Loading...
HomeMy WebLinkAboutKnife River 2016 Road Rehabilitation ProjectCONTRACT FOR CONSTRUCTION This contract, made and entered into this Of day of August 2016, by and between the CITY OF CENTRAL POINT, OREGON, hereinafter called the "OWNER", and LTM, Inc. dba Knife River Materials , hereinafter called the "CONTRACTOR". WITNESSETH; Said Contractor, in consideration of the sum and/or unit prices to be paid to him/her by the Owner, and of the covenants and agreements herein contained, hereby agrees, at his own proper cost and expense, to do all work and furnish all materials, supplies, supervision, labor, tools, equipment, transportation and incidentals, and shall pay all applicable taxes and fees necessary for the completion of the construction of the 2016 Roadwav Rehabilitation Proiect in the City of Central Point, Oregon, for said Owner, to the extent of theoposal, with unit prices filled in made and submitted by the Contractor on the !' R day of P, 2016 all in full compliance with CONTRACT DOCUMENTS, which includes: The Performance Bond and the applicable portions of the City's Public Works Standard Specifications and Details, included herewith, and in accordance with the Plans prepared by RH2 for the City of Central Point, Public Works Department, dated Summer 2016. entitled: 2016 Roadwav Rehabilitation Proiect which Plans and aforementioned Contract Documents are hereby referred to, and by reference made a part of this CONTRACT FOR CONSTRUCTION as fully and completely as if the same were fully set forth herein, and are mutually cooperative herewith. In consideration of the faithful performance of the work herein set forth, and in accordance with the directions of the Engineer, and to his satisfaction as provided herein, the Owner agrees to pay to the Contractor the amounts bid in the Proposal, $187.781.00, adjusted in accordance with the General Conditions, and to make such payments in the manner and at the times provided for in the General Conditions. The Contractor agrees to complete the work within the time limits as specified herein and to accept as full payment the amounts set forth in the Proposal and computed in accordance with the Contract Documents. It is agreed that the Contractor shall complete the work in all respects by 45 days after the notice to proceed. In the event the Contractor shall fail to complete the work within the time limits or the extended time limits agreed upon, liquidated damages shall be paid to the Owner in the amount of $500.00 per day until the work is completed as set forth in the Contract Documents and to the satisfaction of the Engineer. Sundays and legal holidays will be excluded when determining days in default. The Contractor agrees to hold harmless the City from, and to repair and replace (as directed by the City's Public Works Director) any and all defects and deficiencies which develop in workmanship and/or materials for a period of one (1) year or as stated in the special specifications after the date of the written notice from the Engineer of the final acceptance of the project by the City. IN WITNESS THEREOF, we, the parties hereto, each subscribes the same this OfK A'Qmi OWNER: City of Central Point #g By: l Ce Title: 12016. CONTRACTOR: LTM, Inc. dba Knife River Materials. (company Name) By: M- fil M49L Title: Construction Onerations Manager