Loading...
HomeMy WebLinkAboutResolution 670 - Cascade Meadows Villagei~ i ;~.,. r. ~...~ C..~. PLANNING COMMISSION RESOLUTION NO. 67U A RESOLUTION denying a preliminary Development Plan and Land Division for Assessor's Tax Lot 37 2W 11CC 5100 (Lot 92), Cascade Meadows Village, Thomas and Anna Sunday applicant. WHEREAS; on Septetr~ber 6, 2005, at a duly noticed public hearing the Planning Commission considered the Applicant's request for an a~nendz~e~~t to the Cascade Meadows Village PUD and Land Division/ Preliminary Development PIan a {the "Application"} submitted byThornas and Anna Sunday (Applicant}; and WHEREAS; the property is curt•ently zoned as TOD _ EC with a pending application to consider a change in zoning to TOD _.. LMR; and WHEREAS; the Planning Commission's consideration of the Application is based on the standards and criteria applicable to lands designated TOD -LMR; and WHEREAS; after duly considering the Applicant's request it is the Planning Commission's determination that the Application does not comply with the applicable standards and criteria as set forth in the Staff Report dated October 4, 2005; now therefore BE IT RESOLVED; that the Planning Commission of the City of Central Point, by this Resolution No. 669 hereby denies the Application based on the findings stated in the Staff Report dated October ~, 2aos. PASSED by the Planning Commission in open session and signed by me in authentication of its passage this 4a' day of October 2005. J Planning Co issi Ch n ~AtTTEST: -_ City Representative (.J ~ PLANNING COMMISSION RESOLUTION NO. 670 (10042005) City of Central Point, Oregon 140 So.Third 5t., Central Paint,Or 97502 541.664.3323 Fax 541.664.6384 www.[i.[entral-point.or.us STAFF REPORT Planning Commission Meeting October 4, 2005 Planning Department Tom Humphrey, AICP, Cnrnmunity Development iJirettor/ Assistant City Administrator ITEM NO: 05074 TIP Consideration of a Resolution No. 670 denying a request for a four lot Land Division/Preliminary Development Plan and Planned Unit Development amendment on .48 acres, Assessor's Tax Lot 37 2W 11 CC 5100 (Lot 92), Cascade Meadows Planned Unit Development Phase III, Thomas and Anna Sunday applicant (05074 T/PUD). STAFF SOURCE Don Burt, AICP, EDPP BACKGROUND At the September 6, 2005 Planning Commission meeting a public hearing was held to consider the modification of the Cascade Meadows Village PUD for Lot 92, and the subdivision of Lot 92 {.48 acres) in to four (4) single-family residential detached lots. The land division application was accompanied by a preliminary site development plan for each of the four (4) lots. The initial intent for the Cascade Meadows Village PUD was to develop Lot 92 as commercial. The property is currently designated far employment commercial use {EC). The applicant has a pending application to amend the zoning map from TOD-EC (Employment Commercial) to TOD-LMR {Low Mix Residential). In addressing the PUD amendment and Land Division/Preliminary Site Plan it was acknowledged that the application was being reviewed on its merits as if it were designated TOD-LMR and that the issue of whether or not the application to amend the zoning map would be addressed separately on its own merits. After conclusion of the public hearing, and subsequent discussion, the Planning Commission voted to deny the proposed PUD amendment and Land Division and directed staff to prepare findings for denial based on the following considerations: 1. The proposed lots did not meet the minimum rear yard requirement; 2. The proposed lots did not meet the minimum lot width requirements (50 ft.); and 3. With the exception of Lot 12 the proposed lots are smaller in area and width than other standard residential lots in Cascade Meadows Village. 4. The site plans, with the use of shared driveways are not similar to or compatible with adjacent residential uses. FINDINGS Denial is based on the following f ndings as relates to the pending TOD-LMR land use re-classification: Section 17.65.07 Zoning Regulations - TOD Corridor(E} Dimensional Standards. The dizx~ensional standards for lot size, lot dimensions, buildi~~g setbacks, and building height arc specified in Table S. Finding I7.65.070 (E): Section 17.65.070(E) sets forth dimensional standards for the TOD- LMR and references Table S TOD, Corridor Zoning Standards. Table 5 requires a minimum lot width of SO feet. The applicant proposes lot widths less than SD feet. Conclusion I7.65.070(E): The proposed Land Division does not comply with the minimum standards for lot width as set forth in Table 5, Section 17.65.070. Finding 17.65.070 (E): Section 17.65.070(E) sets forth dimensianal standards for the TOD- LMR and references Table 5, Corridor Zoning Standards. Table 5 requires a rear yard setback of IS feet. The applicant proposes a minimum rear yard set back of 10 feet. Conclusion I7.S5.070(E): The proposed Land Division does not comply with the minimum standards for rear yard setbacks as set forth in Table 5, Section 17.65.070. Section 17.68.040 Criteria to Grant or Deny a PUD (C). That the location, size, design and operating characteristics of the PUD will have minimal adverse impact on the livability, value or appropriate development of the surrounding area. Finding I7.68.040(C): In reviewing the proposed PUD amendment and Land Division/Preliminary Development Plan against the surrounding land use pattern it is determined that the lots as proposed do not meet the width, and area standards of all standard single family lots within Cascade Meadows Pillage (excepting Lot 12). It was further determined that the existence of extenuating circumstances warranting any reduction in setbacks or lot width were revealed. Conclusion I7.b8.040(C): The proposed lots and lot design is not consistent with the character of the previously approved and developed standard single family lots. Section 17.65.040 (I). The PUD will be compatible with the surrounding area. Finding ,17.68.040(1): See Finding 17.68.040(C). Conclusion 17.68: See Finding 17.68.040(C). ~s PLANNING COMMISSION ItESOLCI'I`ION NO. G70 A RESOLUTION denying a preliminary Development Plan anal Land Division for Assessor's Tax Lot 37 2W 11CC 5100 {Lot 92}, Cascade Meadows Village, Thomas and Anna Sunday applicant. WHEREAS; on September 6, 2005, at a duly noticed public hearing the Planning Commission considered the Applicant's request for an amendment to the Cascade Meadows Village PUD and Land Division/ Preliminary Development Plana {the "Application") submitted by Thomas and Anna Sunday {Applicant}; and WHEREAS; the property is currently zoned as TOD - EC with a pending application to consider a change in zoning to TOD -~ LMR; and WHEREAS; the Planning Cornxr~ission's consideration of the Application is based on the standards and criteria applicable to lands designated TOD -LMR; and WHEREAS; after duly considering the Applicant's request it is the Planning Commission's determination that the Application does not comply with the applicable standards and criteria as set forth in the Staff Report dated October d, 2005; now therefore BE IT RESOLVED; that the Planning Commission of the City of Central Point, by this Resolution No. 6b9 hereby denies the Application based on the f ndings stated in the StaffReport dated October 4, 2005. PASSED by the Planning Commission in open session and signed by zne in authentication of its passage this 4~' day of October 2005. Planning Commission Chairman ATTEST: City Representative PLANNING COMMISSION RESOLUTION NO. 670 (10042005} 7g Pu~fic Wvrks Department PUBLIC WD August ~ 1, Zoos TO: Planning Department 'ORT CENTRAL POINT FROM: Public Works Department SUBJECT: Tentative Subdivision for 37 2W 11CC, Tax Lot 5100 Cascade Meadows Phase IIl A pIR cant Thomas and Anna Sunday P.Q. Box 2508 Grants Pass, OR 97528 Agent Craig A. Stone 712 Cardley Avenue Medford, OR 97504 PropertX Description/ TOD-EC/C-4 Zoning Purpose Bob Pierce, Direcfor Matf Samitore, Dev. Services Coorad. Provide information to the Planning Corrrmission and Applicant (hereinafter referred to as "Developer"} regarding City Public Works Department (PWD} standards, requirements, and conditions to be included in the design and development of the proposed. Gather information from the Developer/Engineer regarding the proposed development. A City of Central Point Public Works Department Staff Report is not intended to replace the City's Standards & Specifications. Staff Reports are written in coordination with the City's Standards & Specifications to farm a useful guide. The City's Standards & Specifcations should be consulted for any information not contained in a Public Works Staff Report. 155 South Second Street ~ Cenfraf Point, OR 97542 •541.664.3321 ~ Fax 541.664.6384 Existing Infrastructure 1. Streets: Beall Lane is a County Road paved to twenty-four feet in width, with a deceleration lane often feet. It is designated a minor arterial in the City's Transportation System Plan. Haskell Street was paved as part of Cascade Meadows Phase 1 and is designed to TOD Collector Stan dard. Alta Lane was paved as part of Cascade Meadows Phase 1 and is designed to TOD Minor Residential Standards. 2. Water: There is an existing eight-inch water line in Alta Lane. Two water service lines were al- ready stubbed out to the parent parcel. 3. Storm Drain: There is existing twelve inch storm drain in Alta Lane. There are existing catch basins near the intersection of Haskell Street and Alta Lane. Astorm-drain Iine was stubbed out from the South side catch basin. 4. Sewer: There is an existing eight inch sanitary sewer line in Alta Lane with a six inch stub out into the parent parcel. Public Works Review As originally planned this parcel was designed for a Commercial Building. All of the utilities have been stubbed out to the parent parcel. The Public Works Department recommends as a condition of approval that the engineer explore the existing utilities to see if service lines can be connected to them in order to avoid cutting the newly paved street. The Public Works Department is willing to coordinate with the Developer on the coordination of these utility improvements. Transportation Currently Beall Lane is a country road that is paved to twenty four to forty feet in width. In the City of Central Point's Transportation System Plan Beall Lane is classified as a Minor Arterial. When improved, Minor Arterials are designed to handle up to 10,000 vehicle trips a day or 1000 P.M. Peak Hour Trips. The most recent traffic counts for Beall Lane were conducted by the City of Central Point in 2004. The total trips per day were approximately 5000. No major transportation improvements or land use applications have occurred since the count was completed. If approved as a PUD the proposed project entails the development of four residential lots. Based on the Institute of Transportation Engineers {ITE} Trip Generation Manual base figure of 9.55 average trips per day per residence, the project would potentially create up to 38.2 average daily trips or roughly 3.$ P.M. peak hour trips. The Public Works Department does not have standards that require Traffic Studies for new development. The City typically uses the Oregon Department of Transportation's (ODOT) Guide to Development Impact Analysis as a guideline for requiring traffic 155 Soufh Second Street Central Point, OR 97542 •541. fifi4.3321 ~ Fax 541. fi64. f 384 studies. Only developments of 150 or more single family homes require a traffic study Cascade Meadows Phase III Subdivision Condition of Approvals 1. Infrastructure Improvements: The developer's engineer shall explore options of connecting the existing utility stub-outs prior to designing utilities which will involve cutting Alta Street. 2. Public Utili Easement: Aten-foot wide public utility easement will need to be dedicated on the Final Plat. The applicant has not addressed where the PUE will be located. Standard Specifications and Goals The Central Point Public Works Department is charged with management of the City's infrastructure, including streets, waterworks, and storm water drainage facilities. In general, the Department's "Standard Specifications and Uniform Standard Details for Public Works Construction" shall govern how public facilities are to be constructed. The Developer is encouraged to obtain the latest version of these specifications from the Public Works Department. Central Paint Public Works is committed to working with the Planning Department and developers to assure that all developments are adequately served by public facilities. Public facilities not awned or maintained by the City of Central Point include: Power (PP&L}, Gas (Avista}, Communications (Qwest), and Sanitary Sewer (RVSS). In working together it is the Department's expectation that the developer will feel free to call on the Department whenever the standard specifications are not, in the developer's opinion, adequately meeting the needs of the development. The Department will listen to the developer's concerns and work with the developer to achieve the best outcome. However, the Department is not obligated to assure a profitable development and will not sacrifice quality for the sole purpose of reducing cost to the developer. It is always the developer's obligation to provide the public improvements necessary, as determined by the Public Works Department, to serve the development. The Department and the developer also have an obligation to assure that public facilities are constructed so that other properties are not adversely impacted by the development. Development Plans -~ Required Information Review of public improvement plans is initiated by the submittal of 3 sets of plans that are at least 95% complete. The plans shall include those of other agencies such as RVSS. Following plan review, the plans will be returned to the Developer's engineer including comments from Public Works Staff. In order to be entitled to further review, the Applicant's Engineer must respond to each comzxient of the prior review. All submittals and responses to comments must appear throughout the plans to be a realistic attempt to result in complete plan approval. Upon approval, the Applicant's Engineer shall submit (4) copies of the plans to the Department of Public Works. 155 South Second Street ~ Centraf Poinf, OR 975Q2 •549.664.3329 ~ Fax 541. fi64.6384 In general, the plan submittal shall include plan and profile for streets, water, storm drainage and sanitary sewers, storm drainage calculations, storm drainage basin map, erosion control plan, utility and outside agency notifications and approvals. The plan may also include applicable traffic studies, Legal descriptions and a traffic control plan. Public Works Permit A Public Works Permit will only be issued after the Department Director approves the final construction drawings. After approval, the fees associated with the development will be calculated and attached to the public works permit. All fees are required to be paid in full at the time the Public Works Permit is issued, except Public Works Inspection fees. After project completion during the final plat application process, the Public Works Inspector will calculate the appropriate amount of inspection time to assess the developer. Before the final plat application is processed the developer must pay the relevant inspections fees and bond for any uncompleted improvements (as determined by the Public Works Director). Cascade Meadows Phase III Subdivision -Plans 1. Three sets of plans at 95% complete stage are to be submitted for review by the Public Works Depart- ment. 2. Once approval is achieved the Developer shall submit four sets of plans to the Public Works Depart- anent for construction records and inspection. 3. The Developer's Engineer shall document changes to the approved drawings made in the field. A my- lar and digital copy of the final "as-built" drawings will be required before the final plat application is processed. Cascade Meadows Phase III Subdivision -Protection of Existing Facilities The locations of existing facilities shall be shown on all applicable construction drawings for Public Works projects as follows: 1. The exact locations of underground facilities shall be verified in advance of any public works construc- tion, in cooperation with the public or private utilities involved. 955 South Second Street -~ Central Point, OR 97502 0 541.6fi4.3329 ~ Fax 541.664.6384 2. All existing underground and surface facilities shall be protected from damage during design and con- struction of public works projects. 3. Any existing facilities not specifcally designated for alteration or removals, which are damaged during construction, shall be restored or replaced to a "same as" or better than condition, at the expense of the Developer. 4. Suitable notice shall be given to all public and private utility companies in advance of construction for the purpose of protecting or relocating existing facilities. Cascade Meadows Phase III Subdivision ~ Water Connection 1. Water system designs shall consider the existing water system, master plans, neighborhood plans and approved tentative plans. The Developer, Engineer and Contractor shall provide the necessary testing, exploration, survey and research to adequately design water system facilities, which will connect to and be a part of, or an extension of the City water system. All requirements of the Oregon State Plumbing Specialty Code and the Oregon State Health Department, as they pertain to Public Water Systems, shall be strictly adhered to. 2. The City of Central Point Public Works Standards & Specifications should be consulted far specific information regarding the design and construction of water system related components. Cascade Meadows Please III Subdivision -Streets 1. The Developer's street designs shall consider the needs of people with disabilities and the aged, such as visually impaired pedestrians and mobility-impaired pedestrians. Every effort should be made to Iocate street hardware away from pedestrian locations and provide a surface free of bumps and cracks, which create safety and mobility problems. Smooth access ramps shall be provided where required. Ail de- signs shall conform to the current American Disabilities Act (ADA) or as adopted by the Oregon De- partment of Transportation (ODOT}, Oregon Bicycle and Pedestrian Plan. The determination of the pavement width and total right-of way shall be based an the operational needs for each street as determined by a technical analysis. The technical analysis shall use demand volumes that reflect the maximum number of pedestrians, bicyclists, parked vehicles and motorized vehicle traffic expected when the area using the street is fully developed. Technical analysis shall take into consideration, transportation elements of the Comprehensive Plan, TOD, neighborhood plans, approved 155 South Second Street > Central Point, OR 97502 •541.6fi4.3321 ~ Fax 541.564.6384 tentative plans as well as existing commercial and residential developments. All street designs shall be coordinated with the design of other new or existing infrastructure. Cascade Meadows Phase III Subdivision - Storm Drai-t 1. It shall be the responsibility of the Developer's Engineer to investigate the drainage area of the project, including the drainage areas of the channels or storm sewers entering and leaving the project area, if a contiguous drainage area of given size exists, the engineer may use information that has formerly been established if it includes criteria for the drainage area at complete development under current zoning and Comprehensive Flan designations. If the City does not have such information, the engineer shall present satisfactory information to support his storm sewerage design. The engineer shall also be re- quired to provide all hydrology and hydraulic computations to the Public Works Department that are necessary to substantiate the storm sewer design. The storm water sewer system design shall be in con- formance with applicable provisions of Oregon DEQ, DSL and ODFW and United States COE and consistent with APWA Storm Water Phase II requirements. 2. The City of Central Point Public Works Standards & Specifications should be consulted for specific in- formatian regarding the design and construction of storm drain related components. Cascade Meadows Phase III Subdivision -Required Submiltats 1. All design, construction plans and specifications, and "as-built" drawings shall be prepared to accept- able professional standards as applicable, the Developer shall provide copies of any permits, variances, approvals and conditions as may be required by other agencies, including, but not limited to Oregon De- partment of Fish and Wildlife {DFW), Oregon Department of Environmental Quality (DEQ), Oregon Division of State Lands (DSL), Oregon Department of Transportation {ODOT} approval for storm drain connection and easement, landscape berms, U.S. Army Corps of Engineers {ACOE}, affected irrigation districts, Bear Creak Valley Sanitary Authority (RVSS}, and Jackson County Raad and Park Services Department (JC Roads), DSL and ACOE, as applicable (wetland mitigation}. 2. Fire District No. 3 must approve all streets and water improvement plans in writing prior to f nal review by City PWD. 3. During construction, any changes proposed shall be submitted in writing by the Developer's Engineer to the City Public Works Department for approval prior to installation. 155 South Second Street << Central Poinf, OR 97502 •549.664.3321 ~ Fax 541.664.6384 155 Soufh Second Street =~ Cenfraf Point, OFD 975Q2 •541.664.3329 • Fax 541.fi64.6384 BUILDING DEPARTMENT DATE:8116/05 ~,„ ~~ CENTRAL Po~NT Lois DeBenedetti, Building O~cial BUILDING DEPARTMENT STAFF REPORT TO: Planning Department Planning file no. Q5Q74 FROM: Building Department SUBJECT: PUD within a PUD (Cascade Meadows lli) Name: Thomas and Anna Sunday Address:P.O. Box 2508 City:Grants Pass State: Or. Zip code: 97528 PROPERTY DESCRIPTION: 4 lots on Alta Lane PURPOSE The staff report is to provide information to the Planning Commission and the Applicant regarding City Building Department requirements and conditions to be included in the design and development of the proposed project. This is not a plan review. This report is preliminary and compiled solely for use by the Central Point Planning Commission. 155 South Second Street Central Point, OR 97502 • 541.664.3321 ~ Fay 541.664.63$4 BUfLDfNG DEPARTMENT STAFF REPORT -3- A soil investigation report and a report of satisfactory placement of fill (including special inspections of placement of fill and compaction} acceptable to the Building Official shall be submitted prior to final of the gradinglexcavation permit. Bui{ding permits will not be issued until gradinglexcavation permit is finalled. Exception: 1. The upper 1. 5 foot of fill placed outside of public rights-of- way. 2. The upper 1.5 foot of fill that does not underlie buildings, structures, or vehicular access ways or parking areas. 6. To move or demolish any existing structures located on the property call the Building Department for permit requirements. 7. Notify the City Building Department of any existing wells, or septic systems located on the property. 8. Any development (any man-made change) to improved or unimproved real estate located within the flood hazard area of the City of Central Point shall require a Development Permit as set forth in the Central Point Municipal Code 8.24.120. 9. Dust control, and track out elimination procedures must be implemented. 10, Three sets of complete plans indicating compliance with the 2005 Oregon Residential Specialty Code should be submitted for each residence upon approval of this application. Any changes proposed shall be submitted in writing by the Applicant, or Applicant's contractor to the Building Department for approval prior to start of work. 155 South Second Street Central Point, OR 97502 • 541.664.3321 = Pax 541.664.6384