HomeMy WebLinkAboutCouncil Resolutions 1488 RESOLUTION NO. / "
A RESOLUTION AUTHORIZING THE CITY TO ENTER INTO A FIRST AMENDMENT TO THAT
INTERGOVERNMENTAL AGREEMENT WITH JACKSON COUNTY REGARDING GREENWAY
MAINTENANCE.
Recitals:
A. Effective 1/10/2008 the City of Central Point approved an agreement between City of Central
Point and Jackson County entering into an intergovernmental agreement providing major
maintenance along the Bear Creek Greenway Corridor.
B. The original Agreement incorporated by reference the Bear Creek Greenway Management Plan,
2005-2010.
C. The Bear Creek Greenway Management Plan has been updated to reflect current priorities and
maintenance strategies and is intended to serve as the guiding document for management and
operations of the Greenway.
The City of Central Point Resolves as follows:
Section 1.The City is authorized to enter into the attached "Amendment No. 1"amending that
intergovernmental agreement between the City of Central Point and Jackson County for maintenance of
the Bear Creek Greenway.
Section 2.The City Manager is authorized to execute such intergovernmental agreement on behalf of
the City.
Passed by the Council and signed by me in authentication of its passage thisrd day of
ESCIELAF.6.
2017.
Mayor Hank Williams
ATTE
A
City Recorder
•
AMENDMENT NO. 1
TO INTERGOVERNMENTAL AGREEMENT
FOR THE MANAGEMENT OF THE BEAR CREEK GREENWAY
CORRIDOR DATED FEBRUARY 14, 2008
This FIRST AMENDMENT to the Intergovernmental Agreement for the Management of the Bear
Creek Greenway Corridor (the "Agreement"), is hereby made and entered into by and between
Jackson County,a political subdivision of the State of Oregon,hereinafter referred to as"County,"
and the Cities of Ashland, Central Point, Medford, Phoenix and Talent, hereinafter collectively
referred to as the "Cities." County and Cities are hereinafter collectively referred to as the
"Parties."
RECITALS
WHEREAS, in 2008 the Parties executed the Agreement to guide major maintenance of
the Bear Creek Greenway Corridor; and
WHEREAS, the original Agreement incorporated by reference the Bear Creek Greenway
Management Plan, 2005-2010; and
WHEREAS,the Bear Creek Greenway Management Plan has been updated by the Parties
to reflect current priorities and maintenance strategies and is intended to serve as the guiding
document for management and operations of the Greenway.
THEREFORE
For consideration,the receipt and sufficiency of which are hereby acknowledged,the Parties agree
as follows:
1.) Exhibit A and B shall be deleted in their entirety and replaced with the attached
Exhibit A, The Bear Creek Greenway Management Plan 2017-2022.
2.) Section 2 of the Agreement shall be deleted in its entirety and replaced with the
following:
Each Party shall designate an elected or appointed official as the primary representative
of their individual jurisdiction to the JPC and a staff member as the alternate
representative. Each Party shall provide written notification to all other Parties of these
designations and any subsequent changes to these designations. The JPC will meet
annually at a minimum, and more frequently if needed. The JPC shall provide proper
notice of said meetings to the public in accordance with applicable law and comply
with all other provisions of public meetings law.
3.) Section 4 of the Agreement shall be deleted in its entirety and replaced with the
following:
Each Party shall pay its annual obligation for implementation of the Plan as shown in
the Annual Major Maintenance Fund Contribution column on the Funding Table in the
attached Exhibit A, page 20. Funds will be handled as a separate and distinct set of
accounts within Jackson County's Trails Fund,which is established within the Jackson
County budget. Jackson County shall issue an annual invoice for all payments due
pursuant to Exhibit A no later than July 31st of each year. Payments shall be made to
Jackson County annually upon receipt of invoice, on or before August 31st of each
year. Jackson County will have fiduciary responsibility for these funds. Expenditures
from the JPC funds will be made in accordance with the Plan or by a vote pursuant to
Section 3 of this Agreement.
4.) Section 5 of the Agreement shall be deleted in its entirety and replaced with the
following:
Each Party shall be responsible for routine maintenance on the Greenway as
described in Exhibit A within their boundaries as identified in Exhibit A. In addition
to the routine maintenance described in Exhibit A,Parties agree to a two-year pilot
program utilizing Jackson County Community Justice crews to assist with routine
maintenance, including each jurisdiction's costs identified for"CJ Crew" in the table
in Exhibit A, page 10. Before the end of the two-year pilot program,the JPC shall
decide whether to continue the program.
5.) Section 7 of the Agreement shall be deleted in its entirety and replaced with the
following:
At five (5) year intervals Exhibit A will be examined and revised by JPC
representatives as necessary and approved by a two-thirds majority vote of JPC
representatives. Upon such approval, an amendment to the JPA to replace Exhibit A
shall be prepared and forwarded to the Parties for approval by their governing bodies.
6.) Section 8 of the Agreement shall be deleted in its entirety and replaced with the
following:
County shall provide JPC staff support and shall be compensated by the Cities as
described in Exhibit A.
7.) Section 10 of the Agreement shall be deleted in its entirety and replaced with the
following:
Exhibit A provides the framework for the maintenance and operations and the
associated costs for the Greenway, and designates annual obligations for each of the
Parties. The annual work plan shall be based on Exhibit A, and any deviations from
projects listed in the Exhibit A or changes to the budget or scope of individual projects
greater than 10%must be approved by the JPC.
8.) Section 13 of the Agreement shall be deleted in its entirety.
This Amendment is effective the date on which this Amendment is fully executed by the Parties
and fully approved as required by applicable statutes and rules.
CITY OF ASHLAND: CITY OF CENTRAL POINT:
By: By:
Date Date
Title: Title:
CITY OF MEDFORD: CITY OF PHOENIX:
By: By:
Date Date
Title: Title:
CITY OF TALENT: JACKSON
COUNTY:
By: By: / . 7 '--' c� , eS ) '7
Date ,,DANNY JORDAN bate
Title: Title: County Administrator
proved os cot :j
Lr:icd,y:
_ A� - ---
crow('�unpb
EXHIBIT A
Bear Creek Greenway
Management Plan
2017-2022
Table of Contents:
Bear Creek Greenway Background
Purpose and Need of Management Plan
Jurisdiction Boundaries
Routine Maintenance
Routine Maintenance Tasks
Options to Accomplish Routine Maintenance
Cost Estimates
Staff Recommendation
Major/Fadlity-wide Maintenance
Inspections&Trail Counters
Bridge&Pavement Preservation Projects
Pavement Repair Projects
Unanticipated Repair Fund
Facility-wide Improvements
Lighting Feasibility Study
Staffing
JPC Staff
Community Engagement&Volunteer Coordinator
Operations
Greenway Ordinance
Greenway Special Event Standards&Procedures
General Greenway Permits
Expenditures&Funding
Management&Oversight: Joint Powers Committee
Conclusion
2
•
Bear Creek Greenway Background
The Bear Creek Greenway is a currently 20-mile paved, multi-use trail that connects the cities of
Ashland,Talent, Phoenix, Medford and Central Point. The Greenway is continuous from the Ashland
Dog Park to the Dean Creek Frontage Road near the Seven Oaks Interchange on 1-5, north of Central
Point. The trail provides a separated route from cars,with only two at-grade road crossings. The trail
parallels 1-5, Highway 99 and Bear Creek and provides Rogue Valley residents and visitors to the area a
close-in spot for bird watching and wildlife viewing, as well as exercise and general recreation.
There are benches along the trail as well as several city parks along the route that provide parking,
restrooms,drinking water,and picnic tables. The Cities and County share responsibility for routine
maintenance of the trail and work jointly to accomplish major maintenance and management of the
Bear Creek Greenway.
The long-term goal is to extend the trail south through Ashland and on to Emigrant Lake,and to extend
north to the tunnel at Kirtland Road,which provides the "golden spike" connection with the proposed
30-mile Rogue River Greenway trail, connecting to Gold Hill, Rogue River and Grants Pass.
The Bear Creek Greenway is the spine of the non-motorized transportation system in the Bear Creek
Valley, providing people with an option to take trips by bike instead of by car. It provides our largest
regional urban park through our most populated areas in Southern Oregon, providing a close to home
place to connect with nature. It enhances the livability of the region and is often cited as an important
amenity considered by people relocating to our area. An annual average of 250 trips per day are taken
at any given point along the trail, making the trail as busy as many local streets and roads.
It truly is a gem that deserves the best continued care and investment possible.
3
Purpose & Need
The Bear Creek Greenway trail and the associated properties along the corridor represent over four
decades worth of investment and labor and provide a tremendous asset to the Rogue Valley. Protecting
this investment and providing the best possible maintenance and management of the resource is in the
best interest of the health of our residents,our communities,and our watershed.
That being said, budgets and staff resources are limited, and investments need to be made strategically
and implemented efficiently. In that light,the jurisdictions that manage the trail joined forces in 2008
and signed the Bear Creek Greenwav Joint Powers Aereement IJPAI. with the mission"to jointly provide
for the consistent financial support, management, promotion and maintenance of the greenway." The
JPA created a mechanism and set aside funding for staffing and major maintenance, and delineated
responsibility boundaries for routine maintenance.
The concept for the JPA and the management and funding model was identified in the"Bear Creek
Greenway Management Plan: 2005-2010,"completed December of 2006 by the Rogue Valley Council of
Governments. The plan also loosely identifies some management goals but doesn't specify projects or
programs.
Like its predecessor,the Bear Creek Greenway Management Plan: 2017-2022 is intended to provide the
background and framework for the Bear Creek Greenway Joint Powers Agreement. As such,this plan
addresses the following:
• Jurisdiction boundaries:designates each city's and the county's responsibility for segments of
trail
• Routine maintenance: designates desired level of service and analyzes opportunities for
collaborating on routine maintenance efforts
• Major/facility wide maintenance: identifies specific projects that are needed to keep the
pavement and bridges in good repair
• Facility wide improvements: identifies projects that are facility-wide in nature (i.e. signage,
amenities,etc.)
• Staffing: identifies staff needs
• Funding: identifies funding levels for each jurisdiction based on total need identified, using a
formula based on population and lane miles
• Operations: identifies special event standards and permitting, proposes changes to ordinance
• Implementation: provides a framework for the Joint Powers Committee
These elements provide a roadmap for the Greenway during the next five years that will guide
maintenance, management and investments based on current needs,as well as identify roles and
responsibilities for the jurisdictions.
4
Jurisdiction Boundaries
Under the Joint Powers Agreement,each city maintains the portions of the Bear Creek Greenway within
their Urban Growth Boundaries(UGB)and the County maintains the areas outside of any UGB,with the
exception of the City of Ashland,which maintains a portion of the trail parallel to their UGB.
It should be noted that trail corridor maintenance responsibility is based on jurisdiction boundaries not
on property ownership. Issues outside of the 30'wide trail corridor are the responsibility of the
property owner. Jurisdictions responsible for routine maintenance may want to complete projects
outside of the 30' corridor and should check property ownership and consult with the property owner
before doing so.
For this 2016 update, boundaries have been clearly identified and trail segment lengths measured,
resulting in minor changes to the mileage. In addition, UGB's have been expanded in two areas resulting
in changes to the Bear Creek Greenway jurisdiction boundary:
• Phoenix UGB expansion north of Fern Valley
• Central Point expansion north to the Blackwell Road/Highway 140 area
These revised boundaries add separate,discontinuous sections of management for Jackson County and
Central Point,and also result in a very short segment forJackson County north of Phoenix. If the current
system of maintenance is retained, in areas such as these,jurisdictions should consider trading miles
and/or compensating each other for work in their section to gain efficiencies.
2016 Bear Creek Greenway Management Responsibility Extents
Note: Total Central Point trail mileage=2.25;total Jackson County trail mileage=5.25.
Jurisdiction Description Approximate Mile Mileage
Marker (20 total)
Ashland Dog Park to South Valley View 8.0-10.0 2.0
Jackson County South Valley View to Welcome to Talent sign 10.0-11.5 1.5
Talent Welcome to Talent sign to Suncrest Road 11.5-13.5 2.0
Jackson County Suncrest Road to Anderson Creek(+1/8t of a 13.5-15.25 1.75
mile)
Phoenix Anderson Creek to.25-miles north of Fern Valley 15.25-16.75 1.5
Jackson County .25-miles north of Fern Valley to Glenwood Road 16.75-17.25 .5
Medford Glenwood Road to Table Rock Road 17.25-24.25 7.0
Central Point Table Rock Road to Pine Street 24.25-25.5 1.25
Jackson County Pine Street to Upton Road 25.5-27.0 1.5
Central Point Upton Road to Dean Creek Road 27.0-28.0 1.0
5
•
Routine Maintenance
Routine maintenance refers to the day-to-day activities by staff, contractors/community justice crews,
and volunteers to keep the trail clear and free of debris,vegetation and damage. It is a critical element
of both real and perceived safety of trail users, and can help foster positive community perceptions of
the trail; people are less likely to vandalize and far more likely to utilize a well-maintained trail.
The Bear Creek Greenway is not realizing its full potential for use and community support because there
is a common perception, especially in certain areas,that the trail is not safe. In order for the trail to
realize its full potential of serving the region as a transportation and recreation corridor, it is critically
important that maintenance issues are addressed in a timely fashion. Currently, maintenance activities
are not happening consistently-vegetation often grows onto the path, litter is sometimes left for weeks
at a time before being removed, and vandalism and graffiti are not addressed in a timely fashion. Trail
managers recognize that the level of service on the trail is not consistently as good as it could be.
As previously discussed,the current agreement gives each jurisdiction responsibility for routine
maintenance and operations based on urban growth boundaries,effectively creating nine separate
segments of trail(10 with the revised UGB extents). The jurisdictions have varying capacities to
accomplish the variety of routine maintenance tasks and current level of service is variable between and
even within jurisdictions. There is desire by the jurisdictions as well as by trail users for better
consistency of level of maintenance along the entire trail.
It should also be noted that trail corridor maintenance responsibility is based on jurisdiction boundaries
not on property ownership, but issues outside of the 30'wide trail corridor are typically seen as the
responsibility of the property owner, not the maintenance jurisdiction.
The first task in the planning effort was to list the maintenance activities and goals for addressing
complaints and/or issues on the trail. Knowing the desired level of maintenance,staff then considered
alternative concepts for accomplishing the regular, routine maintenance on the trail and analyzed the
costs for current activities and the proposed concepts. At the end of this section,a staff
recommendation is given for consideration.
Routine Maintenance Tasks
The following Regular Routine Maintenance Tasks table was developed with jurisdiction staff from the
county and the cities and gives a summary of regular, routine maintenance activities. The right-hand
column depicts suggested guidelines not regulatory standards. This approach reflects the desire to have
consistent goals and standards while allowing for flexibility to respect the varying demands and
limitations of resources of jurisdictions.
6
Routine Maintenance Tasks
Regular Routine Maintenance Tasks Minimum frequency/timeline to address
Routine inspections/address minor issues Weekly
(vegetation, debris, litter,graffiti, reporting
illegal camping,fill brochure holders,etc.)
Remove"ladder fuel"type vegetation w/i As needed/within 10 business days of report
10x10x10 trail footprint(10'from each side of
the trail and 10'tall)
Remove puncturevine/goathead (w/i 30' As needed/within 10 business days of report
trail/shoulder footprint)
Remove litter As needed/ASAP
Sweep/blow trail surface As needed/within 10 business days of report
Refill brochure holders at kiosks(brochures As needed/weekly
provided by Bear Creek Greenway Foundation)
Non-Predictable Routine Maintenance Tasks Frequency/timeline to address
Repair/remove graffiti As needed/within 1 week or as otherwise required
Remove dumping sites As needed/Address within 1 week if possible
Repair vandalism, including to signage, As needed/Address within 1 week if possible
benches,fencing,and other amenities
Remove blocking vegetation As needed/within 48 hours
Address drainage issues,wash-outs,flood As needed/Signs&cones placed within 48 hours;
damage,etc. These items can,and often do, trail passable within 48 hours of water receding;
fall into the category of major maintenance repair shoulder rock,etc. within 10 business days
Routine Maintenance Tasks Conducted NOT included in options for regular,routine
Periodically by Individual Jurisdictions maintenance
Spray pre-emergent on shoulders& Utilized in the spring and as needed at other times
puncturevine/invasives as needed by some jurisdictions
Assess&remove hazard trees Annually
Cost Estimates per Mile
Routine maintenance costs for multi-use paths vary widely based on method of staffing or contracting,
level of service,and various other factors. Cost estimates from trail systems around the country range
anywhere from$2,000-$40,000 per mile. The five cities and the County reported that they currently
7
•
spend an average of$4,000-$6,000 per mile annually for routine maintenance of the Bear Creek
Greenway.
Options to Accomplish Regular Routine Maintenance
The current system where each jurisdiction maintains the sections within their UGB's creates
inconsistencies between(and sometimes within)jurisdiction segments,and there is a lack of efficiency
in maintaining short segments separately instead of addressing the trail as a whole. For those reasons,
three options have been identified and analyzed for completing regular routine maintenance work on
the trail.
When analyzing the three options,the assumptions were:
• Maintenance activities are limited to the 30' trail corridor-the 10'trail and 10'on either side.
Larger-scale mowing or other vegetation work outside of that corridor is not considered.
• The cities will continue to mow lawn areas within the 30'footprint through manicured parks.
• The duties taken on jointly in Options B&C are assumed to be limited to the Regular Routine
Maintenance Tasks and minor Non-Predictable Routine Maintenance Tasks that don't require a
lot of time to address. The remaining maintenance work(non-predictable tasks,spraying if
applicable,and hazard tree removal)would still be the responsibility of the maintenance
jurisdiction.
• Any additional presence more frequent than identified would be completed by the responsible
jurisdiction.
• Work would need to be funded separately by each jurisdiction or through major maintenance
funds to bring the trail up to a baseline standard that could be maintained in the times and with
the resources identified.
Option A-Remain the same(Jurisdictions responsible for all maintenance)
The first alternative considered is to continue with the current model of each jurisdiction
maintaining the area for which they are responsible. As previously mentioned,this model presents
some challenges in the way of consistency between and sometimes even within jurisdictions and is
inefficient.
Option B-Community Justice Crew
Option B would be to hire Community Justice(CJ)crews to perform a portion of or all of the regular
routine maintenance along the entire trail. Per previous experience and discussions with
Community Justice Managers,once established,the CI crew could perform the routine maintenance
tasks to the desired level of service on the entire trail in an average of 12 days per month. CJ Crews
cost$400 per day,the total annual cost would equal$57,600 or$2,880 per mile. This level of
service would allow for biweekly inspections and work on the trail. Increasing the level of service to
8
•
a weekly presence could be accomplished by adding 4 more days to the month,for 16 total days per
month,with a cost of$76,800 or$3,840 per mile. Jackson County would be responsible for
monitoring the CJ Crew work and for payment to the program, and would invoice each of the other
participating jurisdictions annually.
Option C-Full-time Greenway Park Worker
A full-time,regular, benefited Bear Creek Greenway Worker could be an option for accomplishing
the routine maintenance duties on the trail. This person could also be a "Ranger" and have code
enforcement abilities and serve as an enforcement/patrol presence. There would be times when
additional workers would be needed to accomplish tasks like weed-eating,addressing puncturevine,
addressing large trash issues,and major flood repair,but the person could likely complete many of
the routine tasks on their own. The ranger could potentially coordinate the volunteer program.
Costs with benefits for a full time park ranger are estimated at$65,000 annually for staffing plus
$20,000 for overhead for a total of$85,000 annually or$4,250 per mile. Rough estimates of
additional crew work needed are approximately five days per quarter or 20 days annually for an
additional $8,000 or$400 per mile. These crews could also conceivably be parks staff or volunteers.
Regular Routine Maintenance Options
Note:jurisdiction cost estimate includes all activities on the trail, not just those identified as regular,
routine maintenance,while the costs for the Ci Crew and Greenway Worker only include costs for the
items listed in the table as Regular Routine Maintenance Tasks.
Option Approximate Annual Benefits Drawbacks
Costs (per mile)
Jurisdiction $4,000-$6,000** Jurisdiction ownership Inconsistent
(current) Not cost-effective
Several points of
contact
G Crew $2,880/mile Consistent and cost Not as likely to foster
effective staff ownership
$3,840/mile for weekly
presence
Greenway $4,250 Consistent More expensive than
Worker/Ranger other options
Plus $400-extra help One point of contact
9
•
Cost Implications
The table below shows what each jurisdiction would contribute for a maintenance program based on
jurisdiction mileage. "Current Costs" are estimated based on$4,000 per mile,which is the lowest of the
average reported costs of the jurisdictions, and provides the best comparison to the other options since
the work will only encompass the regular, routine maintenance tasks.
Routine Maintenance Option Costs for Each Jurisdiction
Jurisdiction Mileage Current Cl Crew- Worker/Ranger
Costs Recommended
(Cost per trail mile) ($4,650)
($4,000) ($2,880)
Ashland 2.0 $8,000 $5,760 $9,300
Jackson County 5.25 $21,000 $15,120 $24,413
Talent 2.0 $8,000 $5,760 $9,300
Phoenix 1.5 $6,000 $4,320 $6,975
Medford 7.0 $28,000 $20,160 $32,550
Central Point 2.25 $9,000 $6,480 $10,463
Recommendation
Staff and the Joint Powers Committee recommends a two year pilot program utilizing the Community
Justice Crew"bi-weekly presence" option. This option is the least costly and it would help address the
inconsistent level of service and be more efficient. The jurisdictions would be able to utilize their staff
who are currently working on the Greenway for other activities and possibly save funds.
Jackson County JPC Staff will coordinate and manage the effort including invoicing the cities annually
and providing monthly payments to the Community Justice program, as well as scheduling and
monitoring the CJ Crew work. The County will develop a scope of work based on the regular routine
maintenance tasks and Ci Crew leaders will monitor approximate time spent in each jurisdiction
segment of trail and log it on all invoices.
To measure success,staff will conduct site visits and take photos and/or videos of the trail before the
pilot begins in July of 2017 and at six month intervals. Cl Crew time commitment per each jurisdiction's
segment(s)will be calculated at six month intervals as well,and surveys of jurisdiction staff and
stakeholders will be conducted. A survey conducted by SOU students in November of 2016 could be
replicated in 2017 or 2018 to gauge trail user satisfaction.
It is important to note that all of the jurisdictions do not need to participate in the pilot for it to be
viable, but increased participation will result in better opportunities to monitor level of service and
changes in efficiency and consistency throughout the entire 20-mile trail.
10
Major/Facility-wide Maintenance
Major maintenance typically refers to large-ticket projects that are mostly related to keeping the
pavement and bridges in good repair, and which are most likely to be accomplished through
contractors. These projects generate from root or water damage to the pavement, pavement reaching
its life expectancy, and/or natural disasters such as flooding or earthquakes. Costs for repairs can't
entirely be anticipated for natural disasters, but can often be anticipated and budgeted for in cases of
pavement failure due to age and root damage. Major maintenance costs also include the costs for
assessment of the trail condition and ongoing costs for trail counters.
Much has been accomplished in regards to major maintenance and paving in the eight years since the
Joint Powers Agreement was signed. Three sections of trail, nearly seven miles,were entirely
reconstructed. A root test-plot project that included several repair options for root-heaved trail was
installed,signage including map kiosks and directional signs have been installed,five trail counters are
monitoring the use on the trail, and many other small repair projects have been completed.
Looking forward,work will continue to be required to keep the trail itself in a state of good repair. This
section of the plan discusses pending projects for 2016/2017 which have already been approved for
funding by the JPC but have not been completed yet including fog sealing, shouldering,grant match,
bridge inspections and repairs,and trail counter licenses and batteries. It also identifies the major
maintenance projects proposed on the Bear Creek Greenway for the 2017-2022 timeframe(highlighted
in bold text). Cost estimates are based on the best information available and do not take inflation into
account.
Inspections and Trail Counters
Part of the major maintenance program is inspection of the trail and bridges. The entire trail should be
inspected annually to assess pavement condition by the Joint Powers staff or another qualified party,
and all of the creek crossings should be inspected annually by County Bridge Crews or other qualified
individuals. These inspections identify any immediate safety hazards that need to be addressed.
A more thorough inspection of the bridges by a certified bridge engineer should occur every five years,
and staff should continue to consult with county and city experts to assess the 20-miles of pavement
every five years. These inspections identify pavement maintenance needs on the trail.
Major maintenance funds include bridge inspection costs,which includes clearing around the bridges to
allow access, and assumes staff continues the pavement inspections and reports.
Funds also include trail counter costs-the five trail counters transmit data via cell phone service,which
is$2,100 annually, and need new batteries every other year($500 total cost).
Bridge Inspections& Brushing:$14,000
$2,000 annually(4 years)for County Crews and CJ Crew brushing work
$6,000 every 5 years for engineer inspection
Trail Counter Batteries&Transmission: $11,500
$500 every other year for batteries
11
$2,100 annually for license/data transmission
2016/2017 Trail Counter License& Batteries: $2,600
Total 5 Year Costs for Inspections&Counters: $25,500
Bridge Preservation Projects
All of the bridges along the Bear Creek Greenway were inspected by an engineer in the summer of 2015
and several issues were identified,the most significant issues are joint replacements for two bridges in
order to smooth the transition between the trail and the bridge structure. The JPC has committed
$5,000 to complete this work which will occur in 2016/2017.
The next structural bridge inspections scheduled for 2020 and/or any significant hydrological events may
determine or result in additional bridge repair needs,and $10,000 will be set aside for bridge
maintenance for the next five years.
2016/2017 Bridge Inspections& Repairs: $7,000
Bridge work(contingency fund): $10,000
Pavement Preservation Projects
Maintaining the asphalt on the trail includes fog sealing to protect the investment and prolong the life of
the asphalt. Fog sealing and shouldering the trail as a whole as opposed to splitting it into jurisdictional
boundaries is more efficient and cost effective,therefore these items should be coordinated for the trail
and considered major maintenance.
Fog sealing is scheduled to take place in 2016/2017 as soon as weather permits on the newest sections
of trail: South Valley View to Suncrest, Barnett to Biddle Loops, and Pine Street to the Dean Creek
frontage road,totaling nearly 10 miles of trail, using a system recently adopted by the City of Medford
Public Works. The Suncrest to Barnett section should be fog sealed using the County or similar materials
and method. The remaining sections(Dog Park to Valley View and Biddle to Pine)will not be fog sealed
in 2016 because there are other projects recommended.
Approximately$40,000 of funds will be expended for the fog sealing effort in 2017 under the current
agreement. The fog seal will not need to be reapplied until 2022,following the schedule of sealing every
6-8 years, so no costs are anticipated for the 2017-2022 timeline.
$60,000 has been approved by the Joint Powers Committee for shouldering work to be completed on
the trail in 2016/2017. The work will address portions of trail with a 2" or greater drop,and the trail will
likely need to be touched up in about 5 years,$10,000 is dedicated to that effort.
2016/2017 Shouldering: $60,000
2017-2022 Shouldering touch up: $10,000
Bridge contingency&Pavement Preservation Projects Total: $20,000
12
I
Pavement Repair Projects
The 2-mile segment from the Biddle Road Loops to Pine Street is now the oldest section of trail(built in
1996). It has very significant transverse cracking(which is not a safety issue, but is of concern)and also
has some sections of longitudinal cracking(a significant safety issue),one significant slumped area and
several areas of root heaves. The proposed repair for this section is to replace the longitudinal cracking
and root heave issues with concrete,and to crack seal and slurry seal the remainder of the trail
segment.
Biddle to Pine Street: $110,000
The slightly newer 2-mile segment of trail from the Ashland Dog Park to South Valley View Road (built in
1998)has similar issues that should be addressed,specifically the areas with longitudinal cracking and
root heaves.
Ashland Dog Park to South Valley View: $180,000
There are many sections of trail that are damaged by root heaving, which will continue to be a
maintenance issue. Staff has identified and mapped several "spot repair" pavement needs on the Bear
Creek Greenway and tiered them into short term (0-5 years)and long term (5-10 years)categories based
on height and location of heaves on the pavement,taller bumps on shady curves on the trail being the
most urgent to repair. The repair type is suggested based on the information learned from the root
repair test plot project and other efforts since.
Staff identified 10-15 short-term repair plots totaling roughly 1,300'that need to be repaired in the next
five years,and several that should be ground away with the pavement grinder. Funds to complete the
$165,000 project have been secured through the 2016 Recreational Trails Program utilizing$75,000 of
JPA funds for match, and$10,000 should be committed towards grinding the remaining root heave
issues not addressed by the RTP project.
Root Repair-remove& replace: $165,000(FUNDED w/2016 RTP Grant-JPC Match$75,000 out of
current JPA agreement)
Root Repair-grind: $10,000
Long term
When the Bear Creek Greenway Management Plan is updated in 2022,there will likely be additional
root heaves on the trail that will need to be considered for repair. In addition,the 6.5-miles of trail
between Suncrest Road and Barnett Road was constructed in the mid-2000's and will not likely need any
major investment until 2025 or later but should be monitored,especially the transverse cracking in the
".25-mile section just north of East Glenwood Road.
The newest sections(including the segments that were reconstructed in 2012)will not likely need major
investment until 2035 or later. Spot issues will continue to arise and should be addressed as necessary.
Total Pavement Repair=$300,000
13
Unanticipated Costs:Repairs due to Natural Disasters or Unforeseen Issues
It is important to maintain a contingency fund to complete repairs on the trail that are needed as a
result of natural disasters like floods and earthquakes. It should be noted that most costs to repair
damage from a major event will likely be covered by FEMA,so this fund could be used as match for
FEMA or for smaller event repairs.
Unanticipated Repair fund for Flood,Fire,Earthquake: $30,000
Major Maintenance 5-year costs:
I Inspections&Trail Counters I $25,500
Pavement& Bridge $20,000
Preservation
Pavement Repair $300,000
Unanticipated Repair Fund I $30,000
I Total $375,000(rounded)
14
Facility-wide improvements
Considering the trail and the public land corridor as a whole rather than individual sections is important
for elements such as signage and amenities,as well as for planning efforts like the RVCOG Greenway
Vegetation Management Study, underway as of fall 2016. The JPC has discussed several ideas
throughout the years and decided that the JPC funded vegetation management study and a proposed
lighting study are the most important facility-wide considerations over the next five year horizon.
lighting Feasibility Study
Along with improving routine maintenance, incorporating lighting on at least some sections of the trail
has been identified by trail managers and trail users as a desired safety amenity. There are a lot of
discussions and review that needs to take place in consideration of incorporating lighting including
environmental and community concerns as well as costs of installation, power,and ongoing
maintenance and operations. There are many options for type of lights and power sources and requests
have also been made to trail managers to incorporate charging stations for electric wheelchairs.
The JPC agreed that further analysis is needed and a lighting feasibility study should be completed. The
study will incorporate public input and will analyze opportunities and constraints in consideration of
lighting on the Bear Creek Greenway.
2016/2017 Vegetation Management Plan: $20,000
Lighting Feasibility Study: $15,000
Other facility-wide improvements have been discussed but no further action has been proposed through
this Management Plan effort. These items, including amenities(benches,trash receptacles,fountains,
bike racks, bike fix-it stations, playgrounds, par courses/exercise areas, emergency phones,etc.), a
parallel soft surface trail, and bike rental/bike share could be considered in future planning efforts.
Safety&Homelessness
There was also conversation around safety concerns and managing homelessness on the Bear Creek
Greenway Corridor. Both of these issues warrant further discussion but were not in the purview of this
particular plan. It is vital that conversations with trail managers, law enforcement and the community
continue about how best to address the safety concerns. One model to consider is the Sunriver Police
Department Bicycle Patrol,which consists of eight seasonal employees and eight community volunteers
who patrol the trails of Sunriver to"ensure that Sunriver residents and many thousands of visitors enjoy
their experience and exercise proper safety while riding,walking or running on the Sunriver pathways."
Trail managers and law enforcement should discuss this model for the Greenway.
15
Staffing
Jackson County, per the Joint Powers Agreement,currently provides 24 hours per week of staffing for
the Bear Creek Greenway. Work includes several critical elements of greenway maintenance and
operations management,as well as planning for trail extensions and improving the connections from
communities to the trail. Jackson County will continue this work at this level of service in the future and
also add work not previously identified in the JPA.
JPC staff duties per the JPA include:
• Coordinate JPC meetings-minimum quarterly schedule
• Update the Management Plan and Funding Table every 5 years
• Coordinate annual bridge inspections by County crews and 5 year inspections by certified
engineers
• Conduct annual pavement assessment& make recommendations for annual priority schedule
for major maintenance projects
• Coordinate annual/as needed meetings with maintenance staff
• Coordinate annual/as needed meetings with police,fire &EMS
• Coordinate annual/as needed meetings with natural resources stakeholders
• Coordinate JPC grant applications"
• Coordinate 1PC projects"
**Costs for staff time for these items can be recovered per the agreement
Additional tasks provided by County staff:
• Serve as central clearinghouse for trail questions&issues
o Outreach to the public for trail closures, projects,etc.
o Consultation and review special event permits for the BCG
• Coordinate the management and maintenance of the five trail counters
• Identify and support potential expansion projects: monitor funding programs,advocate for the
Bear Creek/Rogue River Greenways and projects that connect to them
o Liaison with Bear Creek and Rogue River Greenway Foundations
JPC Staffing Costs&Contributions
Under the 2008 agreement,the County provides an employee that staffs the Greenway for 24 hours per
week and contributes$42,000 for labor costs and absorbs the overhead costs($18,700)and each city
contributes$2,600 annually toward the staff member. Total contributions for labor(not including
overhead)are currently$55,000. Costs for labor for the position dedicated to the JPC have increased
20%and are now an estimated $66,000 annually for 24 hours/week. Cost increases are reflected in the
revised annual contributions below.
Staffing Costs: $3,120 per City; County=$50,400+Overhead (these are separate from the formula
funds)
Community Engagement&Volunteer Coordinator
There is currently a lot of interest in the Adopt-a-Greenway and Greenway Host programs, but staff
capacity to manage these programs is limited. To capitalize on the opportunities,Jackson County will
hire a volunteer coordinator to recruit and manage volunteers and foster a robust Greenway Volunteer
16
program. The coordinator position will also help with existing events and develop other programs and
events that focus on the Greenway and potentially raise revenue through events to offset the cost of the
position. The coordinator will also help with regular, routine maintenance on the trail—the efforts of
the volunteers may offset some of the maintenance costs for each jurisdiction.
This position has a great deal of potential to improve the community connection with the Bear Creek
Greenway and help overcome the safety perception problems with the trail.
Costs with benefits for a half-time volunteer coordinator are an estimated$25,000 for salary/benefits
and$15,000 for overhead (vehicle,computer,supplies) annually.
Community Engagement&Volunteer Coordinator tasks include:
• Recruiting, screening,training and managing volunteers(individuals and groups)
• Developing outreach materials including brochures and presentations,and updating the
www.iacksoncounty.ore/bearcreekereenwav website and Facebook page
• Tabling at events,especially related to the Bear Creek Greenway-providing participants
information about the trail and about volunteering
• Hosting rides,walks,and other events on the trail
.5-FTE Community Engagement&Volunteer Coordinator. $40,000/year$200,000
17
Operations
Ordinance Revision
There are several elements of the Bear Creek Greenway Ordinance that have been identified as needing
clarification and/or updating. Jurisdiction staff should work together to discuss the following concerns
and make revisions to the ordinance as necessary. It should be noted that each jurisdiction will need to
go through their own individual process to update the ordinance and it is critical that the ordinance is
consistent along the entire trail.
(1) Motorized vehicles: the current ordinance prohibits use of any motorized vehicles and
doesn't give exception for motorized wheelchairs/mobility devices or electric-assist
bicycles, both of which should be allowed on the trail(and be subject to the speed limit
and other regulations). Consideration should be given to a permitting system to allow
event organizers and others to use motorized vehicles on the trail, including education
about proper driving on the trail.
(2) Trail closure at night: under the current ordinance,the trail closes between 10pm and
6am. Many of the signs say"sunrise to sunset,"and regardless, many commuters use
the trail outside of those hours. This may be something to revisit.
(3) Alcohol is currently prohibited within the Greenway with no permitting option,and is
often requested for special events.
(4) Consideration may be given to incorporate other trails/trail extensions under the
ordinance(i.e. Rogue River Greenway).
(5) Concessions: the current ordinance allows for concessions(fixed or mobile)and
advertising if specifically permitted by the Greenway Authority or other appropriate
local government authority. This doesn't necessarily need to be revisited but a system
to alert the other jurisdictions should be put into place.
Event Standards&Procedures
As more and more event organizers look to the Bear Creek Greenway to host events it is important to
implement a system where criteria and requirements are consistent and which incorporates all
impacted jurisdictions into the review. The event demands on the trail are also an opportunity to
recover some of the costs associated with events,there are significant impacts to the trail both from a
maintenance standpoint and to other trail users on the trail during events, as well as staff time
commitments to reviewing special event permits. Lastly, it is important to have a clearinghouse of
events to avoid double-booking and over scheduling the trail.
Jackson County,through the Community Engagement&Volunteer Coordinator and JPC Staff,will be the
clearinghouse of events and take in the applications for events on the Bear Creek Greenway. Event
organizers anticipating 50 or more participants or charging registration fees will fill out an application
and submit it to Jackson County Parks. Once the application is deemed complete,the County will notify
any impacted jurisdictions and give them at least a week to comment. The County will then respond to
the organizer with any additional criteria and issue the appropriate permit or agreement(based on
event size and impact to the trail).
18
It's important to note that jurisdictions with street or park impacts will still have separate permitting
processes and associated fees. Events on just one jurisdiction's section of trail may be processed
exclusively by that jurisdiction's staff, but County staff should be notified in order to put the event on
the BCG Event Calendar.
Fees to cover staff time for processing events will be incorporated based on the descriptions below. The
guidelines are recommended as a starting point, with staff having the discretion to apply the permit
criteria based on impacts to the trail and staff time needed. Note that any proposal for fees collected by
Jackson County will need to go through Board of Commissioner Review and any proceeds from the fees
would go towards the Bear Creek Greenway. Jurisdictions reviewing permits on their segments of trail
are encouraged to require similar permits including charging the appropriate fees.
• Small events:
o Less than 100 participants
o Less than 5 miles on the trail
o Permit is signed application
o $50 application fee
• Medium events:
o 100-300 participants
o Between 5-10 miles on the trail
o Permit is signed application or agreement(staff discretion based on impact)
o $100 application fee
• Large events:
o 300+ participants
o 10+miles on the trail
o Permit is signed agreement
o Fees minimum$250, maximum$500;$75 late fee
Applications must be submitted at least 30 days prior to the proposed event(60 days for large events)
and Jackson County will review applications within 15 business days. Applications will be accepted up to
one year in advance. Only one event should occur on any section of trail per day(multiple events can
take place, but they have to occur at different areas of the trail), and events will be considered
"reserved"when the permit or agreement is signed and fees have been paid. A master calendar will be
kept by Jackson County on the Greenway website.
See the attached Bear Creek Greenway Special Event Permit Application.
Bear Creek Greenway Concession Permits
As previously mentioned, permits can be used for various activities on the Bear Creek Greenway
including concessions, motor vehicle use,etc. Communication between jurisdictions is recommended
whenever a special permit is issued on the trail, and consideration may be given for developing a Bear
Creek Greenway-specific permit.
19
Funding
Total Expenditures
The total expenditures for all costs except routine maintenance andIPC staffing under this plan are
estimated$610,000. Staff anticipates a beginning fund balance of$110,000 which leaves approximately
$500,000,or$100,000 annually to fully fund the plan as proposed. This does not include the work
mentioned previously which is already funded for the 2016/2017 timeframe ($205,000 for fog seal,
shouldering,trail counters, RTP grant match, bridge inspections and repair,and the Vegetation
Management Plan). The beginning fund balance of$110,000 is accurate assuming the work is
completed by July 1, 2017.
Grant funds could be pursued and/or fundraising could occur through the new Community Outreach
Coordinator for several elements of the Management Plan,thus reducing the money needed to
implement the plan. Any unused portion after five years could be refunded to the jurisdictions or used
as a starting fund balance for the 2023 plan.
2017-2022 Expenditures
Major Maintenance $ 375,000.00
Facility Wide Improvements $ 15,000.00
Volunteer Coordinator $ 200,000.00
Contingency $ 20,000.00
Total $ 610,000.00
Beginning fund balance $ 110,000.00
Total Needed $ 500,000.00
Annual $ 100,000.00
Major Maintenance Contributions
The current JPA divides the responsibility for funding the$67,000 annual major maintenance
contribution using a formula based on lane miles of trail and population. Staff updated the lane miles
and population data,the following table shows contributions weighted 90%based on population and
10%based on lane miles of trail.
Total Annual
Bear Creek
Annual Major Annual BCG JPC Greenway Joint
%Trail Maintenance Fund Staffing Powers
Jurisdiction Miles %of Pop. Contribution Contribution Contribution
Ashland 10 10.60 $10,538 $ 3,120 $13,658
Talent 10 3.26 $3,931 $ 3,120 $7,051
Phoenix 7.5 2.38 $2,893 $ 3,120 $6,013
Medford 35 40.33 $39,797 $ 3,120 $42,917 1
Central Point 11.25 9.08 $9,298 $ 3,120 $12,418
Jackson County 26.25 34.35 $33,544 $ 50,400 $83,944
Total 100 100 $100,000 $ 66,000 $166,000
20
Management & Oversight
The Bear Creek Greenway Joint Powers Committee plays a critical role of oversight of the funds and
projects supported through the Joint Powers Agreement and this Management Plan. Historically,the
JPC has met approximately quarterly and has been comprised of a combination of jurisdiction staff and
elected officials. The JPC Bylaws were based on the JPA and were adopted shortly after JPC formation in
2008.
This new Management Plan is much more prescriptive and should reduce the need for regular meetings,
but it's important that the JPC stay engaged on the efforts. JPC Staff will coordinate an annual meeting
and provide an annual report, and the JPC will review and approve an annual work plan for the next
year. The JPC will also be convened as needed to make decisions about changing scope or budget of
projects and/or to review revisions to the projects or programs in this Management Plan. New
information and ideas should always be considered and changing direction from the Plan should be
considered when appropriate and prudent. Because sometimes decisions are needed to be made in a
timely fashion,email voting and conference calls should be an option for Joint Powers Committee
decisions and meetings.
In order to eliminate the need for JPC approval on already approved projects,JPC staff will move
forward with any work listed within this Management Plan scope as long as it is within 10%of the
budget. Any project that significantly changes in scope or budget will be brought back to the JPC before
proceeding.
Committee membership will include one voting member and one alternate from each jurisdiction-
ideally one staff member and one elected or appointed official (i.e. a Parks and Recreation
Commissioner or City Counselor). It's important that both elected officials and staff are engaged.
A Bear Creek Greenway Technical Working Group comprised of staff from each jurisdiction will meet
approximately bimonthly to discuss greenway management. JPC staff will coordinate the meetings
including scheduling time and location, building an agenda,and making sure notes are taken and sent
out.
Conclusion
This Management Plan will help provide a road map for continued joint management and maintenance
of the Bear Creek Greenway. The proposed plan will bring a new and greatly improved level of service
to greenway maintenance through projects that will improve the trail itself and also to greenway
management through the new Community Outreach&Volunteer Coordinator position. A survey
through SOU is underway as of November of 2016 and if at all possible a follow up survey should be
conducted in 3-4 years to measure success of the plan. Survey results and JPC input will be pertinent
information to frame the next Bear Creek Greenway Management Plan-2022-2027.
21