HomeMy WebLinkAboutDIA 765 Ash StreetJackson County Official Records 2017.039636
Stn=O BARROWKL 11/22/2017 10:49:31 AM
Stn
$20.00 S10.00 $5.00 $8.00 $11.00 $20.00 $78.00
$4.00
I, Christine Walker, County Clerk for Jackson County, Oregon, certify
that the instrument identified herein was recorded in the Clerk
records.
Christine Walker -County Clerk
DEFERRED IMPROVEMENT AGREEMENT
for
765 Ash Street, Central Point, Oregon
This agreement made by and between Bryan F. Herrmann and Lisa C.
Herrmann, hereinafter referred to as "Owner" , and the City of Central Point, Oregon, a
municipal corporation, hereinafter referred to as "City".
Recitals
1. Owner is the owner of real property located at 765 Ash Street, Central
Point, Oregon, which property is fully described as Township 37S, Range 2W, Section
11 BA, tax lot 600, Jackson County, Oregon, as follows:
The West 70.5 feet of Lot 2, CONSTANT TRACT ADDITION, to the City of Central Point, Jackson
County, Oregon
2. Owner has applied for a partition plat in connection with construction of a
new property and City has reviewed and considered such application.
3. In reviewing Owner's applications, City has determined that as one of the
conditions of approving said proposed construction in accordance with Central Point
Municipal Code (CPMC) Chapter 12.04.015, it is reasonable and necessary that Owner
construct and/or install certain improvements, and that without such improvements the
application for the construction would be denied.
4. City has further determined that immediate construction and/or installation
of the necessary improvements is not practical at the present time.
5. Owner agrees that said improvements are reasonable and necessary and
that he or she will install them at the time and in the manner hereinafter provided.
Now, therefore, based on the foregoing and the mutual promises and covenants
contained herein, it is agreed as follows:
Agreement
1. Improvements to be Constructed or Installed. Owner agrees to construct
and/or install the following improvements at the time and in the manner specified herein:
Sidewalks„ including any required driveway aprons, according to City standards,
adjacent to existing house located at 765 Ash Street. Improvements associated with
the newly created lot will be required at the time of development. .
2. Time of Makina Improvements. The parties agree that City shall
determine, in its discretion, the time for construction and/or installation of improvements.
There shall be no specific limitation as to when the City may require the improvements
to be made. Owner specifically understands that City may demand performance at any
time, and Owner agrees to perform upon such demand.
At such time as City determines the improvements shall be made, City shall
cause written notice to be sent to Owner at the street address of the subject property.
Such notice shall inform Owner (which term includes any successors in interest to
Owner) that the improvements shall then be made, and such notice shall set forth the
time requirements deemed proper by City for submission of plans, specifications, start
of construction, bonding requirements, if any, completion of construction, and any other
provision deemed necessary by City. Owner shall then proceed, according to the time
schedule set forth by City, to submit plans, and after approval thereof by City, to
commence and complete the construction and/or installation of the improvements.
3. Responsibilities of Owner. Owner shall be responsible for the following:
(a) Preparing plans and specifications for the improvements and
submitting the same to City for approval;
(b) If required by City in City's discretion, posting a performance bond
in an amount and form deemed sufficient by City, to be released upon satisfactory
completion of the project and acceptance thereof by City;
(c) Construction and/or installation of all improvements specified
herein;
(d) Payment of all applicable fees, including, but not limited to, any
applicable engineering deposits, permit fees, development fees, and inspection fees;
and
(e) Owner shall notify City, at least 48 hours prior to commencement of
the work, of Owner's intention to commence work.
4. Qualitv of Work. All improvements shall be constructed and/or installed in
conformance with all applicable City Public Works Department and/or Building
Department standards and codes, shall be done in a workmanlike manner, and City
2 - DEFERRED IMPROVEMENT AGREEMENT Herrmann
shall also have authority to modify the design of the project as work progresses.
5. Warrantv of Work. All improvements shall be free from defects, and
Owner is deemed to have guaranteed the work to be free of defects for a period of two
years from the date of issuance of the City's written acceptance of the work. If during
such two year period City determines that repair or replacement of all or any part of the
improvements is necessary, City shall so notify Owner and Owner or its agent shall
effect the necessary repair or replacement.
6. Failure of Owner to do Work Required. In the event that Owner fails to
timely complete the initial or warranty work required, in any manner and time period
required herein, City may, at its option, determine to construct and/or install, on its own,
at the Owner's expense, the improvements specified herein. In that event, City may
accomplish the work and then assess the cost thereof against the subject property, in
the same manner as City assesses costs against properties benefitted by local
improvement districts pursuant to CPMC Chapter 11.04. Owner is deemed to have
consented to City entering onto the subject property, as necessary, to construct and/or
install the improvements.
7. Local Improvement District. This agreement may be superceded by the
creation and establishment of a Local Improvement District, which includes said
property, for the noted improvements along Bursell Road.
8. Aareement Bindina on Successors in Interest. This agreement shall run
with the land and be binding upon all successors in interest of both parties. It is
specifically understood that a memorandum of this agreement will be executed by
Owner and recorded so as to notify all third parties of the existence of this agreement
and the nature of the obligations contained herein.
9. Citv Council to Decide Disputes. Should Owner disagree with any of the
discretionary decisions or requirements made by City hereunder, Owner may have such
decision or requirement reviewed by the City Council. Owner shall notify the City
Administrator, within 10 days of Owner's receipt of such decision or requirement, that he
or she seeks review by the City Council. The City Administrator shall then place the
matter on the agenda of the next City Council meeting, and the Council shall rule on the
matter at that time. Both parties agree to be bound by the decision of the City Council.
10. Attornev Fees. In the event either party shall take any action to enforce or
interpret any of the terms of this agreement, including rescission, the prevailing party
shall be entitled to recover from the losing party reasonable attorney fees, including
those incurred in any appeal, if any.
11. Disclosure of Representation. This agreement has been reviewed by
Douglas M. Engle, a lawyer representing City only. Owner acknowledges having had
an adequate opportunity to consult a lawyer of his or her own choice before entering
into this agreement.
3 - DEFERRED IMPROVEMENT AGREEMENT
EXECUTED IN DUPLICATE this
each party retaining an original.
OWNE S
By U
!/ //-
Bry&n F. Herrmann
By
Lisa C. Heermai n
STATE OF OREGON
)ss'
County of Jackson
day of �J6 &-em �ju '2017,
CITY OF CENTRAL POINT
By: ( A.
_4Ma kaitorj-,PPW-D-irector
On the ?Q day of /J diff YYl &L U 1 2017, personally appeared
before me the above-named Bryan F Herrmann and Lisa C. Herrmann, and
acknowledged the foregoing instrument to be his/her voluntary act and deed.
Off ILIAL STAW Ajwq
THERM FNM Notary Public for Oregon
NOTARY PUBLIC -OREGON �-U { 1 GU �Q
COMMISSION NO. 93rM My Commission Expires: / I
W CONIMU od EWW$ MOM It 2N9
STATE OF OREGON )
) ss.
County of Jackson )
On the Qday of�?D� _ 2017, personally appeared
before me the above-named Director Matt Sa re, and acknowledged the foregoing
instrument to be the voluntary act and d;0ta2ryP6uZ'=Iic
City of 769.Ic�
I Point.
AaSh OFFICIAL STAMP ®4
DEANNA UM14 CAGEY r Oregono,'
NOTARY PUBLIC -OREGON M Commission Expires: SS kb-ap
COMMISSION NO. 950044 y p '}dam
W COMMON EXPIRES MAY 10, 2020
4 - DEFERRED IMPROVEMENT AGREEMENT