HomeMy WebLinkAbout2017 Pavement Maintenance - Knife RiverCONTRACT FOR CONSTRUCTION
This contract, made and entered into this 1-14**- day of July 2017, by and between the CITY
OF CENTRAL POINT, OREGON, hereinafter called the "OWNER", and LTM, Inc. dba
Knife River Materials , hereinafter called the "CONTRACTOR".
WITNESSETH;
Said Contractor, in consideration of the sum and/or unit prices to be paid to him/her by the
Owner, and of the covenants and agreements herein contained, hereby agrees, at his own proper
cost and expense, to do all work and furnish all materials, supplies, supervision, labor, tools,
equipment, transportation and incidentals, and shall pay all applicable taxes and fees necessary
for the completion of the construction of the 2017 Pavement Maintenance - Hwv 99 in the City
of Central Point, Oregon, for said Owner, to the extent of the Proposal, with unit prices filled in
made and submitted by the Contractor on the _ day of Jud, 2017 all in full compliance with
CONTRACT DOCUMENTS, which includes: The Performance Bond and the applicable
portions of the City's Public Works Standard Specifications and Details, included herewith, and
in accordance with the Plans prepared by RI -12 for the City of Central Point, Public Works
Department, dated Summer 2017. entitled: 2017 Pavement Maintenance - Hwv 99 which
Plans and aforementioned Contract Documents are hereby referred to, and by reference made a
part of this CONTRACT FOR CONSTRUCTION as fully and completely as if the same were
fully set forth herein, and are mutually cooperative herewith. In consideration of the faithful
performance of the work herein set forth, and in accordance with the directions of the Engineer,
and to his satisfaction as provided herein, the Owner agrees to pay to the Contractor the amounts
bid in the Proposal, $282.750.00. adjusted in accordance with the General Conditions, and to
make such payments in the manner and at the times provided for in the General Conditions.
The Contractor agrees to complete the work within the time limits as specified herein and to
accept as full payment the amounts set forth in the Proposal and computed in accordance with
the Contract Documents.
It is agreed that the Contractor shall complete the work in all respects by 45 days after the notice
to proceed.
In the event the Contractor shall fail to complete the work within the time limits or the extended
time limits agreed upon, liquidated damages shall be paid to the Owner in the amount of $500.00
per day until the work is completed as set forth in the Contract Documents and to the satisfaction
of the Engineer. Sundays and legal holidays will be excluded when determining days in default.
The Contractor agrees to hold harmless the City from, and to repair and replace (as directed by
the City's Public Works Director) any and all defects and deficiencies which develop in
workmanship and/or materials for a period of one (1) year or as stated in the special
specifications after the date of the written notice from the Engineer of the final acceptance of the
project by the City.
IN WITNESS THEREOF, we, the parties hereto, each subscribes the same this
v
[Utivie
City of Central Point
J u 2017.
v
Title: 6, IfTy V*A014?d-A
V
CONTRACTOR:
LTM, Inc. dba Knife River Materials
(Company Name)
By:_;4j66—
Title: w Sk'h.�— in t,p,al,+i5kis I I