Loading...
HomeMy WebLinkAboutCouncil Resolution 1116 RESOLUTION NO. / (~(o A RESOLUTION REVISING THE WATER, TRANSPORTATION, PARKS, AND STORMWATER SYSTEM DEVELOPMENT CHARGES WHEREAS, Oregon Revised Statutes Chapter 223 and Central Point Municipal Code Chapter 11.12 authorize collection of system development charges for water supply, treatment and distribution; transportation; parks and recreation; and drainage and flood control; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CENTRAL POINT, OREGON, AS FOLLOWS: Section 1. IMPROVEMENT PLAN. The City Council hereby adopts, as its improvement plans required by ORS 223.309 and Central Point Municipal Code Section 11.12.080, the project lists contained in Exhibit A. Said exhibit defines the cost of projected capital improvements needed to increase the capacity of each system to which the improvement fee is related and lists the estimated cost, time, and percentage of costs eligible to be funded with revenues from the improvement fee for each improvement. The improvement plan adopted herein maybe modified from time to time by resolution of the Council, as provided in Central Point Municipal Code Section 11.12.080. Section 2. SYSTEM DEVELOPMENT CHARGES. Effective August 1, 2006, the water, transportation, parks, and stormwater system development charges contained in Exhibit B shall be required. Section 3. COLLECTION OF CHARGE. Effective August 1, 2006, the water, transportation, parks, and stormwater system development charges are payable to the City of Central Point as provided in Central Point Municipal Code Section 11.12. 090. ~ Passed by the Council and signed by me in authentication of its passage this ~~ day of .~S`u , 2006. ATTES City Representative Approved by me this ~ day of~ , 2006 ` 1 MAYOR /I% ~!~y d-o ~ MAYOR City of Central Point EXHIBIT 'A' SDC Study Project List: Stormwater Table 4 Project Project Cost # Source (1) Year Estimate Yr Project Description Inputted Default Allocated % Allocated to Growth (2) to Growth (3) Original 2006 SDC Project Project Eligible Cost Cost (4) Cost 1 CIP 2006 2005 Rose Valley Rd /Mingus Creek 0% $ 98,887 $ 104,177 $ - 2 CIP 2009 2005 Crater High School /Third St 0% 176,175 $ 185,600 - 3 MP 2004 Bear Creek drainage basin 57% 1,980,686 $ 2,192,221 1,247,842 4 MP 2004 Mingus Creek drainage basin 38% 1,426,388 $ 1,578,724 607,088 5 MP 2004 Griffin Creek drainage basin 54% 1,082,666 $ 1,198,294 644,590 6 MP 2004 Elk Creek drainage basin 57% 125,370 $ 138,759 78,779 7 MP 2004 Daisy Creek drainage basin 71% 137,104 $ 151,746 108,291 8 MP 2004 Horn Creek drainage basin 85% 35,415 $ 39,197 33,369 9 MP 2004 Jackson Creek drainage basin 70% 15,098 $ 16,710 11,701 Curb inlet retrofit 10 MP 2004 0% - - 27 MP 2004 0% - - Total plus: SDC Credits Outstanding Iess:.Current Improvement Fee Fund Balance (n/a) April 06 Total Future Capital Projects for SDC Calculation $ 2,731,660 $ - $ 5,077,788 $5,605,429 $2,731,660 $0 $2,697,53 NOTES: (1) CIP =Five-Year Capital Improvements Plan 2005-2010 (March 2005) MP =Storm Drain Master Plan (March 1, 2004) (2) Storm Drain Master Plan (March 1, 2004) (3) Calculated Growth Allocation: 0.00% (4) Source: Engineering News Review, March 21, 2005 issue. Total Growth in Customer Base: 31.36% Year (month of March) 2002 2003 2004 2005 20-City Avg. Construction Cost Index 6,502 6,627 6,957 7,309 2006 7, 700 ~~ FCS Group, Inc. (425) 867-1802 7/20/2006 City of Central Point SDC Study Project List: Water Table 4 Cost Inputted Default Original 2006 SDC Operations Project Project Estimate °~ Allocated °~ Allocated Project Project Eligible Cost # Source Year Year Project Description to Growth to Growth Cost Cost Cost 1 CIP 2007 2005 Ninth /Laurel Waterline 28.6% 225,000 237,000 67,740 169,260 2 CIP 2007 2006 SCADA System Phase III 28.6% 80,000 80,000 22,870 57,130 3 CIP 2007 2005 Beebe Road Waterline Phase I 85% 108,600 114,000 96,900 17,100 4 CIP 2007 2006 Water Rights Purchase 28.6% 347,175 347,000 99,240 247,760 5 MP 2007 2002 B5: Connects Bealle meter with Central Point sys 15.0% 51,000 60,000 9,000 51,000 6 CIP 2008 2005 Peninger Road WL Construction (B3) 65% 431,000 454,000 295,100 158,900 7 CIP 2008 2005 Freeman Road 28.6% 200,000 211,000 60,310 150,690 8 MP 2008 2002 Peninger Road WL (C2) 33.3% 394,000 467,000 155,510 311,490 9 CIP 2009 2006 Carlton Ave Waterline 28.6% 65,000 65,000 18,590 46,410 10 CIP 2009 2006 Grant Road Waterline 28.6% 300,000 300,000 85,750 214,250 11 MP 2009 2002 Downtown Small Pipe Replacement Program 10.0% 350,000 414,000 41,400 372,600 12 CIP 2008 2006 Water Rights Purchase 28.6% 303,700 304,000 86,890 217,110 13 CIP 2009 2006 Water Rights Purchase 28.6% 376,500 377,000 107,760 269,240 14 CIP 2010 2006 3 Acres- Water Reservoir 35% 1,000,000 1,000,000 350,000 650,000 15 MP 2010 2002 Downtown Small Pipe Replacement Program 10.0% 350,000 414,000 41,400 372,600 16 MP 2011 2002 Automate MWC Connections: valves/SCADA system, for 2 mg tank 35.0% 115,000 136,000 47,600 88,400 17 CIP 2011 2005 New Pump Design 35.0% 81,857 86,000 30,100 55,900 18 CIP 2011 2005 2-MG Reservoir Construction 35% 1,317,400 1,388,000 485,800 902,200 19 CIP 2012 2005 Gebhard Road Waterline 35% 265,000 279,000 97,650 181,350 20 CIP 2013 2005 Beebe Road Waterline Phase 2 85.0% 1,000,000 1,053,000 895,050 157,950 21 MP 2013 2002 Downtown Small Pipe Replacement Program 10.0% 350,000 414,000 41,400 372,600 22 MP 2014 2002 Wilson/Upton Rd WL (C3) 33.3% 1,230,000 1,457,000 485,180 971,820 23 MP 2015 2002 C4: Connects existing 16" on Bealle Lane 33.3% 440,000 521,000 173,490 347,510 24 MP 2016 2002 Front St Replacement (C5) 33.3% 200,000 237,000 78,920 158,080 25 MP 2022 2002 New 2mg Tank near Vilas: new ground storage t2 65% 1,440,000 1,705,000 1,108,250 596,750 26 MP 2022 2002 VilasPS:fi°ncapacity2800gpm,3°%ofeatimaled2°22peakMurdemand 65% 1,080,000 1,279,000 831,350 447,650 Total $ 5,264,106 $ 549,161 $12,101,232 $13,399,000 $5,813,250 $7,585,750 ;. FCS Group, Inc. (425) 867-1802 7/20/2006 City of Central Point SDC Study Project List: Parks Table 4 Project Source (1) Cost Estimate Yr Project Description Inputted Default % Allocated % Allocated to Growth (1) to Growth (2) Original Project Cost 2006 Project Cost (3) SDC Eligible Cost CIP 2006 Twin Creeks: trails 42.88% $ 290,000 $ 290,000 $ 124,400 CIP 2006 Twin Creeks: open space 42.88% $ 134,000 $ 134,000 $ 57,500 CIP 2006 Twin Creeks: soccer fields 42.88% $ 87,000 $ 87,000 $ 37,300 CIP 2006 Twin Creeks: covered picnic areas 42.88 % $ 58,000 $ 58,000 $ 24,900 CIP 2006 Twin Creeks: sohball field 42.88 % $ 145,000 $ 145,000 $ 62,200 CIP 2006 Twin Creeks: picnic tables 42.88% $ 12,000 $ 12,000 $ 5,100 CIP 2006 Twin Creeks: play equipment (four) 42.88 % $ 116,000 $ 116,000 $ 49,700 CIP 2006 Twin Creeks: tennis courts (three) 42.88% $ 87,000 $ 87,000 $ 37,300 CIP 2006 Twin Creeks: basketball courts (two) 42.88% $ 35,000 $ 35,000 $ 15,000 CIP 2006 Twin Creeks Restrooms 42.88 % $ 100,000 $ 100,000 $ 42,900 CIP 2006 Cascade Meadows: sidewalks, benches and landscaping 42.88% 35,D00 $ 35,000 $ 15,000 CIP 2006 CP Community Park: community center 42.88% 2,000,000 $ 3,000,000 $ 1,286,500 CIP 2006 CP Community Park: open space 42.88 % 50,000 $ 50,000 $ 21,400 CIP 2006 CP Community Center Feasibility Plan 42.88 % 130,000 $ 130,000 $ 55,800 CIP 2006 Flannagan Park: restroom facilities 42.88% 90,000 $ 90,000 I $ 38,600 CIP 2006 Bear Creek Greenway Master Plan 42.88 % 45,000 $ 45,000 $ 19,300 CIP 2006 Beebe-Gebhard Neighborhood Park 42.88% $ 150,000 $ 150,000 $ 64,300 CIP 2006 Blue Grass Downs: covered picnic areas 42.88% $ 17,000 $ 17,000 $ 7,300 CIP 2006 Blue Grass Downs: open space 42.88% $ 58,000 $ 58,000 $ 24,900 CIP 2006 Blue Grass Downs: picnic tables 42.88 % $ 12,000 $ 12,000 $ 5,100 CIP 2006 Blue Grass Downs: walking trails 42.88 % $ 64,000 $ 64,000 $ 27,400 CIP 2006 Don Jones Park 42.88 % 230,000 $ 230,000 $ 98,600 CIP 2006 Don Jones Park I 42.88 % 830,000 $ 830,000 $ 355,900 CIP 2006 Don Jones Park II 42.88% 850,000 $ 850,000 $ 364,500 CIP 2006 Pheasant Creek: covered picnic areas 42.88% 15,000 15,000 8,400 CIP 2006 Pheasant Creek: open space 42.88 % 10,000 10,000 4,300 CIP 2006 Pheasant Creek: picnic tables 42.88% 5,000 5,000 2,100 42.8fl1 CIP 2006 Snowy Butte Station: basketball courts ([wol 42.88 % 37,000 37,000 15,900 CIP 2006 Snowy Butte Station: covered picnic areas 42.88% 17,000 17,000 7,300 CIP 2006 Snowy Buhe Station: open space 42.88% 108,000 108,000 46,300 CIP 2006 Snowy Butte Station: picnic tables 42.88% 12,000 12,000 5,100 CIP 2006 Snowy Butte Station; play equipment 42.88 % 12,000 12,000 5,100 CIP 2006 Snowy Butte Station; walking trails 42.88% 64,000 64,000 27,400 CIP 2006 Summerfield Park: basketball court 42.88% 15,000 15,000 6,400 CIP 2006 Summerfield Park: covered picnic areas 42.88% 15,000 15,000 6,400 CIP 2006 Summerfield Park: open space 42.88% 40,000 40,000 17,200 CIP 2006 Summerfield Park: picnic tables 42.88% 7,000 7,D00 3,000 CIP 2006 Summerfield Park: play equipment 42.88% 10,000 10,000 4,300 CIP 2006 Boes Park :Master Plan 42.88% 15,000 15,000 6,400 CIP 2006 Boes Park :Constructions 42.88% 300,000 300,000 128,700 42.88 42.88% 42.86% 0 0 Total ~ 510,400 ~ 3,195,783 7,176,000 38,116,000 $3,705,800 plus: SDC Credits Outstanding $0 less: April 2006 Park SDC IMP Fund Balances (4) $7.0.4,225 Total Future Capital Projects for SDC Calculation $3,501,525 NOTES: MP - `Central Point Parks and Recreation, Master Plan' (August 2003) CIP -Five-Year Capital Improvements Plan 2005-2010 (July 20061 Parks standard: 10 acres per 1,000 persons. Sowce: "Central Point Parks and Reoeation, Master Pl an' (August 20031, page 15. It is assumed that performance of the plan will result in achievement of the Ciry standard. Current Park Acreage: 129.4 Current Population (Year 2005): 17,500 Curren) Parks Requirement (acres): 175 Prolecled Population (Year 20151: 21,332 Future Parks Requirement (acres): 213 Acreage added through the P)an: 84 Percentage of added acreage for growth: 45.7% Calculated Crowth Allocation: 42.88° Source: Engineering News Review, Ma xx, 2006 issue. Year (month of March) 2002 2003 2004 2005 2006 20-CI Av .Construction Cost Index 6,502 6,627 6,957 7,309 7700 Source: "City of Central Point, Cash and Investments, December 31, 2004" FCS Group, Inc. (425) 867-1802 7/20/2006 CIP 2006 Flannagan Park Restrooms 42.88% 55,000 $ 55,000 $ 23,600 City of Central Point SDC Study Project List: Transportation Table 4 Project Project Cost # Source (t) Year Estimate Yr Project Description Inputted Default Original 2006 SDC Allocated % Allocated Project Project Eligible to Growth (1) to Growth (2) Cost Cost (3) Cost 20 CIP 2007 2006 Hwy 99 RR Crossing 40 % 337,500 337,500 135,000 17 CIP 2007 2006 INTX. Of Scenic Ave/10th SUUpton Rd 40 % 1,501,250 1,501,250 600,500 19 CIP 2008 2005 Haskell Rd: Pine St to Snowy Butte Road 40 % 750,000 790,122 316,049 16 CIP 2008 2005 Freeman Road: Oak St to Hopkins Rd 40 % 1,898,000 1,999,535 799,814 18 CIP 2009 2005 BeebeROad 40% 934,000 983,965 393,586 1 RTP 2009 2005 10th Street, Hazel Street to Scenic Ave: widen to three lanes with bike 8 sidewalks 40 % 1,250,000 1,316,870 526,748 22 CIP 2010 2005 GebhardRoad 40% 1,817,000 1,914,202 765,681 21 CIP 2010 2005 Tenth Street: Hazel St to Scenic Ave 40 % 1,250,000 1,316,870 526,748 23 CIP 2011 2005 Brad Way, Saxbury Drive, Rachel Drive, Manzanita St. Oak St, Ash St 40 % 672,000 707,949 283,180 25 CIP 2011 2005 INTX. Of Beebe Rd 8 Hamrick Rd 40% 150,000 158,024 63,210 28 CIP 2011 2005 Scenic: Tenth to Griffin Creek 40 % 500,000 526,748 210,699 26 CIP 2012 2005 East Pine St: Signal at 4th and 2nd 40 % 375,000 395,061 158,024 24 CIP 2013 2005 Taylor Road 40% 1,000,000 1,053,496 421,398 27 CIP 2014 2005 West Pine Street 40 % 730,000 769,052 307,621 8 RTP 2014 2005 HWY 99 and Beall Lane intersection: realign and upgrade signals and railroad crossing 40 % 452,000 476,180 190,472 32 East Pine Plan 2015 2004 New traffic signal, 700 ft west of Hamrick Road 55 % 350,280 387,690 213,229 33 East Pine Plan 2015 2004 New public street from new signal (project #4a) north to Beebe Road and south to Project #10 55 % 2,250,910 2,491,305 1,370,218 34 East Pine Plan 2015 2004 Install second right-turn lane on northbound off-ramp and eastbound right-turn at Peninger Road I E. Pine S 55 % 609,400 674,483 370,966 35 Easl Pine Plan 2015 2004 Construct second eastbound left-turn lane when Project 4b is completed to Beebe Road. 55 % 402,470 445,453 244,999 36 East Pine Plan 2015 2004 Construct second eastbound left-turn lane and second receiving lane on Hamrick Road north of E. Pine Stre 55 % 733,460 811,793 446,486 37 East Pine Plan 2015 2004 New traffic signal when Project 4b is completed to Beebe Road. 55 % 295,330 326,871 179,779 38 East Pine Plan 2015 2004 Southbound ramp terminal -eliminate westbound left-turn movement and replace w/ loop ramp & right-turn I. 55 % 556,700 616,155 338,885 39 East Pine Plan 2015 2004 Construct new bridges over Bear Creek north and south of E. Pine Street 55 % 8,677,750 9,604,524 5,282,488 40 East Pine Plan 2015 2004 New public street betweeen Peninger Road and Hamrick Road (south of E. Pine Street) 55 % 1,570,350 1,738,062 955,934 41 East Pine Plan 2015 2004 New public street betweeen Peninger Road and Beebe Road / Gephard Road. 55 % 1,214,680 1,344,406 739,424 42 East Pine Plan 2015 2004 Remove traffic signal at Peninger Road and E. Pine Street and convert intersection to right-in /right-out only 55 % 45,720 50,603 27,832 43 East Pine Plan 2015 2004 2nd northbound left-turn lane, 2nd westbound left-turn lane, exclusive northbound and southbound right-turr 55 % 538,120 595,591 327,575 44 East Pine Plan 2015 2004 Construct second eastbound left-turn lane 55 % 393,730 435,780 239,679 45 East Pine Plan 2015 2004 Construct eastbound left-turn lane 55% 332,770 368,309 202,570 46 East Pine Plan 2015 2004 Northbound ramp terminal -eliminate eastbound left-turn movement and replace w/loop ramp and right-turn 55 % 556,700 616,155 338,885 47 East Pine Plan 2015 2004 Widen E. Pine Street to 3 lanes in westbound direction beween Hamrick Road and southbound 15 ramp tem 55 % 4,442,520 4,916,976 2,704,337 48 East Pine Plan 2015 2004 Widen northbound approach for dual left-turn lanes and a shared through right-turn lane. Widen southbounc 55% 840,960 930,774 511,925 49 East Pine Plan 2015 2004 Construct westbound right-turn lane 55% 344,550 381,348 209,741 50 East Pine Plan 2015 2004 Southbound ramp terminal -construct second southbound left-turn lane. 55 % 455,040 503,638 277,001 51 East Pine Plan 2015 2004 Northbound ramp terminal -construct exclusive westbound right-turn lane. 55 % 760,220 841,411 462,776 52 East Pine Plan 2015 2004 Widen E. Pine Street to 3lanes in westbound direction between Table Rock and Hamrick Road. 55 % 1,227,420 1,358,507 747,179 53 East Pine Plan 2015 2004 New public street from southern terminus to Peninger Road. 55% 1,048,080 1,160,014 638,008 54 East Pine Plan 2015 2004 Construct bridge over Bear Creek and roadway between south end of Project #20 and Hamrick Road. 55 % 5,543,100 6,135,097 3,374,303 7 RTP 2016 2005 Scenic Ave, Mary's Way to Scenic Middle School: realign, widen and add bike lanes 8 sidewalks 40 % 630,000 663,702 265,481 9 RTP 2017 2005 Hazel Street, 3rd St to 10th St: add sidewalks, repair cub and gutter 40 % 300,000 316,049 126,419 10 RTP 2017 2005 3rd St, East Pine St to Hazel St: add bike lanes and sidewalks 40 % 192,000 202,271 80,908 2 RTP 2005-2009 2005 Upton Road, approaches to I-5 overcrossing: widen to two lanes with bike 8 sidewalks 40 % 762,000 802,764 321,105 3 RTP 2005-2009 2005 East Pine St, Bear Creek Bridge to Peninger: witlen for turn lanes and bike lanes, add sidewalks 40 % 120,000 126,419 50,568 15 CIP 2005-2010 2005 Miscellaneous alley improvements (paving existing alleys) 40 % 690,000 726,912 290,765 4 RTP 2010-2015 2005 East Pine St and Third St intersection: upgrade signals 40 % 225,000 237,037 94,815 5 RTP 2010-2015 2005 Hwy 99, Pine St to Griffin Creek: provide bike lanes & sidewalks 40 % 600,000 632,097 252,B39 6 RTP 2010-2015 2005 New Haven Rd and Hamrick Rd intersection: add signal for pedestrian crossing 40 % 350,000 368,723 147,489 11 RTP Tier 2 2005 East Pine St, Hamrick Roatl to Bear Creek Bridge: widen for decel/octet lanes, add bike lanes and sidewalk 40% 355,000 373,991 149,596 12 RTP Tier 2 2005 Burrell Rd, Beall to Hopkins: widen to two lanes with bike lanes and sidewalks 40 % 1,262,000 1,329,512 531,805 13 RTP Tier 2 2005 Scenic Ave and HWY 99 intersection: add traffic signal and realign intersection 40% 375,000 395,061 158,024 FCS Group, Inc. (425) 867-1802 7/t 7/2006 Project Project Cost # Source (1) Year Estimate Yr Project Description Inputted Default Original 2006 SDC Allocated % Allocated Project Project Eligible to Growth (1) to Growth (2) Cost Cost (3) Cost 14 RTP Tier 2 2005 HWY 99 ,Beall Lane to Pine St: provide bike lanes 8 sidewalks 40% 900,000 948,146 379,258 40% - - Total plus: SDC Credits Outstanding less: April 2006 Street SDC Fund Balances (4) Total Future Capital Projects for SDC Calculation $ - $28,752,022 $53,568,O1U $58,104,450 $'18,752,OZ2 $0 $846.894 $2 7,905,128 NOTES: (1) RTP = "Draft RTP Project List 2005-2030 (Model Area Only)" CIP =Five-Year Capital Improvements Plan 2005-2010 (March 2005) (2) Calculated Growth Allocation: 40.00 % Total Growth in Customer Base: 40.00 (3) Source: Engineering News Review, March 21, 2005 issue. Year (month of March) 2002 2Q~ 2004 Q 2006 20-Ciri Ava. Construction Cost Index 6.502 6.627 6.957 7,309 7,700 (4) "City of Central Point, Cash and Investments, December 31, 2004" " FCS Group, Inc. (425) 867-1802 7/17/2006 City of Central Point SDC Study SDC Calculation: Transportation Table 1 Not Valid EXHIBIT 'B' Reimbursement Fee Avera a Dail Tri s Peak-Hour Tri s Cost of Net Unused Capacity $ 1,838,674 $ 1,838,674 Growth to End of Planning Period (1 & 2) 35,143 Average Daily Trips 7,375 Peak-Hour Trips Reimbursement Fee $ 52.32 per ADT $ 249.32 per P-HT Improvement Fee Capacity Expanding C1P $ 27,905,128 $ 27,905,128 Growth to End of Planning Period (1 & 2) 35,143 Average Daily Trips 7,375 Peak-Hour Trips Improvement Fee $ 794.05 per ADT $ 3,783.80 per P-HT Total System Development Charge Reimbursement Fee $ 52.32 per ADT $ 249.32 per P-HT Improvement Fee ~ 794.05 per ADT $ x,78 .80 per P-HT SDC Subtotal $ 846.37 per ADT $ 4,033.11 per P-HT plus: Administrative Cost Recovery 3.57% $ '10.25 per ADT S 144.13 per P-HT Total SDC $877 per ADT $4,177 per P-HT NOTES: (1) Source: ODOT. Adjusted (increased) by 10% to account for trips on local streets. 1~ FCS Group, Inc. (425) 867-1802 7/20/2006 City of Central Point SDC Study SDC Calculation: Transportation Table 2 EXHIBIT 'B' ~ Customer Data ~ ADT Growth on Arterials and Collectors (1) 31,948 Year 2002 Population: 13,818 10% Factor for Systemwide ADT Growth Estimate 1.1 Year 2005 Population: 17,500 Total ADT Growth = 35,143 Year 2030 Population: 28,711 P-HT Growth on Arterials and Collectors (1) 2,529 Derived 2005-2030 trip growth, using calculated 2002-2030 growth and populati~ 10% Factor for Systemwide P-HT Growth Estimate 1.1 Total P-HT Growfh = 2,782 (1) Source: Oregon Department of Transportation. Growth from Year 2002 to 2030. Average Daily Trip Growth 42,441 (adjusted above for growth from 2002 to 2005) Peak-hour Trip Growth 3,360 (adjusted above for growth from 2002 to 2005) FCS Group, Inc. (425) 867-1802 7/20/2006 City of Central Point SDC Study SDC Calculation: Stormwater Table 1 Reimbursement Fee Cost of Net Unused Capacity $ - Growth to End of Planning Period 6,821 Equivalent Service Units Reimbursement Fee $ - per ESU Improvement Fee Capacity Expanding CIP $ 2,697,539 Growth to End of Planning Period 6,821 Equivalent Service Units Improvement Fee $ 395.46 per ESU Total System Development Charge Reimbursement Fee $ - per ESU Improvement Fee $ 395.46 per ESU SDC Subtotal $ 395.46 per ESU plus: Administrative Cost Recovery 3.57% ~ 14.13 per ESU Total SDC per Equivalent Service Unit S 410 per ESU NOTES (1) One equivalent service unit (ESU) equals 2,500 square feet. 1~ FCS Group, Inc. (425) 867-1802 7/20/2006 City of Central Point SDC Study SDC Calculation: Stormwater Table 2 ~ Customer Data ~ Demog~nhict # Year Current Population: 17,500 2005 Source: Ciry Staff. May zoos. Future Population: 25,494 2024 End Year for Stormwater Plan: 2024. Current square feet of ISA in City 37,330,920 Source: Memo from Public works Dept, 3/17/05 Assumed square feet (ISA) per ESU 2,500 Source: Based on (1) persons per ESU, (1) 2005 Impervious Surface Area, and (3) escalated 2004 population to 2005. Current number of ESUs 14,932 all FCS Group, Inc. (425) 867-1802 7/20/2006 City of Central Point SDC Study SDC Calculation: Water Table 1 Reimbursement Fee Net Cost Unused Capacity Cost Basis Unit Basis ERUs (1) EMUs (2) $ 2,285 352 $ 3,070 262 $ 2,285 1,335 $ 3,070 993 $ $ 352 1,335 $ $ 262 993 $ $ 1,687 60 $ $ 1,255 45 $1,747 per ERU $1,300 per EMU Growth to End of Planning Period Reimbursement Fee $ 804,880 Improvement Fee Capacity Expanding CIP: $ 3,049,281 Growth to End of Planning Period Improvement Fee Total System Development Charge Reimbursement Fee Improvement Fee SDC Subtotal plus: Administrative Cost Recovery 3.57% Total Base SDC NOTES: (1) One equivalent residential unit (ERU) = 435 gallons per day. (2) One equivalent meter unit (EMU) =flow capacity of a 3/4" meter. ~~ FCS Group, Inc. (425) 867-1802 7/20/2006 City of Central Point SDC Study SDC Calculation: Parks Table 1 Reimbursement Fee Cost of Net Unused Capacity Growth to End of Planning Period Reimbursement Fee Improvement Fee $ 692,250 3,832 Persons $ 180.63 per Person Capacity Expanding CIP $ 3,501,525 Growth to End of Planning Period 3,832 Persons Improvement Fee $ 913.66 per Person Total System Development Charge Reimbursement Fee $ 180.63 per Person Improvement Fee $ 913.66 per Person SDC Subtotal $ 1,094.29 per Person plus: Administrative Cost Recovery 3.57% ~ 39.11 per Person Total SDC $ 1,133 per Person Example SDCs Customer Type Density (1) SDC Basis 1 SFR DU 2.69 $ 3,049 per Dwelling Unit 2 MFR DU 2.02 $ 2,287 per Dwelling Unit 3 Mobile Homes 1.88 $ 2,134 per Dwelling Unit NOTES: (1) Source: City Staff. May 2005. Assumed MFR density: 75% of SFR. Assumed Mobile Home density: 70% of SFR. ~~ FCS Group, Inc. (425) 867-1802 7/20/2006 :` ~ . City of Central Point SDC Study SDC Calculation: Parks Table 2 Customer Data 2005 2015 Growth Population 17,500 (1) 21,332 (2) 3,832 NOTES: (1) Based on 2% annual population growth. Source: Water System Master Plan (December 2002), page 4-7 (2) Ending Year for Study Period is FY2015. Source: Parks and Recreation, Master Plan. 1~ FCS Group, Inc. (425) 867-1802 7/20/2006 ~,. Medford Water Commission Medford Water Commission $948 Administration Fee $17 Total $965 1~