
Technician
Greg Graves
Tecfcr:iciar~
Karen Roeber
Secretary II
Margarita Murroz
Secretary I
~rNAL PU.sLIC WoRxs
STAp'F REPORT
C~
RECOMMENDATIONS
TO: Planning Commission
FROM: Public Works Department
Robert Pierce -Director
Jae Strahl -City Engineer
Chris Clayton -Deputy Director
SUBJECT: Proposed Pear Blossom Retail Development
(207,502 - Sq. Feet}
Applicant Pacland
10121 SE Sunnyside Road, Suite 215
Clackamas, Oregon 97015
Agent Pacland
10121 SE Sunnyside Road, Suite 215
Clackamas, Oregon 97015
.~
mm
~.
Pr~X/ 37S 2W 2D Tax Lot 100 (20.5 Acres}
Zoning C-4 Tourism &c Offzce
Pear Blossortr Retail Developrrrertt
Pu61ie Works Staff Report
Page #2
Pu~ rpose
The comments and recommendations contained in this Staff Report submitted for the March, 1$'~'
Planning Commission is based on the information currently available. As relevant studies and
analysis are completed and become available, the City of Central Point Public Works Department
will provide additional recommendations and information regarding the proposed development.
The purpose of this report is to provide information to the Planning Commission and Applicant
(hereinafter referred to as "Developer") regarding City Public Works Department {PWD}
standards, requirements, and conditions to be included in the design and development of the
proposal and to gather information from the Developer/Engineer.
A City of Central Point Public Works Department Staff Report is not intended to
replace the City's Standards & Specifications. Staff Reports are written in conjunction
with the City's Standards & Specifications to form a useful guide. The City's
Standards & Specifications should be consulted for any information not contained in a
Public Works Staff Report.
Standard S eci tcations and Goals
The Central Point Public Works Department is charged with management of the City's
infrastruct~zre, including streets, waterworks, and storm water drainage facilities. In general, the
Department's "Standard Specifications and Uniform Standard Details for Public Works
Construction" shall govern how public facilities are to be constructed. The Developer is
encouraged to obtain the latest version of these specifications from the Public Works
Department.
Central Point Public Works is committed to working with the Planning Department and
developers to assure that all developments are adequately served by public facilities. Public
facilities not owned or maintained by the City of Central Point include: Power (PP&L), Gas
{Avista}, Communications (Qwest), and Sanitary Sewer (RVSS}. In working together it is the
Department's expectation that the developer will feel free to call on the Department whenever
the standard specifications are not, in the developer's opinion, adequately meeting the needs of
the development. The Department will listen to the developer's concerns and work with the
developer to achieve the best outcome. However, the Department is not obligated to assure a
profitable development and will not sacrifice quality, public safety, community standards or
other concerns for the purpose of reducing cost to the developer. It is always the developer's
obligation to provide the public improvements necessazy, as determined by the Public Works
Department, to serve the development. The Department and the developer also have an
obligation to assure that public facilities are constructed so that other properties are not adversely
impacted by the development.
Pear Blossom Retail Developi~ie-:t
Public Works Staff Report
Page #3
Developtnefzt Plans -Required Infof'jrration
Review of public improvement plans is initiated by the submittal of 3 sets of plans that are at a
minizxzum 95% complete. The plans shall include those of other agencies such as BCVSA or
Jackson County Roads Department. following plan review, the plans will Ge returned to the
Developer's engineer including comments froze Public Works Staff. In order to be entitled to
further review, the Applicant's Engineer must respond to each caznznent of the prior review. All
submittals and responses to comments must appear throughout the plans to be a realistic attempt
to result in complete plan approval Upon approval, the Applicant's Engineer shall submit (5}
copies of the plans to the Department of Public Works.
In general, the plan submittal shall include plan and profile for streets, water, storm drainage and
sanitary sewers, storm drainage calculations, stoz-m drainage basin map, erosion control plan,
utility and outside agency notifications and approvals. The plan may also include applicable
traffic studies, legal descriptions and a traffic control plan.
Public Wo~'ks Permit
A Public Works Permit will only be issued after the Department Director approves the final
construction drawings. After approval, the fees associated with the development will be
calculated and attached to the public works permit. All fees are required to be paid in full at the
time the Public Works Permit is issued, except Public Works Inspection fees. After project
completion during the final plat application process, the Public Works Inspector will calculate
the appropriate amount of inspection time to assess the developer. Before the final plat
application is processed the developer must pay the relevant inspections fees and bond for any
uncompleted improvements {as determined by the Public Works Director).
Plans
1. Three sets of plans at 9S% complete stage are to be submitted for review by the Public
Works Department
2. Onee approval is achieved the Developer shall submit five sets of plans to the Public
Works Department for construction records and inspection.
3. The Developer's Engineer shall document changes to the approved drawings made in the
field. A mylar and digital copy of the final "as-built" drawings will be required before
the final plat application is processed.
Protection of Existing Facilities
The locations of existing facilities shall be shown on all applicable construction drawings for
Public Works projects as follows:
Pear 131ossom Retail Devcloprrrertt
Pu61ic forks Staff Report
Page #~4
1. The exact locations of underground facilities shall be vez-ified in advance of a~ly public
works construction, in cooperation with the public or private utilities involved.
2. All existing underground and surface facilities shall be pz-otecteci from dazxzage during
design and construction of public works projects.
3. Any existing facilities not specifzcally designated for alteration or removals, which are
damaged during construction, shall be restored or replaced to a "same as" or better than
condition, at the expense of the Developer.
4. Suitable notice shall be given to all public and private utility companies in advance of
construction for the purpose of protecting or relocating existing facilities.
Water Connection
1. Water system designs shall consider the existing water system, master plans,
neighborhood plans and approved tentative plans. The Developer, Engineer and
Contractor shall provide the necessary testing, exploration, survey and research to
adequately design water system facilities, which will connect to and be a part of, or an
extension of the Gity water system.
2. All requirements of the Oregon State Plumbing Specialty Code and the Oregon State
Health Department, as they pertain to Public Water Systems, shall be strictly adhered to.
3. The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of water system related
components.
Streets &. Traffcc
1. The Developer's engineer should be aware that certain alternate street standards far the
Transit Oriented District and Transit Oriented Corridor might apply to the design and
construction of streets in specific areas of the City. These alternate standards are fully
described in the Central Point TOD Design Requirements and Guidelines.
Street designs shall consider the needs of people with disabilities and the aged, such as
visually impaired pedestrians and mobility-impaired pedestrians. Evezy effort should be
made to locate street hardware away from pedestrian locations and provide a surface free
of bumps and cracks, which create safety and mobility problems. Smooth access razxzps
shall be provided where required. All designs shall conform to the current American
Disabilities Act (ADA) or as adopted by the Oregon Department of Transportation
(ODOT), Oregon Bicycle and Pedestrian Plan.
Peat Blossotu Retail Dcveloptstext
PuGlic Works Sta• ff Report
Page #S
the determination ofthe pavement width and total right-of way shall be based on the
operational needs for each street as determined by a technical analysis. "l'he technical
analysis shall use demand volumes that reflect the maximum number of pedestrians,
bicyclists, parked vehicles and motorized vehicle traff c expected when the area using the
street is fully developed. Technical analysis shall take into consideration, transportation
elements of the Comprehensive Plan, TOD, neighborhood plans, approved tentative plans
as well as existing commercial and residential developments. All street designs shall be
coordinated with the design of other now or existing infrastructure.
2. The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of street related
components.
3. The City is currently in the process of completing and accepting the East Pine Corridor
Traffic Analysis, which could impact the classification of certain streets and project
"build-out" traffic flows for this northeast portion of the City. The overall road
classification and lane determination needs for Hamrick Road, East Pine Street, Beebe
Road, Table Rock Road, Penninger Road, Gebhard Road, and the City of Central Point
Interstate-five interchange to accommodate projected "build-out" conditions have not yet
been determined by the City, Jackson County, or the Oregon Department of
Transportation. Thus, additional master planning will be warranted once the East Pine
Street Corridor Study is completed. However, it is projected that this additional master
planning /traffic analysis will not be available for several mare weeks.
In an effort to expedite the completion of the East Pine Corridor Traffic Analysis, the
City has retained the services of JRH Transportation Engineering to evaluate existing data
and finalize the recommendations for traffic mitigation measures. Prior to the
involvement of JRH Transportation Engineering the City was relying on input from
traffic engineering frm that currently represents the proposed developer. The
conclusions presented by that firm were questioned after being received by ODOT's
Transportation Planning Analysis Unit (TPAU). TPAU raised serious concerns about the
adequacy of transportation facilities designed to serve a development with a scope and
nature equal to the proposed development. The Public Works Department does not
recommend acceptance of either the developer's traffic engineering conclusions or the
conclusions of TPAU. Considering the potential severe traffic impacts given the
development's location adjacent to Interstate 5 and the present congestion in the Pine
Street Corridor, as well as the impact on the community and nearby existing and future
commercial interests, Public Works recommends that this development be treated as a
"conditional use" and that the use be conditioned to adhere to recommendations of the
final East Pine Street Coi-~-idor Analysis.
4. Attached to this staff report is a copy of a letter provided by JRH Transportation
Engineering. At the request of the City, JRH is currently completing an independent
traffic analysis of data provided by the developer's traffic consultant. The attached letter
Peur Blosso~rr Retail Deuclopirre-rt
Public Works Staff Report
Page #6
classifies the proposed development as conditional use based on its proximity to
Interstate 5, and existing traffic congestion in the northeast portion of the City.
5. At a recent status meeting with JRH the City was provided with some preliminary
recommendations which, if accepted, would seem to significantly improve traffic flow
and provide multiple points of access to tl~e proposed development. These do not appear
to add unreasonable cost to the proposed development, yet appear to reduce traffic
volumes on Pine Street, improve connectivity to other streets, and enhance the desired
concept of connected street systems in the surrounding area.
These recommendations will be made as part of the final report presented by JRH
Transportation Engineering,
Public Worlcs recommends that the Planning Commission consider these
recommendations in its deliberations on the proposed development.
Storm Drain -Ground Water -Flood Plain
1. It shall be the responsibility of the Developer's Engineer to investigate the drainage area
of the project, including the drainage areas of the channels or storm sewers entering and
leaving the project area. If a contiguous annexed drainage area of given size exists, the
engineer may use information that has formerly been established if it includes criteria far
the drainage area at complete development under current zoning and Comprehensive Plan
designations. If the City does not have such information, the engineer shall present
satisfactory information to support his storm sewerage design. The engineer shall also be
required to provide all hydrology and hydraulic computations to the Public Works
Department that are necessary to substantiate the storm sewer design. The storm water
sewer system design shall be in conformance with applicable provisions of Oregon DEQ,
DSL and ODFW and United States COE and consistent with APWA Stone Water Phase
II requirements.
2. The proposed development places improvements and structures within or alters the 100-
year flood plain associated with Bear Creek. The development's location adjacent to and
within the Bear Creek flood plain also indicates potentially adverse or hazardous
characteristics due to flooding that would not normally be found in a use of a similar type
and size located elsewhere in the City. It is recommended that the Developer be required
to have a 140-year flood study analysis performed. The flood study must provide
findings which indicate what affects the placement ofthe proposed improvements and
structures have on the base flood elevation and flood zone boundary; and what affects the
modification of the floodplain elevation and flood zone boundary have on the existing
facilities and properties surrounding the proposed development. The Developer's
engineer shall determine the existing base flood flow rates and the base flood evaluation
contours; and illustrate the existing boundaries of the floodplain and floodway fora 100-
Peaj• Blossom Retail Development
Puhlic Warks Staff Report
Page #7
year "base flood" storm event associated with Bear Creek through the affected properties.
The construction drawings shall indicate the revised base flood elevation contours and
boundaries of the floodplain and floodway expected to occur following the completion of
any development within the identified flood lone (also referred to as the "Area of Special
Flood Hazard"), including any affected up-gradient areas. ~I~l~e information dete~~nined in
this study will also be used to determine ~niniinum finished floor elevations for any
structures that will be placed within the area of special flood hazard.
3. The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of stozan drain related
components.
4. This development proposes adding about 1$ acres of impervious surface to the situ.
Discharging storm runoff directly to Bear Creek from this developed site could have the
following impacts:
Greater potential for flooding in Bear Creek
~ Introduction of pollutants, such as oil and dirt from automobiles, directly to the creek
Increasing the temperature of the water in Bear Creek.
The location adjacent to Bear Creek presents adverse water quality issues that would not
be present in a similar development built elsewhere in the City. Curx-ently the City's
standards for storm drains do not require detention of storm water where the drainage
facilities are adequate. This is correctly stated in the developer's report and the developer
is apparently not planning to install detention facilities or water quality facilities to reduce
potential negative impacts on the creek. However, the City is now subject to NPDES
Phase II requirements. These requirements are designed to limit discharge of storm
waters that tend to affect streams from either a quality or a quantity standpoint. The City
has recently entered into agreement with Rogue Valley Sewer Services {RVS) to manage
the Phase II requirements. Written Input from RVS should be obtained relative to the
storm water quality issues associated with this development.
The City has not yet created standards for developers to comply with Phase II and does
not have any way to evaluate the impacts of discharging storm water from such a large
impervious surface directly into Bear Creek. It seems appropriate therefore, to request
help from Oregon DEQ and/or such federal agencies as maybe able to provide
information which the City and RVS can use to evaluate these environmental impacts
from the proposed development. Should qualified State or Federal agencies recommend
such measures as filters to improve water quality or detention basins to reduce flooding
impacts, these recornmendatians should condition imposed on to the developer for
incorporation into the plans.
If storm water detention practices, which involve the introduction of runoff to subsurface
locations, are proposed, it is recommended that a thorough analysis be conducted to
assure that pollutants will not be introduced into groundwater. The City is aware of
Pear Blossoart RetaiC Developrrtertt
Puhlic r~orks Staff Report
Page #8
shallow water wells in this vicinity, aFUI the City was involved recently in legal actions
relative to groundwater degradation near the proposed development site. The City might
justifiably became involved in additional legal actions unless it insists that this matter be
thoroughly evaluated by competent geologists and hydrologists. in consideration of the
above storm water quality and quantity concerns Public Works recommends that this
development be considered under the provisions of the City Code.
Required Submittals
All design, construction plans and specifications, and "as-built" drawings shall be
prepared to acceptable professional standards as applicable. The Developer shall provide
copies of any permits, variances, approvals and conditions as Fray be required by other
agencies including, but not limited to; Oregon Department of Fish and Wildlife
(ODF&W}, Oregon Departrr-ent of Environmental Quality (DEQ), Oregon Division of
State Lands (DSL}, Oregon Department of Transportation (ODOT}, U.S. ArF~ny Corps of
Engineers (ALOE}, affected irrigation districts, Rogue Valley Sewer Service (RVSS} and
7ackson County Roads and Parks Services Department (J'C Roads).
2. Fire District No. 3 must approve all streets and water improvement plans in writing prior
to final review by City PWD.
3. During construction, any changes proposed by the Developer shall be submitted in
writing by the Developer's Engineer to the City Public Works Department for approval
prior to installation.
General Conditions of approval
*These recommended conditions of approval are in addition to those submitted far the Plartnirtg Contrnissiorr
rrteeting of March 18, 2004.
As stated in the preliminary staff report from Public Works, the primary concerns of the
department are related to environmental issues and adequacy of public facilities, such as streets,
storm drains, water service, sanitary sewers, etc. It appears that water and sewer facilities are
adequate to serve the proposed development. The recommended conditions of approval
associated with these facilities are fairly straightforward.
Conditions of approval for storm water and transportation are more complex due to varying
opinions from consultants and new requirements being imposed upon the City of Central Point.
The following recozx~mended conditions of approval are general in nature. Depending on actions
by the Planning Commission or the City Council, detailed final recommendations for conditions
of approval will be presented at a later date.
Pear I31osratir Retail Developnre~rt
Prr6lic Works Staff Report
Page #9
Water & Sewer
Water and sanitary sewer facilities appear to be adequate. The developer shall submit plans that
are consistent with the City's and Rogue Valley Sewer Services' standard specifications for
review and approval of the agencies. Permits from these agencies shall be obtained aztd all fees
paid prior to the start of any constnzction.
Transportation
Two traffic consultants and the Oregon Department of Transportation have provided information
about the traffic impacts of the development of this property. There are several discrepancies
between the opinions offered by these traffic experts. However, all agree that the impacts on
traffic congestion of this development will be extreme unless mitigation measures are taken. It is
the City's responsibility to assure that appropriate steps are taken to minimize adverse impacts to
traffZC flow for the safety anal convenience of its citizens.
Accordingly, the developer shall submit plans which meet the City's needs for the proper flow
and management of traffic under full development conditions. These plans must address and
reconcile issues, as they relate to safety and convenience of the traveling public, raised by the
traffic experts mentioned above to the satisfaction of the Public Works Department. Public
Works will work with the developer's engineers and planners during the review process to
evaluate mitigation measures in a timely fashion aril to propose alternatives where appropriate.
Wherever an appropriate nexus exists between the impacts of the development on traffic in the
vicinity of this improvement and mitigation measures proposed to address these impacts, the
developer shall be responsible for the proportional cost of implementing the mitigation measures.
Written agreements between the developer and the City related to the cost of improvements shall
be negotiated by the developer and Public Works and presented to the City Manager for
approval.
Storm_Draina~e
The issues raised in the preliminary staff report related to water quality, flooding, and ground
water impacts are potentially serious from the standpoint of protecting the health and safety of
citizens and the environment. Accordingly, the developer shall provide all necessary studies to
assure the City that this development will not have adverse impacts on surface or subsurface
waters and will not adversely impact the environment. These studies maybe shared with
appropriate State and/or Federal agencies for their input and advice to the City.
Sutnrnary
The City of Central Point Public Works Staff Report addresses the City's concerns relative to the
proposed developments potentially adverse impacts. However, the Public Works Department
does not typically establish specific conditions for the Planning Commission to approve
Historically, the City's Engineering Division has been given the authority by the Planning
Pear Blossom Retail Development
Public Works Staff Report
Page #I Q
Commission to negotiate required improvements, relative to proposed developments, during the
course of the improvement plan review process.
The Engineering Division will use all the resources described in this Staff Report to equitably
impose mitigation ofadverse ianpacts resulting from the proposed development per tl~e City of
Central Point's Municipal code as wells as Oregon's governing statutes.