HomeMy WebLinkAboutTwin Creeks - Prelim Engineering InitiationCORP
Matt Samitore
Parks & Public Works Director
City of Central Point
140 South Third Street
Central Point, OR 97502
SUBJECT: TWIN CREEKS RAILROAD CROSSING PROJECT
PRELIMINARY ENGINEERING INITIATION: D0T#927297W Twin Creeks. M.P. 446.35
Dear Mr. Samitore:
This letter is in response to your request for Railroad involvement, with regards the proposed improvements located in, or
adjacent to, our rail corridor.
In order for CORP Engineering Services Department to provide a more timely response to requests from various customers
for improvements and construction projects in, adjacent to, or over the Railroad's right-of-way, we are now contracting our
engineering project engineering work to our outside consultant, Xorail.
This allows for greater customer focus while allowing the Railroad to maintain the high standards and consistency you have
come to expect on all of their affiliated properties. By utilizing the high caliber engineering skills offered by Xorail, it will
expedite the project engineering process and will allow us to better serve you, and all customers throughout the country.
Below is a detailed explanation of the phases, stages, and applicable costs for the proposed project. Also detailed are the
instructions for submittal of required information and fees, so that we can promptly address your request.
PHASE I — PRELIMINARY ENGINEERING,
A Preliminary Engineering deposit of 531,234.00 (USD) is requited to begin work on each project. This deposit covers
work to be completed in Phases I & IT. Stases 1 ti-11012h5-
Along
trou¢h 55.Along with the deposit, please complete the enclosed "APPLICATION FOR HIGHWAY CROSSING OR
CONSTRUCTION PROJECTS 0VERJUNDER OR ADJACENT TO PROPERTIES AND TRACKS" (Form GW -1), sign
and return the fee schedule acknowledgement, provide a detailed set of plans for the proposed work, and provide an original
letter or e-mail authorizing the Railroad to proceed with the Preliminary Engineering.
Please note, additional fees may apply if there is extensive coordination, plan modification or excessive delays on the
customer's part during the review process. You will be notified in advance if any additional costs are required in order to
proceed, and will be billed accordingly.
All correspondence and fee payments are to be addressed to the individual railroad stated below. The required
documentation stated below must be received before Phase I work can commence, and should be submitted as follows:
Submittal Instructions.
BOA OAOtiAL 00%@9XATI0K tEUM
ORlQk4L DOCUMEWAHM BEOOIRED; I PAYM0t7r TO;
(1) original Compieted and Sgnad Application Form (Fpm GW -1) A-KL,Z
(1) Signed fee Soled* adearwbdgement Attn: Mr. Juan Cabo Covarnblas
(1) Original Letts, or eines, audiodring the RR to preosed whh the Prelminery Engineering. Padfk Region—VP of Engineering
(1) Deteiad eel of plans far the proposed wok 33A 9LG iaree4 Me 300
(1) Original Signed Cho*$) for Fees Regdred (made P"08 b fie railroad).
CN, SW f,ChWkNw doWbeaba§da:'RaknMaeabbevmskg Prglsd'sah Sdem,OR 27301
CORP
E ID
Please mail the project payment to:
Wendle Bradley
Senior Accountant — G&W Pacific Region Railroads
3220 State St. Suite# 200
Salem, OR 97301
Please send the check with delivery confirmation and signature required at delivery.
Upon receiving the deposit, Phase I will progress as follows:
Preliminary Engineering
Stage Title I Description
Stage 1 I Project Initiation Roadway Agency requests proposed improvements. All fees/funds are secured
to proud with preliminary engineering (PE).
Stage 2 PreliminaryPerform PE Railroad Site Survey to collect all data/information to define project
g I
Engineering (PE)scope, prepare 5011. civil engineering package, prepare railroad circuit design,
and prepare preliminary cost estimates.
Stage 3 I PE Submittal Prepare PE Package (Configuration Plans, 100% Civil Engineering, Railroad
Circuit Design, and Cost Estimates) for submittal to Roadway Aqency.
Phase I is completed upon submittal of the preliminary engineering package to the customer and the project progresses to
Phase 11- Final Approval and Agreements (Stages 4 & 5). This Phase is detailed as follows.
PHASE R — FINAL APPROVAL AND AGREEMENTS,
This Phase involves final plan revisions and acceptance of all plans and estimates by your organization. Following this
acceptance, the crossing lease agreement, Construction and Maintenance agreement(s), and Right -of -Entry Agmement(s)
are prepared and submitted (as applicable) to you for signed execution.
Along with an executed copy of any agreements, prepayment of the estimated cost for the construction portion of the
project is required (if applicable). Finally, you must provide a Notice to Proceed (NTP) for the Construction portion of the
project All correspondence, checks, Purchase Orders, etc. are to be addressed to the Railroad using the address in the
submittal procedures detailed in Phase 1.
Final Approval and Agreements
Stage Title I Description
Stage 4 Agreement Preparation I Any necessary final revisions completed and PE Package approved by all
agencies. PE Package submitted to the Railroad Real Estate Department for
Lease, Construction, Maintenance, and Right of Entry agreements (as applicable)
for submittal/execution to the Roadway Agency.
Stage 5 I ConstructionI Initiating Agency approves Plans/Estimates for project scope, executes
Authorization Agreements, and provides "Notice to Proceed" in order for project construction
to commence.
CORP
Please Note, if there are utilities involved in the project, additional permitting may be required. Any new installation of
overhead or underground utilities associated with this roadway project will require individual utility lease agreements to be
filed with the Railroad. The Railroad contact for lease agreements pertaining to overhead or underground utilities will be as
follows:
Donna Killingsworth, MBA
Real Estate Manager
13901 Sutton Park Drive South, Suite 160
Jacksonville, FL 32224
Office: 904999-5365
Fax: 904-256-1428
E -Mail: donaa.killingsworth@gwrr.com
Upon receipt of all executed agreements, prepayment of construction fees (if applicable), and the NTP, the project can to
move onto Phase Ili.
PHASE III —FINAL ENGINEERING AND CONSTRUCTION.
During this final Phase, the project work agreed upon during the previous phase is undertaken. During this phase vendors
are selected to complete the work through a competitive bidding process providing the most economical and efficient cost
realization for the project. Coordination between the vendors, the Railroad, Xorail and the customer, is key during this
phase.
A more in-depth breakdown of each of the 5 stages which make up Phase III is detailed below.
Stage
Stage 6
Stage 7
Title
Secure Construction
Vendors
Construction
Commences
Stage 8
I Validation Acceptance
Stage 9
I Project Records
Stage 10
I Project Completion
Final Engineering and Construction
(Post Construction Authorization)
Description
Secure construction vendors for all required work efforts through competitive
bidding.
Railroad Design Team develops the following:
a. Material Requisition
b. Shop Wiring
c. Material Shipment
d. Field Installation Team Mobilization
e. One-Call/Dig tickets/Permits are all secured.
f. Construction Installation
g. Field Testing
h. In -Service Commissionint
Railroad and/or Roadway Agency perform Validation of Installation and
orovides formal acceotance.
Railroad provides Customer with Required Testing and Federal Railroad
Administration filing documentation, as well as the As -In -Service Railroad
Circuit Plans.
Project Documentation accepted, Final Invoicing Completed, and Project is
closed.
Ek,
CORP
Upon completion of Phase III the project is considered complete. On behalf of CORP, Xorail and all Vendors involved, we
thank you for allowing us to satisfy your project requirements and look forward to many more successful project
partnerships in the future.
Should you need to further discuss this matter or have any questions or comments, I can be reached at (530) 480.7789.
Sincerely,
juan Carlos Covarrubias
Pacific Region — VP of Engineering
Enclosures: Form GW -1(09052012)
.�:V
......................................................................................................................................
ROADWAY AUTHORITY FEE SCHEDULE ACKNOWLEDGEMENT AND ACCEPTANCE
Roadway agency acknowledges and accepts all fees and requirements outlined in this letter.
Roadway Authority Agency Name:
Address 1:
Address 2:
City/State/Zip:
Authorized Representative Name:
Date Accepted:
1N'o �oc-Y1� �YL $�cre�
GQn-t'r",\ Pb;nt OR 97-5-t2
�a�1' �.m•toYe
please return this original signed acknowledgement with all applicable fees and documentation as
instructed above.