Loading...
HomeMy WebLinkAboutPlanning Commission Packet - March 20, 2001CITY OF CENTRAL POINT' PLANNING COMMISSION AGF,NDA March 20, 2001 - 7:00 p.m. ~~ ~ ~~ Next Plamring Convnission Resolution No. 51 `_ I. MEETING CALLED TO ORDER II. ROLL CALL City Planning Chuck Piland -Candy Fish, Don Foster, Karolyne Johnson, John LeGros, Paul Lunte and Wayne Riggs III. CORRESPONDENCE IV. MINUTF,S A. Review and approval of March 6, 2001 Planning Commission Minutes V. PUBLIC APPEARANCES VI. BUSINESS Page 1 - 9 A. Public meeting to review a site plan application at 476 North Front Street. The applicant would like to reoccupy two buildings formerly operated as Central Point Plywood Sales. "the businesses being proposed are boat service and repair in one building and a wholesale florist operation with limited retail sales. The subject property is located in the (TOD-GC) Transit Oriented District-General Commercial zoning district on Map 37 2W 03DC, Tax Lots 11-15. 10 - 36 B. Introduction of the Draft Conceptual Development Plan for Scenic Neighborhood Housing, Commercial Rezoning and Street Design and Improvements. The subject properties are located south of Scenic Avenue, west of North Tenth Street, north of Victoria Way and east of Griffin Creek in an areacuirentlyzoned R-1-8, ResidentialSing]eFamily;R-2, Residential Two Family; and C-1 Neighborhood Convenience Shopping. VII. MISCELLANEOUS VIII. ADJOI7RNMF,NT City of Central Point Planning Commission 3/6/2001 I. MEETING CALLED TO ORDER AT 7:00 P.M. II. ROLL CALL: Chuck Piland, Candy Fish, John LeGros„ Paul Lunte, Don Foster and Wayne Riggs were present. Karolyne Johnson was absent. Also in attendance were Tom Humphrey, Planning Director; Ken Gerschler, Community Plainer, and Matt Samitore, Planning Technician. III. CORRESPONDENCE There was correspondence on business items A and B. IV. MINUTES Commissioner Fish made a motion to approve the minutes from the January 16, 2001 meeting as presented. Commissioner Foster seconded the motion. ROLL CALL: Johnson, yes; Fish, yes; LeGros, yes; Lunte, yes; and Foster, yes and Riggs, yes. Motion passed. V. PUBLIC APPEARANCES VI. BUSINESS A. Public meeting to review an application for a fence variance at 543 Mitchell Wad applicant is reouestine that if portions of an existing fence be allowed to remain at a height of six feet in a side vard setback where the code allows a maximum height of 42 inches The subject property is located in the R-1-10 Residential Single Family zoning district on Map 372W l OBB Tax Lot 512. Ken Gerschler, Community Planner, presented the Planning Department Staff Report. The applicants are requesting a variance from the 3 %2 foot height requirements for a portion of a fence in the side yard setback. The side yard setback fora 6' high fence is 10' from the property line. In order for the Planning Commission to grant the variance all the findings of fact and conclusion of law must be met. Complying with the code does not appear to create an unnecessary hardship on the applicant. Fourteen neighbors have signed a petition to keep the fence where it is. The fence is within a Public Utility Easement, but a fence can be allowed within this easement, as long as the property owner knows that a utility company can use the area at anytime. The Applicant, Richard T. Tibbets, 543 Mitchell's Way, stated he already had most of the fence up before he got the permit and didn't notice the writing stating it had to be setback 10'. The fence will provide protection for his children, as well as provide aesthetics to the neighborhood. Road shall be 76'. The sidewalks and curb extensions will be part of the constn~ction drawings. The Traffic Circle will be installed when 'T'aylor Road is realigned and improved. The applicant, Brett Moore, stated construction at W. Pine and Haskell Street will commence in mid-June. Mr. Moore stated he didn't think the Building Department Staff Report should be part of the requirements since it is already required in the Building Code. Debra Ratty, of 4090 Sunland Ave, asked about the added cars to Taylor Road, and the improvements to the intersection of W. Pine and Haskell Street. She also asked about buffering between the property and the new subdivision. Brett Moore explained the traffic issue and the improvements. It will be up to her and her husband to put up a fence along the property line. Ms. Debenedetti stated that Mr. Moore was correct about the requirements being in the Building Code, but she would like it added to the Staff Report as well. Commissioner Fish made a motion to adopt Resolution Number 513, approving the tentative subdivision subject to the recommended conditions of approval and all of the department staff report recommendations. Commissioner Lunte seconded the motion. ROLL CALL: Motion passed unanimously. C. Public hearing to clarify the floodplain boundary for Unit 1 of the Griffen Oaks Subdivision located north of Taylor Road and west of State Highwav 99 Matt Samitore, Planning Technician, presented the Planning Department Staff Report. Last year when Griffen Oaks Phase 1 was platted one of the conditions of the Public Works Department was to place all of the lots in Griffen Oaks Phase 1 in the 100-year floodplain. Upon further investigation it was determined the City cannot expand the boundary shown on the FEMA maps without appropriate justification. The staff has asked that the Commission consider a revised map that depicts the accurate 100-year floodplain for Griffon Creek. This would take lots 7, 12, 13, 20 and 21 out of the floodplain. Mr. Gerschler added that this will help when these lots are developed so that they will not have be elevated and the future residents will not be required to pay for flood insurance. Commissioner Fish made a motion to adopt Resohrtion Number 514, revising the previously approved tentative plan, taking lots 7, 12, 13, 20 and 21 out of the 100 year floodplain. Commissioner Lr~nte seconded the motion. Roll Call: Motion passed unanimously. VII. MISCELLANEOUS Tom Humphrey, Planning Director, stated he would like to have a second meeting this month to deal with a Site Plan application and for the Commission to look at the Master Plan for the area near Scenic Middle School. The Commission Agreed to the meeting. VIII. ADJOURNMENT Commissioner Lunte made a motion to adjourn the meeting. Commissioner LeGros seconded the motion. ROLL CALL: Motion passed unanimously. Meeting Adjourned at 9:30 P.M. PLANNING DEPARTMENT STAFF REPORT HEARING DATE: March 2Q 2001 TO: Central Point Planning Commission FROM: Tom Humphrey AICP, Planning Director SUBJECT: Public Hearing- Site Plan Review for 37 2W 03DC, Tax Lots 11-15 -Southern Oregon Florists and Four Seasons Marine. OFVners Richard Samuelson 337 East Pine Street Central Point, Oregon 97502 Pro er Description/ 37 2W 03DC, Tax Lots 11-15, - 0.59 acres. Zonint: TOD-GC, Transit Oriented Development-General Commercial District Summary: The applicant has requested a Site Plan Review for the remodel and re-occupancy of two buildings as a Boat Service and Repair shop and Wholesale/Limited Retail Florist Business (2,500 square feet and 4,000 square feet respectively). The subject property is located in the new TOD General Commercial zoning district. Authority: CPMC 1.24.050 vests the Planning Commission with the authority to hold a public hearing and render a decision on any application for a Site Plan. Notice of a Public Hearing is not required for site plan review however the Commission may entertain public input during its deliberation on this matter. Applicahle Law• CPMC 17.67.050 et seq. -Site Design Standards - TOD Districts CPMC 17.72.010 et seq. -Site Plan, Landscaping and Construction Plan Approval Discussion: The owner, Richard Samuelson. is requesting site plan approval to remodel and reoccupy two buildings on property fornrerly in the ownership of Central Point Plywood Sales. The letter of project description states that the size and configuration of the Florist operation will use approximately 1600 square feet of floor space for corporate offices, 1700 square feet for design, work and storage area and 600 square feet for limited retail. The Marine Service and Repair operation will use the majority of its internal floor area for mechanical boat repair and may add a separate office area in the future. Exterior improvements to the structures are proposed and include, but are not limited to painting, awnings and new signs. The City will require parking and landscaping as coladitions to re- occupancy. Now that the property is located in the TOD-GC zoning district there are some new requirements with which the owner must comply. This includss landscaping near the buildings (3' boxed areas) and the installation of a total of five trees (three are depicted on the site plan). Driveway access will be taken directly from North Front Street as it was with the previous busiuess. Sidewalks will ultimately be constructed alongNorth Front once jurisdictional control is established and funding is identified. The Planning Department has evaluated the project density and building distance requirements for the zoning district and determined that the development is compliantwith the zoning ordinance. City Staff and the applicants have met to discuss the site plan and work ottt off street parking and improvements. The Municipal Code for the TOD District requires one parking space for each 500 square feet of floor area. Tree planting and live shrubs are associated with the new parking requirements. The minimum number of parking spaces required for this development would be 13. The applicant has met the off street parking requirement by providing 17 spaces (refer to Attachment A). The vehicle maneuvering areas will all need to be paved and the parking stalls striped. The Public Works Department has prepared recommendations (to be distributed during the meeting) for on- and off-site improvements which are believed to be reasonably related to the proposed development. These include, but are not limited to; sidewalk improvements; site grading and drainage; on-site lighting; paving and utility (water, sewer and storm drain) connections or back flow. The Central Point Building Department will provide its input for consideration by the Commission at the meeting. Jackson County Fire District Number 3 would like to review a set of blueprints and plot plan from the applicant that shows general information, on-site water storage and/or hydrant location. Bear Creek Valley Sanitary Authority has indicated that the property can be served with sewer servtce. Findings of tact & Conchtsions of Law: Site Plan Review In approving, conditionally approving or denying the plans submitted, the City bases it's decision on the following standards from Section 17.72.040: A. Landscaping and fencing and the construction of walls on the site in such a manner as to cause the same to not substantially interfere with the landscaping scheme of the neighborhood, and in such a manner to use the same to screen such activities and sights as might be heterogeneous to existing neighborhood uses. The Commission may require the maintenance of existing plants or the installation of new ones for purposes of screening adjoining property. \1CPPDPDC1Ciry Wide\Planning\01019.wpd 2 ^ The site plan shows landscaped areas distributed throughout the project area but a finished landscape and irrigation plan was not submitted. The Planning Department is recommending the submission of landscape and irrigation plans as a condition of approval (Attachment "C"). B. Design, number and location of ingress and egress points so as to improve and to avoid interference with the traffic flow on public streets; ^ Access is shown to be taken from North Pacific I3ighFVay. The Public Works Department may require that improvements be installed on portions of the highway to address the increased vehicular demand. C. To provide off-street parking and loading facilities and pedestrian and vehicle flow facilities in such a manner as is compatible with the use for which the site is proposed to be used and capable of use, and in such a manner as to improve and avoid interference with the traffic flow on public streets; ^ Table 3 of the TOD District Parking standards require that 13 parking spaces be provided. Gaidelines in the new TOD GC zoning district permit 1 parking space per 500 square feet for a total of 13 in this case. The owner will provide 17 spaces or more with associated landscaping and other improvements. D. Signs and other outdoor advertising structures to ensure that they do not conflict with or deter from traffic control signs or devices and that they are compatible with the design of their buildings or uses and will not interfere with or detract from the appearance or visibility of nearby signs; Any signage proposed for the project would require a building permit. Directional signs and building address identification should be installed in a manner that satisfies emet•gency service agencies. Signs located in sight vision areas determined by the Public Works Standards shall not exceed 42 inches in height. E. Accessibility and sufficiency of fire fighting facilities to such a standard as to provide for the reasonable safety of life, limb and property, including, but not limited to, suitable gates, access roads and fire lanes so that all buildings on the premises are accessible to fire apparatus; The project, if approved, would need to meet any requirements ofJackson County Fire District 3. F. Compliance with all city ordinances and regulations; The project as presented by the applicant is in compliance with the requirements of the Central Point Municipal Code subject to the recommended conditions of approval. G. Compliance with such architecture and design standards as to provide aesthetic acceptability in 6CPPDPDC\City Wide\Planning\01019.wpd relation to the neighborhood and the Central Point area and it's environs. ^ The apartment complex is designed to be aesthetically compatihlewith the development located in the surrounding area and meets the intention of the recently approved TOD standards. Recommendation Staff recommends that the Planning Commission take one of the following actions: 1. Adopt Resolution No._, approving the Site Plan subject to the recommended conditions of approval; or 2. Deny the proposed Site Plan; or 3. Continue the review of the Site Plan at the discretion of the Commission. Attachments A. Site Plan B. Project Description(s) C. Planning Department Conditions \\CPPDPDC\City Wide\Planning\OI019.wpd ..~ 4 -1~~ ~` , ,.SSout6iern ,.,---- Oregon ~~orists, ~~re. ~:,;7;; March 13, 2001 City of Central Point $Xld;nglPlanning Department s~~,~~J; De,'ar Sirs: :~, All 1Te~`i';~posed con up dgor wbtt£ld have a new does door would remain in place ~,o. and windows I~,the de~grtar( foot ceiling to c`ut(;down on ea 2 foot planting area wh~li~wil done by licensed contractors. is shown,by doted lines. The 14 foot roll- s=wm~o~s installed. for more light. The e dosed at;mgj~t, behind the new doors areas;~and retadai"ea~we wouldi5ut"ir'an-:i and coo'~ing cgsts In freffit of tie building is a ~ndscaped-and cleaned~ip All work will be`°=-= Thank You, Rick Samuelson W17H THREE LOCA710NS TO SERVE YOU CENTRAL POINT FLORIST CHET'S GRANTS PASS FLORIST ASHLAND FLOWER SHOP 337 EAST PINE STREET 229 S.W. H STREET 180 E. MAIN CENTRAL POINT OR 97502 6RANT5 PASS, OR 97526 ASHLAND, OR 97520 FTD (541)664-7878 (541)476-9007 (541)482-3487 wx+etiNcemralpointlbrist FAX (547) 664-8314 FAX (541) 476-1878 hh FAX (547)482-3485 soflo~sts~wave.net 1-80D~664-1878 7.800.662.4387 „ 1-877-482-5585 V J ~ ~~onthern " -~ Oregon ~lorists, (inc. `:itif5s, March 14, 2001 City of Central Point Building/Planning Department I?ear Sirs: bVewill use approximately 1600 square feet of space for our corporate offices, teT6phone answering & computer stations. Approximately 600 square feet will be used for retail sales, approximately 500 square feet for the cooler and approximately~y~1,~0,O square feet will be used for a design & work area and storage areafor vases, baskets and design 'inventory ) ` f n:~ ,,. .' 5: ~::. - -..: ,. .:., .... ,1 , - Tru .~ s I~Xck Samuelson Southern Oregon Florists, Inc. WITH THREE LOCATIONS TO SERVE YOU CENTRAL POINT FLORIST CHETS GRANTS PASS FLORIST ASHLAND FLOWER SHO 337 EAST PINE STREET 229 S.W. H STREET 180 E. MAIN P CENTRAL POINT OR 97502 GRANTS PASS, OR 97526 ASHLAND, OR 97520 pT0 (541) 664-1878 (541) 476-9001 (541) 482-3481 FAX (541) 664.8314 FAX (541) 476-1878 FAX (541) 482-3485 wvnv.tlNCeNralpoiMliorisl 1-80P6644 878 1.800-662.4387 y {N i-877-482-5585 soliorisfs®mave.ne 1. Open Flame A. Neater in the winter B. Torch outside banding if needed II. Flammables A. Miscellaneous sprays (WD-40, etc.) B. Fuel that is in boats C. Solvent tank ill. Equipment A. Saws B. Drills C. Hoist (A-Frame Hoist) iV. Use of Property A. Marine Service and Repair B. Repair mechanical-boat problems (Engine and drive systems only) V. Floor Plan A. Stays the same B. May build office at a later date VI. Construction A. -Fence (Front of building) B. Repair doors and windows C. Paint building D. t_andscape as needed ATTACHMENT C RECOMMENDED PLANNING CONDITIONS OF APPROVAL The approval of the Site Plan shall expire in one year on March 20, 2002 utiless an application for a building permit or an application for extension has been received by the City. The applicant shall submit a revised site plan depicting any changes discussed and approved at the public hearing within 30 days of Planning Commission approval. The project must comply with all applicable local, state and federal regulations . 3. The project must meet the off-street parking requirements for general commercial development, and the parking, access and maneuvering areas shall be paved with durable materials for all-weather use and approved by the Public Works Department. 4. The applicant shall prepare, submit and obtain approval from City Staff for a landscaping plan including an acceptable selection of shrubs and trees and an irrigation plan. Any structures removed, demolished or remodeled will require a separate permit from the Central Point Building Department. \\CPPDPDC\City Wide\Planning\01019.wpd PLANNING DEPARTMENT MEMORANDUM DATE: March 20, 2001 TO: Central Point Planning Commission FROM: Tom Humphrey AICP, Planning Director SUBJECT: Introduction of Comprehensive Plan and Municipal (Zoning) Map Amendments for Scenic Neighborhood Housing, Commercial Rezoning and Street Design and improvements. Background City Staff have been engaged in planning for a subarea of the City in the vicinity of Scenic Middle School. A Draft Conceptual Development Plan was prepared by Crandall Arambula planning consultants as part of the Transportation Growth Management (TGM) Quick Response program funded by the State. The changes advocated in the plan will necessitate Comprehensive Plan and municipal code changes and Planning staff is seeking preliminary feed back before this process and a series of public hearings is initiated. Discussion The land use changes and new zoning being proposed are broken down into residential and commercial uses that are aimed at using land more efficiently, improving a poorly designed intersection, promoting better pedestrian and vehicular circulation and introducing innovative housing techniques. The concepts being proposed could become new standards for development in Central Point. One of the tasks of the Planning Commission is to determine whether existing provisions (like PUDs) will accommodate the types of changes being proposed. The Planning Commission is being asked to consider and comment on the Draft Conceptual Development Plan and recommend its preference of options (Attachments A & B) which will subsequently be processed as Comprehensive Ptan and Zoning Code text and map amendments. The City has adopted a new Transportation Systems Plan (TSP) which should also be used to consider any changes to this sub-area circulation plan. Excerpts from the DKS Associates traffic study are enclosed as Attachment C. Attachments A. Central Point Conceptual Development Plan B. Neighborhood Plan Options A and B C. DKS Associates Options and Existing Traffic Volumes 10 '`~ Central Point Conceptual Development Plan Background This project is part of the Transportation and Growth Management (TGM) Program of the Oregon Depart- ment of Transportation (ODOn and the Oregon Depart- ment of Land Conservation and Development (DECD), The TGM program is intended to strengthen the ability of local governments to manage growth effectively and to comply with the Transportation Planning Rule (TPR). The TGM program also helps to integrate transportation and land use planning and encourages transportation- efficient land uses, which in turn support both choices of transportation modes and efficient performance of transportation facilities and services. For this project, the City of Central Point is working with developer Brad Miller to develop a site he owns - a four acre parcel adjacent to Scenic Middle School. His plan is to develop that site into a residential area of manu- factured homes. Within the framework of the TGM program, Miller and the City of Central Point are working to incorporate neighborhood design features into the plan and to create atransportation-efficient design. Key objectives for the project are to: • Develop the site into a traditional neighborhood; • Produce conceptual design, re-zoning and build-out analysis for the parcel to the north of Miller's property, re- zoning it as commercial to serve adjacent existing and new neighborhoods; • Redesign the intersection where Scenic Avenue, Tenth Street, Third Street and Old Upton Road meet; • Develop a plan for improved pedestrian and bike path- ways in and around Scenic Middle School. Specific issues to be addressed in the plan include the fol- lowing: Creating pedestrian-friendly streets; Connecting the new neighborhood to the adjacent existing Royal Heights neighborhood as well as to Scenic Middle School and to both new and existing commercial areas along Third Street; Developing a site plan showing lot divisions, building placement including setbacks, streets, alleys, and open spaces. aL1NDAtL Aenmsuu PC I-I TGM QuicK Reseovse cam. g~ ~S r ,~+ ~a Central Paint Conceptual Development Plan Design Objectives and Process Design objectives were developed and en- dorsed by the City of Central Point working with Brad Miller, developer and owner of the site, and w4th the consultants. The final conceptual development plan evolved as plan alternatives were developed and evaluated in response to the following objectives: • Provide affordable housing -Provide housing for groups currently being underserved, especially entry-level homebuyers and lower income level people. • Use manufactured houses -Quality con- structionand basic, efficient design from Fuqua Homes Desert Pointe and First Pointe series of homes. (See Appendix for photos.) • Increase efficiency of land use - Provide for compact development making opti- mal use of Infrastructure investments, open space amenities and access to schools and neighborhood commercial areas. homes to commerclal areas, public spaces, and transit connections. The transportation network should include connections to surrounding existing and planned development. • Mix of uses- Provide a mix of compat- ible residential and commerclal land uses, wh(ch will offer a variety of activi- tiesand destinat(onsand wiliestablish a neighborhood "node." • Public spaces/ outdoor landscaped spaces -Provide adequate public spaces such as small parks, greenways, shared walkways and courtyards where residents can meet or relax. • Transition between uses -Integrate the new neighborhood Into existing com- mercial, school, and residential areas, with sensitive transitit(ons between the different uses. • Access to schools -Maintain and en- hande the existing walkway across the site. • Use traditional neighborhood design prin- ciples -Emphasize the pedestrian environ- ment rather than the auto Infrastructure. Building and Site Design -Promote building and site design that each contr(bute posi- tively to a sense of neighborhood and to the overall streetscape by carefully relat- ing building mass, frontages, entries, and yards to public streets and adJacent prop- erties. Safe Environment: Promote a safe environ- ment for residents and visitors during ail hours of day and night. Design streets which are safe for all residents, and homes oriented to provide eyes on the street. DESIGN PROCESS: • Review City of Central Point's land development regulations. • Identify key stakeholders and coordinate among participants. • Review documents. • {dentify and map factors affecting protect site. • Analyze opportunities and constraints for the site. • Meet with key stakeholders and devei- • Pedestrian-friendly, multi-modal design - Create an environment that encourages walking and bicycling. Allow various modes of transportation each to offer di- rect, safe, and convenient access from • Improved circulation -Improve neigh- borhood circulation at the confluence of Upton Road, Third Street and Tenth Street. Provide a framework for the fu- ture development of new streets. oper. Develop alternatives. Provide a final plan. CRANDALL ARSMBULA PC I-2 TGM QmcK RES9oNS=_ iG:dA Central Point Conceptual Development Plan Existing Conditions North CRANDALL APAMBULA PC I- TGM Quic~ Res~ovse -- ce ~ram~`N°rk ~xistin9 Pian & Ordinan ensifiy CttY of Central 4ofienfirat D four-acre srte in the north. the ropefi' ~s a Middle School to Ih of the west, The subject p Scen~a south and part point, bordered division to the vacant. tZoYal Heights sub the fast. The site is currently lot and Third Street to g 000 Sew ~ uId ac- zoning designatiherefore.$ he prop The existing eX1stinJzantng~ units. s+ze). Under 20 4ots, for a total of 20 units in comet°date oses a total of 3The plan contrasfi, ptOp ed COUrtyards. through The specific plan, by landscap running ouses creatin edestrian pathway Scen~a Middle attached h a TO foot p reenway linking hSchool also includes Crown Avenue and Grater Hig the site across a landscaped g SchooltO the norfhwith to the south. "r' Cpl q~ ,~ a<~a, Central Point Conc [ua1 Develo ment Plan Proposed Neighborhood Land Use Plan Summary R-1-6 (Existing) R-2 {Existing) sc~~. ;~ <~ -w~- 0 U R-3 ---- ~-•- aR-T -6 tsting~ } ~ (Existing) .-. Victoria Way ~ __..~ 3 0 v Developrnenfi Site CRANDALL ARAMBULA PC I-5 TGM Quid Resrovse Ne1ghpothood Plan Nelghboshood °Matn Street' pevelopment North jransit Sto~- Reconfigured Intersection ~ Reconfigured lntersectton adway -'°~ New Ro Proposed--"``---_ ~ New Bus prop-o~ ~ ~ ~ New 5idewatksl --"' es Bicycle Lan ~ Schoal Private pdvewaY >"~ o~ o ~ d ~ r [] ~ ~'~~~, _. bike Lanes _ Landscape g Screen A Farking LOt U u ~ rater us _~w igh t ~-~ ~" ~ W Chool ~j ~ 1 ~ ~ ~ New Sidewatksl Curb Extensions peveloprnent Site (see Existing Conditions. Page 1-3) EmeCgencY Access `~ ~ ,~- Central Point Conce tuai Develo ment Pian Neighborhood Plan -Summary The propoed neighborhood adds one block to the grid of the Royal Heights residential area to the south. The new neigh- borhood will connect to adjacent residential, commercial, and school areas. Anew lane will lead east-west across the north side of the site, creating atree-lined border to the adja- cent Scenic Middle School. The middle school will be linked to Crown Avenue and Crater High School to the south -with a shared walkway leading north-south through the site and onto Crown Avenue. The eastern edge of the site borders Third Street, connecting to the new and existing- neighborhood "Main Street" devel- opment there. A transit stop is located one block away, at the Intersection of Third and Tenth Streets and Scenic Avenue; that intersection will be straightened out to lead directly into the "Main Street" area. CRANDALL ARAMEUi.e1 PC (_7 TG~1 QmcK Rsno~se Conceptual Development Plan 1022" Pedestrian Access Typlcat Street Section to SchooV ----~--"" See Page f"t 5) New Street proposed Neighborhood Commercial Pmergency Access Onty ~„, ~ ~..,.~.-.x..d.....e.r> Athletic Fields ~- ~' ~..: F $~~''~~'''' ~~ ~ O ~ ~ ~ ~ ' . 1 , l ~ e sn n ~ S~ ~~4 _ F ~ ~ _ :1 .. s,:.~. `dl~' ::_ ~ ~ r ..'.~34'~~29~.f ~ v g~ ' ~- ~ ~L r.. s~~..~r ~~1 .~ > fl r--r r--~ '~ ,~ Third Street--------"' . ,--p--~ .-. P-~. y I Crown Avenue {p ____.__.----- Ex(stfng Singte FamIN Houstng Typical Lot Plan (See Page 1-10) Summary Table: Area proposed Zoning Number of Lots Number of Homes penslty 98,000 SF (2,25 Gross Acres) R-3 b 32 14 DwefNng UnltslAcre North Central Pant Conceptual Development Plan - Summary The site contains five full-size lots (180' x 131') ,each with six units; a sixth lot, at the western edge of the site, is half-sized, with three units. Total units number 32, and each has atwo- cargarage. There are 14 units/acre, and gross area is 98,000 SF (2.25 gross acres), Anew, tree-lined lane, with two travel lanes, creates the north- ern edge of the site. Guest parking will be available on the neighborhood side of the new street. Driveways will be set off by curb extensions. Sidewalks will link the street to the pedes- trian entry courtyards leading to the houses, A pedestrian path leads north-south through the site, Iinking Crown Avenue and the high school to the south with the middle school to the north, Where this path meets the new neighborhood lane, there will be a landscaped median and raised crosswalk; these will slow down traffic and break up the otherwise long stretch of the new street. Plan CRANDALI. AAA~IBUTA PC I-J TG~I QUICK RESPONSE Central Point Conc [uai Deveio meat Pian 180' Typical Lot yard Lot Summary Table: Number of Unlts 6 Lot Area 23,692 SF Setbacks: Arbor Walk Unit 1129 SF Building Coverage 9,580 SF (40%) Front 20' Alpha Unit 924 SF Landscaped Area 11,300 SF Rear 10' Stone Ridge Unit 1232 SF Parking 2-Car Garage/Unit Sideyard 0' Zoning R-3 Guest Parking 4 Spaces (On Street) (variance required) CRANDAtL Axamauu PC I-10 TG~t Qu~cK Rseo~se .m sFf~ Central Point Typical Courtyard Lot -Summary The typical lot is 180' x 131' and contains six units. The units are grouped in a U-shaped plan forming a pedestrian entry courtyard. The backs of the houses form a corresponding U-shaped court for automobiles; each unit has atwo-car garage. Pedestrians can walk from the new neighborhood lane, under a plant- covered arbor, and into the entry courtyard; benches flank these arbors. These shared pedestrian courts are landscaped and offer a place for meeting and relaxing, and lead to the front doors of the six homes. Each house has its own outdoor space - a private courtyard off the kitchen and dining area. Front units on the typical lot face the street; other units i~ face into the shared pedestrian courtyard, with either porches or cov- l~ ered stoops marking their entrances. All the shared outdoor areas are landscaped with trees, shrubs, grass, and groundcover. The auto court is also landscaped, its scored concrete surtace further soffened by plant-covered arbors above the garage doors. The typicgl lot is edged at the south by a pair of garages in the auto court and a pair of homes, the "Stone Ridge" unit, at 1232 SF, in the pedestrian court. The smallest units are in the middle of the lot -the "Alpha," at 924 SF; the units opening onto the street are the "Arbor Walk," at 1129 SF. Plan CRANDALL ARAMBULA PC I-1l TGM Qutcx Rseousz Current SFD per'm-}fied UseslHaUSin~ ~y~eS Single ra",,,, petacried Lots dvreUin9s °Q nn0 Centrnt w'en~ial Lafi Rend Size/pensitY Aug, Lot Aug, Lot Width Size ISFI SF 90 Ft. ~ g,000 Max. Jritts Per Front Acre Yard 5 0 Ft. Units/qc ~ min. SvmmacY Matrix Sefiba~ks Zero Lot Side/ line Rear on~we~ Na 5' Side 10~ Rear ~"- '~Q tt. (with 4 ff. porch 11 encroach' 80 Ft. I c nt gvilding prienfiafiian & Massin Front door entrances oriented YeS to street andtor Q' Side ardl pedesta ds ISideY courtY 10' Rear _______--a w be ~---- 1, (Urnts9 me ; hpvu~~-- dwemna• Sin9ie Family 23,580 minimuml allowed traditional ne 9 single family aracter. g5ed can be provided in a atQOnc~o ~s traditional ch Prop attaGYted le housing to achieve thisdenseghb of this nted erciaf areas. adding to the SFA dwellings affordab e resence that Pedestr~an'ppe raposed Comm the street and residential areas, 7h p site so ,n and p more eyes on existing rezoning for the the adlocent ewst• g ,owding velopment and t bic cle, and car ant setback areas' p serving the new de The proposal includes o the site, helPin9 to alI b loo • hes will extend 9 into h mercial activity ccessible a{low greater density ° allow for cam o mix of uses a allowed. Front PpfC erfies to rcwdm Rezoning i rprOep~ll stye df hen them ei hborhood b A Land ~Se Plan ---"pevel pa me t Site Land USe Ma~Cep{va oi_._-e.-~-°~~-"t e~: .and USe 'cable pXOnometCic GaraJe pedE ~pU pa C~ a_ aar S ont orch lyew [2esiden~~a1 Lane TGM Quicx RFSYONSE ,,, ~` i .dd9 Central Point Conc foal Develo ment Plan Building Elevations 97'~Vet/o~ LrYl7' CRiNDA0. ARAMBULA PC I-14 TGM uicx ResroNS=_ Proposed Alternative -Elevation Detail 4/ I~ Central Point Conce tual Develo meni Plan hF . ~_~ ~ ~ treet Sections :r ~:; House Front ack Typical Pad Lot Development -Street Section CRANDALL ARAMBULA PC I-L TG?/i QUICK RESPO\5= 'Front Yard Setback rNewStreetR.O.W.(SeeAppend'a)~ Proposed Alternative- Street Section Central Point Conceptual Development Plan Circulation Plan Saes' q v ¢' C 0 C O .-. Q \\ __ ~ New Vehicle Drop-Off Point for School - Intersection Private Drive Draft Neighborhood Lane (30' R.O.W. 15' P.U.S.) Exlsting Street Alignment g~ ,,. • • New Intersection X39 Alignment ~.. ~'t I tr t! Victoria m Q 3 0 V ~~ Bus Stop and New Intersection } a i~~ ~ CRANDAIL ARAMBULA PC 1-ib T M QUICK RESPONSE ` plan _ ~ummarY Central Point cj~eula~1On d the } eand direct for pe- and ar to be limp The circulati d is mend ors alike. ne}ghhborhoo Cur- bicYClists and c1eaning up destrians, o new intersections each where Upton The interse yet ~vi11 be sfira~ght- There vttll be• ~ trafllc pa~'(enth neigh" Cantus+ng ue and Street all andto a newschooL rently ton Raad leads directly existing Road, Saerii that Up to the new erred out so cling as to the south. borhood lane, conne efts. commercial, and residential are at Third andTenth Swi h a wilt be w}t1 be Cepiaced adla_ intersection oration rid pattern of the ~ The Second new Contig to the g A bus stop Current °Y streets commercial area• T der ~hUSe these linking and the Cent ne1ghbarhoad at this intersection. along the will also be located ad lane will run lgne ne g e middle school. This new' e to UptO Road by the new nosh south tan ~ pn th edge satdiacent to north will aannecabave. hborhoadlaneswilstaeet mentioned w nerg y stretch of the o4thesetwone leng • athwaY tinkrng the e The intersection the ~trl th ispeedestnan p school to th heap break up as venue and the high through th ool verith Crown A middle sch south. ..---~ ,~ _.,, ~~Mwu,PC Neighborhood Plan Option A iGM OUkk Response SCENIC NEIGHBORHOOD HOUSING Crandall Pfambuia PC ~ ~ ,. . n ~~ =a o° I7T~1 co D a v a = ~ 08 pz n O^ G ~- ~"'~c ~'^~~ O ~h O~ Z ~_ ~• O Q. -°v Q ®KS Associates 921 S.W. Washington Street, Suite 6i2 Portland, OR 97205 PH: (503) 243-3500 FX.~ (503) 243-1934 MEMORANDUM TO: FROM: Scott Mansur DATE: Don Arambula, Crandall-Arambula PC Ransford S. McCourt, P.E. December 14, 1999 SUBJECT: Central Point Residential Development Quick Response P99387 The following memo summarizes our initial review ofthe traffic circulation impacts for the residential development south of the existing Scenic Middle School in Cen- tral Point, Oregon. The alternatives that have been developed combine various resi- dential development schemes with circulation changes in the area. The following sections summarize the trip generation of the proposed plan, circulation options and our general fmdings. TRIP GENERATION Three scenarios have been proposed ranging from 26 to 42 new single family at- -~+ tached units. While these units would be attached, for conservative analysis we ~ ,~ have assumed that the trip generation would be for that of single family homes' . to A Project trip generation from proposed and alternatives A and B are shown in Table O o 1. It is likely that actual trip generation may be 20 percent less. For this purpose, Alternative B was tested using Apartment vehicle trip generation rates to provide a p range of potential trip generation from the site. Even with the conservative assump- - """. ~ tions, the proposed site would only generate between 20 and 50 vehicle trips in the O ~ PM peak hour. " fD s- ~ ' As per Trip Generation, 6'" Edition, Institute of Transportation Engineers, 1997, code 210. _ b ~~ 30 Table 1 Trip Generation Estimate 41 Land Use Proposed Concept 42 Dwelling Units (Single Family 210) Alternafive A: 26 Dwelling Units (Single Family 210) Alternative B: 32 Dwelling Units (Apartment 220) ALTERNATIVES Period Daily Trips 467 In(Out 50%/50% In/Out Trips 233/234 AM Peak 39 25°/a/75% 10/29 PM Peak Daily 49 300 64%/3b% 50%/50% 31/18 150(150 AM Peak 28 ZS%f75°lo 7121 PM Peak Daily 32 212 64%13b% 50%150% 20!12 106/106 AM Peak 16 I6%/84% 3/14 PM Peak 20 67%/33% 1317 Three intersection aligmnents and connector street plans (see page A-15) were evaluated for the proposed street system. In Option A, the existing two, two-way stop controlled intersections of Scenic Avenue/Upton Road and 10`h Street/3`d Street were shown as a combined. four legged intersections. Scenic/10`h and Upton/3`d would remain through streets. This intersection alignment would operate at good levels of service. The traffic volumes are low enough that no left turn lanes would be required in the immediate near term. This option would add connector streets at the following locations: tion A: • New Scenic Middle School access points (one opposite Crestwood, and one attached to newly aligned 3`a Avenue. • Frontage road along north side of proposed development ending at the west property line. ^ Pedestrian connection from Scenic Middle School to Crown Avenue (through proposed site). 31 C)ption A F~fsting'iYa~c~Vofumes ro scup Upffon D Existing'f`ratfia `V'.Ql Umrs ros~cu~ > ~ : Y ,S~ s C d' ~ ` ro Qpfron C ~ a rt F..xisting 'fYaff~c Volumes n ~_ Ffgure 9 ""' ~`~'~°RRxuw~') SCE,N~G.~iE,fGfiB0E2NOOD.~OUSING d as;sa~ Peat~iiarcCC~,nedron ~-+ .ExisunyTia~ovop~e OP7fON$ AND EXISTIt~CCa T'i~FPLC f`f3LUMES 32 Ul/O6/0U 1"3:13 ZY5U32431934 llKS ASSUCIATGS 1¢J002l002 N® 7036Gr tE Option D Existing Traffic Volumes EGEND Figure 1a rrr-Proposed ConneUion (fwo-vray) SCENtC NEIGHBORHOOD HOUSING ~ ~ ~- Pedes6ianConnedton OPTION AND EXISTING TRAFFIC VOLUMES xx-+ - E~dsting Traffic Volume _ ^ Options B would create two, two-way stop controlled intersections with Scenic Ave./Upton Road and 3rd Avenue110`h Street. It would connect Scenic Avenue with 3`d Street as the main through street and Upton Road and 10"' Street would be minor street stopped approaches. The intersections created with this alignment would operate at good levels of service. This option would add connector streets at the following locations: lion B: ^ New Scenic Middle School access points (one opposite Upton Road, and one opposite l0ei Avenue). ^ New road from 3`d Avenue (serving the east parcel} ending at the Scenic Middle School boundary. • New road connection from Crown Ave (serving the west parcel) to the proposed site. Options C also creates two, two way stop controlled intersections with S cenic Ave./Upton Road and 3`d Avenue/10`b Street. It would connect Upton Road with 3`d Street as the main through street and Scenic Road and 10`h Street would be minor street . stopped approaches. The intersections created with this alignment would operate at good levels of services. This option would add connector streets at the following locaBons: lion C: New Scenic Middle School access points (one opposite Upton Road, and one opposite 10`h Avenue). Frontage road along north side of proposed development dead ending at property line. 'T'his new road would have connection to Crown Avenue. All of the options call fora 24-foot wide street section with no parking. It would have a 3-foot planter strip and 5-foot sidewalks on each side. This layout is similaz to the City of Central Point Street Standazds proposed layout for a AResidential Lane@. It may be desirable for the through streets to be configured as 28 foot residential streets so on-street pazking would not impact traffic flow, TRANSPORTATION SYSTEM PLAN The Central Point TSP does not specifically make any recommendations for the intersection of 3`dlScenic/10`b/Upton. The County has a capital project planned that allocates approximately $500,000 toward the realignment ofthe intersection. WYrile no specific information regarding bicycle or pedestrian systems was obtained, it would appeaz desirable that 3`d/Scenic/I Oa'/Upton would have sidewalks and bicycle lanes due to the proximity to schools in the area n e p b 0 34 CONCLUSION Alignment of 3`"/Upton/Scenidl0'b Each of the altematives would have acceptable traffic capacity operation since the traffic volumes in the area are not lazge. None of the altematives provide for left turning lanes, but some of the alternatives would create greater need forthem. Option A would have the most desirable traffic operational intersection alignment creating a four legged intersection with Upton Road, Scenic Ave, 10'" Street, and 3'd Street. This would retain the through nature of Upton/3`' and Scenic/10'". Key issues include: • Limit unnecessary out of direction traffic that would be created with two separate T-intersections • Creates significant unusable land and impacts right-of--way • Turning traffic would not require turning lanes in the near term with a four leg intersection (because volumes are through). Option B alignment where Scenic/3'd is the through route retains many of the benefits of Option A, but creates large left turn movements onto 10'^. The two tee intersections would be safer than existing conditions, without right-of--way impacts of Option A. • Creates out of direction traffic resulting in large left tom vohune that may require a left tom lane for southbound toms onto 10'". • Abetter use of land, without right-of--way impacts of Option A. Option C also has two tee-intersections, but Upton/3`' is retained as the through route. • Creates two lazge left turning volumes which add conflicts and is less desirable than Options A or B • Minimal land impacts. FINDING: Options A and B would be preferable altematives for realignment Local Streets Each of the options addresses connectivity in different ways. The most desirable elements of connectivity for the area south and east of Scenic Middle School would include the following: • Crown Avenue be connected from its existing stub street north to Scenic Middle School via apedestrian/ bicycle path. This should extend azound the southern edge of the school to the pedestrian entrances to the school. While a full roadway connection would be desirable, the priority roadway connections aze noted below. Enhancements to the pedestrian facilities (a sidewalk) should be considered to the south to Crater High School, linking the two schools safely. • Anew east-west roadway be developed through the proposed residential development site that would connect Third Street to Comet Way. This should be a full roadway connection (28 feet wide) with side- walks. Adjustments to the Scenic Middle School track would be required and the roadway would also serve for loading to the middle school. Fire access would be substantially enhanced and the length of any col-de-sac options would be undesirable. • A local linkage (28 foot minimum) be developed north of the proposed site to intersection with either/and Tenth and Upton. This connection should not be considered in lieu of the east-west link between Comet and Third. The position of the east-west roadway between Third and Comet should be to the north of the proposed site to allow for shazed use/access for the school. Coordination with the school would be necessary to determine the appropriate security measures. The school parking lotto the north could be linked to the east-west street neaz Comet via a driveway that could be gated. 35 a The proposed size oftheeast-west street (2A feet -while desirable forpedestrian friendliness) should be considered to be wider. A 28 foot cross section has proven effective in settings similar to this one and is of particular importance due to its proximity to the school. It may require shared right-of--way with properties to the north. The value of the recommended connectivity is that it can be staged over time between property owners withoufimpacting the adjacent pazcels. Without the connectivity recommended, greater traffic loadings of the 3'B/Upton/Scenic/10~' intersection would occur, resulting in left turning lane needs that otherwise may not be warranted. Shoutd you have any questions, please feel free to contact me or Scott. 0 ~' 36