HomeMy WebLinkAboutResolution 670 - Cascade Meadows Villagei~ i
;~.,. r. ~...~ C..~.
PLANNING COMMISSION
RESOLUTION NO. 67U
A RESOLUTION denying a preliminary Development Plan and Land Division for Assessor's
Tax Lot 37 2W 11CC 5100 (Lot 92), Cascade Meadows Village, Thomas and Anna Sunday
applicant.
WHEREAS; on Septetr~ber 6, 2005, at a duly noticed public hearing the Planning Commission
considered the Applicant's request for an a~nendz~e~~t to the Cascade Meadows Village PUD and
Land Division/ Preliminary Development PIan a {the "Application"} submitted byThornas and Anna
Sunday (Applicant}; and
WHEREAS; the property is curt•ently zoned as TOD _ EC with a pending application to consider a
change in zoning to TOD _.. LMR; and
WHEREAS; the Planning Commission's consideration of the Application is based on the standards
and criteria applicable to lands designated TOD -LMR; and
WHEREAS; after duly considering the Applicant's request it is the Planning Commission's
determination that the Application does not comply with the applicable standards and criteria as set
forth in the Staff Report dated October 4, 2005; now therefore
BE IT RESOLVED; that the Planning Commission of the City of Central Point, by this Resolution
No. 669 hereby denies the Application based on the findings stated in the Staff Report dated October
~, 2aos.
PASSED by the Planning Commission in open session and signed by me in authentication of its
passage this 4a' day of October 2005.
J
Planning Co issi Ch n
~AtTTEST:
-_
City Representative (.J ~
PLANNING COMMISSION RESOLUTION NO. 670 (10042005)
City of Central Point, Oregon
140 So.Third 5t., Central Paint,Or 97502
541.664.3323 Fax 541.664.6384
www.[i.[entral-point.or.us
STAFF REPORT
Planning Commission Meeting
October 4, 2005
Planning Department
Tom Humphrey, AICP,
Cnrnmunity Development iJirettor/
Assistant City Administrator
ITEM NO: 05074 TIP
Consideration of a Resolution No. 670 denying a request for a four lot Land Division/Preliminary
Development Plan and Planned Unit Development amendment on .48 acres, Assessor's Tax Lot 37 2W
11 CC 5100 (Lot 92), Cascade Meadows Planned Unit Development Phase III, Thomas and Anna
Sunday applicant (05074 T/PUD).
STAFF SOURCE
Don Burt, AICP, EDPP
BACKGROUND
At the September 6, 2005 Planning Commission meeting a public hearing was held to consider the
modification of the Cascade Meadows Village PUD for Lot 92, and the subdivision of Lot 92 {.48 acres)
in to four (4) single-family residential detached lots. The land division application was accompanied by
a preliminary site development plan for each of the four (4) lots.
The initial intent for the Cascade Meadows Village PUD was to develop Lot 92 as commercial. The
property is currently designated far employment commercial use {EC). The applicant has a pending
application to amend the zoning map from TOD-EC (Employment Commercial) to TOD-LMR {Low
Mix Residential). In addressing the PUD amendment and Land Division/Preliminary Site Plan it was
acknowledged that the application was being reviewed on its merits as if it were designated TOD-LMR
and that the issue of whether or not the application to amend the zoning map would be addressed
separately on its own merits.
After conclusion of the public hearing, and subsequent discussion, the Planning Commission voted to
deny the proposed PUD amendment and Land Division and directed staff to prepare findings for denial
based on the following considerations:
1. The proposed lots did not meet the minimum rear yard requirement;
2. The proposed lots did not meet the minimum lot width requirements (50 ft.); and
3. With the exception of Lot 12 the proposed lots are smaller in area and width than other standard
residential lots in Cascade Meadows Village.
4. The site plans, with the use of shared driveways are not similar to or compatible with adjacent
residential uses.
FINDINGS
Denial is based on the following f ndings as relates to the pending TOD-LMR land use re-classification:
Section 17.65.07 Zoning Regulations - TOD Corridor(E} Dimensional Standards. The
dizx~ensional standards for lot size, lot dimensions, buildi~~g setbacks, and building height arc specified in
Table S.
Finding I7.65.070 (E): Section 17.65.070(E) sets forth dimensional standards for the TOD-
LMR and references Table S TOD, Corridor Zoning Standards. Table 5 requires a minimum lot
width of SO feet. The applicant proposes lot widths less than SD feet.
Conclusion I7.65.070(E): The proposed Land Division does not comply with the minimum
standards for lot width as set forth in Table 5, Section 17.65.070.
Finding 17.65.070 (E): Section 17.65.070(E) sets forth dimensianal standards for the TOD-
LMR and references Table 5, Corridor Zoning Standards. Table 5 requires a rear yard setback
of IS feet. The applicant proposes a minimum rear yard set back of 10 feet.
Conclusion I7.S5.070(E): The proposed Land Division does not comply with the minimum
standards for rear yard setbacks as set forth in Table 5, Section 17.65.070.
Section 17.68.040 Criteria to Grant or Deny a PUD (C). That the location, size, design and operating
characteristics of the PUD will have minimal adverse impact on the livability, value or appropriate
development of the surrounding area.
Finding I7.68.040(C): In reviewing the proposed PUD amendment and Land
Division/Preliminary Development Plan against the surrounding land use pattern it is
determined that the lots as proposed do not meet the width, and area standards of all standard
single family lots within Cascade Meadows Pillage (excepting Lot 12). It was further determined
that the existence of extenuating circumstances warranting any reduction in setbacks or lot width
were revealed.
Conclusion I7.b8.040(C): The proposed lots and lot design is not consistent with the character
of the previously approved and developed standard single family lots.
Section 17.65.040 (I). The PUD will be compatible with the surrounding area.
Finding ,17.68.040(1): See Finding 17.68.040(C).
Conclusion 17.68: See Finding 17.68.040(C).
~s
PLANNING COMMISSION
ItESOLCI'I`ION NO. G70
A RESOLUTION denying a preliminary Development Plan anal Land Division for Assessor's
Tax Lot 37 2W 11CC 5100 {Lot 92}, Cascade Meadows Village, Thomas and Anna Sunday
applicant.
WHEREAS; on September 6, 2005, at a duly noticed public hearing the Planning Commission
considered the Applicant's request for an amendment to the Cascade Meadows Village PUD and
Land Division/ Preliminary Development Plana {the "Application") submitted by Thomas and Anna
Sunday {Applicant}; and
WHEREAS; the property is currently zoned as TOD - EC with a pending application to consider a
change in zoning to TOD -~ LMR; and
WHEREAS; the Planning Cornxr~ission's consideration of the Application is based on the standards
and criteria applicable to lands designated TOD -LMR; and
WHEREAS; after duly considering the Applicant's request it is the Planning Commission's
determination that the Application does not comply with the applicable standards and criteria as set
forth in the Staff Report dated October d, 2005; now therefore
BE IT RESOLVED; that the Planning Commission of the City of Central Point, by this Resolution
No. 6b9 hereby denies the Application based on the f ndings stated in the StaffReport dated October
4, 2005.
PASSED by the Planning Commission in open session and signed by zne in authentication of its
passage this 4~' day of October 2005.
Planning Commission Chairman
ATTEST:
City Representative
PLANNING COMMISSION RESOLUTION NO. 670 (10042005}
7g
Pu~fic Wvrks Department
PUBLIC WD
August ~ 1, Zoos
TO: Planning Department
'ORT
CENTRAL
POINT
FROM: Public Works Department
SUBJECT: Tentative Subdivision for 37 2W 11CC, Tax Lot 5100
Cascade Meadows Phase IIl
A pIR cant Thomas and Anna Sunday
P.Q. Box 2508
Grants Pass, OR 97528
Agent Craig A. Stone
712 Cardley Avenue
Medford, OR 97504
PropertX
Description/ TOD-EC/C-4
Zoning
Purpose
Bob Pierce, Direcfor
Matf Samitore, Dev. Services Coorad.
Provide information to the Planning Corrrmission and Applicant (hereinafter referred to as "Developer"}
regarding City Public Works Department (PWD} standards, requirements, and conditions to be included in the
design and development of the proposed. Gather information from the Developer/Engineer regarding the
proposed development.
A City of Central Point Public Works Department Staff Report is not intended to replace the City's Standards
& Specifications. Staff Reports are written in coordination with the City's Standards & Specifications to farm
a useful guide. The City's Standards & Specifcations should be consulted for any information not contained in
a Public Works Staff Report.
155 South Second Street ~ Cenfraf Point, OR 97542 •541.664.3321 ~ Fax 541.664.6384
Existing Infrastructure
1. Streets: Beall Lane is a County Road paved to twenty-four feet in width, with a deceleration lane
often feet. It is designated a minor arterial in the City's Transportation System Plan. Haskell
Street was paved as part of Cascade Meadows Phase 1 and is designed to TOD Collector Stan
dard. Alta Lane was paved as part of Cascade Meadows Phase 1 and is designed to TOD Minor
Residential Standards.
2. Water: There is an existing eight-inch water line in Alta Lane. Two water service lines were al-
ready stubbed out to the parent parcel.
3. Storm Drain: There is existing twelve inch storm drain in Alta Lane. There are existing catch
basins near the intersection of Haskell Street and Alta Lane. Astorm-drain Iine was stubbed out
from the South side catch basin.
4. Sewer: There is an existing eight inch sanitary sewer line in Alta Lane with a six inch stub out
into the parent parcel.
Public Works Review
As originally planned this parcel was designed for a Commercial Building. All of the utilities have
been stubbed out to the parent parcel. The Public Works Department recommends as a condition of
approval that the engineer explore the existing utilities to see if service lines can be connected to
them in order to avoid cutting the newly paved street. The Public Works Department is willing to
coordinate with the Developer on the coordination of these utility improvements.
Transportation
Currently Beall Lane is a country road that is paved to twenty four to forty feet in width. In the City
of Central Point's Transportation System Plan Beall Lane is classified as a Minor Arterial. When
improved, Minor Arterials are designed to handle up to 10,000 vehicle trips a day or 1000 P.M. Peak
Hour Trips. The most recent traffic counts for Beall Lane were conducted by the City of Central
Point in 2004. The total trips per day were approximately 5000. No major transportation
improvements or land use applications have occurred since the count was completed.
If approved as a PUD the proposed project entails the development of four residential lots. Based on
the Institute of Transportation Engineers {ITE} Trip Generation Manual base figure of 9.55 average
trips per day per residence, the project would potentially create up to 38.2 average daily trips or
roughly 3.$ P.M. peak hour trips. The Public Works Department does not have standards that
require Traffic Studies for new development. The City typically uses the Oregon Department of
Transportation's (ODOT) Guide to Development Impact Analysis as a guideline for requiring traffic
155 Soufh Second Street Central Point, OR 97542 •541. fifi4.3321 ~ Fax 541. fi64. f 384
studies. Only developments of 150 or more single family homes require a traffic study
Cascade Meadows Phase III Subdivision
Condition of Approvals
1. Infrastructure Improvements: The developer's engineer shall explore options of connecting the existing
utility stub-outs prior to designing utilities which will involve cutting Alta Street.
2. Public Utili Easement: Aten-foot wide public utility easement will need to be dedicated on the Final
Plat. The applicant has not addressed where the PUE will be located.
Standard Specifications and Goals
The Central Point Public Works Department is charged with management of the City's infrastructure, including
streets, waterworks, and storm water drainage facilities. In general, the Department's "Standard Specifications
and Uniform Standard Details for Public Works Construction" shall govern how public facilities are to be
constructed. The Developer is encouraged to obtain the latest version of these specifications from the Public
Works Department.
Central Paint Public Works is committed to working with the Planning Department and developers to assure
that all developments are adequately served by public facilities. Public facilities not awned or maintained by
the City of Central Point include: Power (PP&L}, Gas (Avista}, Communications (Qwest), and Sanitary Sewer
(RVSS). In working together it is the Department's expectation that the developer will feel free to call on the
Department whenever the standard specifications are not, in the developer's opinion, adequately meeting the
needs of the development. The Department will listen to the developer's concerns and work with the developer
to achieve the best outcome. However, the Department is not obligated to assure a profitable development and
will not sacrifice quality for the sole purpose of reducing cost to the developer. It is always the developer's
obligation to provide the public improvements necessary, as determined by the Public Works Department, to
serve the development. The Department and the developer also have an obligation to assure that public
facilities are constructed so that other properties are not adversely impacted by the development.
Development Plans -~ Required Information
Review of public improvement plans is initiated by the submittal of 3 sets of plans that are at least 95%
complete. The plans shall include those of other agencies such as RVSS. Following plan review, the plans
will be returned to the Developer's engineer including comments from Public Works Staff. In order to be
entitled to further review, the Applicant's Engineer must respond to each comzxient of the prior review. All
submittals and responses to comments must appear throughout the plans to be a realistic attempt to result in
complete plan approval. Upon approval, the Applicant's Engineer shall submit (4) copies of the plans to the
Department of Public Works.
155 South Second Street ~ Centraf Poinf, OR 975Q2 •549.664.3329 ~ Fax 541. fi64.6384
In general, the plan submittal shall include plan and profile for streets, water, storm drainage and sanitary
sewers, storm drainage calculations, storm drainage basin map, erosion control plan, utility and outside agency
notifications and approvals. The plan may also include applicable traffic studies, Legal descriptions and a
traffic control plan.
Public Works Permit
A Public Works Permit will only be issued after the Department Director approves the final construction
drawings. After approval, the fees associated with the development will be calculated and attached to the
public works permit. All fees are required to be paid in full at the time the Public Works Permit is issued,
except Public Works Inspection fees. After project completion during the final plat application process, the
Public Works Inspector will calculate the appropriate amount of inspection time to assess the developer.
Before the final plat application is processed the developer must pay the relevant inspections fees and bond for
any uncompleted improvements (as determined by the Public Works Director).
Cascade Meadows Phase III Subdivision -Plans
1. Three sets of plans at 95% complete stage are to be submitted for review by the Public Works Depart-
ment.
2. Once approval is achieved the Developer shall submit four sets of plans to the Public Works Depart-
anent for construction records and inspection.
3. The Developer's Engineer shall document changes to the approved drawings made in the field. A my-
lar and digital copy of the final "as-built" drawings will be required before the final plat application is
processed.
Cascade Meadows Phase III Subdivision -Protection of Existing Facilities
The locations of existing facilities shall be shown on all applicable construction drawings for Public Works
projects as follows:
1. The exact locations of underground facilities shall be verified in advance of any public works construc-
tion, in cooperation with the public or private utilities involved.
955 South Second Street -~ Central Point, OR 97502 0 541.6fi4.3329 ~ Fax 541.664.6384
2. All existing underground and surface facilities shall be protected from damage during design and con-
struction of public works projects.
3. Any existing facilities not specifcally designated for alteration or removals, which are damaged during
construction, shall be restored or replaced to a "same as" or better than condition, at the expense of the
Developer.
4. Suitable notice shall be given to all public and private utility companies in advance of construction for
the purpose of protecting or relocating existing facilities.
Cascade Meadows Phase III Subdivision ~ Water Connection
1. Water system designs shall consider the existing water system, master plans, neighborhood plans and
approved tentative plans. The Developer, Engineer and Contractor shall provide the necessary testing,
exploration, survey and research to adequately design water system facilities, which will connect to and
be a part of, or an extension of the City water system.
All requirements of the Oregon State Plumbing Specialty Code and the Oregon State Health
Department, as they pertain to Public Water Systems, shall be strictly adhered to.
2. The City of Central Point Public Works Standards & Specifications should be consulted far specific
information regarding the design and construction of water system related components.
Cascade Meadows Please III Subdivision -Streets
1. The Developer's street designs shall consider the needs of people with disabilities and the aged, such as
visually impaired pedestrians and mobility-impaired pedestrians. Every effort should be made to Iocate
street hardware away from pedestrian locations and provide a surface free of bumps and cracks, which
create safety and mobility problems. Smooth access ramps shall be provided where required. Ail de-
signs shall conform to the current American Disabilities Act (ADA) or as adopted by the Oregon De-
partment of Transportation (ODOT}, Oregon Bicycle and Pedestrian Plan.
The determination of the pavement width and total right-of way shall be based an the operational needs
for each street as determined by a technical analysis. The technical analysis shall use demand volumes
that reflect the maximum number of pedestrians, bicyclists, parked vehicles and motorized vehicle
traffic expected when the area using the street is fully developed. Technical analysis shall take into
consideration, transportation elements of the Comprehensive Plan, TOD, neighborhood plans, approved
155 South Second Street > Central Point, OR 97502 •541.6fi4.3321 ~ Fax 541.564.6384
tentative plans as well as existing commercial and residential developments. All street designs shall be
coordinated with the design of other new or existing infrastructure.
Cascade Meadows Phase III Subdivision - Storm Drai-t
1. It shall be the responsibility of the Developer's Engineer to investigate the drainage area of the project,
including the drainage areas of the channels or storm sewers entering and leaving the project area, if a
contiguous drainage area of given size exists, the engineer may use information that has formerly been
established if it includes criteria for the drainage area at complete development under current zoning
and Comprehensive Flan designations. If the City does not have such information, the engineer shall
present satisfactory information to support his storm sewerage design. The engineer shall also be re-
quired to provide all hydrology and hydraulic computations to the Public Works Department that are
necessary to substantiate the storm sewer design. The storm water sewer system design shall be in con-
formance with applicable provisions of Oregon DEQ, DSL and ODFW and United States COE and
consistent with APWA Storm Water Phase II requirements.
2. The City of Central Point Public Works Standards & Specifications should be consulted for specific in-
formatian regarding the design and construction of storm drain related components.
Cascade Meadows Phase III Subdivision -Required Submiltats
1. All design, construction plans and specifications, and "as-built" drawings shall be prepared to accept-
able professional standards as applicable, the Developer shall provide copies of any permits, variances,
approvals and conditions as may be required by other agencies, including, but not limited to Oregon De-
partment of Fish and Wildlife {DFW), Oregon Department of Environmental Quality (DEQ), Oregon
Division of State Lands (DSL), Oregon Department of Transportation {ODOT} approval for storm drain
connection and easement, landscape berms, U.S. Army Corps of Engineers {ACOE}, affected irrigation
districts, Bear Creak Valley Sanitary Authority (RVSS}, and Jackson County Raad and Park Services
Department (JC Roads), DSL and ACOE, as applicable (wetland mitigation}.
2. Fire District No. 3 must approve all streets and water improvement plans in writing prior to f nal review
by City PWD.
3. During construction, any changes proposed shall be submitted in writing by the Developer's Engineer
to the City Public Works Department for approval prior to installation.
155 South Second Street << Central Poinf, OR 97502 •549.664.3321 ~ Fax 541.664.6384
155 Soufh Second Street =~ Cenfraf Point, OFD 975Q2 •541.664.3329 • Fax 541.fi64.6384
BUILDING
DEPARTMENT
DATE:8116/05
~,„ ~~
CENTRAL
Po~NT
Lois DeBenedetti, Building O~cial
BUILDING DEPARTMENT STAFF REPORT
TO: Planning Department
Planning file no. Q5Q74
FROM: Building Department
SUBJECT: PUD within a PUD (Cascade Meadows lli)
Name: Thomas and Anna Sunday
Address:P.O. Box 2508
City:Grants Pass
State: Or. Zip code: 97528
PROPERTY DESCRIPTION: 4 lots on Alta Lane
PURPOSE
The staff report is to provide information to the Planning Commission and
the Applicant regarding City Building Department requirements and
conditions to be included in the design and development of the proposed
project.
This is not a plan review. This report is preliminary and compiled solely
for use by the Central Point Planning Commission.
155 South Second Street Central Point, OR 97502 • 541.664.3321 ~ Fay 541.664.63$4
BUfLDfNG DEPARTMENT
STAFF REPORT
-3-
A soil investigation report and a report of satisfactory placement of fill
(including special inspections of placement of fill and compaction}
acceptable to the Building Official shall be submitted prior to final of the
gradinglexcavation permit. Bui{ding permits will not be issued until
gradinglexcavation permit is finalled.
Exception:
1. The upper 1. 5 foot of fill placed outside of public rights-of-
way.
2. The upper 1.5 foot of fill that does not underlie buildings,
structures, or vehicular access ways or parking areas.
6. To move or demolish any existing structures located on the
property call the Building Department for permit requirements.
7. Notify the City Building Department of any existing wells, or septic
systems located on the property.
8. Any development (any man-made change) to improved or
unimproved real estate located within the flood hazard area of the City of
Central Point shall require a Development Permit as set forth in the Central
Point Municipal Code 8.24.120.
9. Dust control, and track out elimination procedures must be
implemented.
10, Three sets of complete plans indicating compliance with the 2005
Oregon Residential Specialty Code should be submitted for each
residence upon approval of this application.
Any changes proposed shall be submitted in writing by the Applicant, or
Applicant's contractor to the Building Department for approval prior to start
of work.
155 South Second Street Central Point, OR 97502 • 541.664.3321 = Pax 541.664.6384