HomeMy WebLinkAboutPlanning Commission Packet - July 1, 2003CITY OF CENTRAL POINT
PLANNING COMMISSION AGENDA
July 1, 2003 - 7:00 p.m.
Q ~? `v~
Next Planning Conunission
Resolution No 577
I. MEETING CALLED TO ORDER
II. ROLL CALL
Chuck Pitand -Candy Fish, Don Poster, Paul Lunte, Connie Moczygemba, Rick Perry
and Wayne Riggs
III. CORRESPONDENCE
IV. MINUTES
A. Review and approval of June 3, 2003, Planning Commission Minutes
VI. PUBLIC APPEARANCES
VI. BUSINESS
~%~~\
~~~~ A. Public Meeting to review a site plan application that would allow the construction of
1L ~ a commercial garage on Map 37 2W 11BC, Tax Lot 4100. The applicant has
requested a continuation of the site plan review for Below Wholesale Auto.
.~ . ~~. Public hearing to consider a tentative plan fora 10 lot subdivision lurown as the Jackson
~~
~~- Oaks Subdivision located east of Hanley Road near its intersection with Diego Courtin
~ ~~ the R-I-8, Residential Single Family zoning district on Map 37 2W lOCA, Tax 5900
C. Public hearing to consider a tentative plan fora 21 lot subdivision named Jackson Oaks,
Phase IV located north of Taylor Road east of Grant Road in the TOD-LMK, Low Mix
Residential zoning district on Map 37 2W 03C, Tax Lots 100, 101, 102 and 201.
D. Public hearing to consider a tentative plan fora 41ot subdivision known as Pine West
Subdivision located north of Pine Street near Vincent Avenue in the R-1-8, Residential
Single Family zoning district on Map 37 2W lOBD, Tax Lot 1100.
VII. MISCELLANEOUS
~~~I~~~zvs~ ~-~~~°~ ~~1,<<o~~~ic~'t~~~t~~~~ .. ~ri2~i~~f~~G(.'--
e~n~n~2nns
VIII. ADJOURNMrNT
rcmo i znoa
City of Centl•al Point
Planning Commission Minutes
June 3, 2003
I. MEETING CALLED TO ORDER AT 7:00 P.M.
II. ROLL CALL:
Chairman Chuck Piland, Rick Peny, Candy Fish, Connie Moczygemba, Paul Lunte, Don Poster
and Wayne Riggs were present.
Also in attendance were Tom humphrey, Planning Director; Ken Uerschler, Community
Plarmer; Matt Samitore, Community Plamrer; Chris Clayton, Senior Public Works Technician;
and Dave Arkens, Planning Technician.
III. CORRESPONDENCE
There was correspondence relating to Item C.
IV. MINUTES
Commissioner Lunte made a motion to approve the minutes from the May 6, 2003 meeting.
Commissioner Poster seconded the motion. ROLL CALL: Peny; yes, Fish, yes; Moczygemba,
yes; Lunte, yes; Foster, yes; and Riggs, yes. Motion passed.
V. PUBLIC APPEARANCES
Margaret Jacobson, Jackson County Library, and'fom Humphrey, Planning Director, presented
the Commission with a brief overview of the proposed library and city hall expansion. Ms. Jacobson
explained the process and who is involved in the steering committee. Mr. Htmtphrey explained the
arrangement with Jackson County and added that the plan to have the building close to Oak and 3~"
Streets will fit in with our downtown plan. The expanded City Hall area will be upstairs and could be
leased initially. The council chambers will be constructed as a separate building.
1 /annrng Connnission iLfi~u~les
./une 3, 2003
Page 1
VI. BUSINESS
A. Public hearing to review a site plan application thatwould allow the construction
of a commercial garage. The subject parcel is identified on Map 37 2VV 11BC,
Tax Lot 4100, Applicant has requested a emrtinuation of the site plan review.
Matt Samitore, Community Planner, asked the Commission members for a continuation of this item.
The applicant was unable to produce the necessary drawings for the application.
Commissioner Fish made a motion to continue this application to a later date. Commissioner
Riggs seconded the motion. ROLL CALL: Motion passed unanimously.
B. Public hearing to review a site plan application that would allow the construction
of a Drive Through Coffee Stand at 536 East Pine Street. The subject parcel
is in a TOD-EC, Employment Commercial Zoning district and is identified on
Map 37 2W02CC, Tax Lot 6700.
There were no conflicts of interest, or ex-parte communications.
Matt Samitore presented the Planning Department Staff report. He explained that the current Human
Bean business on North 15C Street is doing very well and the applicant would like to build a second store
at the newly remodeled Cash Connection site at 536 East Piue Street Most of the'fOD standards have
already been met due to the Cash Connection remodel. Drive-Through businesses are a permitted use
in the 'I'OD-EC zone and the building design meets the TOD design standards. The current sign pole
at the corner will also be used for the Human Bean sign which cannot be internally illuminated.
Employee acid customer parking requirements have been met and additional parking spaces can be fomrd
on the street and at an office building parking lot behind the cun•ent Cash Connection building.
The Public Works staff report requires that parking bumpers be placed on the parking spaces to the
west of the Drive Through building and that an alley apron to South 6°i Street be constructed to city
standards. Traffic direction of the alley will be worked out with the owner at a later daft.
Tom Casey, the applicant, stated that because of the size of the building some of the parking spaces
behind the cash connection are not needed. Conunissioner Fish said that it would be more convenient
to access those parking spaces from the east instead of the west. Mr. Samitore recommended that the
bumpers be used and that access to the parking spaces be from the west. Commissioner Perry
suggested that the two south parking spaces on the east side of the Cash Connection building be
removed to allow better access for the drive through coffee business.
Plnnnixg Convni.rsron rtliwules
Jurte 3, 2003
Page J
built on the lots at this time and there are other house plans ready to review. "fhe landscaping plans
were turned in to the city but were unable to be located before the meeting. We are encouraging more
developments like this in Central Point because it is good use of the land. The applicants eliminated one
of the lots, reducing the total number from 12 to 11, and creating more parking and open area. Rire
District #3 has approved all driveways within the development. The City attorney has reconnnended that
the road maintenance agreement be modified.
Commissioner Fish made a motion to strike the 3r`' sentence of #1 of the Private Road
Maintenance and Access Agreement and adopt Resolution #574 approving the final
development plan, based on findings of fact and conclusion of law contained in the record and
subject to the recommended conditions of approval as set forth in Resolution .557 and this staff
report. Commissioner Riggs seconded the motion. ROLL CALL: The motion pass unanimously.
E. Public meeting to review the final development plan for the Cascade Meadows
Planned Unit Development. The project is located near the intersection of Seall Lane
and Chicory Lane in a TOD-LMR, Low Mix Residential zoning district on Map 37
2W11C, Tax Lot 9500.
'There were no conflicts of interest, or ex-parte conununications.
Tom Humphrey, Planning Director, presented the Platming Department Staff report. Cascade Meadows
will be developed in two phases. The first phase does not include Chicory Lane. Some miscalculations
were made during the tentative stage which resulted in the park area being reduced in size and some
other land use changes being made. 'there will be a commercial building at the corner of Haskell Street
and Beall Lane and a mini storage facility at the southeast corner of the development. Lots 67 & 66
will be a pocket park and a pedestrian path will be built from west to east that leads to the main park
area. The park land will be gifted to the city by the developer. The development of the park is
scheduled for the next budget cycle and will be paid for using park SDCs.
The planning staff will keep track of the specific types of guage styles to make sure that the conditions
of approval are satisfied. Home owners will be responsible for the up-keep of the landscape row which
parallels their property line. "hhere will be no significant change to the commercial properties except that
no cell tower will be located in the development at this time.
Commissioner Riggs asked Craig Stone of Capital Development 2002, LLC, the applicant, what the
square footage of the townhouses will be. Mr. Stone approximated 1200 square feet per unit.
Commissioner Riggs made a motion to adopt Resolution #575 approving the Cascade Meadows
Planning Conanission Aliaales
Jaire 3, 2003
Page 5
Phase 1 final development plan, based on findings of fact and conclusions of law contained in
the record and subject to the recommended conditions of approval as set forth in Resolution
539 and this staff report. Commissioner Perry seconded the motion. ROLL CALL: The motion pass
unanimously.
VII. MISCELLANEOUS
A. Cedar Park Subdivision modification.
Matt Samitore stated that the applicant of the tentatively approved Cedar Park Subdivision would like
to reduce the number of lots from 32 to 28 for the placement of some duplex waits. This change does
not reduce the density of the subdivision.
Commissioner Riggs made a motion to adopt Resolution 576 revising Resolution 566 reducing
the number of lots from 32 to 28 in the Cedar Park Subdivision. Commissioner Fish seconded
the motion. ROLL CALL: The motion pass unanimously.
B. Tom Humphrey stated that the planning department would like to proceed with an
expedited land partition for the Masonic Lodge property north of the cemetery
property. The dedication of a public orad will create one more tax lot than was originally
approved.
All Commissioners agreed to allow staff to notice the expedited land partition and process it
administratively.
Commissioner Pish asked Mr. Humphrey about the alley vacations near Haskell and Ash Streets. IIe
said that the vacation process has been started for the proposed Snowy Butte Station development.
Mr. Humphrey commented about the following:
- The city council asked staff to develop
Snowy Butte Lane.
street improvement plans and a cost estimate for
- We have received CMAQ grant money to be used for North 9°i Street improvements.
- "There was a ribbon cutting for the grand opening at the Cash Connection Saturday, May 31.
- The old Brown's hardware building has been purchased by Tommy Malot. IIe plans on
remodeling and using the top floor for residential purposes.
P(arening Cnnvxissroaa A1in~atcas
Jame 3, 1003
Page
- The city council approved the RPS areas recommended to them by the Citizens Advisory
Committee and the Planning Commission.
-The Planning Department is working towards revising our C-4 zoning district code to better
define a community shopping center.
VIII. ADJOURNMIiNT
Commissioner Fish made a motion to adjourn the meeting. Commissioner Lunte seconded the
motion. ROLL CALL: Motion passed unanimously. Meeting was adjourned at 9:15 P.M.
PLANNING DEPARTMENT MF,MORANDUM
HEARING DATE: July 1, 2003
TO: Central Point Planning Commission
FROM: Matt Samitore, Community Planner
SUBJECT: Public Hearing- Site Plan Review for 37 2W 11BC, Tax Lot 4100 -
Commercial Garage
Applicant Scott Narramore
431 South Front Street
Central Point, Oregon 97502
Agent David Kenyon
557 Eastwood Drive
Medford, OR 97504
Pro er Same as Applicant
Owner
Pro er
Description/ 37 2W 11 BC, Tax Lot 4100 - 0.12 acres total.
Zoning: C-5, Commercial Thoroughfare, with a TOD GC Corridor Overlay
Summary:
The applicant is withdrawing their site plan review application. No commission action is necessary.
Discussion:
This item was continued from Maybecause ofissues with vehicular access from Highway 99 and Cedar
Streets. The applicant was never able to work out an agreement with the City and with the Oregon
Department ofTransportation. The applicants have decided to withdraw their application and will work
on a site plan for the future that will meet everyone's goals.
Attachments:
A. Letter of withdrawal dated June 25, 2003.
1
~1~.a~c~xcx~ A
June 25, 2003
City of Central Point
155 South Second Street
Central Point, OR 97502
To: City Planning Department
We the owners of the Below Whole Sale Auto Dealership agree to withdraw our application from
consideration for a Site Plan Review. We will reapply for a new Site Plan Review if we decide to
proceed with a new building.
Sincerely,
Scott Nanamore
Owner, Below Whole Sale Auto
431 S. Front Street
Central Point, OR 97502
David Kenyon
Agent for the Applicant
557 Eastwood Drive
Medford, OR 97504
2
craftsman feel to them and some of the homes will feature recessed or detached garages. Lot 10 will
be dedicated to the City as either park land or open space. The applicants are planning on retaining the
existing home on the property.
All of the lots within Jackson Woods Subdivision are within the 100-year flood plain of Jackson Creek.
This creek is currently having a flood study done for it and the results of that information will be
available in the upcoming months. The new flood plain analysis will need to be part of the engineering
plans for the subdivision. All homes must be built to the minimum standards for homes in the Special
Flood Hazard Area. The homes will be on the same elevations as the homes in Rosewood Estates.
Engineering fill is allowed inside the flood plains, but will need to be designed to ensure that the 100-
year flood plain is not altered. All structures must be setback 25' from the top of the bank in order to
comply with the Cities Special Setback Ordinance.
The Planning Department has reviewed the tentative plan for compliance with the City's Zoning code
and Comprehensive Plan. The area is designated for low density residential development and has a
zoning of R-1-8, which is an 8,000 square foot residential lot minimum. The 10 lots that comprise
Jackson Woods Addition range in size from 7,350 to 13,073 square feet. The applicants have been
informed that the minimum lot size is 8,000 square feet. Lot lines will need to be adjusted prior to
issuance of a final plat application to ensure all lots have a minimum of 8,000 square feet. The lot
coverage for Jackson Woods Addition will be a maximum of 40% of the lot area. This is the standard
subdivision requirement and is actually less dense then the neighboring homes in Rosewood Estates.
The Public Works Department has provided their comments, recommendations and requirements for
this application (Attachment E). The applicants have dedicated ten feet (10') ofRight-of--Way along
Hanley Road for future expansion. The applicants plan on putting in all of the improvements along
Hanley Road including, curb, gutter, and sidewalk. The applicants are also electing to use the a/
decorative street lighting instead of the standard cobra head lights.
Jackson County Roads and Parks, Jackson County Surveyor, and Bear Creek Valley Sanitary
Authority were notified of this application, but have not submitted any comments or recommendations.
Findings of Fact and Conclusions of La~v
Staff suggests the following findings of fact and conclusions of law as applicable to the project and
necessary for its approval.
1. The project site is located in the R-1-8, Residential Single-Family Zoning District and
increases residential land use efficiency in this area.
The proposed tentative plan for single family residential development is a permitted use in the R-1-8
zoning district. The zoning in turn is consistent with the Low Density Residential Comprehensive Plan
map designation. The Comprehensive Plan encourages innovative residential planning and development
techniques that would help to increase land use efficiency and reduce the cost of utilities and services
4
(Comprehensive Plan, Page XII-12).
2. The project consists of a tentative plan application for the subdivision of approximately
2.42 acres for the purpose of developing asingle-family residential subdivision,
Jackson Woods Addition. The total number of lots proposed for the subdivision is 10,
one of which is a park site.
The proposed single-family subdivision meets the density requirement for the R-1-8 residential zone
which is a maximum of 4.5 units per acre. Eight of the lots within the subdivision meet the requirement
of the City's subdivision and zoning codes for residential lots as well as the specific requirement of the
R-1-8 zone. The other two lots must be adjusted in order to meet the standards of the R-1-8 zone.
The tentative plan includes all information required by CPMC 16.10.010 et seq.
3. The Planning and Public Works Departments have reviewed both the tentative plan for
the proposed subdivision and the findings of fact and determined that the project meets
all City standards and requirement subject to the recommended conditions found in
Attachments E and F.
Recommendation:
Staff recommends that eh Planning Commission take the following action:
1. Adopt Resolution No., approving the tentative subdivision subject to the recommended
conditions of approval (Attachment E and F); or
2. Deny the tentative subdivision; or
3. Continue the review of the tentative subdivision at the discretion of the Commission.
Attachments:
A. Reduced Copy of Tentative Plan
B. Notice of Public Hearing
C. Original Rosewood Estates Subdivision (1997)
D. 2000 Rosewood Estates PUD Plan
E. Public Works Staff Report
F. Planning Department Conditions of Approval
5
'e~
4W.1i0 ~ I
_ ~~~~ ~~
uwlp
~'rwu I i
___ ---~ 1
pIEGO COURT
1
~.^.a.»--Ti 1
~~.~ ~
WNa u~~')t I 1
if 41
7
'I 1
SANITARY SEWE 1 1
Ip'
~f I
~Q
(Ip 1
1 IK j
iar vee I I ff
u°nwapOO~ i
l~ 1
1
Ilal
li
I
v~ ~
Y f ' ~ I
Iaw wo ~ pm~l
v c'am'p++~
TENTATIVE PLAN
"JACKSON WOODS ADDITION"
LOCATED IN:
THCITY pp CENTRAL PDINT. )JACKSON COUN'fYµ
OREGON. TAX LOT 5900 (37 2W TOGA)
App 1 ANT'
SAIIY J., llC
28 gU1NCY STREET
(Sli) 825 ~0770N 97501
]flu+~•
SAL ESQUIYAL
1097 NEDFORO CENTER
(541) 608 ~6363N 97504
DIDJrwct ND. s
,~ATIW o1DTMGS ~ _~ pGVaA
DMIITATICN DIDTRiDt ~ -- ~~, pp1T
yfptR'R DIDJPoGT ~ --- 24R AL1LLD
T~ i ~--^~' FEDIDOffIAL
R~lDgUDD ~ ~- E@OIDRN7IAL
HOffBUHR A A55001ATE5, IriC.
3755 AU~IEOA STR£ 341)1779 064 MEDFORD. OREGON
P4S No, 1913
8Y: DOUGU5 C• 60 Hd N DATE: fAaY 7. 2003
SGLE: t Inch - f0.E0 SURVEY N0. 55677
BASIS OF BEARING:
G = RROROSED GARAGE
N PROPOSED HOUSE
D•
~.~~~,"~' ,4
r
~._~r
ABM
(NOT(NOT T~)
RENEWS i3J31{Oi
a
ST 1W IOCA i.L 3900
C1 ~ y o f Cen tra 1 Poln t
PLANNING D~PARTML`NT
Tom Ilumphrey, ~11CP
Planning Director
Ken Gerschler
Community Planner
Matt. Samitore
Community Planner
Dave Arkens
Planning 't'echnician
Notice of Public Meeting
Date of Notice: June 10, 2003
Meeting Date:
Time:
Place:
NATURE OF MEETING
July 1, 2003
7:00 p.m. (Approximate)
Central Point City Hall
155 South Second Street
Central Point, Oregon
Beginning at the above time and place, the Central Point Planning Commission will review an
application for a ten lot tentative subdivision. The subject parcel is in an R-1-8, Residential Single
Family zoning district and is identified in the records of the Jackson County Assessor as Map 37 2W
l OCA, Tax Lot 5900.
The Central Point Planning Commission will review the site plan application to determine if all of
the requirements ofthe Central Point Municipal Code can be met. If the Commission determines that
the application meets the City's standards, an approval could be issued .
CRITERIA FOR DECISION
The requirements for site plans are set forth in Chapter 17 of the Central Point Municipal Code,
relating to General Information and conditions on the project approval.
PUBLIC COMMENTS
Any person interested in commenting on the above-mentioned land use decision may submit
written comments up until the close of the meeting scheduled for Tuesday, July 1, 2003.
2. Written comments may be sent in advance of the meeting to Central Point City Hall, I55
South Second Street, Central Point, OR 97502.
] 55 South Second Street ~ Central Point, OR 97502 ~ (541) 664-3321 ~ Fax: (541) 664-6384
Issues which may provide the basis for an appeal on the matters shall be raised prior to the
expiration ofthe comment period noted above. Any testimony and written comments about
the decisions described above will need to be related to the proposal and should be stated
clearly to the Planning Commission.
4. Copies of all evidence relied upon by the applicant are available for public review at City
Hall, 155 South Second Street, Central Point, Oregon. Copies of the same are available at
15 cents per page.
For additional inforniation, the public may contact the Planning Department at (541) 664-
3321 ext. 292.
SUMMARY OF PROCEDURE
At the meeting, the Planning Commission will review the applications, technical staff reports, hear
testimony from the applicant, proponents, opponents, and hear arguments on the application. Any
testimony or written comments must be related to the criteria set forth above. At the conclusion of
the review the Planning Commission may approve or deny the site plan application as submitted.
City regulations provide that the Central Point City Council be informed about all Planning
Commission decisions.
}-
v
0
G
iP
Q
f-
Z
W
U
Z
CREEKSIDE
8
155 South Second Street ~ Central Point, OR 97502 ~ (541) 664-3321 • Fax: (541) 664-6384
,~~
~o
LOT t LOT 6
aon >q. +t. LOT 4 LOT 5 8035 aq. tt.
LOT 3 8001 sq. tt. 8000 aq. It.
\ BOt 1 sq /t. '
~~ A-_ \\
~G ~~ LOT 2 `~ ~
(~~ 8288 sq Il. \ ~~\
~~~~a~ d~~~R~_
O o ~ LOT for POOL ~
s ~ '" asas. sq. It./
R °
LOT 13 . i
LOT 17 s3os sq, tt. /; / ~
8767 aq, tt. ~ / ~~
/ LOT t 1 ~~ / /
ga76 sq. fl. LOT t S
~ ~ / / to4S7 aq. tc.
LOT 10 i `" ~. ~
8581 aq +t r
~~
~ i
t
~ /
-... _
1 ~/' __ ~~
~ _ i
{~ r / /
~~ ~ LOT 20
/ 20510 sq, ft.
.~
LOT 19
to327 sq. +t.
LOT 7 LOT 9 ~
t t 98 LOT 8 ~
t383t sq. ++ /
8305 `aq. it.
J
~~~
- ~°~,
-- .~
i ~
LOT 16
LOT 17 t7~4o sq. « ~~
963 sq. ti.
Houston Court
LOT t5
10494 >q. 1t.
LOT i 4
t 0303 >q. ri.
~~®~
c0
~~w~ ~~~s
_____ .
Original Plan Phase 2 (1997)
Y :W ~.
~~" / / al:. _..... ..
\~8 r / L
0\?A':
ryvY m
1 55>B' /
n ;
/ 18'19.2t' `~ '~ ~'
-"
.. S o .. ~4_..._
~ ~ ~ ~ ~ ~
I TI.O\~ / .. ~ VQ1\ 9' .. 6.52
y
~.
_... _.
/ I Oi R'. '.. \. SAO' ~~ .. ~ 9~ S e
C
m .
_.,._.>
.-
^" r
'.
•y N t ~ i .. ~~ ea r f ~ NIIL/ieHFlll
. ~= e ~ ''. ~~..
:='~'°%'" ,..r° .' Ss 1 w coon '" ~' o` ' _.
~~ ^ ~~
0
m _
~.
/ .~"k"„ \ _ __-_ ___ro. w*et>u 'ukte Stre ... _~
_. _
_ _
/°4~m^ry i ~o° ..: ___.zs\. R p'S g B SJ~D " co,cv____ `~~.. ~~ "A,
_
/ _ --_
\
_. ..
_ "'_" _
~ )~i / mot.. ...: ". \ 44 1 0.0°:____ ..
_.
_....
1H
I °. ~
C
_-
h~~.
.._-
I_
"tY1 \~ `
s~ _
,l lb
.__.", y J.._
k'
?`
r ... l
o ~ eo 17 __ .. _. __ _ ___
__ .°
`Y___..... ~._ _
/ • ;I ~~ p _
__
- _ -
_ pUC ~ _, ~""°
5 C i :. ....ByH. .. I0. NM.F _
i _
/tAtK 649' ~"/ ~~_ _ _ \M'p0•
_..
S _
avrr ~ ~f~' S1.C1-~" Oi o ~~Nf ./ _ _' _ I ~pa~' 3°''""._..._~- A p _-----' ~--~- _ -~ ` ~~~--~`~
' _ LCJ53 --'
'-'-':1'" s"' I ,
/ `_ _
a
_. ----
~ .. --_ - .
----- lC~~,lp11
A ~~- ~
g~~D p
20~~ hose Z
oo~-~'
o -~~~e-w
~~
Q
as "~m
ae
u.nej.xte_»~o
d>.. ~--_
__--
A RANNGD GOMNIN4'K ~ ~` ~
o.
T ~5 .:.>b.,..
~
i~./~r 'OO+~
l~~
'2° JVyfRy PlpPtMfKf:Ax,xe.~oc ua°°'
T~rt~;~
o ,~,~,u~,~,~
r.bn~~le zo
~, ru.vJ
~(.(U ..,.. ~_,_„
toNxlFn~ i n»Y
1004
4Fh 14vtNO~ OetpWr 12. ~~ 1 ZOOa
NvU~On Nev.mb
TpfAL uMf'S: tOew'~"im~tM"~`1
Dt+x
ON
1V
_MS
YAW
d ~
/oF ,,--., ,~ .
_, --
.~ ,
\~2O t,, ~ . .~`00~
~ .
June 25, 2003
TO:
FROM:
SUBJECT:
,Cit of Central Point __
Public Works De>7artment
Planning Commission
Public Works Department
Public Hearing -Site Plan Review for 37 2W lOCA, Tax Lots 5900
Jackson Woods Addition
Applicant Sally J., LLC
28 Qunice Street
Medford, Oregon 97501
Owner Sal Esquival
1091 Medford Center
Medford, Oregon 97504
Agent Hoffbuhr & Associates, Inc.
3155 Alameda Street, Suite 201
Medford, Oregon 97501
Property 37 2W lOCA Tax Lots 5900
Description/
Zoning
Purpose
Roherl Pierce
Puhlrc Works Du'ertm'
Rirk /3nr(lett
Supen'i.cw'
CGrir Cln)7nn
Sr. Teclwicim,
Mike Ono
!eclwiciaq
Greg Grays
rechnicinn
Km'en Rocber
saer~~m,~ !i
Lisn Alorgnn
.S'ecrem,7~ 1
Provide information to the Planning Commission and Applicant (hereinafter referred to as
"Developer") regarding City Public Works Department (PWD) standards, requirements, and
conditions to be included in the design and development of the proposed. Gather information
from the Developer/Engineer regarding the proposed development.
A City of Central Point Public Works Department Staff Report is not intended to
replace the City's Standards & Specifications. Staff Reports are written in
coordination with the City's Standards & Specifications to form a useful guide. The
City's Standards & Specifications should be consulted for any information not
contained in a Public Works Staff Report.
. ~. 12
25 June 2003
JACKSON WOODS ADDITION
Jackson Oaks, Phase IV
Standard Specificatimzs and Goals
The Central Point Public Works Department is charged with managcnment of the City's
infi•astructure, including streets, wateitivorks, and storm water drainage facilities. In general, the
Department's "Standard Specifications and Uniform Standard Details for Public Works
Construction" shall govenm how public facilities are to be constructed. The Developer is
encouraged to obtain the latest version of these specifications from the Public Works
Department.
Central Point Public Works is committed to working with the Planning Department acid
developers to assure that all developments are adequately served by public facilities. Public
facilities not owned or maintained by the City of Central Point include: Power (PP&L), Gas
(Avista), Communications (Qwest), and Sanitary Sewer (BCVSA). In working together it is the
Department's expectation that the developer will feel free to call on the Department whenever
the standard specifications are not, in the developer's opinion, adequately meeting the needs of
the development. The Department will listen to the developer's concerns and work with the
developer to achieve the best outcome. However, the Department is not obligated to assure a
profitable development and will not sacrifice quality for the sole purpose of reducing cost to the
developer. It is always the developer's obligation to provide the public improvements necessary,
as determined by the Public Works Department, to serve the development. The Department and
the developer also have an obligation to assure that public facilities ai-e constructed so that other
properties are not adversely impacted by the development.
Developmezzt Plans -Required Information
Review of public improvement plans is initiated by the submittal of 3 sets of plans that are at
least 95% complete. The plans shall include tlmose of other agencies such as BCVSA or Jackson
County Roads Department. Following plan review, the plans will be returned to the Developer's
engineer including comments from Public Works Staff. In order to be entitled to further review,
the Applicant's Engineer must respond to each comment of the prior review. All submittals and
responses to comments must appear throughout the plans to be a realistic attempt to result in
conmplete plan approval. Upon approval, the Applicant's Engineer shall submit (4) copies of the
plans to the Department of Public Works.
In general, the plan submittal shall include plan and profile for streets, water, stone drainage and
sanitary sewers, stone drainage calculations, storm drainage basin map, erosion control plan,
utility and outside agency notifications and approvals. The plan may also include applicable
traffic studies, legal descriptions and a traffic control plan.
Public Works Permit
A Public Works Permit will only be issued after the Department Director approves the final
construction drawings. After approval, the fees associated with the development will be
13
25 June 2003
JACKSON WOODS ADDI"LION
calculated and attached to the public works permit. All fees are required to be paid in full at the
time the Public Works Permit is issued, except Public Works htspection fees. After project
completion during the final plat application process, the Public Works Inspector will calculate
the appropriate amowrt of inspection time to assess the developer. Before the final plat
application is processed the developer must pay the relevant inspections fees and bond for any
uncompleted improvements (as determined by the Public Works Director).
Jackson: Oaks, Please IV -Plana
1. Three sets of plans at 95% complete stage are to be submitted for review by the Public
Works Department
2. Once approval is achieved the Developer shall submit four sets of plans to the Public
Works Department for construction records and inspection, including a set of mylar
drawings to be stamped, approved, and maintained by the City until final "As-built"
drawing are received.
3. The Developer's Engineer shall document changes to the approved drawings made in the
field. A mylar and digital copy of the final "as-built" drawings will be required before the
final plat application is processed.
Jacksozz Woods Addition -Protection of Existing Facilities
The locations of existing facilities shall be shown on all applicable construction drawings for
Public Works projects as follows:
The exact locations of underground facilities shall be verified in advance of any public
works construction, in cooperation with the public or private utilities involved.
2. All existing underground and surface facilities shall be protected from damage during
design and construction of public works projects.
3. Any existing facilities not specifically designated for alteration or removals, which are
damaged during construction, shall be restored or replaced to a "same as" or better than
condition, at the expense of the Developer.
4. Suitable notice shall be given to all public and private utility companies in advance of
construction for the purpose of protecting or relocating existing facilities.
Jackson Woods Addition -Water Connection
Water system designs shall consider the existing water system, master plans;
neighborhood plans and approved tentative plans. The Developer, Engineer and
Contractor shall provide the necessary testing, exploration, survey and research to
adequately design water system facilities, which will connect to acid be a part of or azi
~. 14
25 Junc 2003
JACKSON WOODS ADDITION
extension of the City water system.
2. All requirements of the Oregon State Plumbing Specialty Code and the Oregon State
Health Department, as they pertain to Public Water Systems, shall be strictly adhered to.
The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of water system related
components.
Jackson Woods Addition -Streets
1. The Developer's engineer should be aware that certain alternate street standards for the
Transit Oriented District and Transit Oriented Corridor might apply to the design and
construction of streets in specific areas of the City. These alternate standards are fully
described in the Central Point TOD Design Requirements and Guidelines.
Street designs shall consider the needs of people with disabilities and the aged, such as
visually impaired pedestrians and mobility-impaired pedestrians. Every effort should be
made to locate street hardware away from pedestrian locations and provide a surface free
of bumps and cracks, which create safety and mobility problems. Smooth access ramps
shall be provided where required. All designs shall conform to the current American
Disabilities Act (ADA) or as adopted by the Oregon Department of Transportation
(ODOT), Oregon Bicycle and Pedestrian Plan.
The determination of the pavement width and total right-of--way shall be based on the
operational needs For each street as determined by a technical analysis. The technical
analysis shall use demand volumes that reflect the maximum number of pedestrians,
bicyclists, parked vehicles and motorized vehicle traffic expected when the area using the
street is fully developed. Technical analysis shall take into consideration, transportation
elements of the Comprehensive Plan, TOD, neighborhood plans, approved tentative plans
as well as existing commercial and residential developments. All street designs shall be
coordinated with the design of other new or existing infrastnicture.
2. It is the understand of the Public Works Department that all access drives in Jackson
Woods Addition will be constructed to City of Central Point private street standards,
which include the following street layout:
A. (1) 18-foot paved travel lane
B. (2) 1.5-foot rolled curb & gutter
C. Street section as described by the City of Central Point Standards &
Specifications.
3. The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of street related
15
25 June 2003
JACKSON WOODS ADDITION
components.
Jackson Woods Addition - Storzs: Drain
It shall be the responsibility of the Developer's Engineer to investigate the drainage area
of the project, including the drainage u~eas of the channels or storm sewers entering and
leaving the project area. If a contiguous annexed drainage area of given size exists, the
engineer may use information that has fornmerly been established if it includes criteria for
the drainage area at complete development under current zoning and Comprehensive Plan
designations. If the City does not have such information, the engineer shall present
satisfactory information to support his stornm sewerage design. The engineer shall also be
required to provide all hydrology and hydraulic computations to the Public Works
Department that are necessary to substantiate the stonn sewer design. The stonn water
sewer systenm design shall be in conformance with applicable provisions of Oregon DEQ,
DSL and ODFW and United States COE and consistent with APWA Storm Water Phase
II requirements.
2. The City of Central Point Public Works Standards & Specifications slmould be consulted
for specific information regarding the design and consri~uction of storm drain related
components.
4~IOOl@S
Jackson 9utrs, Phase IV-Required Submittals
All design, construction plans and specifications, and "as-built" drawings shall be
prepared to acceptable professional standards as applicable, tlme Developer shall provide
copies of any pernmits, variances, approvals and conditions as may be required by other
agencies, including, but not limited to Oregon Department of Fish and Wildlife (DFW),
Oregon Department of Environmental Quality (DEQ), Oregon Division of State Lands
(DSL), Oregon Department of Transportation (ODOT) approval for stomm drain
connection and easement, landscape beams, U.S. Army Corps of Engineers (ACOE),
affected irrigation districts, Bear Creak Valley Sanitary Authority (BCVSA), and Jackson
County Road and Park Services Department (JC Roads), DSL and ACOE, as applicable
(wetland mitigation).
2. Fire District No. 3 must approve all streets and water improvement plans in writing prior
to final review by City PWD.
During construction, any changes proposed by the Developer shall be submitted in
writing by the Developer's Engineer to the City Public Works Department for approval
prior to installation.
16
ATTACHMENT F
PLANNING DEPARTMENT RECOMMENDEll CONDITIONS OF APPROVAL
Prior to final plat approval, the applicant shall submit to the City a copy of the proposed
covenants, conditions and restrictions (CC&Rs) for Jackson Woods Addition Subdivision
within one years time, or July 1, 2004.
2. The applicant shall comply with all requirements imposed by affected public agencies and
utilities as they pertain to the development of the Jackson Woods Addition Subdivision.
Evidence of such compliance shall be submitted to the City prior to final plat approval.
The applicant shall comply with all federal, state and local regulations, standards and
requirements applicable to the development and construction of the Jackson Woods Addition
Subdivision.
1'7
PLANNING DEYARTMEN"I' S'CAFF REPORT'
MEETING
DATE: July 1, 2003
TO: Central Point Planning Commission
FROM: Ken Gerschler, Community Planner
SUBJECT: Public Hearing - To consider a Tentative Plan fora 21 lot subdivision known as
Jackson Oaks Subdivision, Unit Number 4 located north of "Taylor Road iu the
TOD-LMR zoning district (Map 37 2W 03C, Tax Lots 100, 101, 102, and
201).
Applicant/
Owner: Twin Creeks Development L.L.C.
P.O. Box 3577
Central Point, Oregon 97502
Agent: I Ierb Farber/Farber Surveying
120 Mistletoe Street
Medford, Oregon 97501
Summary: "I'he applicant has submitted a development proposal to subdivide 3.6 acres of
land into 21 residential Lots. This tentative plan is located within the Twin
Creeks Transit Oriented Development (TOD) master plan.
Authority: CPMC 1.24.050 vests the Planning Commission with the authority to hold a
public hearing and render a decision on any application for a Tentative Plan.
Notice of the Public I Iearing was given in accordance with CPMC
1.24.060(Attachment "B").
Applicable Law: CPMC 16.10.010 et seq. -Tentative Plans
CPMC 17.65 et seq. -TOD Districts and Corridors
Discussion•
Jackson Oaks, Unit Number 4 is a portion of a multiple phased commercial and residential
development proposed north of Taylor Road and cast of Grant Road in the Transit Oriented
Development (TOD) District.
The Platming Department has reviewed the tentative plan (Attachment "A") for compliance with the
TOD Design Requirements, Guidelines and Comprehensive Plan. The area is designated for low mix
residential development and is zoned TOD-LMR. The mix of housing types anticipated have numerous
lot sizes and configurations. The 21 lots that comprise Unit 4 of the Jackson Oaf s Subdivision range in
1.8
size from 3,500 to 4514 square feet with the average lot size being approximately 4,084 square feet
(Attachment A).
This proposed subdivision is one of seven distinct neighborhoods located within the Twiu Creeks
Development which has been master planned with stringent standards designed to ensure project
quality and to create a form of community that lessens reliance upon the automobile by emphasizing
public transportation, bicycle and pedestrian activities. Jackson Oaks, Unit Number 4 is in compliance
with the Twin Creeks Transit-Oriented Master Plan which includes pedestrian and bicycle paths, traffic
calming measures, open space, landscaping and street light standards.
This development represents the beginning of the next phase iu W.L. Moore's agreement with the City.
The Commission may recall that the applicants entered into apre-annexation development agreement
with the City which established public improvement "triggers" tied to vehicle trips associated with the
number of housing units.
Griffin Oaks and the first phase of Jackson Oaks was tied to the Haskell/Pine Street intersection
improvements. Phase four of Jackson Oaks is tied to Highway 99 and Pine Street improvements which
are now in the design stage. The Highway 99/Pine Street trigger could allow up to six or seven hundred
new housing units. It is likely that the Pine Street improvements will be under construction (2004)
before any of the new homes in this subdivision are completed. The Commission can conditionally
approve this proposal contingent upon the City Council's concurrence.
Park and open space has been acconunodated in the vicinity of the proposed neighborhood where a
mid block pocket park (Attachment "C") is proposed east of the subdivision boundary on a future
phase of the development. A 7.23 acre parcel has been identified for civic use near the southeasterly
fringe of the proposed subdivision on an adjoining parcel (Attachment "D"). This could become the
location of a new elementary school or a community center. The property owners have discussed the
probability of seeding this area for a temporary playing field.
The Rogue River Valley Irrigation District, Jackson County Fire District Number 3 and the Bear Creek
Valley Sanitary Authority have been notified of the this tentative subdivision. Bear Creek Valley
Sanitary Authority will continue to work with the applicant in the design of infrastructure. Water service
is in the area with details outlined in the Public Works Staff Report (Attachment "E"). Fire Officials will
require that the applicant provide a copy of maps with hydrant locations for review by the district.
19
Findings of Fact and Conclusions of Law
Staff suggests the following f udings of fact and conclusions of law as applicable to the project and
necessary for its approval.
1. The project site is located in the TOD-LMK (Low Mix Residential) zoning district and
increases residential and mixed use land use efficiency in this area.
The proposed tentative plan for low mix residential development is a permitted use in the "COD zoning
district. "Che zoning in turn is consistent with the TOD Comprehensive Plan map designation. The
Comprehensive Plan encourages innovative residential planning and development techniques that would
help to increase land use efficiency and reduce costs of utilities and services (Comprehensive Plan, page
XII-12).
2. The project consists of a tentative plan application for the subdivision to subdivide
approximately 3.6 acres for the purpose of developing Unit 4 of the Jackson Oaks
Subdivision. The total number of lots proposed for what the applicants have identified as the
Unit 4 of their subdivision is 21.
The proposed mixed use subdivision meets the density requirement for the 'COD-LMR (Low Mix
Residential) Zoning District which is a maximum of 12 units per acre. Each lot within the subdivision
meets the requirements of the TOD Design Requirements and Guidelines. The tentative plan includes all
information required by CPMC 16.10.010 et. seq.
3. The Planning and Public Works Departments have reviewed both the tentative plan for
the proposed subdivision and the findings of fact and determined that the project meets all
City standards and requirements subject to the recommended conditions found in Attachments
E and F. The timing for the design and construction of Pine Street improvements is compatible
with this phase of the Twin Creeks Development
Recommendation:
Staff recommends that the Planning Commission take the following action:
1. Adopt Resolution No., approving the tentative subdivision subject to the recommended
conditions of approval; or
2. Deny the tentative subdivision; or
3. Continue the review of the tentative subdivision at the discretion of the Commission.
\\epchsl\cit~~ wide\Planning\03041.wpd
4 O
Attachments:
A. Copy of Tentative Plat
B. Notice of Public Hearing
C. Schematic of Mid Block Pocket Park
D. Map of TOD Civic-Designated Area
E. Public Works Staff Report
F. Planning Department Recommended Conditions of Approval
\\cpchsl\ciq- u~idc\Plannin~\03041.e~pd
z~
\\ ~ ~ / / /
,\ 5 \ / /
\ / / /
~ /' ~
~o ~~ o.
\ ,
\
~ ~.
iM-LR6 fNASE ~~ ~
dL ~/o \
mefi~ TpjS' ~o
/ o ~ L
d,1' 'P \
/ / ~ s B'1
~ ~ pt .p0' tpu'
- / ~ ~_,~
h y?.
'"\~ ~ ~ 0. ODD ~~ & F P
'Y `rP' ~~ r
v ~ ~ Vg, Npl ~N W \
A Zp0 h
\ \ ~ J~4. ~Y ~tPtP 0.
\
_\~ \y ~ / i\`CeViEO RUSE ttt ~, y01 YR; 'S
/ a ~ e ,. ~
_ ~ _ T _ _ -.` ~ ~ 4t. v~p8,¢ fib- s \.
h9
~ ~ \ ti j~*df'd
~ /_t~ F
~ ~ ~ > 8
~ ~ w soya
\ ~'~
n a~-
-------~'---~1~ /
_ - ~ ~ / /
JT i ,_ _ R9 R6 I ~ 2> u
I Lain I
I I LOl .B I I I I
~ I I i____-_-j a
I I lOt <6 I
~.-____-{ F- _~-~ 8
I
-~ G LDi <9 I I
I i I I ' I LO, .5 4
I F-----~w I I I s
~ f I
I R f Lor a< y $
.-_ _-, i,. F _ ~___ ~ ,.
I LOi 5t I I ~ ~ $
I I 1 Loi ., I
~ ~-----~{ I I 8
_~~- + -
v JF Lot SJ
I ~ l01 .: g
l \ Js R6. I I
~ ~\ ~ F-___-~ s
~ °
'~ ~\ ~ o
\ ~ I t0i <1
L
/ I n' S
\ L _ ~
~ \ _ - . .
~ rRwoxo nusE n.
I
Sheet t of 1
s5csscrzs MAP Fnr RD n-
rRnoxo Rum n
LOT TB
vt6 syx
LoT
HYI
NOT )6
i3 Sph
Lor.ao'
LOT J5
Mb SpT.
1DtW'
LOT N
xAO syx
io.6o
LOT T3
J!b Sph
1M W
LOT R
xw sPx
waW
Lpi TI
b10 bn
tOd.CO'
City of Central Point
~~~~T ftAtt
Planning Department
r,
mr
TWIN CREEKS DEVELOPMENT CO., LLC
P.O. QOX 3i]]
CENTRAL POMT. CRECON 97502-002.
at
fle
PROF AL
VEYOR
LAN
r
.a¢n
A
w L DAtE tx-m_m
//i
/ /
/ /.
i
/
g. /
S
I ~
M
b'f~ r
121$
I
i
I~
~`
]I
y I
LOi ]0
.L~ ~x
t .~ I f216
LOT 69 S
at6o syn. g
1Dl.W'
LOT 66 E
x160 Syx $
1M.W I
LOT 6J
a
Sta $y(t S
tO1CV bM'
CIE[F5 GROSSiNO
a I
~~ \ lot as ~ ~ ~. r - - wt .O I I
too. to.. rw o,.e zoi
~~ 22
NOTES
- A55ESSOP$ VAP No. SJ-IW-OJC iL t00, tOi. tOJ PNO 10t
- PPQ°EPiv t$ ZPVED iOD-LMR
- TOTAL AREA - J6 ACRES
- (\/"uiWR /N iERVAL ~ 1'
- SMALLEST LOi ~ J500 SU F, PKRPOC LOi a d08< $p, FI.
- Jt LOTS
NCIN~TY MAP
(NO SCALE)
OFFICE LOCATION: MAlLINC AOORE55:
431 OAK STREET P~O. BOx 5286
L POINT. OREGON 9]502 CENTRAE POINT, OREGON
5[PLE: - - 50"
' DATE: s. sma
JCp NO.: OSa9;96
CRCC/S (LC\JACKSO.V OAKS\VtCROSVR KV\JACKSW OAKS R.5
SUiveycd by.
FARBEft & SONS, WC.
dbo FARBER SURVEYLNG
(541) 664-5599
C1 .,y of Central Pozn t
PLANNING DL'PARTMENT
Tom f]umphrey, AICP
Planning Director
Ken Gerschler
Community Planner
Matt Samitore
Community Planner
Dave Arkens
Plamring Technician
Notice of Public Meeting
Date of Notice: June 10, 2003
Meeting Date:
Time:
Place:
July 1, 2003
7:00 p.m. (Approximate)
Central Point City Hall
155 South Second Street
Central Point, Oregon
NATURE OF MEETING
~.~~,.
CYty of ~;'tntral Point
E~H~~~~T tiB tr
Planning Department
Beginning at the above time and place, the Central Point Planning Commission will review an
application for atwenty-one lot tentative subdivision. The subject parcel is in an TOD-LMR, Low
Mix Residential zoning district and is identified in the records of the Jackson County Assessor as
Map 37 2W 03C, Tax Lot 100, 101, 102, and 201.
The Central Point Planning Commission will review the site plan application to determine if all of
the requirements of the Central Point Municipal Code can be met. Ifthe Commission determines that
the application meets the City's standards, an approval could be issued .
CRITERIA FOR DECISION
The requirements for site plans are set forth in Chapter 17 of the Central Point Municipal Code,
relating to General Information and conditions on the project approval.
PUBLIC COMMENTS
Any person interested in commenting on the above-mentioned land use decision may submit
written comments up until the close of the meeting scheduled for Tuesday, July 1, 2003.
2. Written comments may be sent in advance of the meeting to Central Point City Hall, 155
South Second Street, Central Point, OR 97502.
Issues which may provide the basis for an appeal on the matters shall, be raised prior to the
155 South Second Street ~ Central Point, OR 97502 ~ (541) 664-3321 • Fax: (541) 664-6384
- 23
expiration of the comment period noted above. Any testimony and written couunents about
the decisions described above will need to be related to the proposal and should be stated
clearly to the Planning Commission.
4. Copies of all evidence relied upon by the applicant are available for public review at City
Hall, 155 South Second Street, Central Point, Oregon. Copies of the same are available at
15 cents per page.
5. For additional information, the public may contact the Planning Department at (541) 664-
3321 ext. 292.
SUMMARY OF PROCEDURE
At the meeting, the Planning Commission will review the applications, technical staff reports, hear
testimony from the applicant, proponents, opponents, and hear arguments on the application. Any
testimony or written comments must be related to the criteria set forth above. At the conclusion of
the review the Planning Commission may approve or deny the site plan application as submitted.
City regulations provide that the Central Point City Council be informed about all Planning
Commission decisions.
-- __._..-__I
I
i
I
~~ ~
\~~
~~~
\\
~'
~..
,~'~
-L
in
:--'
~~
~/~
~ ~/<
~~ `!"
i~ ~
y~~,
\~ i
i ~
/ ~
~ ~v
vj
\~\
~~ V
~~%
~ ~\
i~
`~~
< ~
~~ ~~
155 South Second Street ~ Central Point, OR 97502 S (541) 664-3321 ~ Fax: (541) 664-6384
iii
~'i
p!g
e~
e~
ieii
to
'~"~&~hw~7f-~,RYH B?1~'P'"~~;A~~'~~RI~!;1L®ff'li~~N'fl'
EzhiGit 26, Mid Block Pocket Park Prototypical Plan
~~~,y,~
p '~{'v~
'~' '~{ o
C~' }ay '^
a~ }dl 7
ri' H f{
4
v
RECREATION k OPEN SPACE SUMMARY:
)+~^._'.ey,~'}•. Civic (C): Existing School 9.6 ocres + New
North Naighhorhood 16,9 ocres
srk Prototype Plan
d
Neighborhood Pork (N). J.8 ocrea
Pocket Park (P): 4.5 ocres
~~
Pedestrian Promenotle (PP): LS acres
~'' ~ o'
~ °+~ ~^.
Refer to Ccntrol Neighborhood
Park P.ofalype von
~
Open S-oce (OS): 2iJ ocres
U a 9
~ Griffin Creek Corridor {GCC): 7.2 ocres
v/ b
~ Refer to Courtyard Packet Pork Total Parks k Open $p-ce - 48.7 Acres
~ Prololypo Plon
'~ Total Parks, Open Space, Civic Araa &
Q
• Existng School = 65.6 Acres
~~ ? ~
Rebr to Pedestrian Promena
Prototype Plon de
~ GENER/~ FACIUN PRGVISIONS:
Neighborhood Park (Nj: picnic tables/playgr
f
~' court/(ieids (or passive recreation/drinking f
J - support lorilities.
~~e
'/ 1 Y M Ds Pocket Pork (P): walks/benches/ploy equip
~~~. <od~ fountains.
i
Pedestrian Promenatle (PP): walks/benches
-" Open Space (OS) mWG-purpose bike & pm
benches/trash receDtocles.
.r ~
s,.
1/4 Mile radius - 5 minute walk to recreal
t"
/
I /
'
~,
%
Refer to CenVal Commons
(rs
I'r ~~C Ptlrk Prototype Plan
I
:.
\ .,,
Refer {o Creekside I
dz~a, Prototype Plon
4 r~i
r / ~
r
~
~ 4 h i ~
~
~ Q
i a~V,
Skw r r\ ~ Jl
J V y
D \
i O
}, \
tJOD dat7 Db D 6
.; . ~7 L7 ' L7 Q c7 6 Q '
~J C?
b P G ~
n C7
t~ Q
~ g.
~ fl ;; A\
;, 1 o.m Y,
~ ~
~
SS G. i. r,
r.,w ~ - ~ f
~ ~
t ~
' '
NoM 0' 200' 100'
26
---------1248'
City of Central Point
EXIiIIIIT t`D„
Planning Department ,~T
593.88'
` ~ TWIN GREEKS GROSSING
--=-
474.45' ~
n
218.46' ~ 394.77'
M
__t0~llE -- ~ 38' 38'
-----1 _ _._ -_
OT 40
25~Sq. ft.
119.42'
LOT 39 _
65 Sq.ft. n ~
~
o er
119.42' p
[
LOT 38 1-
{65 5q.ft. ~
119.42' ~ ~ ,
LOT 37 ~
669 Sq.ft. I
~
~
~~,++ O
N w
' ~
N
-1•~.~Q- ~ ~
•-~
LOT 25
2650 Sq.ft. `
F 1
{
I
1 } 0.00' ~
c~vlc A~~A
314990 Sq ft.
7.23 ACRES
1 c,~1 T~v,2 2
O ~m
\ .JS, C 29'
~/2 ~~
i' \ MW
1250'---~
38'
I I
1,000' 1
LOT 24 30' 30' i
72110 Sq.ft.'
T ~--' m /
0 284.46' 230.41'
~ ,.
6 2
- - ~
/ ~
.. ,.
o q.
S
$f106-- ~ ~? -
\
j,
"~a~,~ n/ ~7t~.~
Q
_°
_ ~ ~~e0~
t ~-
0~
'-
^>
~
_
80.00' 80 00'
2'7
I
c.,
l ~
a
A,
4
W
1
4~
38' l 38' l
`~'
°~ . b ~~ '` A Cit of Central Point
--. ytJ ~.p~^.U O
~ ~- ~, ,? Public Works De artment
" .=
PULBIC WORKS STAFF REPORT
June 25, 2003
TO: Planning Commission
FROM: Public Works Department
SUBJECT: Public Hearing -Site Plan Review for 37 2W 03C, Tax Lots 100, 101,
102, 201
Jackson Oaks Subdivision, Phase IV
Applicant Twin Creeks Development Co., LLC
P.O. Box 3577
Central Point, Oregon 97502-0021
A ent Herb Farber
Property 37 2W 03C Tax Lots 100, 101, 102, 201.
Description/ TOD-EC, Employment Commercial
Zoning
Purpose
Provide information to the Planning Commission and Applicant (hereinafter referred to as
"Developer") regarding City Public Works Department (PWD) standards, requirements, and
conditions to be included in the design and development of the proposed. Gather information
from the Developer/Engineer regarding the proposed development.
A City of Central Point Public Works Department Staff Report is not intended to
replace the City's Standards & Specifications. Staff Reports are written in
coordination with the City's Standards & Specifications to fornl a useful guide. The
City's Standards & Specifications should be consulted for any information not
contained in a Public Works Staff Report.
Robert Pierce
Pubfic Yt'orks Director
17irk Bnrtlert
Supercisor
cln r~ cfn, m„
S>~. Teehnieinn
A4ikc Ono
Teclmicinn
Creg Grcn'cs
Tecluricinn
Knreu RoeGer
Linn Iv/orgtnr
Secre7m7~1
~®
25 June 2003
JACKSON OAKS PHASE IV
Jackson Oaks, Phase IV
Standard Specifications and Goals
The Central Point Public Works Deparfiient is charged with management of the City's
infrastructure, including streets, watettivorks, and storm water drainage facilities. In general, the
Department's "Standard Specifications and Uniform Standard Details for Public Works
Constriction" shall govern how public facilities are to be constucted. The Developer is
encouraged to obtain the latest version of these specifications from the Public Works
Department.
Central Point Public Works is committed to working with the Plamiing Department and
developers to assure that all developments are adequately served by public facilities. Public
facilities not owned or maintained by the City of Central Point include: Power (PP&L), Gas
(Avista), Communications (Qwest), and Sanitary Sewer (BCVSA). In working together it is the
Department's expectation that the developer will feel free to call on the Department whenever
the standard specifications are not, in the developer's opinion, adequately meeting the needs of
the development. The Department will listen to the developer's concerns and work with the
developer to achieve the best outcome. However, the Department is not obligated to assure a
profitable development and will not sacrifice quality for the sole purpose of reducing cost to the
developer. It is always the developer's obligation to provide the public improvements necessary,
as determined by the Public Works Department, to serve the development. The Department and
the developer also have an obligation to assure that public facilities are constructed so that other
properties are not adversely impacted by the development.
Development Plans -Required baformation
Review of public improvement plans is initiated by the submittal of 3 sets of plans that are at
least 95% complete. The plans shall include those of other agencies such as BCVSA or Jackson
County Roads Department. Following plan review, the plans will be returned to the Developer's
engineer including comments from Public Works Staf£ hi order to be entitled to further review,
the Applicant's Engineer must respond to each comment of the prior review. All submittals and
responses to comments must appear throughout the plans to be a realistic attempt to result in
complete plan approval. Upon approval, the Applicant's Engineer shall submit (4) copies of the
plans to the Department of Public Works.
In general, the plan submittal shall include plus and profile for streets, water, storm drainage and
sanitary sewers, storni drainage calculations, storm drainage basin map, erosion control plan,
utility and outside agency notifications and approvals. The plan may also include applicable
traffic studies, legal descriptions and a traffic control plan.
Public Works Permit
A Public Works Permit will only be issued after the Department Director approves the final
construction drawings. After approval, the fees associated with the development will be
29
25 June 2003
JACKSON OAKS PHASE IV
calculated and attached to the public works permit. All fees are required to be paid in full at the
time the Public Works Permit is issued, except Public Works Tnspection fees. After project
completion during the final plat application process, the Public Works Inspector will calculate
the appropriate amount of inspection time to assess the developer. Before the final plat
application is processed the developer must pay the relevant inspections fees and bond for any
uncompleted improvements (as determined by the Public Works Director).
Jackson Oaks, Phase IV-Plans
1. Tluee sets of plans at 95% complete stage are to be submitted for review by the Public
Works Department
2. Once approval is achieved the Developer shall submit four sets of plans to the Public
Works Department for construction records and inspection.
3. The Developer's Engineer shall document changes to the approved drawings made in the
field. A mylar and digital copy of the final "as-built" drawings will be required before the
final plat application is processed.
Jackson: Oaks, Plzase IV - Protection: of Existing Facilities
The locations of existing facilities shall be shown on all applicable construction drawings for
Public Works projects as follows:
The exact locations of underground facilities shall be verified in advance of any public
works constriction, in cooperation with the public or private utilities involved.
2. All existing underground and surface facilities shall be protected from damage during
design and construction of public works projects.
3. Any existing facilities not specifically designated for alteration or removals, which are
damaged during construction, shall be restored or replaced to a "same as" or better than
condition, at the expense of the Developer.
4. Suitable notice shall be given to all public and private utility companies in advance of
construction for the purpose of protecting or relocating existing facilities.
Jackson Oaks, Plzase IV-Water Conr:ection
1. Water system designs shall consider the existing water system, master plans,
neighborhood plans and approved tentative plans. The Developer, Engineer and
Contractor shall provide the necessary testing, exploration, survey and research to
adequately design water system facilities, which will connect to and be a part of, or an
extension of the City water system.
~. 30
25 June 2003
JACKSON OAKS PHASE IV
A. 52-feet of ROW
B. (2) 10-foot travel lanes
C. (1) 8-foot parking lane
D. (2) 6-inch curbs
E. (2) 6-foot planter strips
F. (2) 5-foot sidewalks
The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of street related
components.
Jackson Oaks, Phase IV-Storm Drain
It shall be the responsibility of the Developer's Engineer to investigate the drainage area
of the project, including the drainage areas of the channels or stoma sewers entering and
leaving the project area. If a contiguous annexed drainage area of given size exists, the
engineer may use information that has formerly been established if it includes criteria for
the drainage area at complete development under cun~ent zoning and Comprehensive Plan
designations. If the City does not have such information, the engineer shall present
satisfactory information to support his storm sewerage design. The engineer shall also be
required to provide all hydrology and hydraulic computations to the Public Works
Department that are necessary to substantiate the storm sewer design. The storm water
sewer system design shall be in conformance with applicable provisions of Oregon DEQ,
DSL and ODFW and United States COE and consistent with APWA Storm Water Phase
II requirements.
2. The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of storm drain related
components.
Jackson Oaks, Phase IV-Required Submittals
All design, construction plans and specifications, and "as-built" drawings shall be
prepared to acceptable professional standards as applicable, the Developer shall provide
copies of any pernlits, variances, approvals and conditions as may be required by other
agencies, including, but not limited to Oregon Department of Fish and Wildlife (DFW),
Oregon Department of Environmental Quality (DEQ), Oregon Division of State Lands
(DSL), Oregon Department of Transportation (ODOT) approval for storm drain
connection and easement, landscape berms, U.S. Anny Corps of Engineers (ALOE),
affected irrigation districts, Bear Creak Valley Sanitary Authority (BCVSA), and Jackson
County Road and Park Services DeparCment (JC Roads), DSL and ACOE, as applicable
(wetland mitigation).
Fire District No. 3 must approve all streets and water imptrovement plans in writing prior
to final review by City PWD.
32
25 June 2003
JACKSON OAKS PHASE N
During construction, any changes proposed by the Developer shall be submitted in
writing by the Developers Engineer to the City Public Works Department for approval
prior to installation.
33
A'I'TACIIMENT F
PLANNING DEPARTMENT RECOMMENllED CONDITIONS OF APPROVAL
Prior to final plat approval, the applicant shall submit to the City a copy of the proposed
covenants, conditions and restrictions (CC&Rs) for Unit 4 of the Jackson Oaks Subdivision.
The applicant shall comply with all requirements of affected public agencies and utilities as they
pertain to the development of Unit 4 of the Jackson Oaks Subdivision. Evidence of such
compliance shall be submitted to the City prior to final plat approval.
3. The applicant shall comply with all federal, state and local regulations, standards and
requirements applicable to the development and construction of Unit 4 of the Jackson Oaks
Subdivision.
V\c~chsl\citp ~eidcAPlonnin¢A03UAl.wpd
34
PLANNING DEPARTMENT STAFF REPORT
MEETING
DATE: July I, 2003
TO: Central Point Planning Commission
FROM: Ken Gerschler, Community Planner
SUBJECT: Public Hearing - To consider a Tentative Plan fora 41ot subdivision known as
Pine West Subdivision, north of West Pine Street in the R-1-8 zoning district
(Map 37 2W l OBD, Tax Lot 1100).
Applicant/
Owner: Mt. Valley Association LLC
1758 Siskiyou Boulevard
Ashland, Oregon 97520
Aeent: Hoffbuhr and Associates
3155 Alameda Street, Suite 201
Medford, Oregon 97504
Summary: The applicant has submitted a development proposal to subdivide 0.95 acres of
land into 4 residential lots.
Authority: CPMC 1.24.050 vests the Planning Commission with the authority to hold a
public hearing and render a decision on any application for a Tentative Plan.
Notice of the Public I Iearing was given iu accordance with CPMC 1.24.060(
Attachment `B").
Applicable Law: CPMC 16.10.010 et seq. -Tentative Plans
CPMC 17.20 et seq. -R-1, Residential Single Family District
Discussion:
The applicant, Mt. Valley Association LLC is requesting that the Planning Commission approve a
tentative plan to subdivide an approximately 0.95 acre lot into four individual parcels ranging in sire
from 8,069 to 13,289 square feet (Attachment "A").
Setbacks for the K-1-8 zone are 20 feet for front lot line, 5 feet per story on sides and 15 for rear lot
lines. If two-story structures are proposed, the side yard setback would increase to 10 feet. The
maximum allowable height is 35 feet.
Currently there are three buildings on the parent tax tot, a house, a garage and a storage shed. 'T'he
storage shed will be removed while the house and garage will remain ou The proposed lot number one.
3~
Access to the lots would occur from a twenty foot wide private driveway connecting into West Pine
Street near ifs intersection with Vincent Avenue. "1 he Public Works Department will require that the
roadway be built to standards that are typical to cluster development The Planning Department
requests that the private driveway have a street name recorded on the plat since there is limited address
range along West Pine Street. The new street name would allow staff to assign addresses that will assist
emergency services easily locate the homes.
The Rogue River Valley Irrigation District, Jackson County Fire District Number 3 and the Bear Creek
Valley Sanitary Authority have been notified of the this tentative subdivision. Bear Creek Valley
Sanitary Authority will work with the applicant in the design of infrastructure and tie the development
into an existing eight inch sewer line in Pine Street. Water service is also shown in the area. Fire
Officials will require that the applicant provide a copy of maps with hydrant location for review by the
district.
Findin>?s of Fact and Conclusions of Law
Staff suggests the following findings of fact and conclusions of law as applicable to the project and
necessary for its approval.
CPMC 17.20.010 establishes minimum area, width and access requirements for the R-1,
Residential Single-Family District.
1. The project site is located in the R-1-8 (Low Mix Residential) and consists of a tentative plan
application for the subdivision of approximately 0.95 acres into 4 separate lots.
CPMC 16.10.010 requires that applications for tentative plans be submitted with improvement
plans and other supplementary information as may be needed to indicate the development
plan.
2. The Planning and Public Works Departments have reviewed both the tentative plan for the proposed
subdivision and the findings of fact and determined that the project meets all City standards and
requirements subject to the recommended conditions found in Attachments C and D.
Rcpchsl\ciq wide\Planning\03046.wpd
36
Recommendation:
Staff recommends that the Planning Commission take the following action:
1. Adopt Resolution No., approving the tentative subdivision subject to the recommended
conditions of approval; or
2. Deny the tentative subdivision; or
3. Continue the review of the tentative subdivision at the discretion of the Commission.
Attachments:
A. Copy of Tentative Plat
B. Notice of Public Hearing
C. Public Works Staff Report
D. Planning Department Recommended Conditions of Approval
VAcpchslAeity wideVPlannineA03046.wpd ~~y
r
Y
~ ~ 1
'a y«~'
L ~
`~'~ ~"
y ) °~`
f,} '°~ ~
}'~
O /L\ \ \ \ / / i1~ / / sTZw9Baa \~~F
\ (~ / J { / t I' Y A.)Jtll]E A.
\ \ / / / ~~ / CH RIEY
\\ \ ~/~30. /~
PLAT 4F
TENT ATtVESl1801v1SfON>,
„piN~ WEST R2W W.M.,
LOCATED tN:
COUNTY,
THE NW ~ I4 OFP~~1yTT10,}pCK50N37S ORGGON
OF CETAXALOT 1100 (37 2W 168D)
CITY
SITE ADDRESS:
496 W, PINE STREET97502
CENTRAL- POINT, OREGON
~4/q/~~ Jw, G`Y_V
/ /,/ ~~ /
/
~~ ~ ~
/~//ii ~ /
i t9Tt \ T.LW930B
~ / KEVIN LIANN NAA
~/ / \ \ GUDZAN
~' / / \
/ \
3T2WtOBD
74 9/206 \
w~Hltt'ENEANA
\ ~{\~~ \
\ ~ // / / 1 ~ ~,[~\
' LW1300
DDN 3. 3 SAOUEUNE N.
~ 3T2wIDB0 ~ ORIG449
\ 5.4 1800~UZ AVRAJ NEN
\ NICAEU ~yNOZ
\ CRUZ JVAN
~. F----
\
~ TLW~9D Np R.
\ t}{p}IAS 0. SR.jED 1
\ KOGN !
\
\ ~N
..nn \
\ NUB4 D.INARY
\ F,) NNEA
\
\
\
_ \
\ WIUANO-.
/ 'As
\ / .
,Z~R
\
3T2W10g6
00 \ /
\/ \
a
/ / \
T.L. 23
N NNA
i
A
µt~NBOtI / ~ 3T2W108D
/ \ ON JR./YINA ~\
O
NA
\ /
\ R
S
RC
/
\/ / gTZWtOBD \ /
\ \ pE1BERTDIYNN BROWN \ / Q~
OWNER A L1 ANT
Mt. VaNeY AssoBlvd LC
1758 Siskryou g7520
Ashland, Oregon
SURD
}toffbuhr & Associates
3t 55 Alamed0 St•° Sutte
Medford, Oregon 97504
(541) 779-46A1
A510ND 0~tR1G~Gg~Gyy~yA POMR
SpNItAtION DI~B~g
~IN~ a'i fDENtIly
~IgtPO E ~~~01DFNTIPL
PR+~
C~ ~y of Central Poln t
PLANNING DEPARTML'NT
Tom Ilumphrey, ~1CP
Planning Director
Ken Ccrschler
Community Planner
Malt Samii.ore
Community Planner
Dave Arkens
Planning Technician
Notice of Public Meeting
Date of Notice: June 10, 2003
Meeting Date
Time:
Place:
July 1, 2003
7:00 p.m. (Approximate)
Central Point City Hall
155 South Second Street
Central Point, Oregon
NATURE OF MEETING
CYty of C.'errY,raTl Poizi;t
~11Y1~_~~.~d tBB ft
1'19TrIIlIlg Beparhn Pll[
Beginning at the above time and place, the Central Point Planning Commission will review an
application for a three lot minor land partition. The subject parcel is in an R-1-8, Residential Single
Family zoning district and is identified in the records ofthe Jackson County Assessor as Map 37 2 W
l OBD, Tax Lot 1100.
The Central Point Planning Commission will review the site plan application to determine if all of
the requirements ofthe Central Point Municipal Code can be met. Ifthe Commission determines that
the application meets the City's standards, an approval could be issued .
CRITERIA FOR DECISION
The requirements for site plans are set forth in Chapter 17 of the Central Point Municipal Code,
relating to General Information and conditions on the project approval.
PUBLIC COMMENTS
1. Any person interested in commenting on the above-mentioned land use decision may submit
written comments up until the close of the meeting scheduled for 'T'uesday, July 1, 2003.
2. Written comments may be sent in advance of the meeting to Central Point City Hall, I55
South Second Street, Central Point, OR 97502.
39
I55 South Second Street • Central Point, OR 97502 ~ (541) 664-3321 • Fax: (541) 664-6384
o~
f;~''b ~:
U ~ '~°~<
~- ~ ~~~ r
2~,
June 25, 2003
TO:
FROM:
SUBJECT:
n oCit of Central Point
~- y Public Works De artment
^ya RoGert Pierce
~0
Pt~hlic I~Vorks Direotor
Planning Commission
Public Works Department
Public Hearing -Site Plan Review for 37 2W l OBD Tax Lot 1100
Applicant Mt. Valley Assoc., LLC
1758 Siskiyou Blvd.
Ashland, Oregon 97520
Owner Mt. Valley Assoc., LLC
1758 Siskiyou Blvd.
Ashland, Oregon 97520
Agent Hoffbuhr & Associates, Inc.
3155 Alameda Street, Suite 201
Medford, Oregon 97501
Property 37 2W lOBD Tax Lots 1100
Description/
Zoning
Purpose
Provide information to the Plamring Commission and Applicant (hereinafter referred to as
"Developer") regarding City Public Works Department (PWD) standards, requirements, and
conditions to be included in the design and development of the proposed. Gather information
from the Developer/Engineer regarding the proposed development.
A City of Central Point Public Works Department Staff Report is not intended to
replace the City's Standards & Specifications. Staff Reports are written in
coordination with the City's Standards & Specifications to form a useful guide. The
City's Standards & Specifications should be consulted for any information not
contained in a Public Works Staff Report.
Rick 6mY[c([
Supendsor
Cluis Clgpmu
Sr Terhr+icinn
d4iAe Ono
r«'a„re,t,,,
Greg Grnres
Tedmieinn
Km'ee Roeber
Sncrctar~. l1
Lisn Mor¢mr
Secre(m7~ 1
40
25 June 2003
PINE WEST SUBDIVISION
Pine West Subdivision
Standard Specifications and Goals
The Central Point Public Works Deparhnent is charged with management of the City's
infrastructure, including streets, waterworks, and storm water drainage facilities. In general, the
Departments "Standard Specifications and Uniform Standard Details for Public Works
Construction" shall govern how public facilities are to be constructed. The Developer is
encouraged to obtain the latest version of these specifications from the Public Works
Department.
Central Point Public Works is committed to working with the Planning Department and
developers to assure that all developments are adequately served by public facilities. Public
facilities not owned or maintained by the City of Central Point include: Power (PP&L), Gas
(Avista), Communications (Qwest), and Sanitary Sewer (BCVSA). In working together it is the
Department's expectation that the developer will feel free to call on the Department whenever
the standard specifications are not, in the developer's opinion, adequately meeting the needs of
the development. The Department will listen to the developer's concerns and work with the
developer to achieve the best outcome. However, the Department is not obligated to assure a
profitable development and will not sacrifice quality for the sole purpose of reducing cost to the
developer. It is always the developer's obligation to provide the public improvements necessary,
as deternrined by the Public Works Department, to serve the development. The Department and
the developer also have an obligation to assure that public facilities are constructed so that other
properties are not adversely impacted by the development.
Development Plazrs -Required bzforn:ation
Review of public improvement plans is initiated by the submittal of 3 sets of plans that are at
least 95% complete. The plans shall include those of other agencies such as BCVSA or Jackson
County Roads Department. Following plan review, the plans will be returned to the Developer's
engineer including comments from Public Works Staff. In order to be entitled to further review,
the Applicant's Engineer must respond to each comment of the prior review. All submittals and
responses to comments must appear throughout the plans to be a realistic attempt to result in
complete plan approval. Upon approval, the Applicant's Engineer shall submit (4) copies of the
plans to the Department of Public Works.
In general, the plan submittal shall include plan and profile for streets, water, storm drainage and
sanitary sewers, storm drainage calculations, storm drainage basin map, erosion control plan,
utility and outside agency notifications and approvals. The plan may also include applicable
traffic studies, legal descriptions and a traffic control plan.
4i
25 June 2003
PINE WEST SUBDIVISION
Public Works Permit
A Public Works Permit will only be issued after the Department Director approves the final
construction drawings. After approval, the fees associated with the development will be
calculated and attached to the public works permit. All fees are required to be paid in full at the
time the Public Works Permit is issued, except Public Works hispection fees. After project
completion during the final plat application process, the Public Works Inspector will calculate
the appropriate amount of inspection time to assess the developer. Before the final plat
application is processed the developer must pay the relevant inspections fees, and bond for any
uncompleted improvements (as determined by the Public Works Director).
Pine West Subdivision -Plans
I. Three sets of plans at 95% complete stage are to be submitted for review by the Public
Works Department
2. Once approval is achieved the Developer shall submit four sets of plans to the Public
Works Department for construction records and inspection, including a set of mylar
drawings to be stamped, approved, and maintained by the City until final "As-built"
drawing are received.
3. The Developer's Engineer shall document changes to the approved drawings made iu the
field. A mylar and digital copy of the final "as-built" drawings will be required before the
final plat application is processed.
Pine West Subdivision -Protection of Existi~rg Facilities
The locations of existing facilities shall be shown on all applicable construction drawings for
Public Works projects as follows:
The exact locations of underground facilities shall be verified in advance of any public
works construction, in cooperation with the public or private utilities involved.
2. All existing underground and surface facilities shall be protected from damage during
design and construction of public works projects.
3. Any existing facilities not specifically designated for alteration or removals, which are
damaged during construction, shall be restored or replaced to a "same as" or better than
condition, at the expense of the Dcveloper.
4. Suitable notice shall be given to al] public and private utility companies in advance of
construction for the purpose of protecting or relocating existing facilities.
42
25 Tune 2003
PINE WEST SUBDIVISION
Pine West Subdivision -Water Connection
Water system designs shall consider the existing water system, master plans;
neighborhood plans and approved tentative plans. The Developer, Engineer and
Contractor shall provide the necessary testing, exploration, survey and research to
adequately design water system facilities, which will connect to and be a part of, or an
extension of the City water system.
2. All requirements of the Oregon State Plumbing Specialty Code and the Oregon State
Health Department, as they pertain to Public Water Systems, shall be strictly adhered to.
The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and constriction of water system related
components.
Pine West Subdivision -Streets
The Developer's engineer should be aware that certain alternate street standards for the
Transit Oriented District and Transit Oriented Corridor might apply to the design and
construction of streets in specific areas of the City. These alternate standards are fully
described in the Central Point TOD Design Requirements and Guidelines.
Street designs shall consider the needs of people with disabilities and the aged, such as
visually impaired pedestrians and mobility-impaired pedestrians. Every effort should be
made to locate street hardware away from pedestrian locations and provide a surface fi•ee
of bumps and cracks, which create safety and mobility problems. Smooth access ramps
shall be provided where required. All designs shall conform to the current American
Disabilities Act (ADA) or as adopted by the Oregon Department of Transportation
(ODOT), Oregon Bicycle and Pedestrian Plan.
The determination of the pavement width and total right-of--way shall be based on the
operational needs for each street as determined by a technical analysis. The technical
analysis shall use demand volumes that reflect the maximum number of pedestrians,
bicyclists, parked vehicles and motorized vehicle traffic expected when the area using the
street is fully developed. Technical analysis shall take into consideration, transportation
elements of the Comprehensive Plan, TOD, neighborhood plans, approved tentative plans
as well as existing commercial and residential developments. All street designs shall be
coordinated with the design of other new or existing infrastructure.
Z. It is the understand of the Public Works Department that all access drives in Pine West
Subdivision will be constructed to City of Central Point private street standards, which
include the following street layout:
43
25 June 2003
PINE WEST SUBDIVISION
A. (I) 18-foot paved travel lane
B. (2) 1.5-foot rolled curb & gutter
C. Street section as described by the City of Central Point Standards &
Specifications.
3. The City of Central Point Public Works Standards & Specifications should be consrrltcd
for specific information regarding the design and construction of street related
components.
Pine West Subdivision - Storrs: Drain
It shall be the responsibility of the Developer's Engineer to investigate the drainage area
of the project, including the drainage areas of the channels or storm sewers entering and
leaving the project area. If a contiguous annexed drainage area of given size exists, the
engineer may use information that has formerly been established if it includes criteria for
the drainage area at complete development under current zoning and Comprehensive Plan
designations. If the City does not have such information, the engineer shall present
satisfactory information to support his storni sewerage design. The engineer shall also be
required to provide all hydrology and hydraulic computations to the Public Works
Department that are necessary to substantiate the storni sewer design. The storm water
sewer system design shall be in conformance with applicable provisions of Oregon DEQ,
DSL and ODFW and United States COE and consistent with APWA Storm Water Phase
II requirements.
2. The City of Central Point Public Works Standards & Specifications should be consulted
for specific information regarding the design and construction of storm drain related
components.
Piue West Subdivision -Required Submittals
All design, construction plans and specifications, and "as-built" drawings shall be
prepared to acceptable professional standards as applicable, the Developer shall provide
copies of any permits, variances, approvals and conditions as maybe required by other
agencies, including, but not limited to Oregon Department of Fish and Wildlife (DFW),
Oregon Department of Environmental Quality (DEQ), Oregon Division of State Lands
(DSL), Oregon Department of Transportation (ODOT) approval for storm drain
connection and easement, landscape beans, U.S. Arnry Corps of Engineers (ACOE),
affected irrigation districts, Bear Creak Valley Sanitary Authority (BCVSA), and Jackson
County Road and Park Services Department (JC Roads), DSL and ACOE, as applicable
(wetland mitigation).
2. Fire District No. 3 must approve all streets and water improvement plans in writing prior
to final review by City PWD.
44
25 Jude 2003
PINE WEST SUBDIVISION
During constniction, any changes proposed by the Developer shall be submitted in
writing by the Developers Engineer Yo the City Public Works Department for approval
prior to installation.
45
AT"CACFIMENT D
PLANNING DEPARTMENT RECOMMENDED CONDITIONS OF AI'PI20VAL
The applicant shall comply with all requirements of affected public agencies and utilities as they
pertain to the development of the Pine West Subdivision. )/vidence of such compliance shall be
submitted to the City prior to final plat approval.
2. The applicant shall comply with all federal, state and local regulations, standards and
requirements applicable to the development and construction of the Pine West Subdivision.
The applicant shall name the private roadway on the final subdivision plat. The Jackson County
Surveyor's Office should be consulted in naming the street to ensure that there are no conflicts
with similar names in other parts of the County.
A final plat application shall be filed within one year of the Planning Commission approval or the
tentative plan approval shall become null and void. The applicant may request a six month
extension with the Planning Department.
\\cpchsl\city o~ide\Planning\03046wpd
4G