PLANNING COMMISSION RESOLUTION NO. 611
A RESOLUTION GRANTING TENTATIVE PLAN APPROVAL FOR A MINOR LAND
PARTITION ON THE NORTHWEST CORNER OF E. PINE STREET 8c HAMRICK ROAD
(Applicant (s}: PacLanci}
{37S 2W Parent Tax Lot 100}
Recitals
1. 1. Applicant{s} has/have submitted an application for tentative plan approval for a
minor land partition on a 21.6 acre parcel located at northwest corner of East Pine Street and
Hamrick Road in the City of Central Point, Oregon.
2. On, March 18 & March 30, 2004, the Central Point Planning Commission conducted duly-
noticed public hearings on the application, at which time it reviewed the City staff reports and
heard testimony and comments an the application.
Now, therefore;
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF CENTRAL
POINT, OREGON, AS FOLLOWS:
Section 1. Approval Criteria. The requirements for approval of land partitions and
tentative plans are set forth in CPMC Title 16 and 17, relating to infoz-mational requirements,
zoning, lot dimension, access, and similar requirements.
Section 2. Findin and Conclusions. The Planning Commission Ends and detez-nzines as
follows:
A. Tentative Plan Requirements. The application and tentative plan are in the correct
form and contain all of the information required by CPMC 16.10.
B. Area and Width of Lot. This partition in a C-4 zone would create 2 parcels:
All parcels meet the minimum area and width requirements for Lots in the C-4 zone as set
forth in CPMC 17.44, and such parcels meet the general requirements for lots contained in
CPMC 16.24.050.
Planning Commission Resolution No. 611 {03/30/04}
EXI~II3IT A
PLANNING COMMISSION CONDITIONS OF APPROVAL
The approval of the Site Plan shall expire in one year on April &, 2005 unless an
application for a building permit or an application for extension has been received by
the City.
2. The approval of the tentative plan shall expire in one year on Apri16, 2005 unless an
application for final plat or an extension bas been received by tlae City. Reciprocal
Easement Agreements shall be obtained and recorded prior to or in conjunction with
the recording of a final plat. The applicant shall submit a copy of the proposed
agreements to the city prior to recordation.
3. The tentative and final plats shall depict utility easements requested by the City, RVS
and WP Natural Gas. Any changes to utility layout including f re hydrants shall
require subsequent approval by the respective service provider.
4. The project must comply with all applicable local, state and federal regulations
including, but not limited to, those of ODOT, ODF&W, DEQ, DSL, RVS and FD#3.
5. The applicant shall submit a mare detailed landscape and irrigation plan far City
review and approval in conjunction with building permit inspection and site
improvements. Said plan shall include the addition of street trees along each street
frontage in keeping with the City's tree ordinance. Trees recommended by the
Planning Commission are cypress along Hamrick Road and Magnolia along East
Pine Street, both of which shall be a minimum of 1.5 caliper. An ongoing property
maintenance plan is required to ensure the survivability of attractiveness of the site's
vegetation.
6. The applicant shall prepare and submit a complete sign `package' for review and
approval by the city planning and building departments prior to the issuance of any
building permits for store front or freeway signs. Furthermore, the applicant shall
prepare and submit a lighting design plan for review and approval by City staff using
lighting fixtures for the parking lot that are similar to those used in the Central Point
TOD developments.
7. The applicant shall be responsible to implement and/or bond for transportation
improvements that are recommended in the East Pine Street Corridor flan including,
but not limited to; 1 } participating in the constzuction of a new traffic signal at Beebe
and Hamrick Roads.
8. The project developer shall incorporate a tr~ore robust set of storm water treatn~e3it
and infiltration measures into the site design. Post-eonsti•uction best manageme~~t
practices (BMPs} and mitigation measures shall include, but are not limited to;
constructing detention facilities adequate to detain 40-50 percent of the two-year
storm, implementation of water quality treatment devices in addition to `natural
storm water bio-filters', acquisition of a DEQ erosio~i control permit {1200-C),
development of stream buffers and the installation of catch basin inserts.
9. The applicant shall not promote or allow overnight Recreational Velliclc parking on
site. The applicant is solely responsible for the enforcement of this condition.
10. The developer shall be responsible for the design and construction of a landscaped
berrri and a wall along the northern and eastern boundaries of the property that will
suf#-iciently mitigate impacts of new noise and light generated by development on the
site. The construction of the wall along Hamrick Road shall be similar in construction
and architectural appeal to that of Pheasant Creek Estates on Hanley Road. The solar
of said wall shall compliment those being proposed for the super center building.
11. All new tenants to the Pear Blossomy Plaza will be required to apply for individual
business licenses tlu•augh the City of Central Point. This will enable to City to
determine whether individual uses being proposed are consistent with the C-4 zoning
district and could result in further planning and/or building department review.
EXt~1t31T ~
~. .
~~
:~
~ ~~_
y~
TIC
ity_ of Central Point
~?~ PubX~c Works Depar~men~
~~~°~
~~ .
FINAL PUBLIC WORKS
STAFF REPORT
~c
RECOMMENDATIONS
TO
Planning Commission
FROM: Public Works Department
Robert Pierce -Director
Joe Strahl --- City Engineer
Chris Clayton -Deputy Director
SUBJECT: Proposed Pear Blossom Retail Development
(207,502 - Sq. Feet)
Applicant Pacland
10121 SE Sunnyside Road, Suite 21 S
Clackamas, Oregon 970 i 5
Agent Pacland
IOI21 SE Sunnyside Road, Suite 215
Clackamas, Oregon 97015
Robert PlCYCG'
Public Wnrk,c Director
Rick Bartlett
Supervisor
Chris Clayton
Deputy Director
Joe StYalrl
City Engineer
Mike Ono
Technician
Greg Graves
Techrticiart
Karen Roeber
Secretary II
Margarita Munoz
Secretary ~
Property/ 37S 2W 2D Tax Lot 104 (20.5 Acres}
Zoning C-4 Tourism & Office
Pear 131ossont Detail Development
Public i~orks Staff Report
Page #2
Purpose
The comments and recommendations contained in this Staff Report submitted for the March, 18"'
Planning Commission is based on the information currently available. As relevant studies and
analysis are completed and become available, the City of Central Point Public Works Department
will provide additional recommendations and infonnatipn regarding the proposed development.
The purpose of this report is to provide information to the Planning Commission and Applicant
(hereinafter refezxed to as "Developer") regarding City Public Works Department {PWD)
standards, requirements, and conditions to be included in the design and development of the
proposal and to gather information from the Developer/Engineer.
A City of Central Point Public Works Department Staff Report is not intended to
replace the City's Standards & Specifications. Staff Reports are written in conjunction
with the City's Standards & Specifications to form a useful guide. The City's
Standards & Specifications should be consulted for any information not contained in a
Public Works Staff Report.
Standard S eci tcations and Goals
The Central Point Public Works Department is charged with management of the City's
infrastructure, including streets, waterworks, and storm water drainage facilities. In general, the
Department's "Standard Specifications and Uniform Standard Details for Public Works
Construction" shall govern how public facilities are to be constructed. The Developer is
encouraged to obtain the latest version of these specifications from the Public Works
Department.
Central Point Public Works is committed to working with the Planning Department and
developers to assure that all developments are adequately served by public facilities. Public
facilities not owned or maintained by the City of Central Point include: Power (PP&L), Gas
{Avista), Communications (Qwest}, and Sanitary Sewer (RVSS). In working together it is the
Department's expectation that the developer will feel free to call on the Department whenever
the standard specifications are not, in the developer's opinion, adequately meeting the needs of
the development. The Department will listen to the developer's concerns and work with the
developer to achieve the best outcome. However, the Department is not obligated to assure a
profitable development and will not sacrifice quality, public safety, community standards or
other concerns for the purpose of reducing cost to the developer. It is always the developer's
obligation to provide the public improvements necessary, as determined by the Public Works
Department, to serve the development. The Department and the developer also have an
obligation to assure that public facilities are constructed so that other properties are not adversely
impacted by the development.
Pear Blossom: Retail Developnresrt
Pu61ic Works Staff Report
Page #3
Developrrrent Plans -.Required In arnration
Review of public improvement plans is initiated by the submittal of 3 sets of plans that are at a
minimum 95% complete. The plans shall include those of other agencies such as BCVSA or
3ackson County Roads Department. Following plan review, the plans will be returned to tlic
Developer's engineer including comments from Public Works Staff. In order to be entitled to
further review, the Applicant's Engineer must respond to each comment of the prior z-eview. All
submittals and responses to comments must appear throughout the plans to be a realistic attempt
to result in complete plan approval. Upon approval, the Applicant's Engineer shall submit (5)
copies of the plans to the Department of Public Works.
In general, the plan submittal shall include plan and profile for streets, water, storzxz drainage and
sanitary sewers, storm drainage calculations, storm drainage basin map, erosion control plan,
utility and outside agency notifications and approvals. The plan may also include applicable
traffic studies, legal descriptions and a traffic control plan.
Public Works Per•rnit
A Public Works Pezaxiit will only be issued after the Department Director approves the final
construction drawings. After approval, the fees associated with the development will be
calculated and attached to the public works pezxnit. All fees are required to be paid in full at the
time the Public Works Permit is issued, except Public Works Inspection fees. After project
completion during the final plat application process, the Public Works Inspector will calculate
the appropriate amount of inspection time to assess the developer. Before the final plat
application is processed the developer must pay the relevant inspections fees and bond for any
uncompleted improvements (as determined by the Public Works Director).
Plans
1. Three sets of plans at 95% complete stage are to be submitted for review by the Public
Works Department
2. Once approval is achieved the Developer shall submit five sets of plans to the Public
Works Department for construction records and inspection.
3. The Developer's Engineer shall document changes to the approved drawings made in the
field. A mylar and digital copy of the final "as-built" drawings will be required before
the final plat application is processed.
Protection a Existirt Facilities
.f ~ ...............-~
The locations of existing facilities shall be shown on all applicable construction drawings for
Public Works projects as follows:
Pear Blossorrt Retail Developsrertt
Public YYorks Staff Report
Page #~4
1, The exact locations of underground facilities shall be verihed in adva~~ce of any public
works construction, in cooperation with the public or private utilities involved.
2. All existing underground and surface facilities shall be protected from damage during
design and construction of public works prajects.
3. Any existing facilities not specif cally designated for alteration or removals, which are
damaged during construction, shall be restored or xeplaced to a "same as" or bctter than
condition, at the expense of the Developer.
4. Suitable notice shall be given to all public and private utility companies in advance of
construction for the purpose of protecting ar relocating existing facilities.
Water Connection
1. Water system designs shall consider the existing water system, master plans,
neighborhood plans and approved tentative plans. The Developer, Engineer anal
Contractor shall provide the necessary testing, exploration, survey and research to
adequately design water system facilities, which will connect to and be a part of, or an
extension of the City water system.
2. All requirements of the Oregon State Plumbing Specialty Cade and the Oregon State
Health Department, as they pertain to Public Water Systems, shall be strictly adhered ta.
3. The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of water system related
components.
Streets & Traffic
l . The Developer's engineer should be aware that certain alternate street standards for the
Transit Oriented District and Transit Oriented Corridor might apply to the design and
construction of streets in specific areas of the City. These alternate standards are fully
described in the Central Paint TOD Design Requirements and Guidelines.
Street designs shall consider the needs of people with disabilities and the aged, such as
visually impaired pedestrians and mobility-impaired pedestrians. Every effort should be
xnade to locate street hardware away from pedestrian locations and provide a surface free
of bumps and cracks, which create safety and mobility problems. Smooth access ramps
shall be provided where required, All designs shall conform to the current American
Disabilities Act (ADA} or as adopted by the Oregon Department of Transportation
{ODOT}, Oregon Bicycle and Pedestrian Plan.
Pear Blnssorrr Retail DeveloPrrrent
Pu61ic Works ,staff Repnrt
Page #S
the determination of the pavement width and total right-of=way shall be based on the
operational needs for each street as detez-n~incd by a technical analysis. 'I'hc technical
analysis shall use demand volumes that reflect the maximum number of pedestrians,
bicyclists, parked vehicles and motorized vehicle traffic expected whe~~ the area using the
street is fully developed. Technical analysis shall take into consideration, transportation
elements of the Comprehensive Plan, TOD, neighborlioad plans, approved tentative plans
as well as existing commercial and residential developments. All street designs shall be
coordinated with the design of other new or existing infrastz-uctuz•e.
2. The City of Central Point Public Works Standards & Specifications should be consulted
for specific infozrzzation regarding the design and construction of street related
components.
3. The City is currently in the process of completing and accepting the East Pine Cozxidor
Traffic Analysis, which could impact the classification of certain streets and project
"build-out" traffic flaws for this northeast portion of the City. The overall road
classification and lane detezxz-zination needs for Hamrick Road, East Pine Street, Beebe
Road, Table Rock Road, Penninger Road, Gebhard Road, and the City of Central Paint
Interstate-five interchange to accommodate projected "build-out" conditions knave not yet
been determined by the City, Jackson County, or the Oregon Department of
Transportation. Thus, additional master planning will be warranted once the East Pine
Street Corridor Study is completed. However, it is projected that this additional master
planning / traffzc analysis will not be available for several mare weeks.
In an effort to expedite the completion of the East Pine Corridor Traffic Analysis, the
City has retained the services of JRH Transportation Engineering to evaluate existing data
and fznalize the recommendations for traffzc mitigation measures. Prior to the
involvement ofJRH Transportation Engineering the City was relying on input from
traffic engineering fzrm that currently represents the proposed developer. The
conclusions presented by that firth were questioned after being received by ODOT's
Transportation Planning Analysis Unit (TPAU). TPAU raised serious concerns about the
adequacy of transportation facilities designed to serve a development with a scope and
nature equal to the proposed development. The Public Works Department does not
recommend acceptance of either the developer's traffic engineering conclusions or the
conclusions of TPAU. Considering the potential severe traffic impacts given the
development's location adjacent to Interstate 5 and the present congestion in the Pine
Street Corridor, as well as the impact on the community and nearby existing and future
commercial interests, Public Works recommends that this development be treated as a
"conditional use" and that the use be conditioned to adhere to recommendations of the
final East Pine Street Corridor Analysis.
4. Attached to this staff report is a copy of a letter provided by JRH Transportation
Engineering. At the request of the City, JRH is currently completing an independent
traffzc analysis of data provided by the developer's traffic consultant. The attached letter
Pear Blossom Retail Developrrrertt
Ptrhlic Works Staff Report
Page #6
classifies the proposed development as conditional use based on its proximity to
Interstate S, and existing traffic congestion in the northeast pardon of the City.
At a recent status meeting with JRH the City was provided with saznc preliminary
recommendations which, if accepted, would seem to significantly improve tz'affic flow
and provide multiple points of access to the proposed development. These do not appear
to add unreasonable cost to the proposed development, yet appear to reduce traffic
volumes on Pine Street, improve connectivity to other streets, and enhance the desired
concept of connected street systems in the surrounding area.
These recommendations will be made as part of the final report presented by JRH
Transportation Engineering.
Public Works recommends that the Planning Commission consider these
recommendations in its deliberations on the proposed development.
Storm Drain -Ground Water -Flood Plain
It shall be the responsibility of the Developer's Engineer to investigate the drainage area
of the project, including the drainage areas of the channels or storm sewers entering and
leaving the project area. If a contiguous annexed drainage area of given size exists, the
engineer may use information that has formerly been established if it includes criteria for
the drainage area at complete development under current zoning and Comprehensive Plan
designations. If the City does not have such information, the engineer shall present
satisfactory information to support his storm sewerage design. The engineer shall also be
required to provide all hydrology and hydraulic computations to the Public Works
Department that are necessary to substantiate the storm sewer design. The storm water
sewer system design shall be in conformance with applicable provisions of Oregon DEQ,
DSL and ODFW and United States COE and consistent with APWA Storm Water Phase
fI requirements.
2. The proposed development places improvements and structures within or alters the 100-
year flood plain associated with Bear Creek. The development's location adjacent to and
within the Bear Creek flood plain also indicates potentially adverse or hazardous
characteristics due to flooding that would not normally be found in a use of a similar type
and size located elsewhere in the City. It is recommended that the Developer be required
to have a 140-year flood study analysis performed. The flood study must provide
findings which indicate what affects the placement of the proposed improvements and
structures have on the base flood elevation and flood zone boundary; and what affects the
modif cation of the floodplain elevation and flood zone boundary have on the existing
facilities and properties surrounding the proposed development. The Developer's
engineer shall determine the existing base flood flow rates and the base flood evaluation
contours; and illustrate the existing boundaries of the floodplain and floodway fora 144-
Pear 131ossorrr Retail Developrrrerrt
Public Works Staff Report
Pale #7
year "base flood" storm event associated with Bear Creek through the affected properties.
The construction drawings shall indicate the revised base flood elevation contours and
boundaries of the floodplain and floodway expected to occur following the completion of
any development within the identified flood zone {also referred to as the "Area of Special
Flood Hazard"), including any affected up-gradient areas. The information determined in
this study will also be used to determine zniniznuzn fznished Haar elevations for any
structures that will be placed within the area of special flood hazard.
3. The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of storm drain related
components.
4. This development proposes adding about 1 S acres of impervious surface to the site.
Discharging storm runoff directly to Bear Creek from this developed site could have the
following impacts:
~ Greater potential far flooding in Bear Creek
Introduction of pollutants, such as oil and dirt from automobiles, directly to the creek
Increasing the temperature of the water in Bear Creek.
The location adjacent to Bear Creek presents adverse water quality issues that would not
be present in a similar development built elsewhere in the City. Currently the City's
standards for storm drains do not require detention of storm water where the drainage
facilities are adequate. This is correctly stated in the developer's report and the developer
is apparently not planning to install detention facilities or water quality facilities to reduce
potential negative impacts on the creek. However, the City is now subject to NPDES
Phase II requirements. These requirements are designed to limit discharge of storm
waters that tend to affect streams from either a quality or a quantity standpoint. The City
has recently entered into agreement with Rogue Valley Sewer Services {RVS) to manage
the Phase II requirements. Written Input from RVS should be obtained relative to the
storm water quality issues associated with this development.
The City has not yet created standards for developers to comply with Phase Il and does
not have any way to evaluate the impacts of discharging storm water from such a large
impervious surface directly into Bear Crook. It seems appropriate therefore, to request
help from Oregon. DEQ and/or such federal agencies as maybe able to provide
infoz~xzation which the City and RVS can use to evaluate these environmental impacts
from the proposed development. Should qualified State or Federal agencies recommend
such measures as filters to improve water quality or detention basins to reduce flooding
impacts, these recommendations should condition impaled on to the developer for
incorporation into the plans.
5. If storm water detention practices, which involve the introduction of runoff to subsurface
locations, are proposed, it is recommended that a thorough analysis be conducted to
assure that pollutants will oat be introduced into groundwater. The City is aware of
Pear Blossom Retail Development
Public YT'orks Staff Report
Page #8
shallow water wells in this vicinity, and the City was involved recently in legal actions
relative to groundwater degradation near the proposed development site. The City might
justifiably become involved in additional legal actions unless it insists that this matter be
thoroughly evaluated by competent geologists anti hydrologists. 1n consideration of the
above storm water quality and quantity concerns Public Works recommends that this
development be considered under the provisions of the City Code.
Requited Submittals
1. All design, construction plans and specifications, and "as-built" drawings shall be
prepared to acceptable professional standards as applicable. The Developer shall provide
copies of any permits, variances, approvals and conditions as may be required by other
agencies including, but not limited to; Oregon Department of Fish and Wildlife
{ODF&W}, Oregon Department of Environmental Quality {DEQ), Oregon Division of
State Lands {DSL), Oregon Department of Transportation {ODOT}, U.S. Army Corps of
Engineers {ALOE), affected irrigation districts, Rogue Valley Sewer Service (RVSS} and
Jackson County Roads and Parks Services Department (JC Roads).
2. Fire District No. 3 must approve all streets and water improvement plans in writing prior
to final review by City PWD.
3. During construction., any changes proposed by the Developer shall be submitted in
writing by the Developer's Engineer to the City Public Works Department for approval
prior to installation.
General Conditions,.of approval
*These recommended conditions of approval are in addition to those submitted for the Planning Contricission
meeting of March 18, ,2004
As stated in the preliminary staff report fiom Public Works, the primary concerns of the
department are related to environmental issues and adequacy of public facilities, such as streets,
storm drains, water service, sanitary sewers, etc. It appears that water and sewer facilities are
adequate to serve the proposed development. The recommended conditions of approval
associated with These facilities are fairly straightforward.
Conditions of approval for storm water and transportation are more complex due to varying
opinions from consultants and new requirements being imposed upon the City of Central Point.
The following recommended conditions of approval are general in nature. Depending on actions
by the Planning Commission or the City Council, detailed final recommendations for conditions
of approval will be presented at a later date.
Pear I3lossassr Retail Developsrsesrt
Prr6lic Works Staff Report
Page #4
Water & Sewer
Water and sanitary sewer facilities appear to be adequate. The developer shall subn~zit plans that
are consistent with the City's and Rogue Valley Sewer Services' standard specifications for
review and approval of the agencies. I'ezzrzits froze these agcncics shall be obtained and all fees
paid prior to the start of arty construction.
Transportation
Two traffic consultants and the Oregon Department of Transportation have provided information
about the traffic impacts of the development of this property. There are several discrepancies
between the opinions offered by these traffic experts. However, all agree that the impacts on
traffic congestion of this development will be extreme unless mitigation measures are taken. It is
the City's responsibility to assure that appropriate steps are taken to minimize adverse impacts to
traffic flow for the safety and convenience of its citizens.
Accordingly, the developer shall submit plans which meet the City's needs for the proper flaw
and management of traffic under full development conditions. These plans must address and
reconcile issues, as they relate to safety and convenience of the traveling public, raised by the
traffzc experts mentioned above to the satisfaction of the Public Works Department. Public
Works will work with the developer's engineers and planners during the review process to
evaluate mitigation measures in a timely fashion and to propose alternatives where appropriate.
Wherever an appropriate nexus exists between the impacts of the development on traffic in the
vicinity of this improvement and mitigation measures proposed to address these impacts, the
developer shall be responsible for the proportional cost of implementing the mitigation measures.
Written agreements between the developer and the City related to the cost of improvements shall
be negotiated by the developer and Public Works and presented to the City Manager for
approval.
Storm Drainage
The issues raised in the preliminary staff report related to water quality, flooding, and ground
water impacts are potentially serious from the standpoint of protecting the health and safety of
citizens and the environment. Accordingly, the developer shall provide all necessary studies to
assure the City that this development will not have adverse impacts on surface or subsurface
waters and will not adversely impact the environment. These studies maybe shared with
appropriate State andlor Federal agencies for their input and advice to the City.
Sumniafy
The City of Central Point Public Works Staff Report addresses the City's concerns relative to the
proposed developments potentially adverse impacts. However, the Public Works Department
does not typically establish specific conditions for the Planning Commission to approvc.
Historically, the City's Engineering Division has been given the authoz7ty by the Planning
Pear Blossarre Retail Developrrtertt
Public Works Stuff Re~art
Pale #I Q
Commission to negotiate required improvements, relative to proposed developments, during the
course of the improvement plan review process.
The Engineering Division will use all the resources described in this staff Report to equitably
impose mitigation of adverse impacts resulting from the proposed developmont per the City of
Central Point's Municipal code as wells as Oregon's governing statutes.